A pulverized coal silo equipped with a discharging and weighing device and a feeding fluidization system

By using a conical hopper, annular injection gas supply and fluidization device in the pulverized coal bunker, combined with a multi-channel valve structure, the problems of poor fluidization and safety hazards in the pulverized coal bunker are solved, and a stable supply of pulverized coal is achieved. Uniform firing of lime shaft kiln combustion system.

CN110789855BActive Publication Date: 2024-10-01ACRE COKING & REFRACTORY ENG CONSULTING CORP DALIAN MCC
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201911215113.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-12-02
Publication Date
2024-10-01
Estimated Expiration
2039-12-02

AI Technical Summary

Technical Problem

The existing pulverized coal bunker has problems such as poor fluidity, easy blockage, eddy flow return and inaccurate weighing when transporting pulverized coal, which affects the stable supply of the lime shaft kiln combustion system and poses safety risks of pulverized coal deflagration.

Method used

A pulverized coal bunker equipped with a discharging and weighing device and a feed fluidization system is designed. It adopts a conical hopper and an annular injection air supply device, combined with a fluidization device and a multi-channel valve structure. Through compressed air injection and Nitrogen injection system improves the fluidity and safety of pulverized coal and prevents clogging and spontaneous combustion.

Benefits of technology

It improves the fluidization and weighing accuracy of pulverized coal, reduces the quality fluctuation of finished products, enhances the stability and safety of the lime shaft kiln combustion system, and reduces the risks of raw and over-burning.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110789855B_ABST
    Figure CN110789855B_ABST
Patent Text Reader

Abstract

The present invention relates to a coal powder bin equipped with a discharge and weighing device and a feed fluidization system, comprising a coal powder bin, an annular injection air supply device, a fluidization device and a powder weighing device; a conical hopper is arranged at the bottom of the coal powder bin, and an annular injection air supply device and an inlet pipe are arranged on the conical hopper; the coal powder discharge port is connected with a pneumatic gate valve, an electric cut-off sealing valve 1, a fluidization device, an electric cut-off sealing valve 2 and a powder weighing device in sequence, and the coal powder discharge port and the pneumatic gate valve, the pneumatic gate valve and the electric cut-off sealing valve 1, the electric cut-off sealing valve 1 and the fluidization device, and the fluidization device and the electric cut-off sealing valve 2 are respectively connected by flanges; the inlet pipe is used as a channel for nitrogen injection and manual processing of bulk materials. The present invention can solve the problems that coal powder is prone to blockage, poor fluidization, vortex return material, inaccurate coal powder weighing, and cannot stably provide fuel to the lime shaft kiln combustion system during storage, discharge, transportation and weighing in the bin.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of coal powder conveying and feeding in a large-scale lime shaft kiln, and in particular to a coal powder bin equipped with a discharging and weighing device and a feeding fluidization system. Background Art

[0002] When the combustion system of the lime shaft kiln uses pulverized coal as fuel, a pulverized coal bin is required as an intermediate storage tool, and the supply of pulverized coal is controlled by a pulverized coal weighing device. The pulverized coal weighing device then supplies equal amounts of weighed pulverized coal to multiple evenly distributed burners of the combustion system, thereby ensuring that the lime in each part of the lime shaft kiln is burned evenly and uniformly, avoiding or reducing the phenomenon of overburning and underburning of quicklime.

[0003] The commonly used connection structure between the coal powder bin and the coal powder weighing device has the following defects: First, due to the frequent occurrence of poor fluidization in the lower part of the bin and unstable flow of coal powder in the pipeline system, the normal operation of the coal powder weighing device is affected, which in turn affects the stable and uniform supply of coal powder in the lime shaft kiln combustion system, and ultimately affects the quality stability of the finished lime product; in addition, the flammability of the coal powder material itself requires high safety in the bin and during transportation. The temperature, sealing and flow process of ordinary coal powder in the bin and during transportation are prone to safety hazards such as coal powder explosion. Once a coal powder explosion accident occurs, the consequences are disastrous. It is necessary to provide a system that changes the fluidization capacity of coal powder during transportation and is safe and reliable. Summary of the invention

[0004] The present invention provides a pulverized coal bin equipped with a discharging and weighing device and a feed fluidization system, which can solve the problems of clogging, poor fluidization, eddy return, inaccurate pulverized coal weighing, and failure to stably provide fuel to a lime shaft kiln combustion system during storage, discharging, transportation and weighing of pulverized coal in the bin, meet the process requirements of the lime shaft kiln combustion system, improve the heating uniformity of finished kiln chamber materials, and help reduce quality fluctuations of finished products and improve the quality of finished products.

[0005] In order to achieve the above object, the present invention adopts the following technical solutions:

[0006] A pulverized coal bin equipped with a discharging and weighing device and a feed fluidizing system comprises a pulverized coal bin, a conical hopper is arranged at the lower part of the pulverized coal bin, and the bottom of the conical hopper is a pulverized coal discharge port; it also comprises an annular injection air supply device, a fluidizing device and a powder weighing device; the conical hopper is provided with an annular injection air supply device and an inlet pipe; the pulverized coal discharge port is connected in sequence with a pneumatic gate valve, a first electric cut-off sealing valve, a fluidizing device, a second electric cut-off sealing valve and a powder weighing device, and flanges are respectively connected between the pulverized coal discharge port and the pneumatic gate valve, between the pneumatic gate valve and the first electric cut-off sealing valve, between the first electric cut-off sealing valve and the fluidizing device, and between the fluidizing device and the second electric cut-off sealing valve; the inlet pipe is used as a passage for nitrogen injection and manual processing of bulk materials.

[0007] The angle between the side wall of the conical hopper and the horizontal plane is ≥70°, a material level meter is arranged on the upper part of the conical hopper, and an annular spray air supply device is arranged on the lower part of the conical hopper.

[0008] The annular blowing air supply device is an annular double-layer blowing air supply device, including a compressed air annular pipe, an upper connecting hose, a lower connecting hose, an upper nozzle and a lower nozzle; an upper nozzle and a lower nozzle are provided at the lower part of the conical hopper, and the upper nozzle and the lower nozzle are respectively composed of a plurality of compressed air nozzles uniformly arranged along the annular direction on the wall plate of the conical hopper; a compressed air annular pipe is provided on the periphery of the conical hopper, the upper nozzle is connected to the compressed air annular pipe through the corresponding upper connecting hose, and the lower nozzle is connected to the compressed air annular pipe through the corresponding lower connecting hose; the air inlet end of the compressed air annular pipe is connected to an external compressed air delivery pipeline.

[0009] The upper nozzle and the corresponding interface of the upper connecting hose, and the lower nozzle and the corresponding interface of the lower connecting hose are respectively connected through a hexagonal joint and a hose joint, and a copper gasket is arranged between the hexagonal joint and the wall plate of the conical hopper; the compressed air ring pipe and the corresponding interface of the upper connecting hose or the corresponding interface of the lower connecting hose are respectively connected through a clamp, a pipe joint and a hose flexible joint.

[0010] An inlet pipe is arranged at the bottom of the conical hopper near the coal powder discharge port, the middle part of the inlet pipe is connected to the external nitrogen delivery pipe through a one-way throttle valve, and the one-way throttle valve is connected to the inlet pipe through a connecting slipknot; a stop valve is arranged at the outer end of the inlet pipe, and the stop valve is connected to the inlet pipe through a connecting flange; the stop valve is provided with a valve on-off detection switch, and the valve on-off detection switch and the one-way throttle valve are respectively connected to the control system, and the stop valve is a manual stop valve.

[0011] A connecting flange is arranged between the coal powder discharge port and the pneumatic gate valve, a temperature measuring device is arranged on one side of the connecting flange, and the temperature measuring device is interlocked and controlled with the nitrogen switch valve on the nitrogen delivery pipeline through a control system.

[0012] The fluidizing device is composed of an inlet flange, an upper shell, an upper guide cone, a lower guide cone, a lower shell and an outlet flange, which are arranged in sequence from top to bottom. The upper shell and the lower shell are flexibly connected by an anti-static needle-punched filter felt, and the anti-static needle-punched filter felt is fixed to the upper shell or the lower shell by a throat clamp; a low-resistance conductive connecting copper sheet is also provided between the upper shell and the lower shell; the upper guide cone is a conical cylinder with a larger upper part and a smaller lower part, and the lower guide cone is an X-shaped cylinder narrowed in the middle, and the lower end of the upper guide cone extends to the middle of the lower guide cone; a compressed air blowing pipe is provided in the upper shell, and the compressed air blowing pipe is connected to an external compressed air delivery pipeline; the injection direction of the compressed air blowing pipe is toward the lower discharge port of the upper guide cone.

[0013] The two flanges of the flange connection are connected by a copper sheet.

[0014] The discharge port of the second electric cut-off sealing valve is connected to the powder weighing device through a coal powder guide pipe, and the coal powder guide pipe and the discharge port of the second electric cut-off sealing valve are connected through a flange.

[0015] Compared with the prior art, the present invention has the following beneficial effects:

[0016] 1) The bottom hopper of the coal powder bin adopts a conical hopper with an inner angle of 70°, and an annular injection air supply system is set on the conical hopper. The slope of the conical hopper is conducive to the flow and discharge of powder. When the powder is blocked, the annular injection air supply system sprays compressed air to make the material discharge smoothly from the bin. The annular and double-layer injection makes the injection control area wide and the injection effect more uniform and effective. The conical hopper is also equipped with an adjustable flow nitrogen gas supply system. After the valve on-off detection switch sends a signal, nitrogen can be sprayed into the bin to eliminate the safety hazards of coal powder spontaneous combustion and explosion.

[0017] 2) The fluidizing device used in the present invention is composed of an upper and lower conical material guide structure. This structure can avoid the blockage of coal powder during storage, discharge, transportation and weighing in the bin, or the poor fluidization, which easily generates eddy return material, resulting in inaccurate coal powder weighing and failure to stably provide fuel, meet the process requirements of stably providing fuel to the kiln chamber nozzle, improve the heating uniformity of the kiln chamber material finished product, reduce the quality fluctuation of the finished product, increase the activity of lime, reduce the problem of raw burning and overburning, and improve the quality of the finished product; a compressed air duct and a nozzle are arranged on the upper part of the fluidizing device for introducing external compressed air, the compressed air duct is arranged along the material flow direction, and the injection port is aligned with the lower discharge port of the upper guide cone to prevent material blockage and facilitate material flow;

[0018] 3) The upper and lower parts of the fluidized device are connected by a low-resistance conductive copper sheet to prevent static electricity. The upper shell and the lower shell are flexibly connected by an anti-static needle-punched filter felt, which can prevent static electricity and offset the deformation stress caused by internal and external temperature changes, vibration, dimensional errors generated during manufacturing, etc., to ensure the weighing accuracy of the coal powder weighing device;

[0019] 3) The inlet pipe at the bottom of the conical hopper is used for manual handling of large accumulated materials. A manual stop valve is installed there. When it is necessary to open this valve to manually handle the material discharge problem in the bin, the valve on-off detection switch sends a signal to the control system, and the entire system stops running to prevent danger and ensure the safety of the operator.

[0020] 4) After the fluidity of the powder entering the coal powder weighing device is greatly improved, the accuracy and stability of the coal powder weighing device are improved, the accuracy of the coal powder provided to the burner of the lime kiln is improved, the burning uniformity of the limestone in the kiln is improved, and the occurrence of raw burning and over-burning is reduced.

[0021] 5) Three valves are set between the coal powder bin and the coal powder weighing device, one is a pneumatic valve and two are electric valves. The combination of these three valves can meet various process requirements of the system. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a front view of a pulverized coal bin equipped with a discharging and weighing device and a feed fluidization system according to the present invention.

[0023] Figure 2 It is a structural schematic diagram of the conical hopper described in the present invention.

[0024] Figure 3 yes Figure 2 Top view of the .

[0025] Figure 4 It is a schematic diagram of the connection relationship between the upper connecting hose, the compressed air ring pipe and the upper nozzle of the present invention.

[0026] Figure 5 It is a schematic diagram of the connection relationship between the lower layer connecting hose, the compressed air ring pipe and the lower layer nozzle of the present invention.

[0027] Figure 6 yes Figure 2 Enlarged view of Part I.

[0028] Figure 7 yes Figure 2 An enlarged view of part 1 in the figure.

[0029] Figure 8 It is a structural schematic diagram of the connecting flange 1 of the present invention.

[0030] Fig. 9 It is a schematic structural diagram of the fluidizing device of the present invention.

[0031] Fig.10 yes Fig. 9 Top view of the .

[0032] In the figure: 1. Conical hopper 1-1. Coal powder discharge port 1-2. Wall plate 2. Level meter 3. Annular injection air supply device 3-1. Compressed air ring pipe 3-2. Lower connecting hose 3-3. Clamp 3-4. Pipe joint 3-5. Hose flexible joint 3-6. Upper connecting hose 3-7. Hose joint 3-8. Hexagonal joint 3-9. Copper gasket 3-10. Compressed air nozzle 4. Flange connection structure 1 5. Connecting flange 5-1. Flange body 5-2. Top flange 5-3. Bottom flange 5-4. Temperature measuring device conduit 5-5. Temperature measuring device interface 6. Pneumatic gate valve 7. Flange connection structure 2 8. Electric cut-off sealing valve 1 9. Flange connection structure 3 10. Fluidization device 10- 1. Inlet flange 10-2. Upper shell 10-3. Upper guide cone 10-4. Lower guide cone 10-5. Lower shell 10-6. Outlet flange 10-7. Compressed air blowing pipe 10-8. Compressed air delivery pipeline 10-9. Low resistance conductive connection copper sheet 10-10. Antistatic needle-punched filter felt 10-11. Laryngeal clamp 11. Flange connection structure four 12. Electric cut-off sealing valve two 13. Flange connection structure five 14. Coal powder guide pipe 15. Powder weighing device 16. Inlet pipeline 16-1. Steel pipe 16-2. Connecting joint 16-3. One-way throttle valve 16-4. Connecting flange 16-5. Stop valve 16-6. Valve on-off detection switch 17. Copper sheet DETAILED DESCRIPTION

[0033] The specific implementation of the present invention will be further described below in conjunction with the accompanying drawings:

[0034] like Figure 1 As shown, a pulverized coal bin equipped with a discharge and weighing device and a feed fluidization system according to the present invention comprises a pulverized coal bin, a conical hopper 1 is arranged at the lower part of the pulverized coal bin, and the bottom of the conical hopper 1 is a pulverized coal discharge port 1-1; it also comprises an annular blowing air supply device 3, a fluidization device 10 and a powder weighing device 15; the conical hopper 1 is provided with an annular blowing air supply device 3 and an inlet pipe 16; the pulverized coal discharge port 1-1 is connected to a pneumatic gate valve 6, an electric cut-off sealing valve 18, a fluidization device 10, an electric cut-off sealing valve 2 12 and a powder weighing device 15 in sequence, and the pulverized coal discharge port 1-1 and the pneumatic gate valve 6, the pneumatic gate valve 6 and the electric cut-off sealing valve 18, the electric cut-off sealing valve 18 and the fluidization device 10, and the fluidization device 10 and the electric cut-off sealing valve 2 12 are connected respectively by flanges; the inlet pipe 16 is used as a channel for nitrogen blowing and manual processing of large pieces of material.

[0035] The angle between the side wall of the conical hopper 1 and the horizontal plane is ≥70°. A material level meter 2 is arranged on the upper part of the conical hopper 1 , and an annular spray air supply device 3 is arranged on the lower part of the conical hopper 1 .

[0036] The annular blowing air supply device 3 is an annular double-layer blowing air supply device, including a compressed air annular pipe 3-1, an upper connecting hose 3-6, a lower connecting hose 3-2, an upper nozzle and a lower nozzle; an upper nozzle and a lower nozzle are provided at the lower part of the conical hopper 1, and the upper nozzle and the lower nozzle are respectively composed of a plurality of compressed air nozzles 3-10 uniformly arranged along the annular direction on the wall plate 1-2 of the conical hopper 1; a compressed air annular pipe 3-1 is provided on the periphery of the conical hopper 1, the upper nozzle is connected to the compressed air annular pipe 3-1 through the corresponding upper connecting hose 3-6, and the lower nozzle is connected to the compressed air annular pipe 3-1 through the corresponding lower connecting hose 3-2; the air inlet end of the compressed air annular pipe 3-1 is connected to the external compressed air delivery pipeline.

[0037] The corresponding interface between the upper nozzle and the upper connecting hose 3-6, and the corresponding interface between the lower nozzle and the lower connecting hose 3-2 are respectively connected through a hexagonal joint 3-8 and a hose joint 3-7, and a copper gasket 3-9 is arranged between the hexagonal joint 3-8 and the wall plate 1-2 of the conical hopper 1; the compressed air ring pipe 3-1 and the corresponding interface of the upper connecting hose 3-6 or the corresponding interface of the lower connecting hose 3-2 are respectively connected through a clamp 3-3, a pipe joint 3-4 and a hose flexible joint 3-5.

[0038] An inlet pipe 16 is arranged at the bottom of the conical hopper 1 near the coal powder discharge port 1-1, and the middle part of the inlet pipe 16 is connected to the external nitrogen delivery pipeline through a one-way throttle valve 16-3, and the one-way throttle valve 16-3 is connected to the inlet pipe 16 through a connecting slipknot 16-2; a stop valve 16-5 is arranged at the outer end of the inlet pipe 16, and the stop valve 16-5 is connected to the inlet pipe 16 through a connecting flange 16-4; the stop valve 16-5 is provided with a valve on-off detection switch 16-6, and the valve on-off detection switch 16-6 and the one-way throttle valve 16-3 are respectively connected to the control system, and the stop valve 16-5 is a manual stop valve.

[0039] A connecting flange 5 is provided between the pulverized coal outlet 1-1 and the pneumatic gate valve 6, and a temperature measuring device is provided on one side of the connecting flange 5. The temperature measuring device is interlocked and controlled with the nitrogen switch valve on the nitrogen delivery pipeline through a control system.

[0040] The fluidizing device 10 is composed of an inlet flange 10-1, an upper shell 10-2, an upper guide cone 10-3, a lower guide cone 10-4, a lower shell 10-5 and an outlet flange 10-6 which are arranged in sequence from top to bottom. The upper shell 10-2 and the lower shell 10-5 are flexibly connected by an antistatic needle-punched filter felt 10-10, and the antistatic needle-punched filter felt 10-10 is fixed to the upper shell 10-2 or the lower shell 10-5 by a throat clamp 10-11; the upper shell 10-2 and the lower shell 10- 5 is also provided with a low-resistance conductive connecting copper sheet 10-9; the upper guide cone 10-3 is a conical cylinder with a larger upper part and a smaller lower part, and the lower guide cone 10-4 is an X-shaped cylinder narrowed in the middle, and the lower end of the upper guide cone 10-3 extends to the middle of the lower guide cone 10-4; a compressed air blowing pipe 10-7 is provided in the upper shell 10-2, and the compressed air blowing pipe 10-7 is connected to the external compressed air delivery pipeline 10-8; the injection direction of the compressed air blowing pipe 10-7 is toward the lower discharge port of the upper guide cone 10-3.

[0041] The two flanges of the flange connection are connected via a copper sheet 17 .

[0042] The discharge port of the second electric cut-off sealing valve 12 is connected to the powder weighing device 15 through the coal powder guiding pipe 14, and the coal powder guiding pipe 14 and the discharge port of the second electric cut-off sealing valve 12 are connected through a flange.

[0043] The following examples are implemented on the premise of the technical solution of the present invention, and provide detailed implementation methods and specific operation processes, but the protection scope of the present invention is not limited to the following examples. The methods used in the following examples are conventional methods unless otherwise specified.

[0044] [Example]

[0045] In this embodiment, a pulverized coal bin equipped with a discharge and weighing device and a feed fluidization system includes a pulverized coal bin, at the bottom of which a conical hopper 1, a level meter 2, an annular injection air supply device 3, an inlet pipe 16, a connecting flange 5, a pneumatic gate valve 6, an electric cut-off sealing valve 1 8, an environmentally friendly and safe fluidization device 10, an electric cut-off sealing valve 2 12 and a powder weighing device 15 are provided.

[0046] like Figure 1 , Figure 2 As shown, the taper of the conical hopper 1 is 40°, that is, the material flow angle reaches 70°, which is very conducive to the flow of powdered materials. The flange specification at the coal powder outlet 1-1 is DN200, PN1.6; the level meter 2 is interlocked with the feeding device of the coal powder bin through the control system, and the material level height in the bin body is adjusted in time according to the measurement data of the level meter.

[0047] like Figure 2-Figure 5As shown, in this embodiment, the annular blowing air supply device 3 adopts an annular double-layer blowing air supply device, including a compressed air annular pipe 3-1, an upper connecting hose 3-6, a clamp 3-3, a pipe joint 3-4, a hose flexible joint 3-5, a lower connecting hose 3-2, a hose joint 3-7, a hexagonal joint 3-8, a copper gasket 3-9, and a plurality of compressed air nozzles 3-10. The annular blowing air supply device 3 is not limited to a double-layer structure. When it is specifically used, the number of layers and the number of compressed air nozzles 3-10 are set according to the volume of the conical hopper 1. The annular blowing air supply device 3 is set to prevent the bottom of the conical hopper from expanding and make the material fluidization system more effective. The compressed air nozzles 3-10 are only sprayed when the coal powder is blocked.

[0048] like Figure 3 As shown, in this embodiment, the upper nozzle of the annular double-layer blowing air supply device is composed of 6 compressed air nozzles 3-10 evenly distributed at 60° intervals along the circumference of the conical hopper 1, and the lower nozzle near the coal powder discharge port 1-1 is composed of 4 compressed air nozzles 3-10 evenly distributed at 90° intervals along the circumference of the conical hopper 1. The design principle is to keep the spacing of the compressed air nozzles 3-10 between 350 and 450 mm, mainly considering that the blowing capacity of the compressed air nozzles 3-10 is within its effective control range for preventing expansion of the material. The pressure and flow rate of the compressed air sprayed by the compressed air nozzles 3-10 are both adjustable.

[0049] like Figure 2 , Figure 6 , Figure 7 As shown, in this embodiment, the conical hopper 1 is provided with an inlet pipe 16, and a nitrogen inlet is provided on the inlet pipe 16, which is connected to an external nitrogen delivery pipe through a slipknot 16-2 (diameter DN20) and a one-way throttle valve 16-3. The one-way throttle valve 16-3 is used to control the nitrogen flow rate. The body of the inlet pipe 16 is a steel pipe 16-1 with a pipe diameter of DN80. The inlet pipe 16 is also used as a channel for manual processing of bulk materials. A stop valve 16-5 (manual) is provided at its end to control the on-off with the outside. The stop valve 16-5 is connected to one end of the steel pipe 16-1 through a flange 16-4, and the other end of the steel pipe 16-1 is fixedly connected to the conical hopper. A valve on-off detection switch 16-6 is also provided at the stop valve 16-5. When the valve on-off detection switch 16-6 detects that the stop valve 16-5 is in an open state (such as Figure 7 As shown, the valve stem of the stop valve 16-5 is in the open position), a signal is sent to the central control room through the control system, and the entire pulverized coal bin system stops running to prevent accidents; only when the valve detection switch 16-6 detects that the stop valve 16-5 is in the closed state (such as Figure 7 As shown, the valve stem of the stop valve 16-5 is in the closed position), and a signal is sent to the central control room through the control system, and the entire pulverized coal bin system can be put into operation.

[0050] like Figure 1 , Figure 8 As shown, the connecting flange 5 arranged at the coal powder discharge port 1-1 is composed of a flange body 5-1, a top flange 5-2 and a bottom flange 5-3, wherein the top flange 5-2 is connected with the flange plate at the coal powder discharge port 1-1 to form a flange connection structure 1 4, and the bottom flange 5-3 is connected with the flange plate on the top of the pneumatic gate valve 6 to form a flange connection structure 2 7. One side of the connecting flange 5 is connected to the temperature measuring device interface 5-5 through the temperature measuring device conduit 5-4. The temperature measuring device is installed at the temperature measuring device interface 5-5. When the temperature measuring device detects that the material temperature is higher than the set value, the control system opens the switch valve on the nitrogen delivery pipeline to input nitrogen with a certain pressure into the conical hopper 1 to avoid the dangerous situation of coal powder combustion and explosion caused by excessive temperature in the bin.

[0051] like Figure 1 As shown, the pneumatic gate valve 6 is used to open and close the coal powder discharge port 1-1. It is in a normally open state during normal operation and is used to temporarily close the coal powder discharge port 1-1 only when the electric cut-off sealing valve 8 fails or is under maintenance.

[0052] The pneumatic gate valve 6 is connected to the electric cut-off sealing valve 8 via a flange connection structure 2 7; the electric cut-off sealing valve 8 is connected to the fluidizing device 10 via a flange connection structure 3 9, and the electric cut-off sealing valve 8 is used to control the opening and closing of the feed port of the fluidizing device 10.

[0053] like Figure 1 , Fig. 9 As shown, in this embodiment, the fluidizing device 10 is composed of an upper and lower conical material guide structure. The upper part is composed of an inlet flange 10-1, an upper shell 10-2, and an upper guide cone 10-3, and the lower part is composed of a lower shell 10-5, an outlet flange 10-6, and a lower guide cone 10-4. In order to avoid eddy currents and backflows generated by materials during transportation, to ensure that materials do not overflow, to ensure that materials are normally transported within the system, and to ensure the normal operation of the subsequent powder weighing device 15. The lower outlet diameter of the upper guide cone 10-3 is The diameter of the middle contraction opening of the lower guide cone 10-4 is A compressed air blowing pipe 10-7 is arranged in the upper shell 10-2, and the compressed air blowing pipe 10-7 is arranged along the material flow direction, and the injection port is aligned with the lower discharge port of the upper guide cone 10-3 to prevent material blockage and facilitate material flow; the upper shell 10-2 and the lower shell 10-5 of the fluidizing device 10 are connected by a low-resistance conductive connecting copper sheet 10-9 to prevent static electricity, and the upper shell 10-2 and the lower shell 10-5 are flexibly connected by ZLN type polyester anti-static needle-punched filter felt, which can not only prevent static electricity, but also perform displacement compensation when deformation stress is generated under the influence of internal and external temperature, vibration or manufacturing errors, so that the accuracy of the subsequent powder weighing device 15 will not be affected.

[0054] like Figure 1 As shown, the powder weighing device 15 is used to weigh coal powder to provide a stable flow of coal powder fuel to the burner in the kiln chamber. The electric cut-off sealing valve 12 is used to control the feeding port of the powder weighing device 15. The powder weighing device 15 is provided with a sealed weighing tank. The electric cut-off sealing valve 12 is connected to the sealed weighing tank through a coal powder guide pipe 14. The coal powder guide pipe 14 and the electric cut-off sealing valve 12 are connected through a flange connection structure 13. Before closing the electric cut-off sealing valve 12, it is necessary to close the electric cut-off sealing valve 18 first.

[0055] like Figure 1 As shown in , in the present invention, each functional component between the coal powder bin and the powder weighing device 15 is connected by flange sealing to ensure that the overall system structure is tight and does not leak materials.

[0056] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A pulverized coal bin equipped with a discharging and weighing device and a feed fluidization system, comprising a pulverized coal bin, a conical hopper is arranged at the bottom of the pulverized coal bin, and the bottom of the conical hopper is a pulverized coal discharge port; characterized in that: It also includes an annular blowing air supply device, a fluidizing device and a powder weighing device; the conical hopper is provided with an annular blowing air supply device and an inlet pipe; the coal powder discharge port is connected in sequence with a pneumatic gate valve, an electric cut-off sealing valve 1, a fluidizing device, an electric cut-off sealing valve 2 and a powder weighing device, and the coal powder discharge port and the pneumatic gate valve, the pneumatic gate valve and the electric cut-off sealing valve 1, the electric cut-off sealing valve 1 and the fluidizing device, and the fluidizing device and the electric cut-off sealing valve 2 are respectively connected by flanges; the inlet pipe is used as a channel for nitrogen blowing and manual processing of bulk materials; The angle between the side wall of the conical hopper and the horizontal plane is ≥70°, a material level meter is provided on the upper part of the conical hopper, and an annular spray air supply device is provided on the lower part of the conical hopper; The annular blowing air supply device is an annular double-layer blowing air supply device, including a compressed air annular tube, an upper connecting hose, a lower connecting hose, an upper nozzle and a lower nozzle; an upper nozzle and a lower nozzle are arranged at the lower part of the conical hopper, and the upper nozzle and the lower nozzle are respectively composed of a plurality of compressed air nozzles uniformly arranged on the wall plate of the conical hopper along the annular direction; a compressed air annular tube is arranged at the periphery of the conical hopper, the upper nozzle is connected to the compressed air annular tube through the corresponding upper connecting hose, and the lower nozzle is connected to the compressed air annular tube through the corresponding lower connecting hose; the air inlet end of the compressed air annular tube is connected to the external compressed air delivery pipeline; The upper nozzle and the corresponding interface of the upper connecting hose, and the lower nozzle and the corresponding interface of the lower connecting hose are connected through a hexagonal joint and a hose joint respectively, and a copper gasket is arranged between the hexagonal joint and the wall plate of the conical hopper; the compressed air ring pipe and the corresponding interface of the upper connecting hose or the corresponding interface of the lower connecting hose are connected through a clamp, a pipe joint and a hose flexible joint respectively; An inlet pipe is arranged at the bottom of the conical hopper near the coal powder discharge port, the middle of the inlet pipe is connected to the external nitrogen delivery pipe through a one-way throttle valve, and the one-way throttle valve is connected to the inlet pipe through a connecting slipknot; a stop valve is arranged at the outer end of the inlet pipe, and the stop valve is connected to the inlet pipe through a connecting flange; the stop valve is provided with a valve on-off detection switch, the valve on-off detection switch and the one-way throttle valve are respectively connected to the control system, and the stop valve is a manual stop valve; A connecting flange is arranged between the coal powder discharge port and the pneumatic gate valve, a temperature measuring device is arranged on one side of the connecting flange, and the temperature measuring device is interlocked and controlled with the nitrogen switch valve on the nitrogen delivery pipeline through a control system.

2. A pulverized coal bunker equipped with a discharge and weighing device and a feed fluidization system according to claim 1, characterized in that: The fluidizing device is composed of an inlet flange, an upper shell, an upper guide cone, a lower guide cone, a lower shell and an outlet flange, which are arranged in sequence from top to bottom. The upper shell and the lower shell are flexibly connected by an anti-static needle-punched filter felt, and the anti-static needle-punched filter felt is fixed to the upper shell or the lower shell by a throat clamp; a low-resistance conductive connecting copper sheet is also provided between the upper shell and the lower shell; the upper guide cone is a conical cylinder with a larger upper part and a smaller lower part, and the lower guide cone is an X-shaped cylinder narrowed in the middle, and the lower end of the upper guide cone extends to the middle of the lower guide cone; a compressed air blowing pipe is provided in the upper shell, and the compressed air blowing pipe is connected to an external compressed air delivery pipeline; the injection direction of the compressed air blowing pipe is toward the lower discharge port of the upper guide cone.

3. A pulverized coal bunker equipped with a discharging and weighing device and a feeding fluidization system according to claim 1, characterized in that: The two flanges of the flange connection are connected by a copper sheet.

4. A pulverized coal bunker equipped with a discharging and weighing device and a feeding fluidization system according to claim 1, characterized in that: The discharge port of the second electric cut-off sealing valve is connected to the powder weighing device through a coal powder guide pipe, and the coal powder guide pipe and the discharge port of the second electric cut-off sealing valve are connected through a flange.