A positioning device and positioning method for pre-embedded construction of exposed connecting steel bars in vertical structure of prefabricated building transfer layer
By using positioning devices such as T-shaped skeleton beams, steel bar positioning components and pipeline positioning components in prefabricated buildings, the problems of low positioning accuracy and low construction efficiency in traditional positioning methods are solved, achieving higher positioning accuracy and construction safety. It expands the vibrating space and improves construction efficiency and safety.
Patent Information
- Application Number
- CN202010292226.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-04-14
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2040-04-14
AI Technical Summary
In prefabricated buildings, traditional positioning devices and methods lead to low accuracy and large errors in pre-embedded positioning of connecting steel bars, low construction efficiency, low reuse rate, and small vibrating space, which affects the positioning of embedded pipelines and leads to prefabricated components. Hoisting speed and construction safety are affected.
A positioning device including a T-shaped skeleton beam, steel bar positioning component and pipeline positioning component is used to achieve accurate positioning of the connecting steel bars through elastic steel sheets, locking bolts and clamps, and the pipeline is positioned through the clamping plate and slot to ensure accurate positioning performance and construction efficiency.
It improves the accuracy and construction efficiency of pre-buried positioning of connecting steel bars, expands the vibration space, assists in pipeline positioning, and improves the safety and construction speed of pre-buried construction of exposed connecting steel bars in the vertical structure of the transfer layer of prefabricated buildings.
Smart Images

Figure CN111395656B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a positioning device and a positioning method for the pre-embedded construction of exposed connecting steel bars in the vertical structure of the transition layer of an assembled building. The positioning device and the positioning method are used in the pre-embedded construction process of the exposed connecting steel bars in the vertical structure of the transition layer of an assembled building to ensure accurate pre-embedded positioning of the connecting steel bars, optimize construction procedures, and facilitate construction, and belong to the field of construction engineering. Background Art
[0002] The connection between vertical structures in prefabricated concrete structures is often achieved by grouting sleeve connection. When converting the cast-in-place concrete layer to the prefabricated layer, it is necessary to embed connecting steel bars in the lower layer (cast-in-place concrete layer) so that the connecting steel bars are exposed in the cast-in-place layer and correspond one-to-one with the sleeve positions of the upper prefabricated components. The accuracy of the embedded positioning of the connecting steel bars directly affects the speed of hoisting of prefabricated components and the safety of prefabricated building construction.
[0003] However, in actual construction, the traditional positioning devices and positioning methods have low accuracy and large errors in pre-embedded positioning, and the positioning construction is cumbersome. The exposed length of the connecting steel bars is difficult to control, and secondary repairs are required, which has low construction efficiency. At the same time, the positioning device has a large amount of auxiliary materials and a low reuse rate. In addition, due to the small space of the vibration hole, the vibration during the concrete pouring process is prone to cause the positioning device to deviate. The positioning device also often affects the positioning of the pre-embedded pipeline, making it difficult to connect the pre-embedded pipeline with the pipeline in the prefabricated component. Summary of the invention
[0004] The purpose of the present invention is to overcome the deficiencies of the above-mentioned prior art and devices, and to provide a positioning device and a positioning method for the pre-embedded construction of exposed connecting steel bars in the vertical structure of the transition layer of an assembled building. The positioning device has a simple and reliable structure, strong applicability, and a high reuse rate, which ensures accurate pre-embedded positioning of the connecting steel bars, optimizes construction procedures, facilitates construction, expands the vibration space, and assists in pipeline positioning.
[0005] The object of the present invention is achieved by providing a positioning device for the pre-embedded construction of exposed connecting steel bars of the vertical structure of the transfer layer of an assembled building, characterized in that it comprises a T-shaped skeleton beam, a steel bar positioning assembly, and a pipeline positioning assembly;
[0006] The T-shaped skeleton beam comprises a T-shaped beam, a stiffening plate, a positioning hole, and a fixing bolt. The stiffening plate is fixedly connected to the flange plate and the web plate of the T-shaped beam, and the positioning hole is arranged on the flange plate of the T-shaped beam.
[0007] The steel bar positioning assembly comprises an elastic steel sheet, a locking bolt, a clamp, a first fixing hole, and a locking hole. The clamp is arranged and fixed at the end of the elastic steel sheet, the first fixing hole is arranged on the elastic steel sheet, the locking hole is arranged on the clamp, and the locking bolt is passed through and screwed on the locking hole; the fixing bolt passes through the first fixing hole on the steel bar positioning assembly and the positioning hole on the T-shaped frame beam and is screwed and fixed, so that the elastic steel sheet is fixedly connected to the T-shaped frame beam;
[0008] The pipeline positioning assembly includes a positioning plate, a positioning groove, and a second fixing hole. The positioning groove and the second fixing hole are both arranged on the positioning plate. The fixing bolt passes through the second fixing hole on the pipeline positioning assembly and the positioning hole on the T-shaped skeleton beam and is tightened to fix the positioning plate and the T-shaped skeleton beam.
[0009] The T-beam is in the shape of a straight line, an L-shape or a ring shape.
[0010] Clamps are arranged at both ends or one end of the elastic steel sheet. The clamp is cylindrical, and the inner side of the clamp is serrated. A locking hole is arranged on the side wall of the clamp, and a locking bolt passes through the locking hole.
[0011] The locking plate is provided with one or more locking grooves.
[0012] A method for positioning a positioning device for pre-embedded construction of exposed connecting steel bars in a vertical structure of a prefabricated building transfer layer, characterized in that it comprises the following steps:
[0013] Step 1) Construction preparation: According to the basic modulus of the connecting steel bar spacing, determine the location of the positioning hole, determine the specifications of the elastic steel sheet, including the length of the elastic steel sheet and the diameter of the clamp, and determine the location and size of the positioning slot;
[0014] Step 2), assembling the positioning device: according to the exposed connecting steel bar embedded drawings and pipeline drawings of the vertical structure of the conversion layer, assemble the T-shaped frame beam, the steel bar positioning assembly and the pipeline positioning assembly through the positioning holes, fixing bolts, the first fixing holes and the second fixing holes to match the steel bars and pipelines at the conversion parts of each cast-in-place structure and the prefabricated structure; the fixing bolts pass through the first fixing holes on the steel bar positioning assembly and the positioning holes on the T-shaped frame beam and are tightened and fixed, so that the elastic steel sheet is fixedly connected to the T-shaped frame beam; the fixing bolts pass through the second fixing holes on the pipeline positioning assembly and the positioning holes on the T-shaped frame beam and are tightened and fixed, so that the clamping plate is fixedly connected to the T-shaped frame beam;
[0015] Step 3) Assembly of connecting steel bars: according to the design requirements, cut the connecting steel bars to the specified length and mark the exposed length on the connecting steel bars; according to the marked position, pass the connecting steel bars through the clamp, screw the locking bolts on the locking holes, and use a torque wrench to tighten the locking bolts to fix the connecting steel bars;
[0016] Step 4) Positioning: Preliminarily determine the position of the prefabricated components, set horizontal and vertical control lines, and after the steel mesh skeleton of the cast-in-place concrete layer is tied, preliminarily position the positioning device that fixes the connecting steel bars, adjust the elevation and plane position of the positioning device, and preliminarily tie and fix the positioning device to the steel mesh skeleton of the cast-in-place concrete layer;
[0017] Step 5) Connecting steel bars and fixing them: Place the positioning bars one by one, and weld or tie them to the structural steel bars and connecting steel bars respectively to ensure the effective fixing of the connecting steel bars;
[0018] Step 6) Pipeline positioning: pass the pre-buried water, electricity, heating and ventilation pipelines through the corresponding slots, adjust the posture of each water, electricity, heating and ventilation pipeline to avoid serious squeezing and deformation of the pipelines, and protect the pipeline joints of the water, electricity, heating and ventilation pipelines;
[0019] Step 7) Review and Correction: Review the position and elevation of the positioning device, the spacing between connecting steel bars, the diameter of connecting steel bars, the exposed length of connecting steel bars, the number and position of water, electricity, heating and ventilation pipelines to ensure the accuracy of the construction; after the concrete is poured, before the concrete begins to set, check the position of the positioning device again, and correct any deviation in time;
[0020] Step 8) Positioning device removal: After the cast-in-place concrete is removed from the formwork, use a torque wrench to loosen the locking bolts, lift the positioning device upward as a whole, and separate the positioning device from the connecting steel bars;
[0021] Step 9) Adjustment and turnover of positioning components: After the pre-embedded construction of the connecting steel bars in the construction section is completed, adjust the position, quantity and specifications of the steel bar positioning components and pipeline positioning components according to the design drawings, reassemble the positioning device according to step 2) and put it into use in the next construction section.
[0022] In the step 1), the specification of the elastic steel sheet is determined according to the spacing between the embedded steel bars and the diameter of the connecting steel bars, and is used in conjunction with connecting steel bars of various diameters to ensure the accuracy of the embedded position of the connecting steel bars.
[0023] In the step 2), the specifications and quantity of the steel bar positioning components and pipeline positioning components in the positioning device are arranged as needed according to design requirements, and the diameters of the positioning holes, the first fixing holes, and the second fixing holes are larger than the outer diameters of the fixing bolts.
[0024] In the step 3), the inner diameter of the clamp is 4 mm larger than the diameter of the embedded steel bar to facilitate the passing of the connecting steel bar and accurate positioning; by adjusting the clamping position of the connecting steel bar on the clamp and the elevation of the positioning device, the exposed length of the connecting steel bar can be accurately controlled while ensuring that the positioning device does not enter the cast-in-place concrete.
[0025] In step 5), the length of the positioning reinforcement should be moderate, the welding or binding should be firm, and during the connection process, the connection should be carried out symmetrically and at intervals from the middle of the positioning device to both sides.
[0026] The present invention has a reasonable and simple structure, is easy to manufacture and manufacture, and is convenient to use. Through the present invention, a positioning device for the pre-embedded construction of exposed connecting steel bars of the vertical structure of the transition layer of an assembled building is provided, comprising a T-shaped skeleton beam, a steel bar positioning assembly, and a pipeline positioning assembly; the T-shaped skeleton beam comprises a T-shaped beam, a stiffening plate, a positioning hole, and a fixing bolt, and the stiffening plate is fixedly connected to the flange and web of the T-shaped beam; the steel bar positioning assembly comprises an elastic steel sheet, a locking bolt, a clamp, a first fixing hole, and a locking hole, and the elastic steel sheet passes through the first fixing hole and the positioning hole through the fixing bolt and is fixedly connected to the T-shaped skeleton beam; the pipeline positioning assembly comprises a clamping plate, a clamping groove, and a second fixing hole, and the clamping plate passes through the second fixing hole and the positioning hole through the fixing bolt and is fixedly connected to the T-shaped skeleton beam.
[0027] The method of the present invention is advanced and scientific, and the positioning device has a simple and reliable structure, strong applicability, and high reuse rate. It ensures accurate pre-embedded positioning of exposed connecting steel bars in the vertical structure of the transition layer of the prefabricated building, optimizes the construction process, and facilitates construction. It expands the vibration space, assists in pipeline positioning, increases the turnover of the positioning device, and improves the construction efficiency of the pre-embedded construction of exposed connecting steel bars in the vertical structure of the transition layer of the prefabricated building, ensuring the speed of hoisting of prefabricated components of the transition layer and the safety of construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a structural schematic diagram of the positioning device of the present invention;
[0029] Figure 2 It is a schematic diagram of the T-shaped skeleton beam structure;
[0030] Figure 3 It is a schematic diagram of the structure of the steel bar positioning component;
[0031] Figure 4 It is a schematic diagram of the positioning method of the present invention;
[0032] Among them, 1 T-shaped skeleton beam, 2 steel bar positioning components, 3 pipeline positioning components, 11 T-shaped beam, 12 stiffening plate, 13 positioning holes, 14 fixing bolts, 21 elastic steel sheets, 22 locking bolts, 23 clamps, 24 first fixing holes, 25 locking holes, 31 positioning plates, 32 positioning grooves, 33 second fixing holes, 4 connecting steel bars, 5 steel mesh skeletons, 51 structural steel bars, 6 positioning measure bars, 7 water, electricity, HVAC pipelines, and 71 pipeline joints. DETAILED DESCRIPTION
[0033] The present invention will be described in detail below with reference to the accompanying drawings.
[0034] like Figure 1As shown, the positioning device of the present invention is composed of a T-shaped skeleton beam 1, a steel bar positioning component 2, and a pipeline positioning component 3; the T-shaped skeleton beam 1 serves as a carrier of the entire device to provide support, and the steel bar positioning component 2 and the pipeline positioning component 3 are respectively used for connecting the steel bars and positioning the pipelines.
[0035] like Figure 2 As shown, the T-shaped skeleton beam 1 includes a T-shaped beam 11, a stiffening plate 12, a positioning hole 13, and a fixing bolt 14; the shape and size of the T-shaped beam 11 match the distribution form of the connection nodes of the prefabricated components, and can be in various forms such as "I" type, "L" type, and ring type; the stiffening plate 12 is adjusted according to the overall stiffness requirements to ensure the stability of the device; the positioning holes 13 and the fixing bolts 14 are used to fix the steel bar positioning assembly and the pipeline positioning assembly.
[0036] like Figure 3 As shown, the steel bar positioning assembly 2 includes an elastic steel sheet 21, a locking bolt 22, a clamp 23, a first fixing hole 24, and a locking hole 25; the two ends or one end of the elastic steel sheet 21 are clamps 23, the clamp 23 is cylindrical, the inner side of the cylinder is serrated, and the side wall of the clamp has a locking hole 25, and the locking bolt 22 passes through the locking hole for locking the steel bar.
[0037] like Figure 4 As shown, a positioning method for pre-embedded construction of exposed connecting steel bars of the vertical structure of the transfer layer of an assembled building, the steps are as follows:
[0038] Step 1, construction preparation: according to the basic modulus of the spacing of the connecting steel bars 4, determine the position of the positioning hole 13, according to the diameter and position of the connecting steel bars 4, determine the specifications of the elastic steel sheet 21, the positioning spacing is adjusted by the length of the elastic steel sheet 21, the inner diameter of the clamp 23 is 4mm larger than the diameter of the clamped connecting steel bars 4; determine the position and size of the clamping slot 32;
[0039] Step 2, assembling the positioning device: according to the exposed connecting steel bar pre-embedded drawings and pipeline drawings of the transfer layer vertical structure, select the steel bar positioning components 2 and pipeline positioning components 3 of matching size and quantity, and assemble them to the T-shaped skeleton beam 1 through the positioning holes 13, fixing bolts 14, first fixing holes 24, and second fixing holes 33 to form a complete positioning device;
[0040] Step 3, assembling the connecting steel bars: according to the design requirements, clarify the exposed length, complete the cutting of the connecting steel bars 4 at each position, and mark the exposed length on the connecting steel bars 4; pass the connecting steel bars 4 through the clamp 23, adjust the clamping position of the connecting steel bars 4 and the elevation of the positioning device, and accurately control the exposed length of the connecting steel bars 4 on the premise of ensuring that the positioning device does not enter the cast-in-place concrete, tighten the locking bolts 22 with a torque wrench, fix the steel bars 4, and fix all the connecting steel bars 4 to be positioned in the same way;
[0041] Step 4, positioning: preliminarily determine the position of the prefabricated component, set the horizontal and vertical control lines, and after the steel mesh skeleton 5 of the cast-in-place concrete layer is tied, preliminarily position the positioning device fixed with the connecting steel bars 4, adjust the elevation and plane position of the positioning device for precise positioning, and finally, preliminarily tie and fix the positioning device to the steel mesh skeleton 5 of the cast-in-place concrete layer;
[0042] Step 5, connecting steel bars and fixing: place the positioning bars 6 one by one, and respectively weld or tie them to the structural steel bars 51 and the connecting steel bars 4; the length of the positioning bars 6 should be moderate, and the welding or tying should be firm. During the connection process, start from the middle of the positioning device to both sides symmetrically and at intervals, and do not damage the connecting bars 4 and the structural steel bar positions 51 to ensure the effective fixation of the connecting steel bars 4;
[0043] Step 6, pipeline positioning: During the construction of water, electricity, heating and ventilation pipelines, the water, electricity, heating and ventilation pipelines 7 embedded in the main structure are passed through the corresponding positioning grooves 32, and the postures of the water, electricity, heating and ventilation pipelines 7 are adjusted to avoid serious squeezing and deformation of the water, electricity, heating and ventilation pipelines 7, and plastic caps or tapes are used to protect the pipeline joints 71 to prevent contamination of the poured concrete;
[0044] Step 7, review and correction: After the positioning device of the construction section is positioned, re-check the position and elevation of the positioning device, the spacing of the connecting steel bars 4, the diameter of the connecting steel bars 4, the exposed length of the connecting steel bars 4, the number and position of the water, electricity, heating and ventilation pipelines 7 to ensure the accuracy of the construction; and after the concrete is poured and before the concrete is initially set, check the position of the positioning device again, and correct any deviation in time;
[0045] Step 8, dismantling the positioning device: After the cast-in-place concrete is demolded, use a torque wrench to loosen each locking bolt 22, lift the positioning device upward as a whole, and separate the positioning device from the connecting steel bar 4;
[0046] Step 9, adjustment and turnover of positioning components: After the pre-embedded construction of the connecting steel bars in the construction section is completed, adjust the position, quantity and specifications of the steel bar positioning component 2 and the pipeline positioning component 3 according to the design drawings, reassemble the positioning device according to step 2, and put it into use in the next construction section.
[0047] In the present invention, the positioning device is composed of a T-shaped skeleton beam 1, a steel bar positioning component 2, and a pipeline positioning component 3. The device skeleton has large rigidity and strong integrity. The positioning device can be reused by combining the steel bar positioning component 2 and the pipeline positioning component 3.
[0048] By locking the connecting steel bars 4, the positioning device is first fixed to the connecting steel bars 4 and then fixed as a whole to the lower steel skeleton mesh 5. This can accurately control the exposed length of the connecting steel bars 4 and improve construction efficiency. The pipeline positioning component 3 can be used to position the water, electricity, heating and ventilation pipelines 7. At the same time, since the entire positioning device is a skeleton type and occupies a small area, the vibration space of the concrete is expanded, and there is no need to set special vibration holes, which facilitates construction and reduces damage to the positioning device.
[0049] Those skilled in the art should realize that the above-mentioned specific embodiments are only exemplary, and are intended to enable those skilled in the art to better understand the content of this patent. They should not be understood as limiting the scope of protection of the present invention. Any equivalent changes or modifications made based on the spirit disclosed by the present invention shall fall within the scope of protection of this patent.
Claims
1. A positioning method for pre-embedded construction of exposed connecting steel bars in the vertical structure of the transfer layer of an assembled building, characterized in that: It includes a T-shaped skeleton beam (1), a steel bar positioning component (2), and a pipeline positioning component (3); The T-shaped skeleton beam (1) comprises a T-shaped beam (11), a stiffening plate (12), a positioning hole (13), and a fixing bolt (14); the stiffening plate (12) is fixedly connected to the flange plate and the web plate of the T-shaped beam (11); and the positioning hole (13) is provided on the flange plate of the T-shaped beam (11); The steel bar positioning assembly (2) comprises an elastic steel sheet (21), a locking bolt (22), a clamp (23), a first fixing hole (24), and a locking hole (25); the clamp (23) is arranged and fixed to the end of the elastic steel sheet (21); the first fixing hole (24) is arranged on the elastic steel sheet (21); the locking hole (25) is arranged on the clamp (23); the locking bolt (22) is passed through and screwed on the locking hole (25); the fixing bolt (14) passes through the first fixing hole (24) on the steel bar positioning assembly (2) and the positioning hole (13) on the T-shaped skeleton beam (1) and is screwed and fixed, so that the elastic steel sheet (21) is fixedly connected to the T-shaped skeleton beam (1); The pipeline positioning assembly (3) comprises a positioning plate (31), a positioning groove (32), and a second fixing hole (33); the positioning groove (32) and the second fixing hole (33) are both provided on the positioning plate (31); a fixing bolt (14) passes through the second fixing hole (33) on the pipeline positioning assembly (3) and the positioning hole (13) on the T-shaped skeleton beam (1) and is screwed and fixed, so that the positioning plate (31) is fixedly connected to the T-shaped skeleton beam (1); When positioning, the method is as follows: Step 1), construction preparation: according to the basic module of the spacing between the connecting steel bars (4), determine the position of the positioning hole (13), determine the specifications of the elastic steel sheet (21), including the length of the elastic steel sheet (21) and the diameter of the clamp (23), and determine the position and size of the positioning slot (32); Step 2), assembling the positioning device: according to the pre-embedded drawings of the exposed connecting steel bars of the vertical structure of the conversion layer and the drawings of the pipelines, assemble the T-shaped skeleton beam (1), the steel bar positioning assembly (2) and the pipeline positioning assembly (3) through the positioning holes (13), the fixing bolts (14), the first fixing holes (24) and the second fixing holes (33) to match the steel bars and pipelines at the conversion parts of the cast-in-place structure and the assembled structure; the fixing bolts (14) pass through the first fixing holes (24) on the steel bar positioning assembly (2) and the positioning holes (13) on the T-shaped skeleton beam (1) and are screwed and fixed, so that the elastic steel sheet (21) is fixedly connected to the T-shaped skeleton beam (1); the fixing bolts (14) pass through the second fixing holes (33) on the pipeline positioning assembly (3) and the positioning holes (13) on the T-shaped skeleton beam (1) and are screwed and fixed, so that the positioning plate (31) is fixedly connected to the T-shaped skeleton beam (1); Step 3) Assembling the connecting steel bars: according to the design requirements, cut the connecting steel bars (4) to the specified length and mark the exposed length on the connecting steel bars (4); according to the marked position, pass the connecting steel bars (4) through the clamp (23), screw the locking bolts (22) into the locking holes (25), and use a torque wrench to tighten the locking bolts (22) to fix the connecting steel bars (4); Step 4) Positioning: Preliminarily determine the position of the prefabricated component, set the horizontal and vertical control lines, and after the steel mesh skeleton (5) of the cast-in-place concrete layer is tied, preliminarily position the positioning device fixed with the connecting steel bars (4), adjust the elevation and plane position of the positioning device, and preliminarily tie and fix the positioning device to the steel mesh skeleton (5) of the cast-in-place concrete layer; Step 5) Connecting steel bars are fixed: positioning bars (6) are placed one by one, and are welded or tied to the structural steel bars (51) and the connecting steel bars (4) respectively to ensure that the connecting steel bars (4) are effectively fixed; Step 6) Pipeline positioning: pass the pre-buried water, electricity, heating and ventilation pipelines (7) through the corresponding positioning slots (32), adjust the posture of each water, electricity, heating and ventilation pipeline (7) to avoid serious compression and deformation of the pipeline, and protect the pipeline joints (71) of the water, electricity, heating and ventilation pipeline (7); Step 7) Review and Correction: Review the position and elevation of the positioning device, the spacing of the connecting steel bars (4), the diameter of the connecting steel bars (4), the exposed length of the connecting steel bars (4), the number and position of the water, electricity, heating and ventilation pipelines (7) to ensure the accuracy of the construction; after the concrete pouring is completed, before the concrete begins to set, check the position of the positioning device again, and correct any deviation in time; Step 8) Positioning device removal: After the cast-in-place concrete is removed from the formwork, use a torque wrench to loosen the locking bolts (22), lift the positioning device upward as a whole, and separate the positioning device from the connecting steel bar (4); Step 9) Adjustment and turnover of positioning components: After the pre-embedded steel bars of the construction section are completed, adjust the position, quantity and specifications of the steel bar positioning components (2) and pipeline positioning components (3) according to the design drawings, reassemble the positioning device according to step 2) and put it into use in the next construction section; A clamp (23) is provided at one or both ends of the elastic steel sheet (21), the clamp (23) is cylindrical, the inner side of the clamp (23) is serrated, a locking hole (25) is provided on the side wall of the clamp, and a locking bolt (22) passes through the locking hole (25); In the step 1), the specifications of the elastic steel sheet (21) are determined according to the pre-embedded steel bar spacing and the diameter of the connecting steel bar (4), and are used in conjunction with connecting steel bars (4) of various diameters to ensure the accuracy of the pre-embedded position of the connecting steel bar (4).
2. A positioning method for pre-embedded construction of exposed connecting steel bars in the vertical structure of the transfer layer of an assembled building according to claim 1, characterized in that: The T-shaped beam (11) is in the shape of a straight line, an L-shaped beam or a ring-shaped beam.
3. A positioning method for pre-embedded construction of exposed connecting steel bars in the vertical structure of the transfer layer of an assembled building according to claim 1, characterized in that: One or more locking slots (32) are provided on the locking plate (31).
4. A positioning method for pre-embedded construction of exposed connecting steel bars in the vertical structure of the transfer layer of an assembled building according to claim 1, characterized in that: In the step 2), the specifications and quantity of the steel bar positioning assembly (2) and the pipeline positioning assembly (3) in the positioning device are arranged as needed according to design requirements, and the diameters of the positioning hole (13), the first fixing hole (24), and the second fixing hole (33) are larger than the outer diameter of the fixing bolt (14).
5. A positioning method for pre-embedded construction of exposed connecting steel bars in the vertical structure of the transfer layer of an assembled building according to claim 1, characterized in that: In step 3), the inner diameter of the clamp (23) is 4 mm larger than the diameter of the embedded steel bar to facilitate the passing of the connecting steel bar (4) and accurate positioning; by adjusting the clamping position of the connecting steel bar (4) on the clamp (23) and the elevation of the positioning device, the exposed length of the connecting steel bar (4) is accurately controlled while ensuring that the positioning device does not enter the cast-in-place concrete.
6. A positioning method for pre-embedded construction of exposed connecting steel bars in the vertical structure of the transfer layer of an assembled building according to claim 1, characterized in that: In step 5), the length of the positioning reinforcement (6) should be moderate, and the welding or binding should be firm. During the connection process, the positioning reinforcement should be symmetrical and spaced from the middle of the positioning device to both sides.
Citation Information
Patent Citations
Prefabricated shear wall vertical steel bar positioning device
CN109403553A
Novel embedded wire box and construction method thereof
CN110593566A
Positioning device for embedded construction of exposed connecting steel bars of vertical structure of assembly type building transfer floor
CN212358861U