A lead smelting furnace system and control method for automatically controlling lead and slag discharge
The automated slag and lead discharge devices have solved the safety hazards and operational difficulties of high-temperature operations in lead smelting, achieving stable control and efficient production.
Patent Information
- Application Number
- CN202010000822.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-01-02
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2040-01-02
AI Technical Summary
In the lead smelting process, the slag and lead discharge operations are characterized by high temperatures, high safety hazards, and difficulty in controlling the quantity. In particular, the cleaning and sealing of refractory mud piles are time-consuming and labor-intensive, and are prone to slag and lead spillage.
An automatic slag and lead discharge device is adopted, including components such as a rotating shaft, gate, speed reducer, and guide column. The slag and lead discharge process is controlled mechanically to ensure the stable discharge and sealing of smelting slag and molten lead.
This technology reduces manual operation in high-temperature environments, lowers labor intensity, avoids safety accidents, ensures stable control of slag and lead discharge processes, prevents slag hanging and running from slag chutes, and improves production efficiency.
Smart Images

Figure CN111023834B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a lead smelting furnace system and a control method, in particular to a lead smelting furnace system and a control method for automatically controlling lead and slag discharge. Background Art
[0002] After crushing and sorting, waste lead-acid batteries are separated into components such as metal lead grids and lead mud, and then smelted separately. The metal lead grid is directly melted at low temperature to produce alloy lead. The lead in the lead mud mainly exists in the form of lead oxide and lead sulfate, and high-temperature reduction smelting is required to produce crude lead. In the lead smelting process, lead-containing waste is smelted and reduced to liquid lead in the smelting furnace. A high-temperature liquid slag layer floats on the upper layer of the lead liquid. After smelting is completed, slag and lead are discharged through the slag discharge port and the lead discharge port. Usually, the lead discharge port is located at the lower part of one side of the smelting furnace, and the slag discharge port is located at the upper part of the lead discharge port on one side of the smelting furnace.
[0003] Before the slag outlet is opened, the refractory mud pile is usually used to seal the slag outlet. Due to the high temperature at the slag outlet, the refractory mud pile often solidifies and hardens. Before slag discharge, the refractory mud pile at the slag outlet needs to be cleaned and unblocked manually by steel chisels or slag removers. In a smelting process, the refractory mud pile that has been cleaned and unblocked cannot be piled up again. Cleaning and unblocking the refractory mud pile is time-consuming and laborious. Sometimes, due to improper operation, "slag running" and "slag hanging" on the slag chute occur. Operators are in a high temperature environment, with high labor intensity, harsh conditions, unsafe conditions, and low production efficiency.
[0004] The traditional way of plugging the lead outlet is to use a sledgehammer to drive the wedge-shaped plugging wood into the lead outlet and tie it up tightly before adding materials in each shift, and then use yellow mud to plug it to prevent the lead from escaping due to the burning of the plugging wood; after adding materials and smelting, slag is discharged and lead is released. When releasing the lead, use a steel chisel to pry out the yellow mud and the tail of the wooden stick, and then use a sledgehammer to drive the steel chisel into the lead outlet pipe to release the lead until the lead liquid in the furnace (leaving a certain amount of bottom lead) is completely released at one time. Only then can the plugging wood and yellow mud be used to tie up the lead outlet and end the lead release. With this method, the wooden stick is often not tied tightly and the lead leaks; sometimes the lead outlet pipe is completely blocked by condensed solid lead, and the steel chisel cannot penetrate. It is necessary to use an oxygen flame to burn the mouth through the steel pipe manually, burn the solid lead in the lead outlet pipe at high temperature, or use a special punching machine to clear the solid lead in the lead outlet pipe. The above operations are all carried out in a high temperature environment, which makes the operation difficult and labor-intensive for the operators, and is prone to production safety accidents. Summary of the invention
[0005] The purpose of the present invention is to provide a lead smelting furnace system and control method for automatically controlling lead and slag discharge, so as to solve the problems of high temperature operation of workers, high safety hazards and difficulty in controlling the amount of slag and lead discharge during the slag and lead discharge process.
[0006] The object of the present invention is achieved in this way: the present invention includes a smelting furnace system and a control method based on the smelting furnace system.
[0007] The smelting furnace system comprises: an automatic slag discharge device, a lead smelting furnace and an automatic lead discharge device; a lead discharge chute and a slag discharge chute are arranged outside the lead smelting furnace, and the bottom of the lead smelting furnace is connected to the lead discharge chute through a lead discharge pipe; a slag discharge port is arranged on the side wall of the lead smelting furnace and communicated with the slag discharge chute, and a slag outlet is arranged in the slag discharge chute; a lead discharge hole is arranged at the lower part of the lead smelting furnace, a lead discharge chute is arranged outside the lead discharge hole, an outer shell is arranged on the outer wall of the lead discharge chute, and refractory bricks are lined in the outer shell.
[0008] The automatic slag discharge device comprises: a rotating shaft, a rotating shaft sleeve, a coupling, a slag discharge reduction driver, a shaft sleeve bracket and a slag discharge gate; there are two shaft sleeve brackets, each of which is connected to a rotating shaft sleeve, the rotating shaft passes through the two rotating shaft sleeves, and rotates with the rotating shaft sleeve as a fulcrum; one end of the rotating shaft is connected to the shaft of the slag discharge reduction driver through a coupling; a slag discharge gate is fixedly connected to the rotating shaft between the two shaft sleeve brackets, and the slag discharge gate rotates in a circular arc in the slag discharge chute along with the rotating shaft.
[0009] The automatic lead placing device comprises: a plunger, a plunger base and a lead placing deceleration driver; the plunger base has supports at both ends, the plunger is installed through the supports at both ends, and the lead placing deceleration driver is provided at one end of the plunger base, and the lead placing deceleration driver drives the plunger to perform telescopic movement;
[0010] The angle between the lead discharge hole and the lead discharge chute is 20-40 degrees.
[0011] The lower end of the shaft sleeve bracket is connected to the shell of the slag chute; or the shaft sleeve bracket is supported on the ground.
[0012] The shell of the slag chute is made of 10-30mm thick steel plate, lined with refractory bricks to form a slag chute connected to the slag outlet of the smelting furnace to form a slag discharge channel; refractory soil is piled at the slag outlet to prevent the smelting slag in the lead smelting furnace from leaking out.
[0013] The slag discharge gate comprises: a gate fire wall, a gate arm and a gate body; the bottom surface of the gate body is an arc surface, and a side plate is connected to each end of the arc surface to form a gate slot, and the gate fire wall is placed in the gate slot, and the gate fire wall maintains the gate slot state; the gate arm is connected to the upper end of the gate body side plate, and the upper end of the gate arm is connected to the rotating shaft.
[0014] The plunger comprises: a guide column, a lead hole plug, a connecting rod and a screw rod;
[0015] One end of the connecting rod is connected to the screw rod, and the other end is connected to the rear end of the lead-releasing hole plug. The front end of the lead-releasing hole plug is connected to a guide column; the lead-releasing reduction driver drives the screw rod to rotate and pushes the lead-releasing hole plug forward or backward.
[0016] The guide column is a cylinder; or a conical truncated cone; the guide column is hollow; or a solid core;
[0017] The lead hole plug is a semi-sphere or a cone, the diameter of which is larger than the inner diameter of the lead hole, and the shape of the lead hole plug is consistent with the lead hole opening.
[0018] The plunger base comprises: a connecting rod sleeve, a bracket, a rotating shaft seat and a rotating shaft;
[0019] The connecting rod of the plunger penetrates the connecting rod sleeve and the rotating shaft seat, and can rotate with the connecting rod sleeve and the rotating shaft seat as a fulcrum;
[0020] The connecting rod sleeve is connected to one end of the screw base, and the other end of the screw base is connected to a rotating shaft seat; a rotating shaft is connected to both sides of the rotating shaft seat, and the rotating shaft is fixedly installed on the upper end of the side wall of the lead chute through a bracket, and rotates on the rotating shaft seat with the rotating shaft as a fulcrum; a lead release speed reduction driver is connected to the rear wall of the rotating shaft seat;
[0021] The lead placing deceleration driver comprises: a motor and a reducer, wherein the output shaft of the motor is connected with the input shaft of the reducer to directly drive the screw rod to operate and open and close the lead placing hole and the lead placing hole plug.
[0022] Slag and lead discharge control method based on lead smelting furnace system:
[0023] Clean the slag outlet and slag chute before charging the smelting furnace;
[0024] The slag discharge deceleration drive is turned on to raise the slag discharge gate to the closed state, and refractory soil is filled between the slag discharge port and the slag discharge gate to form a refractory soil pile to ensure that the slag in the smelting furnace does not leak out;
[0025] After smelting is completed, the slag is discharged. First, the refractory pile between the slag discharge port and the slag discharge gate is cleaned, the slag discharge deceleration drive is turned on in the reverse direction, and the slag discharge gate is slowly moved down to control the amount of liquid slag released. The high-temperature liquid slag on the upper surface of the lead liquid flows out of the smelting furnace and is discharged through the slag discharge chute;
[0026] The release state of the slag discharge gate is adjusted according to the amount of slag in the smelting furnace to control the flow rate of the liquid slag. After the liquid slag in the smelting furnace is discharged, the slag discharge gate is closed and the slag discharge port is filled with refractory clay to block the slag discharge port;
[0027] After the slag is discharged, the lead discharge deceleration drive is turned on to loosen the screw rod in the reverse direction, and the lead discharge guide column is slowly lifted to release the lead liquid. The lead liquid flows out from the lead discharge hole along the guide column, and flows out through the lead discharge port to the lead discharge chute for lead discharge;
[0028] If it is necessary to add materials for smelting midway, open the slag discharge deceleration drive again to raise the slag discharge gate to the closed state and close the lead discharge port; fill the refractory soil pile between the slag discharge port and the slag discharge gate to realize uninterrupted opening or closing of the slag discharge chute and the lead discharge port during the smelting process.
[0029] Beneficial effect: Due to the adoption of the above scheme, a slag gate is installed on the slag chute. If the slag gate is needed to add materials for smelting midway, the slag reduction drive can be turned on again to raise the slag gate to a closed state, and a refractory pile is filled between the slag outlet and the slag gate to achieve uninterrupted opening or closing of the slag chute; the slag gate releases the opening of the slag chute as needed, and there is no "slag escape" or "slag hanging" in the slag chute.
[0030] The slag gate is controlled by a worm gear reducer, which ensures that the slag gate running between the upper limit and the lower limit can remain in the stop position.
[0031] An upper limit switch and a lower limit switch are installed on the track of the slag discharge gate. When the slag discharge gate runs to the upper limit and the lower limit, the slag discharge deceleration drive automatically stops running to avoid operation accidents.
[0032] Before charging the smelting furnace in each shift, the lead discharge reduction drive is turned on, and the lead discharge hole plug is driven by the screw rod to seal the lead discharge hole of the smelting furnace. When the specified position of sealing the lead discharge hole is reached, the lead discharge reduction drive stops running under the control of the lower limit switch, thereby ensuring that the lead discharge hole is well sealed. When the charge is melted by the high-temperature reduction reaction and meets the lead discharge requirement, the reduction motor is turned on to loosen the screw rod in the reverse direction, and the guide column is slowly lifted. When the lead discharge hole is fully opened, the lead discharge reduction drive stops running under the control of the upper limit switch, and the lead liquid flows out of the lead discharge hole along the guide column, and flows out through the lead discharge port to the lead discharge chute for lead discharge.
[0033] It is possible to realize or stop lead discharge in the middle of lead discharge, which completely changes the past that once the lead discharge hole is opened, the lead discharge process cannot be stopped and a pot of lead must be discharged. The lead discharge process can be effectively controlled and lead discharge can be implemented as needed.
[0034] The guide column has a heat storage function. Even if solid lead condenses in the lead hole, the heat stored in the guide column can melt the solid lead and keep the lead hole conductive. There is no need for manual unblocking, which greatly reduces the labor intensity of workers and prevents the occurrence of production safety accidents caused by unblocking the lead hole.
[0035] When the lead-releasing operation is carried out, the lead-releasing hole is not blocked and the operators are no longer in a high-temperature environment, which saves time and effort. While greatly reducing the labor intensity, the time and flow of lead-releasing can be effectively controlled.
[0036] The invention solves the problems of high temperature operation of workers, high potential safety hazard and difficulty in controlling the amount of slag and lead release in the process of slag and lead release, thereby achieving the purpose of the invention.
[0037] Advantages: The invention has reasonable structure, low cost, easy production and simple operation. When the slag and lead are discharged, the workers are no longer in a high temperature environment, which greatly reduces the labor intensity of the workers, effectively controls the time, speed and flow rate of slag discharge, and makes the flow rate of liquid slag stable and uniform without accumulation; the lead discharge hole plug is used to seal the lead discharge hole, and the guide column is used to guide and discharge the lead liquid, which is not blocked, easy to control, saves time and labor, and can effectively control the time and flow rate of lead discharge while greatly reducing the labor intensity. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] Figure 1 It is a schematic diagram of the overall structure of the present invention.
[0039] Figure 2 It is a structural schematic diagram of the automatic slag discharge device of the present invention when the gate body is in a fully opened state.
[0040] Figure 3 yes Figure 1 Schematic diagram of the side structure.
[0041] Figure 4 It is a structural schematic diagram of the automatic slag discharge device of the present invention when the gate bodies are in a completely closed state.
[0042] Figure 5 It is a structural schematic diagram of the automatic lead placing device of the present invention in a state where the lead placing hole is not blocked.
[0043] Figure 6 It is a structural schematic diagram of the lead placing hole of the automatic lead placing device of the present invention being in a blocked state.
[0044] In the figure, 1. Automatic slag discharge device; 2. Lead smelting furnace; 3. Automatic lead discharge device.
[0045] 1-1, rotating shaft; 1-2, rotating shaft sleeve; 1-3, coupling; 1-4, slag discharge reduction driver; 1-5, sleeve bracket; 1-6, slag discharge chute shell; 1-7, slag discharge chute refractory wall; 1-8, slag discharge gate; 1-9, gate refractory wall; 1-10, gate arm; 1-11, gate body; 1-12, refractory clay; 1-13, slag discharge chute.
[0046] 3-1. Guide column; 3-2. Lead discharge hole plug; 3-3. Connecting rod; 3-4. Connecting rod sleeve; 3-5. Plunger base; 3-6. Bracket; 3-7. Rotating shaft seat; 3-8. Screw rod; 3-9. Lead discharge reduction drive; 3-11. Lead discharge pipe; 3-12. Lead discharge hole; 3-13. Lead discharge chute. DETAILED DESCRIPTION
[0047] Embodiment 1: The present invention includes a smelting furnace system and a control method based on the smelting furnace system.
[0048] The smelting furnace system comprises: an automatic slag discharge device 1, a lead smelting furnace 2 and an automatic lead discharge device 3; a lead discharge chute and a slag discharge chute are arranged outside the lead smelting furnace 2, and the bottom of the lead smelting furnace 2 is connected to the lead discharge chute 3-13 through a lead discharge pipe 3-11; a slag discharge port is arranged on the side wall of the lead smelting furnace 2 and communicates with the slag discharge chute 1-13, and a slag outlet is arranged in the slag discharge chute 1-13; a lead discharge hole 3-12 is arranged at the lower part of the lead smelting furnace 2, a lead discharge chute 3-13 is arranged outside the lead discharge hole 3-12, and the outer wall of the lead discharge chute 3-13 is provided with an outer shell, and the inner wall of the outer shell is lined with refractory bricks.
[0049] The automatic slag discharge device 1 comprises: a rotating shaft 1-1, a rotating shaft sleeve 1-2, a coupling 1-3, a slag discharge reduction driver 1-4, a sleeve bracket 1-5 and a slag discharge gate 1-8; there are two sleeve brackets 1-5, each of which is connected to a rotating shaft sleeve 1-2, and the rotating shaft 1-1 passes through the two rotating shaft sleeves 1-2 and rotates with the rotating shaft sleeve 1-2 as a fulcrum; one end of the rotating shaft 1-1 is connected to the shaft of the slag discharge reduction driver 1-4 through the coupling 1-3; a slag discharge gate 1-8 is fixedly connected to the rotating shaft 1-1 between the two sleeve brackets 1-5, and the slag discharge gate 1-8 rotates in a circular arc with the rotating shaft 1-1 in the slag discharge chute 1-13.
[0050] The automatic lead placing device 3 comprises: a plunger, a plunger base 3-5 and a lead placing deceleration driver 3-9; the plunger base 3-5 has supports at both ends, the plunger is installed through the supports at both ends, and a lead placing deceleration driver 3-9 is provided at one end of the plunger base 3-5, and the lead placing deceleration driver 3-9 drives the plunger to perform telescopic movement;
[0051] The angle between the lead discharge hole 3-12 and the lead discharge chute 3-13 is 20-40 degrees.
[0052] The lower end of the sleeve bracket 1-5 is connected to the slag chute shell 1-6; or the sleeve bracket 1-5 is supported on the ground.
[0053] The slag chute shell 1-6 is made of 10-30mm thick steel plate, lined with refractory bricks to form a slag chute 1-13 connected to the slag outlet of the smelting furnace to form a slag channel; a refractory pile 1-12 is piled at the slag outlet to prevent the smelting slag in the lead smelting furnace from leaking out.
[0054] The slag discharge gate 1-8 comprises: a gate fire wall 1-9, a gate arm 1-10 and a gate body 1-11; the bottom surface of the gate body 1-11 is an arc surface, and a side plate is connected to each end of the arc surface to form a gate slot, and the gate fire wall 1-9 is placed in the gate slot, and the gate fire wall 1-9 maintains the gate slot state; the gate arm 1-10 is connected to the upper end of the side plate of the gate body 1-11, and the upper end of the gate arm 1-10 is connected to the rotating shaft 1-1.
[0055] The plunger comprises: a guide column 3-1, a lead hole plug 3-2, a connecting rod 3-3 and a screw rod 3-8;
[0056] One end of the connecting rod 3-3 is connected to the screw rod 3-8, and the other end is connected to the rear end of the lead hole plug 3-2. The front end of the lead hole plug 3-2 is connected to the guide column 3-1; the lead release reduction driver 3-9 drives the screw rod 3-8 to rotate and push the lead hole plug 3-2 forward or backward.
[0057] The guide column 3-1 is a cylinder; or a conical cone; the guide column 3-1 is hollow; or a solid core;
[0058] The lead hole plug 3-2 is a semi-sphere or a cone, and its diameter is larger than the inner diameter of the lead hole 3-12. The shape of the lead hole plug 3-2 is consistent with the mouth of the lead hole 3-12.
[0059] The plunger base 3-5 includes: a connecting rod sleeve 3-4, a bracket 3-6, a rotating shaft seat 3-7 and a rotating shaft 3-10;
[0060] The connecting rod 3-3 of the plunger penetrates the connecting rod sleeve 3-4 and the rotating shaft seat 3-7, and can rotate with the connecting rod sleeve 3-4 and the rotating shaft seat 3-7 as a fulcrum;
[0061] The connecting rod sleeve 3-4 is connected to one end of the screw base 3-5, and the other end of the screw base 3-5 is connected to a rotating shaft seat 3-7; a rotating shaft 3-10 is connected to both sides of the rotating shaft seat 3-7, and the rotating shaft 3-10 is fixedly installed on the upper end of the side wall of the lead chute 3-13 through a bracket 3-6, and rotates on the rotating shaft seat 3-7 with the rotating shaft 3-10 as a fulcrum; a lead release speed reduction driver 3-9 is connected to the rear wall of the rotating shaft seat 3-7;
[0062] The lead placing deceleration driver 3-9 comprises: a motor and a reducer, the output shaft of the motor is connected to the input shaft of the reducer, directly driving the screw rod to operate, and opening and closing the lead placing hole and the lead placing hole plug.
[0063] Slag and lead discharge control method based on lead smelting furnace system:
[0064] Clean the slag outlet and slag chute before charging the smelting furnace;
[0065] The slag discharge deceleration driver 1-4 is turned on to raise the slag discharge gate to a closed state, and refractory soil is filled between the slag discharge port and the slag discharge gate to form a refractory soil pile to ensure that the slag in the smelting furnace does not leak out;
[0066] After smelting is completed, the slag is discharged. First, the refractory pile between the slag discharge port and the slag discharge gate is cleaned, and the slag discharge deceleration drive 1-4 is turned on in the reverse direction. The slag discharge gate is slowly moved down to control the amount of liquid slag released. The high-temperature liquid slag on the upper surface of the lead liquid flows out of the smelting furnace and is discharged through the slag discharge chute;
[0067] The release state of the slag discharge gate is adjusted according to the amount of slag in the smelting furnace to control the flow rate of the liquid slag. After the liquid slag in the smelting furnace is discharged, the slag discharge gate is closed and the slag discharge port is filled with refractory clay to block the slag discharge port;
[0068] After the slag discharge is completed, the lead discharge deceleration driver 3-9 is turned on to loosen the screw rod in the reverse direction, and the lead discharge guide column is slowly lifted to release the lead liquid. The lead liquid flows out from the lead discharge hole along the guide column, and flows out through the lead discharge port to the lead discharge chute for lead discharge;
[0069] If it is necessary to add materials for smelting midway, the slag discharge deceleration driver 1-4 is turned on again to raise the slag discharge gate 8 to the closed state and close the lead discharge port; a refractory pile is filled between the slag discharge port and the slag discharge gate 8 to achieve uninterrupted opening or closing of the slag discharge chute 13 and the lead discharge port during the smelting process.
Claims
1. A lead smelting furnace system for automatically controlling lead and slag discharge, characterized in that: The smelting furnace system comprises: an automatic slag discharge device, a lead smelting furnace and an automatic lead discharge device; a lead discharge chute and a slag discharge chute are provided outside the lead smelting furnace, and the bottom of the lead smelting furnace is connected to the lead discharge chute through a lead discharge pipe; a slag discharge port is provided on the side wall of the lead smelting furnace and communicates with the slag discharge chute, and a slag discharge port is provided in the slag discharge chute; a lead discharge hole is provided at the lower part of the lead smelting furnace, a lead discharge chute is provided outside the lead discharge hole, and an outer shell is provided on the outer wall of the lead discharge chute, and refractory bricks are lined in the outer shell; The automatic slag discharge device comprises: a rotating shaft, a rotating shaft sleeve, a coupling, a slag discharge reduction driver, a shaft sleeve bracket and a slag discharge gate; there are two shaft sleeve brackets, each of which is connected to a rotating shaft sleeve, and the rotating shaft passes through the two rotating shaft sleeves and rotates with the rotating shaft sleeve as a fulcrum; one end of the rotating shaft is connected to the shaft of the slag discharge reduction driver through a coupling; a slag discharge gate is fixedly connected to the rotating shaft between the two shaft sleeve brackets, and the slag discharge gate rotates in a circular arc in the slag discharge chute along with the rotating shaft; The automatic lead placing device comprises: a plunger, a plunger base and a lead placing deceleration driver; the plunger base has supports at both ends, the plunger is installed through the supports at both ends, and the lead placing deceleration driver is provided at one end of the plunger base, and the lead placing deceleration driver drives the plunger to perform telescopic movement; The angle between the lead discharge hole and the lead discharge chute is 20-40 degrees; The plunger comprises: a guide column, a lead hole plug, a connecting rod and a screw rod; One end of the connecting rod is connected to the screw rod, and the other end is connected to the rear end of the lead-releasing hole plug. The front end of the lead-releasing hole plug is connected to a guide column. The lead-releasing reduction driver drives the screw rod to rotate and push the lead-releasing hole plug forward or backward. Before charging the smelting furnace in each shift, the lead discharge reduction drive is turned on, and the lead discharge hole plug is driven by the screw rod to seal the lead discharge hole of the smelting furnace. When the specified position of sealing the lead discharge hole is reached, the lead discharge reduction drive stops running under the control of the lower limit switch, thereby ensuring that the lead discharge hole is well sealed. When the charge is melted by the high-temperature reduction reaction and meets the lead discharge requirement, the reduction motor is turned on to loosen the screw rod in the reverse direction, and the guide column is slowly lifted. When the lead discharge hole is fully opened, the lead discharge reduction drive stops running under the control of the upper limit switch, and the lead liquid flows out of the lead discharge hole along the guide column, and flows out through the lead discharge port to the lead discharge chute for lead discharge.
2. A lead smelting furnace system for automatically controlling lead and slag discharge according to claim 1, characterized in that: The lower end of the shaft sleeve bracket is connected to the shell of the slag chute; or the shaft sleeve bracket is supported on the ground.
3. A lead smelting furnace system for automatically controlling lead and slag discharge according to claim 2, characterized in that: The shell of the slag chute is made of 10-30mm thick steel plate, lined with refractory bricks to form a slag chute connected to the slag outlet of the smelting furnace to form a slag discharge channel; refractory soil is piled at the slag outlet to prevent the smelting slag in the lead smelting furnace from leaking out.
4. A lead smelting furnace system for automatically controlling lead and slag discharge according to claim 1, characterized in that: The slag discharge gate comprises: a gate fire wall, a gate arm and a gate body; the bottom surface of the gate body is an arc surface, and a side plate is connected to each end of the arc surface to form a gate slot, and the gate fire wall is placed in the gate slot, and the gate fire wall maintains the gate slot state; the gate arm is connected to the upper end of the gate body side plate, and the upper end of the gate arm is connected to the rotating shaft.
5. A lead smelting furnace system for automatically controlling lead and slag discharge according to claim 1, characterized in that: The guide column is a cylinder; or a conical truncated cone; the guide column is hollow; or a solid core; The lead hole plug is a semi-sphere or a cone, the diameter of which is larger than the inner diameter of the lead hole, and the shape of the lead hole plug is consistent with the lead hole opening.
6. A lead smelting furnace system for automatically controlling lead and slag discharge according to claim 1, characterized in that: The plunger base comprises: a connecting rod sleeve, a bracket, a rotating shaft seat and a rotating shaft; The connecting rod of the plunger penetrates the connecting rod sleeve and the rotating shaft seat, and can rotate with the connecting rod sleeve and the rotating shaft seat as a fulcrum; The connecting rod sleeve is connected to one end of the screw base, and the other end of the screw base is connected to a rotating shaft seat; a rotating shaft is connected to both sides of the rotating shaft seat, and the rotating shaft is fixedly installed on the upper end of the side wall of the lead chute through a bracket, and rotates on the rotating shaft seat with the rotating shaft as a fulcrum; a lead release speed reduction driver is connected to the rear wall of the rotating shaft seat; The lead placing deceleration driver comprises: a motor and a reducer, wherein the output shaft of the motor is connected with the input shaft of the reducer to directly drive the screw rod to operate and open and close the lead placing hole and the lead placing hole plug.
7. A control method for a lead smelting furnace system for automatically controlling lead and slag discharge according to claim 1, characterized in that: Slag and lead discharge control method based on lead smelting furnace system: Clean the slag outlet and slag chute before charging the smelting furnace; The slag discharge deceleration drive is turned on to raise the slag discharge gate to the closed state, and refractory soil is filled between the slag discharge port and the slag discharge gate to form a refractory soil pile to ensure that the slag in the smelting furnace does not leak out; After smelting is completed, the slag is discharged. First, the refractory pile between the slag discharge port and the slag discharge gate is cleaned, the slag discharge deceleration drive is turned on in the reverse direction, and the slag discharge gate is slowly moved down to control the amount of liquid slag released. The high-temperature liquid slag on the upper surface of the lead liquid flows out of the smelting furnace and is discharged through the slag discharge chute; The release state of the slag discharge gate is adjusted according to the amount of slag in the smelting furnace to control the flow rate of the liquid slag. After the liquid slag in the smelting furnace is discharged, the slag discharge gate is closed and the slag discharge port is filled with refractory clay to block the slag discharge port; After the slag is discharged, the lead discharge deceleration drive is turned on to loosen the screw rod in the reverse direction, and the lead discharge guide column is slowly lifted to release the lead liquid. The lead liquid flows out from the lead discharge hole along the guide column, and flows out through the lead discharge port to the lead discharge chute for lead discharge; If it is necessary to add materials for smelting midway, open the slag discharge deceleration drive again to raise the slag discharge gate to the closed state and close the lead discharge port; fill the refractory soil pile between the slag discharge port and the slag discharge gate to realize uninterrupted opening or closing of the slag discharge chute and the lead discharge port during the smelting process.
