A regional distributed energy system and lake water source heat pump composite energy supply system

By using a regional distributed energy system combined with a lake water source heat pump in building air conditioning and hot water systems, and using the joint operation of internal combustion units and lake water source heat pump units, the problem of high power consumption of building heating and cooling is solved, and the construction is achieved. It provides efficient and energy-saving heating and heating energy supply, meeting the comfort needs of the building.

CN111219906BActive Publication Date: 2024-11-29CHONGQING UNIV
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202010137000.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-03-02
Publication Date
2024-11-29
Estimated Expiration
2040-03-02

AI Technical Summary

Technical Problem

Existing building air conditioners and hot water systems consume a lot of electricity, have low energy efficiency ratios, are not environmentally friendly and energy-saving, and are difficult to meet the needs of building cooling and cooling, resulting in a tight energy supply.

Method used

The energy supply system is combined with the lake water source heat pump, including internal combustion units, lithium bromide absorption refrigeration units and lake water source heat pump units. Through the internal combustion units, power generation and waste heat utilization, combined with the lake water source heat pump to achieve heating and cooling energy supply, and use ice The cooling storage device and multiple heat exchangers improve energy utilization efficiency.

Benefits of technology

It realizes efficient energy saving in building heating and heating energy supply, reduces electricity consumption, improves energy utilization efficiency, meets building heating and heating needs, and reduces energy costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111219906B_ABST
    Figure CN111219906B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of HVAC, and specifically to an energy supply system of a regional distributed energy system and a lake water source heat pump, including an internal combustion engine unit, a lithium bromide absorption refrigeration unit, a lake water source heat pump unit and building cooling equipment; the internal combustion engine unit is used to generate electricity to supply power to the power terminal; the lithium bromide absorption refrigeration unit is used to use the waste heat of the internal combustion engine unit to produce cold water; the lake water source heat pump unit is used to provide the building cooling equipment with return water after refrigeration. The present application realizes the reuse of energy by using the lithium bromide absorption refrigeration unit to absorb the heat energy generated during the power generation process of the internal combustion engine unit to provide a cold source for the building. When the cold source cannot meet the needs of the building, the lake water source heat pump unit uses the lake water on the surface to achieve heat exchange through the lake water source heat pump unit, thereby realizing the recycling of energy. Finally, the electricity generated by the internal combustion engine unit is used to provide electric energy to the building cooling equipment, saving the consumption of electric energy.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of HVAC, and in particular to an energy supply system composed of a regional distributed energy system and a lake water source heat pump. Background Art

[0002] With the rapid development of the market economy in recent years, the urbanization process has developed rapidly, the scale of urban construction has continued to expand, and various industrial parks, large-scale building complexes and small towns have continued to emerge, causing the total construction area to increase year by year. At the same time, with the improvement of people's living standards and comfort, the energy consumption per unit of construction area has shown a rigid upward trend. Building energy consumption is the energy consumption necessary to meet the building functions and building comfort services.

[0003] Due to the continuous growth of demand and the adjustment of urban energy structure, the energy supply situation in the whole country has become tense, and the energy supply can no longer meet the needs of sustainable economic and environmental development. The power load has increased year by year, especially the peak power shortage and the increase in the peak-to-valley difference in summer. Many cities have to cut off power supply every summer; natural gas shortages and price increases have occurred in many cities across the country. Energy has become a bottleneck restricting the further development of the economy.

[0004] The air conditioning and heating loads that meet the building's heating and cooling comfort requirements account for the largest proportion of building energy consumption and have the greatest energy-saving potential. In the existing technology, building air conditioning and hot water systems consume a lot of electricity, have high electricity consumption, low energy efficiency, and are not environmentally friendly and energy-saving. Summary of the invention

[0005] In view of the problem that current building cooling consumes a lot of electric energy, the present invention provides an energy supply system combining a regional distributed energy system and a lake water source heat pump.

[0006] In order to achieve the above-mentioned object of the invention, the present invention provides the following technical solutions:

[0007] A regional distributed energy system and lake water source heat pump composite energy supply system,

[0008] It includes an internal combustion engine, a lithium bromide absorption refrigeration unit, a lake water source heat pump unit and a building cooling device; the internal combustion engine is used to generate electricity to supply power to the power terminal; the lithium bromide absorption refrigeration unit is used to absorb the waste heat of the internal combustion engine to cool the water and then provide it to the building cooling device; the lake water source heat pump unit is used to cool the return water of the building cooling device and then provide it to the building cooling device;

[0009] The heating flue gas inlet of the lithium bromide absorption refrigeration unit is connected to the heating flue gas outlet of the internal combustion unit, and the cold water outlet of the lithium bromide absorption refrigeration unit is connected to the cold water inlet of the building cooling equipment. After the return water of the building cooling equipment flows out, it is divided into two branches, one branch flows into the return water inlet of the lithium bromide absorption refrigeration unit, and the other flows into the return water inlet of the lake water source heat pump unit. The cold water outlet of the lake water source heat pump unit is merged with the cold water outlet of the lithium bromide absorption refrigeration unit and connected to the cold water inlet of the building cooling equipment.

[0010] Preferably, the energy supply system further comprises a dual-condition chiller and an ice storage device, wherein the dual-condition chiller is used to cool the return water of the building cooling equipment and then provide a cold source for the building cooling equipment; the dual-condition chiller is also used to prepare slurry ice and store it in the ice storage device; the ice storage device is used to store slurry ice and release the coldness of the slurry ice to provide a cold source for the building cooling equipment; the return water inlet of the dual-condition chiller is connected to the return water outlet of the building cooling equipment, the cold water outlet of the dual-condition chiller is divided into two branches, one is connected to the cold water inlet of the building cooling equipment, and the other is connected to the cold water inlet of the ice storage device, the cold water outlet of the ice storage device is connected to the cold water inlet of the building cooling equipment, and the return water outlet of the ice storage device is connected to the return water inlet of the dual-condition chiller. Peak shifting and valley filling can be achieved through the dual-condition chiller and the ice storage device, further improving the flexibility of the energy supply system and greatly improving energy efficiency.

[0011] Preferably, the energy supply system further comprises an ice plate heat exchanger, which is used to cool the return water of the building cooling equipment through the dual-mode chiller; the return water inlet of the ice plate heat exchanger is connected to the return water outlet of the building cooling equipment, the return water outlet of the ice plate heat exchanger is connected to the inlet of the dual-mode chiller, the cold water inlet of the ice plate heat exchanger is connected to the cold water outlet of the dual-mode chiller, and the cold water outlet of the ice plate heat exchanger is connected to the cold water inlet of the building cooling equipment. The cold energy generated by the dual-mode refrigeration unit is used by the ice plate heat exchanger to cool the return water on the user side of the building.

[0012] Preferably, the energy supply system further includes a first ice-melting plate heat exchanger, the first cold water inlet of the first ice-melting plate heat exchanger is connected to the cold water outlet of the ice storage device, the second cold water inlet of the first ice-melting plate heat exchanger is connected to the cold water outlet of the ice-making plate heat exchanger, and the cold water outlet of the first ice-melting plate heat exchanger is connected to the cold water inlet of the building cooling equipment; the first ice-melting plate heat exchanger is used to further cool the cold water cooled by the ice-making plate heat exchanger using the fluid ice stored in the ice storage device. In order to further reduce the temperature of the cold source and reduce the energy consumption of the system, the first ice-melting plate heat exchanger is added to further cool the cold water cooled by the ice-making plate heat exchanger, thereby meeting the needs of the building cooling equipment.

[0013] Preferably, the energy supply system also includes a second ice melting plate heat exchanger, which is used to use the ice storage device to re-cool the outlet water of the lithium bromide absorption refrigeration unit and the lake water source heat pump unit and then provide it to the building cooling equipment; the first cold water inlet of the second ice melting plate heat exchanger is connected to the cold water outlet of the ice storage device, the second cold water inlet of the second ice melting plate heat exchanger is connected to the cold water outlet of the lithium bromide absorption refrigeration unit, and the cold water outlet of the lithium bromide absorption refrigeration unit is connected to the cold water inlet of the building cooling equipment, thereby further saving energy.

[0014] Preferably, the energy supply system further comprises a waste heat boiler, a smoke-water heat exchanger and a building heating equipment, the heating smoke inlet of the waste heat boiler is connected to the heating smoke outlet of the internal combustion engine, the return water inlet of the waste heat boiler is connected to the return water outlet of the building heating equipment, the hot water outlet of the waste heat boiler is connected to the hot water inlet of the building heating equipment, the heating smoke outlet of the waste heat boiler is connected to the heating smoke inlet of the smoke-water heat exchanger, and the hot water pipe of the lake water source heat pump unit is connected to the hot water inlet of the building heating equipment after passing through the smoke-water heat exchanger; the waste heat boiler is used to absorb the waste heat of the internal combustion engine to produce hot water and then provide it to the building heating equipment; the smoke-water heat exchanger is used to absorb the waste heat of the waste heat boiler to reheat the outlet water of the lake water source heat pump unit and then provide it to the building heating equipment. In winter, the waste heat generated by the internal combustion engine is transferred to the waste heat boiler to heat the water and then provide it to the building heating equipment, so as to achieve heating of the building and save energy.

[0015] Preferably, the energy supply system further includes a phase change heat storage device, which is used to store the waste heat at the outlet of the smoke-water heat exchanger in a phase change heat storage tank, and gradually release the stored heat energy according to the heat demand during the peak heat or electricity consumption period. The heating smoke inlet of the phase change heat storage device is connected to the heating smoke outlet of the smoke-water heat exchanger, and the heating smoke outlet of the smoke-water heat exchanger is connected to the hot water inlet of the building heating equipment. The waste heat of the smoke-water heat exchanger is utilized again through the phase change heat storage device, so that the heat is utilized to the maximum extent.

[0016] Preferably, the energy supply system further comprises a gas boiler, the hot water outlet of the gas boiler is connected to the hot water inlet of the building heating equipment, the return water inlet of the gas boiler is connected to the return water outlet of the building heating equipment, and the gas boiler is used to produce hot water and provide it to the building heating equipment. When the heat energy provided by the waste heat boiler phase change heat storage device and the lake water source heat pump unit cannot meet the needs of the building heating equipment, the gas boiler is used to provide heat energy for the building.

[0017] Compared with the prior art, the invention has the following beneficial effects: the invention uses a lithium bromide absorption refrigeration unit to absorb the heat energy generated during the power generation process of the internal combustion engine to produce cold water, thereby providing cold capacity for the building cooling equipment, realizing the reuse of energy. Then, when the cold capacity generated by the lithium bromide absorption refrigeration unit cannot meet the building demand, the building cooling equipment realizes heat exchange with the water in the ground surface through the lake water source heat pump unit, thereby realizing the recycling of energy. The internal combustion engine unit, the lithium bromide absorption refrigeration unit, and the lake water source heat pump unit jointly operate to provide cooling, saving the consumption of electric energy. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 A schematic diagram of the structure of a regional distributed energy system and a lake water source heat pump composite energy supply system provided in this application;

[0019] Figure 2 A schematic diagram of the structure of a regional distributed energy system and a lake water source heat pump composite energy supply system for summer operation provided in this application;

[0020] Figure 3 A schematic diagram of the structure of a regional distributed energy system and a lake water source heat pump composite energy supply system for winter operation provided in this application.

[0021] Markings in the figure: 1-internal combustion unit, 2-electricity terminal, 3-lithium bromide absorption refrigeration unit, 4-lake water source heat pump unit, 5-dual-mode chiller, 6-ice storage device, 7-ice-making plate heat exchanger, 8-first ice-melting plate heat exchanger, 9-second ice-melting plate heat exchanger, 10-smoke-water heat exchanger, 11-waste heat boiler, 12-gas boiler, 13-building cooling equipment, 14-building heating equipment, 15-phase change heat storage device. DETAILED DESCRIPTION

[0022] The present invention will be described in detail below in conjunction with the accompanying drawings.

[0023] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0024] In the description of the present invention, it is necessary to understand that the terms "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship, are based on the orientation or position relationship shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0025] In the description of the present invention, unless otherwise specified and limited, it should be noted that the terms "installed", "connected" and "connected" should be understood in a broad sense. For example, it can be a mechanical connection or an electrical connection, or it can be the internal connection between two components. It can be a direct connection or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to the specific circumstances.

[0026] like Figure 1 As shown, the present application provides a regional distributed energy system and a lake water source heat pump composite energy supply system, including an internal combustion engine unit 1, a lithium bromide absorption refrigeration unit 3, a lake water source heat pump unit 4, a building cooling equipment 13, a dual-mode chiller 5, a waste heat boiler 11 and a smoke-water heat exchanger 10.

[0027] The internal combustion unit 1 is a power generation device, which generates electricity by doing work, and is used for the operation of the lithium bromide absorption refrigeration unit 3, the lake water source heat pump unit 4, the building refrigeration equipment and the building heating equipment. The internal combustion unit compresses the air through the compressor turbine, and the high-pressure air is mixed with natural gas in the combustion chamber to burn, so that the flue gas expands and does work, which drives the power turbine to rotate and do work to drive the generator to generate electricity. The generated electricity is used to supply power to the power terminal, and the discharged high-temperature flue gas is transported to the next level of heat-using equipment for use.

[0028] The waste heat boiler 11 utilizes the waste heat discharged by the internal combustion unit 1 to produce heat to meet the heat demand of the building heating equipment 14. The working principle of the waste heat boiler: the fuel is burned to produce high-temperature flue gas to release heat, and the high-temperature flue gas first enters the furnace, then enters the waste heat recovery device of the front smoke box, then enters the smoke and fire pipe, and finally enters the waste heat recovery device in the flue of the rear smoke box to produce hot water or steam.

[0029] The gas boiler 12 is used to produce heat to peak the heating in winter and ensure the heating of the building. The working principle of the gas boiler: After the gas boiler is powered on, the control system starts to detect the water level and shell temperature of the boiler. If the detection is normal, the boiler starts to start the burner to heat the water. When the water temperature reaches the set temperature, the burner stops heating. At the same time, the boiler water temperature has reached the pump start temperature. The boiler starts the hot water circulation pump, and the hot water circulates in the heating pipe system. The heat is dissipated through the radiator (such as radiator, fan coil water heating air conditioner, central air conditioning unit, etc.) to achieve the purpose of heating.

[0030] The lithium bromide absorption refrigeration unit 3 utilizes the waste heat generated by the power generation of the internal combustion unit 1 to produce cold capacity to meet the cold demand of the building refrigeration equipment. The working principle of the lithium bromide absorption refrigeration machine: water is used as the refrigerant and lithium bromide is used as the absorbent. Using the heat energy discharged by the internal combustion unit as the power, when the lithium bromide aqueous solution is heated by the high-temperature flue gas in the generator, the water in the solution is continuously vaporized; as the water is continuously vaporized, the concentration of the lithium bromide aqueous solution in the generator is continuously increased and enters the absorber; the water vapor enters the condenser, is cooled by the cooling water in the condenser, and condenses to become high-pressure and low-temperature liquid water; when the water in the condenser enters the steam generator through the throttle valve, it rapidly expands and vaporizes, and absorbs a large amount of heat from the refrigerant water in the evaporator during the vaporization process, thereby achieving the purpose of cooling and refrigeration.

[0031] The lake water source heat pump unit 4 uses surface water for heat exchange as the heat source of the water source heat pump. In winter, the heat in the lake water is "taken" out to supply indoor heating. At this time, the lake water is the "heat source"; in summer, the indoor heat is discharged and released into the surface water. At this time, the lake water is the "cold source". Under summer working conditions, it is combined with the dual-condition chiller unit 5 and the lithium bromide absorption refrigeration unit 3 to generate cold capacity to meet the cold demand of the building cooling equipment 13; under winter working conditions, it is combined with the waste heat boiler 11 and the gas boiler 12 to produce heat to meet the building heat demand. The working principle of the lake water source heat pump unit: using the low-grade thermal energy resources formed by the lake water body absorbing solar energy, using the lake water as the heat source, and using the heat pump principle, in summer, the lake water source heat pump unit transfers the heat in the building to the lake water to realize building cooling; in winter, it extracts heat from the lake water to realize building heating. Low-grade thermal energy resources are heat energy that is difficult to use.

[0032] The dual-mode chiller 5 converts water into liquid ice and stores it in the ice storage device 6 during the low period of cooling demand, and releases the cooling capacity in the ice storage device 6 to meet the cooling demand of the building during the peak period of cooling demand, thus having the effect of shifting peaks and filling valleys. The working principle of the dual-condition chiller: During the day, the ethylene glycol liquid cooled by the main unit flows through the ice plate heat exchanger to deliver cold air to the air-conditioning terminal. The temperature before entering the ice plate heat exchanger is 3.5°C. After passing through the ice plate heat exchanger, the temperature of the refrigerant rises to 10.5°C, and the refrigerant returns to the refrigeration unit through the refrigeration pump; at night, the ethylene glycol liquid with a concentration of 20% of the refrigerant flows through the main unit for cooling, and then is transported to the ice storage device to cool the water in the ice storage device. The temperature is generally reduced to about -3°C. At the same time, the ethylene glycol liquid is transported out from the pipe on the other side of the ice storage device, and returns to the main unit through the refrigeration pump. In this way, the low-temperature ethylene glycol circulates and cools the water in the ice storage device.

[0033] The ice plate heat exchanger 7 is used to cool the return water on the user side of the building by using the cooling capacity generated by the dual-mode refrigeration unit. The working principle of the ice plate heat exchanger: the ethylene glycol liquid cooled by the main engine flows through the ice plate heat exchanger. The temperature before entering the ice plate heat exchanger is about 3.5°C. After heat exchange with the return water of the building cooling equipment, the temperature of the ethylene glycol liquid rises to about 10.5°C, and the return water is cooled for building cooling.

[0034] The working principle of the ice storage device: the liquid ice produced by the dual-mode chiller is stored in the ice storage tank. During the peak load in the day, the 0℃ water in the ice storage tank is transported to the ice-melting plate heat exchanger for heat exchange. The high-temperature water after heat exchange flows back to the ice storage tank and is sprinkled on the ice to melt it directly. As long as there is ice in the tank, the outlet water temperature can be kept at around 3.5℃, providing 5-7℃ cold water to the other side of the ice-melting plate heat exchanger for building cooling.

[0035] The first ice-melting plate heat exchanger 8 is used to utilize the cold released by the ice storage device 6 to cool the outlet water of the ice-making plate heat exchanger 7 to reach a set value, thereby reducing the energy consumption of the system.

[0036] The second ice melting plate heat exchanger 9 is used to utilize the cold released by the ice storage device 6 to re-cool the outlet water on the air conditioning unit side to reach the set value, thereby reducing the energy consumption of the system.

[0037] Working principle of the ice melting plate heat exchanger: The water at 0°C in the ice storage device 6 is transported to the ice melting plate heat exchanger for heat exchange, providing 5-7°C cold water to the other side of the ice melting plate heat exchanger for building cooling.

[0038] The smoke-water heat exchanger 10 is used to utilize the waste heat at the outlet of the waste heat boiler 11 to reheat the outlet water of the air conditioning side of the lake water source heat pump unit 4 to reach the set value, thereby improving the heating efficiency of the lake water source heat pump system. The working principle of the smoke-water heat exchanger: the smoke passes through one side of the heat exchange surface, and the water to be heated passes through the other side. The two exchange heat, so that the water is heated, the water temperature is increased, the smoke exhaust temperature is reduced, and the utilization of the waste heat of the smoke is improved.

[0039] The phase-change heat storage device 15 is used to store the excess heat at the outlet of the smoke-water heat exchanger 10 in the phase-change heat storage tank, and gradually release the stored heat energy according to the heat demand of the building during the peak heat or electricity consumption period. The working principle of the phase-change heat storage device: the heat energy provided by the heat source is stored in the phase-change heat storage tank, and the stored heat energy is gradually released according to the heat demand of the user during the peak heat or electricity consumption period to produce hot water to heat the building.

[0040] The building cooling equipment 13 uses the cold water produced by the air conditioning unit to perform heat exchange with the air in the indoor rooms of the building, thereby cooling the indoor room air and achieving the purpose of cooling.

[0041] The internal combustion engine unit 1, lithium bromide absorption refrigeration unit 3, lake water source heat pump unit 4, dual-mode chiller 5 and other refrigeration or heating equipment in the present application may each include one or more identical devices. If there are multiple devices, they are connected in parallel for output and the inlets are also connected in parallel. For example, the lithium bromide absorption refrigeration unit 3 may be one lithium bromide absorption refrigeration machine or multiple lithium bromide absorption refrigeration machines. If there are multiple lithium bromide absorption refrigeration machines, each lithium bromide absorption refrigeration machine is connected in parallel, and the output end after parallel connection is connected to the building cooling equipment for cooling.

[0042] The energy supply system provided in the present application also includes a signal feedback network for monitoring the real-time power consumption of the lithium bromide absorption refrigeration unit 3, the lake water source heat pump unit 4, the dual-mode chiller 5, etc. and the building terminal equipment, and controlling the transmission of electricity.

[0043] like Figure 2 As shown, it is a schematic structural diagram of the energy supply system of the regional distributed energy system and the lake water source heat pump composite provided by this application for summer.

[0044] The internal combustion engine unit 1 is used for generating electricity, and the internal combustion engine unit 1 is used for generating electricity to supply power to the electricity terminal 2; the lithium bromide absorption refrigeration unit 3 is used for absorbing the waste heat of the internal combustion engine unit 1 to cool the water and then provide it to the building cooling equipment 13; the lake water source heat pump unit 4 is used to cool the return water of the building cooling equipment and then provide it to the building cooling equipment 13.

[0045] The heating flue gas inlet of the lithium bromide absorption refrigeration unit 3 is connected to the heating flue gas outlet of the internal combustion unit 1, and the cold water outlet of the lithium bromide absorption refrigeration unit 3 is connected to the cold water inlet of the building cooling equipment 13. The return water of the building cooling equipment 13 flows out and is divided into three branches. The first branch flows into the return water inlet of the lithium bromide absorption refrigeration unit 3, and the second branch flows into the return water inlet of the lake water source heat pump unit 4. The cold water outlet of the lake water source heat pump unit 4 is combined with the cold water outlet of the lithium bromide absorption refrigeration unit 3 and then communicated with the cold water inlet of the building cooling equipment 13. The third return water of the building cooling equipment 13 is communicated with the return water inlet of the ice-making plate heat exchanger 7.

[0046] The cold water outlet of the dual-mode chiller 5 is divided into two branches, one of which is connected to the cold water inlet of the ice-making plate heat exchanger 7, and the other is connected to the cold water inlet of the ice storage device 6. The cold water outlet of the ice storage device 6 is connected to the first cold water inlet of the first ice-melting plate heat exchanger 8 and the first cold water inlet of the second ice-melting plate heat exchanger 9, and the return water outlet of the first ice-melting plate heat exchanger 8 and the return water outlet of the second ice-melting plate heat exchanger 9 are both connected to the return water inlet of the ice storage device 6. The second cold water inlet of the first ice-melting plate heat exchanger 8 is connected to the cold water outlet of the ice-making plate heat exchanger 7, and the second cold water inlet of the second ice-melting plate heat exchanger 9 is connected to the cold water outlet of the lithium bromide absorption refrigeration unit 3, and the cold water outlet of the first ice-melting plate heat exchanger 8 and the cold water outlet of the second ice-melting plate heat exchanger 9 are connected to the cold water inlet of the building cooling equipment 13. The return water outlet of the ice storage device 6 is communicated with the return water inlet of the dual-mode chiller 5. The return water outlet of the ice-making plate heat exchanger 7 is communicated with the inlet of the dual-mode chiller 5.

[0047] The lake water inlet of the lake water source heat pump unit 4 and the dual-mode chiller 5 is connected to the lake water, and the lake water outlet of the lake water source heat pump unit 4 and the dual-mode chiller 5 is also connected to the lake water.

[0048] The internal combustion unit 1 can use natural gas as fuel to input into the internal combustion unit 1 to generate electricity. The high-temperature flue gas from the outlet of the internal combustion unit 1 enters the lithium bromide absorption refrigeration unit 3 for refrigeration, and the insufficient building cooling capacity is provided by the lake water source heat pump unit 4 and the dual-mode chiller 5, so that the lake water source heat pump unit 4 and the lithium bromide absorption refrigeration unit 3 and the dual-mode chiller 5 can operate in a multi-energy complementary manner to meet the building cooling demand. During the day, the ice storage device 6 is used for cooling first, and the return water on the user side flows through the ice-making plate heat exchanger 7 for cooling, and then flows through the first ice-melting plate heat exchanger 8 to the set temperature for supply to the user. The lake water source heat pump unit 4 and the lithium bromide absorption refrigeration unit 3 are turned on for the insufficient part, and the return water on the user side flows through the lake water source heat pump unit 4 and the lithium bromide absorption refrigeration unit 3 for cooling, and then flows through the second ice-melting plate heat exchanger 9 to the set temperature for supply to the user. At night, taking advantage of the off-peak electricity price, the dual-mode chiller 5 is fully loaded to produce liquid ice. The lake water source heat pump unit 4 and the lithium bromide absorption refrigeration unit 3 provide cooling for the building, and the insufficient part is provided by the ice storage device 6. At the same time, the power consumption of the units and building terminal equipment is monitored in real time through the signal feedback network to control the transmission of power.

[0049] The heat of the heated flue gas of the internal combustion unit 1 is heat-exchanged with the return water of the lithium bromide absorption refrigeration unit in the lithium bromide absorption refrigeration unit, so that the temperature of the return water of the lithium bromide absorption refrigeration unit 3 is lower than the temperature of the cold water of the lithium bromide absorption refrigeration unit 3. Similarly, the temperature of the cold water flowing out of the cold water outlet of the lake water source heat pump unit 4 is lower than the temperature of the return water flowing into the return water inlet. Similarly, the return water flowing out of the return water inlet of the dual-mode chiller 5, the ice storage device 6, the ice-making plate heat exchanger 7, the first ice-melting plate heat exchanger 8, and the second ice-melting plate heat exchanger 9 is higher than the temperature of the cold water flowing out of the respective cold water outlets.

[0050] The flow rates of the lake water inlet and the lake water outlet of the lake water source heat pump unit 4 are set according to actual demand, and the flow rates of the lake water inlet and the lake water outlet of the dual-mode chiller unit 5 are also set according to actual demand. Generally, the flow rates of the lake water inlet and the lake water outlet are the same. The flow rates of the heating flue gas flowing from the internal combustion unit 1 into the lithium bromide absorption refrigeration unit 3 and the heating flue gas ejected from the lithium bromide absorption refrigeration unit 3 are also the same.

[0051] like Figure 3 As shown, it is a schematic diagram of the operation of the regional distributed energy system and lake water source heat pump composite energy supply system provided by this application in winter.

[0052] The waste heat boiler 11, the lake water source heat pump unit 4, the smoke-water heat exchanger 10 and the phase change heat storage device 15 are connected in series. The heating smoke inlet of the waste heat boiler 11 is connected to the heating smoke outlet of the internal combustion unit 1, the return water inlet of the waste heat boiler 11 is connected to the return water outlet of the building heating equipment 14, the hot water outlet of the waste heat boiler 11 is connected to the hot water inlet of the building heating equipment 14, the heating smoke outlet of the waste heat boiler 11 is connected to the heating smoke inlet of the smoke-water heat exchanger 10, and the hot water pipe of the lake water source heat pump unit 4 is connected to the hot water inlet of the building heating equipment 14 after heat exchange with the heating smoke through the smoke-water heat exchanger 10. The heating smoke inlet of the phase change heat storage device 15 is connected to the heating smoke outlet of the smoke-water heat exchanger 10, and the heating smoke outlet of the smoke-water heat exchanger 10 is connected to the hot water inlet of the building heating equipment 14.

[0053] The waste heat boiler 11 is used to absorb the waste heat of the internal combustion engine unit 1 to produce hot water and then provide it to the building heating equipment 14; the smoke-water heat exchanger 10 is used to absorb the waste heat of the waste heat boiler 11 to reheat the outlet water of the lake water source heat pump unit 4 and then provide it to the building heating equipment 14. The phase change heat storage device 15 is used to absorb the waste heat at the outlet of the smoke-water heat exchanger 10 and store it in the phase change heat storage tank, and gradually release the stored heat energy according to the heat demand during the peak heat or electricity consumption period.

[0054] Natural gas enters the internal combustion unit 1, burns, expands, and generates electricity, which is used for the operation of the unit and the terminal equipment of the building. The high-temperature flue gas from the internal combustion unit 1 enters the waste heat boiler 11 for heating, and the flue gas from the waste heat boiler 11 enters the smoke-water heat exchanger 10 to reheat the outlet water on the air-conditioning side of the lake water source heat pump unit 4 to the set temperature for supply to the user. The phase change heat storage device 15 stores the excess heat in the phase change heat storage tank, and gradually releases the stored heat energy according to the building's heat demand during the peak heating or electricity consumption period, so as to maximize the utilization of waste heat and meet the building's heat demand in winter. The insufficient building heat energy is supplemented by the gas boiler 12 to ensure a stable supply of building heat energy. The gas boiler 12 plays the role of peak heating in the building in winter. At the same time, the power consumption of the unit and the building terminal equipment is monitored in real time through the signal feedback network to control the transmission of electricity.

[0055] The lake water source heat pump unit 4 used in the energy supply system of the regional distributed energy system and the lake water source heat pump composite provided by the present application in winter and summer can be the same device. The cold capacity and cold source described in the present application are cold water, and the heat and heat source are hot water. The cold capacity, cold source, heat and heat source are all a kind of carrier. The connection between each unit is connected by pipeline.

[0056] The present invention has the following beneficial effects:

[0057] 1. The regional distributed energy system and lake water source heat pump composite energy supply system provided by the present invention comprehensively utilizes multiple energy technologies such as heat energy generated by the internal combustion engine 1, natural gas energy, and renewable energy such as lake water. By jointly operating the three energy systems, the advantages of each are brought into play, the stability of the system energy supply is ensured, and the system operating costs are greatly reduced.

[0058] 2. The energy supply system of the regional distributed energy system and the lake water source heat pump provided by the present invention fully considers the low-peak electricity price at night, uses the ice storage device 6 to store cold at night, and releases cold energy during the day to achieve peak shifting and valley filling, further improves the flexibility of the composite energy supply system, and greatly improves energy utilization efficiency.

[0059] 3. The regional distributed energy system and lake water source heat pump composite energy supply system provided by the present invention realizes the cascade utilization of energy by realizing power generation in the high temperature section, cooling or heating in the medium temperature section, and recycling the waste heat in the low temperature section by using the energy step by step and multiple times, thereby improving the performance efficiency of the entire internal combustion unit.

[0060] 4. The energy supply system of the regional distributed energy system and the lake water source heat pump provided by the present invention utilizes the waste heat discharged by the distributed energy system to reheat the lake water source heat pump system, thereby improving the outlet water temperature of the lake water source heat pump unit 4 and further improving the heating efficiency of the lake water source heat pump system.

[0061] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A regional distributed energy system and lake water source heat pump composite energy supply system, It is characterized in that The invention comprises an internal combustion engine (1), a lithium bromide absorption refrigeration unit (3), a lake water source heat pump unit (4) and a building cooling device (13); the internal combustion engine (1) is used to generate electricity to supply power to a power terminal (2); the lithium bromide absorption refrigeration unit (3) is used to absorb the waste heat of the internal combustion engine (1) to cool the water and then provide it to the building cooling device (13); the lake water source heat pump unit (4) is used to cool the return water of the building cooling device and then provide it to the building cooling device (13); The heating flue gas inlet of the lithium bromide absorption refrigeration unit (3) is connected to the heating flue gas outlet of the internal combustion engine unit (1), the cold water outlet of the lithium bromide absorption refrigeration unit (3) is connected to the cold water inlet of the building cooling equipment (13), the return water of the building cooling equipment (13) flows out and is divided into two branches, one branch flows into the return water inlet of the lithium bromide absorption refrigeration unit (3), and the other branch flows into the return water inlet of the lake water source heat pump unit (4), the cold water outlet of the lake water source heat pump unit (4) and the cold water outlet of the lithium bromide absorption refrigeration unit (3) are combined and connected to the cold water inlet of the building cooling equipment (13); The energy supply system further comprises a waste heat boiler (11), a smoke-water heat exchanger (10) and a building heating device (14); the heating smoke inlet of the waste heat boiler (11) is connected to the heating smoke outlet of the internal combustion engine unit (1); the return water inlet of the waste heat boiler (11) is connected to the return water outlet of the building heating device (14); the hot water outlet of the waste heat boiler (11) is connected to the hot water inlet of the building heating device (14); the heating smoke outlet of the waste heat boiler (11) is connected to the heating smoke inlet of the smoke-water heat exchanger (10); and the hot water pipe of the lake water source heat pump unit (4) passes through the smoke-water heat exchanger (10) and is connected to the hot water inlet of the building heating device (14); The waste heat boiler (11) is used to absorb waste heat from the internal combustion engine unit (1) to produce hot water and then provide it to the building heating equipment (14); the smoke-water heat exchanger (10) is used to absorb waste heat from the waste heat boiler (11) to reheat the outlet water of the lake water source heat pump unit (4) and then provide it to the building heating equipment (14); The energy supply system further comprises a phase change heat storage device (15), the phase change heat storage device (15) being used to store the waste heat absorbed at the outlet of the smoke-water heat exchanger (10) in a phase change heat storage tank, and gradually releasing the stored heat energy according to the heat demand during the peak heat consumption period or the peak electricity consumption period, the heating smoke inlet of the phase change heat storage device (15) being connected to the heating smoke outlet of the smoke-water heat exchanger (10), and the heating smoke outlet of the smoke-water heat exchanger (10) being connected to the hot water inlet of the building heating equipment (14); The energy supply system further comprises a gas boiler (12), the hot water outlet of the gas boiler (12) being connected to the hot water inlet of the building heating equipment (14), the return water inlet of the gas boiler (12) being connected to the return water outlet of the building heating equipment (14), and the gas boiler (12) being used to produce hot water and provide it to the building heating equipment (14).

2. The energy supply system according to claim 1, It is characterized in that The energy supply system further comprises a dual-mode chiller (5) and an ice storage device (6); the dual-mode chiller (5) is used to cool the return water of the building cooling equipment (13) and then provide a cold source for the building cooling equipment (13); the dual-mode chiller (5) is also used to prepare slurry ice and store it in the ice storage device (6); the ice storage device (6) is used to store slurry ice and release the cold energy of the slurry ice to provide a cold source for the building cooling equipment (13); the dual-mode The return water inlet of the chiller (5) is connected to the return water outlet of the building cooling equipment (13); the cold water outlet of the dual-mode chiller (5) is divided into two branches, one branch is connected to the cold water inlet of the building cooling equipment (13), and the other branch is connected to the cold water inlet of the ice storage device (6); the cold water outlet of the ice storage device (6) is connected to the cold water inlet of the building cooling equipment (13), and the return water outlet of the ice storage device (6) is connected to the return water inlet of the dual-mode chiller (5).

3. The energy supply system according to claim 2, It is characterized in that The energy supply system further comprises an ice plate heat exchanger (7), which is used to cool the return water of the building cooling equipment (13) through the dual-mode chiller (5); the return water inlet of the ice plate heat exchanger (7) is connected to the return water outlet of the building cooling equipment (13), the return water outlet of the ice plate heat exchanger (7) is connected to the inlet of the dual-mode chiller (5), the cold water inlet of the ice plate heat exchanger (7) is connected to the cold water outlet of the dual-mode chiller (5), and the cold water outlet of the ice plate heat exchanger (7) is connected to the cold water inlet of the building cooling equipment (13).

4. The energy supply system according to claim 3, It is characterized in that The energy supply system further comprises a first ice-melting plate heat exchanger (8), a first cold water inlet of the first ice-melting plate heat exchanger (8) being connected to a cold water outlet of the ice storage device (6), a second cold water inlet of the first ice-melting plate heat exchanger (8) being connected to a cold water outlet of the ice-making plate heat exchanger (7), and a cold water outlet of the first ice-melting plate heat exchanger (8) being connected to a cold water inlet of the building cooling equipment (13); the first ice-melting plate heat exchanger (8) is used to further cool the cold water cooled by the ice-making plate heat exchanger (7) by using the fluidized ice stored in the ice storage device (6).

5. The energy supply system according to claim 3, It is characterized in that The energy supply system further comprises a second ice-melting plate heat exchanger (9), which is used to utilize an ice storage device (6) to re-cool the outlet water of the lithium bromide absorption refrigeration unit (3) and the lake water source heat pump unit (4) and then provide the outlet water to the building cooling equipment (13); a first cold water inlet of the second ice-melting plate heat exchanger (9) is connected to the cold water outlet of the ice storage device (6), a second cold water inlet of the second ice-melting plate heat exchanger (9) is connected to the cold water outlet of the lithium bromide absorption refrigeration unit (3), and the cold water outlet of the lithium bromide absorption refrigeration unit (3) is connected to the cold water inlet of the building cooling equipment (13).

Citation Information

Patent Citations

  • Hybrid type energy supply system coupling natural gas based distributed energy source system with ground source heat pump

    CN103256754A

  • Energy supply system combining regional distributed energy system and lake water source heat pump

    CN211695491U