A temporary cross support for tunnel step method construction and its installation method
By designing prefabricated rod-shaped temporary cross supports and using hinged movable joints and fasteners to fix them, the problems of long installation time, loud dismantling noise, and inconvenient transportation in tunnel step method construction were achieved, achieving a fast, safe, and efficient construction and dismantling, reducing costs and pollution, and improving installation efficiency.
Patent Information
- Application Number
- CN202010268922.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-04-08
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2040-04-08
AI Technical Summary
In the existing tunnel step method construction, the traditional reinforced concrete cross supports take a long time to install, the demolition is noisy and dusty, and produces a large amount of construction waste and scrap steel. Oxygen welding and cutting in a small space are dangerous, and the prefabricated cross supports are It is inconvenient to transport and assemble in large-section tunnels.
Design a prefabricated rod-shaped temporary cross support, including a middle section and a movable section. The movable section is hinged at both ends of the middle section and can rotate around the hinge point and be fixed in a vertical or coaxial position. It is made of composite resin material. , fixed by fasteners to achieve quick installation and disassembly, and can be bent for easy transportation.
It achieves rapid installation, safe and efficient dismantling of tunnel step method construction, reduces construction costs and noise and dust pollution, improves transportation efficiency and installation efficiency, and reduces the need for staff experience.
Smart Images

Figure CN111396094B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of temporary tunnel support, and in particular to a temporary cross support for tunnel step method construction and an installation method thereof. Background Art
[0002] The three-step method is often used in large-section soft rock tunnels. After the steps are excavated step by step, the surrounding rock pressure of the tunnel increases, the bending moment and axial force of the support device gradually increase, and the primary support structure undergoes obvious sliding deformation into the tunnel. The traditional treatment method is to set up reinforced concrete cross supports, which require welding steel arch frames and pouring concrete. After the construction is completed, the concrete is broken with a handheld pneumatic pick, and the fixed rods and steel arch frames are cut off with oxy-welding. In this process, the cross supports cannot be reused. The problems with this method are: the installation process takes a long time; the demolition process is noisy and dusty, generating a large amount of construction waste and scrap steel; and there is a certain risk of oxy-welding and cutting operations in narrow spaces such as tunnels.
[0003] In addition, some existing prefabricated tunnel cross supports will cause problems such as extremely heavy cross supports, inconvenient transportation, and difficult assembly when the tunnel cross-section is large. Summary of the invention
[0004] The technical problem to be solved by the present invention is to overcome the shortcomings of the prior art and provide a temporary cross support for tunnel step construction that is suitable for step construction, is quick and easy to install and disassemble, is reusable and can reduce costs, as well as an installation method using the temporary cross support with simple steps.
[0005] In order to solve the above technical problems, the technical solution proposed by the present invention is:
[0006] A temporary cross support for tunnel step method construction, supported on the transverse chord of the main tunnel steel arch frame, with both ends connected to the main tunnel steel arch frame, the temporary cross support is a prefabricated rod-shaped cross support, including an intermediate section and two sections of movable sections, the two sections of the movable sections are respectively hinged at the two ends of the intermediate section, the movable sections can rotate around the hinge point and be fixed at a position perpendicular to the intermediate section and fixed at a position coaxial with the intermediate section.
[0007] As a further improvement of the temporary cross support of the above tunnel step method construction:
[0008] The non-hinged end of the movable joint is provided with a concave docking avoidance area matched with the end of the main hole steel arch frame, and the rotation plane of the movable joint around the hinge point is parallel to the cross section of the docking avoidance area.
[0009] The non-hinged end of the movable joint is provided with an avoidance gap for avoiding the end of the main hole steel arch frame. The bottom of the avoidance gap is provided with a docking steel plate that matches the cross-sectional shape of the end of the main hole steel arch frame. The docking steel plate and the avoidance gap are surrounded by the docking avoidance area.
[0010] The avoidance gap includes a top opening perpendicular to the end of the main hole steel arch frame, an end opening located at the end of the movable joint and a side opening located on the side of the movable joint. The side opening is located on the outside of the movable joint when the movable joint is perpendicular to the middle section.
[0011] Both ends of the middle section are provided with interfaces, which are two splints arranged in parallel at the ends of the middle section. The hinged end of the movable section is provided with a plug-in plate, and the width of the plug-in plate is not greater than the spacing between the two splints; the plug-in plate is inserted between the two splints of the interface to form a plug-in connection, and is hinged by the inserted hinge shaft.
[0012] The outer edges of the interface and the plugboard are both semicircular arcs with the hinge point as the center.
[0013] The plug plate is provided with at least one first through hole, and the clamping plate is provided with second through holes corresponding to the positions of the first through holes when the intermediate section and the movable section are coaxial, and the intermediate section and the movable section are fixed in a coaxial position by fasteners penetrating the first through holes and the second through holes.
[0014] The clamping plate is also provided with third through holes corresponding to the positions of the first through holes when the middle section and the movable section are vertical, and the middle section and the movable section are fixed in a vertical position by fasteners penetrating the first through holes and the third through holes.
[0015] The temporary cross support is made of composite resin material.
[0016] A method for installing a temporary cross support constructed using the tunnel step method, the steps comprising:
[0017] S1: Temporary cross supports for tunnel bench construction prefabricated in the factory;
[0018] S2: Rotate the movable joints to make the two movable joints perpendicular to the middle joint, insert the fasteners into the first through hole and the third through hole and fasten them, and then transport them to the construction site;
[0019] S3: After the main tunnel steel arch frame is constructed, a groove required for assembling the temporary cross support is pre-excavated, and the middle section of the temporary cross support in step S2 is installed in the groove;
[0020] S4: Remove the fasteners that penetrate into the first through hole and the third through hole, rotate the movable joint around the hinge point and make it coaxial with the middle joint, and penetrate the fasteners into the first through hole and the second through hole and tighten them;
[0021] S5: Connect the two ends of the movable joint to the ends of the main hole steel arch frame;
[0022] S6: Backfill the soil above the temporary transverse support to complete the installation.
[0023] S7: Before removing the temporary transverse support, dig out the soil covering the temporary transverse support.
[0024] S8: Remove the fasteners passing through the first through-hole and the second through-hole. The movable section rotates around the hinge point and is perpendicular to the intermediate section. Then, insert fasteners through the first through-hole and the third through-hole and tighten them.
[0025] S9: Transport the folded temporary transverse support to the next excavation section.
[0026] S10: Repeat steps S3 - S9 until the construction is completed.
[0027] Compared with the prior art, the advantages of the present invention are as follows:
[0028] The present invention provides a temporary transverse support applicable to the construction of the tunnel bench method. It is supported on the transverse chord of the main tunnel steel arch, and both ends are connected to the main tunnel steel arch, providing lateral support force for the initial support structure of the tunnel and preventing the initial support structure from sliding and deforming into the tunnel. Different from the existing cast-in-situ transverse support, the temporary transverse support of the present invention is a prefabricated rod-shaped transverse support that can be reused. Therefore, steps such as pouring are omitted during installation, saving construction materials such as steel supports and shotcrete, enabling rapid installation and timely force application; during demolition, steps such as oxyacetylene cutting are not required, which is not only faster, more convenient and efficient, but also improves safety performance, and does not generate noise, dust pollution and various wastes, thus reducing construction costs and having significant economic benefits.
[0029] For tunnels with a larger cross-section, the required transverse support is also longer. Therefore, when transporting the transverse support, the long rod-shaped transverse support has higher requirements for transportation tools, which will increase the required cost. However, the temporary transverse support for the tunnel bench method construction of the present invention includes an intermediate section and two movable sections. The two movable sections are respectively hinged at both ends of the intermediate section. The movable section can rotate around the hinge point and be fixed at a position perpendicular to the intermediate section and a position coaxial with the intermediate section. During transportation, only need to bend the transverse support into a "冂" shape, then it can be transported by general transportation tools, reducing costs and improving transportation efficiency.
[0030] In addition, when installing an integral transverse support, it is often necessary to connect both ends to the parts to be installed simultaneously, so the installation difficulty is large, the installation efficiency is low, and the installation experience requirements for workers are high. However, since the transverse support of the present invention can be bent, it can be installed at both ends sequentially during installation, reducing the installation difficulty, improving the installation efficiency, and reducing the installation experience requirements for workers. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 This is a schematic diagram of the connection between the temporary cross support and the main tunnel steel arch frame during tunnel step construction;
[0032] Figure 2 It is a schematic diagram of the docking avoidance area of the movable joint in the temporary cross support of the tunnel step method construction;
[0033] Figure 3 It is a schematic diagram of the coaxiality of the movable section and the intermediate section in the temporary cross support of the tunnel step method construction;
[0034] Figure 4 It is a schematic diagram of the verticality of the movable section and the intermediate section in the temporary cross support of the tunnel step method construction;
[0035] Figure 5 It is a structural diagram of the interface and plug-in plate in the temporary cross support of the tunnel step method construction.
[0036] Legend: 1. Main hole steel arch frame; 2. Intermediate section; 21. Interface; 211. Clamp; 212. Second through hole; 213. Third through hole; 3. Movable section; 31. Insert plate; 311. First through hole; 32. Docking avoidance area; 321. Docking steel plate. DETAILED DESCRIPTION
[0037] In order to facilitate the understanding of the present invention, the present invention will be described in more comprehensive and detailed manner below in conjunction with the accompanying drawings and preferred embodiments of the specification, but the protection scope of the present invention is not limited to the following specific embodiments.
[0038] Example:
[0039] like Figure 1 As shown, the temporary cross support of this embodiment suitable for tunnel step method construction is supported on the transverse chord of the main tunnel steel arch frame 1, and the two ends are connected to the main tunnel steel arch frame 1 to provide lateral support for the tunnel primary support structure to prevent the primary support structure from sliding and deforming into the tunnel. Different from the existing cast-in-place cross supports, the temporary cross supports of this embodiment are prefabricated rod-shaped cross supports, which are reusable cross supports. Therefore, the steps of pouring and the like are omitted during installation, and construction materials such as steel supports and shotcrete are saved, so that rapid installation and timely force can be achieved; there is no need to go through the steps of oxygen welding and cutting during dismantling, which is not only faster, more convenient and efficient, but also improves safety performance, and does not generate noise, dust pollution and various waste materials, thereby reducing construction costs and saving various energy sources.
[0040] Tunnels with a larger cross-section require longer transverse supports. Therefore, when transporting transverse supports, long rod-shaped transverse supports have higher requirements for transportation tools, which will increase the required costs. However, the temporary transverse support in this embodiment is a prefabricated rod-shaped transverse support, including an intermediate section 2 and two movable sections 3. The two movable sections 3 are respectively hinged to both ends of the intermediate section 2. The movable section 3 can rotate around the hinge point and be fixed at a position perpendicular to the intermediate section 2 and at a position coaxial with the intermediate section 2. When transporting, only by bending the transverse support into a "冂" shape can general transportation tools be used for transportation, reducing costs and improving transportation efficiency.
[0041] In addition, when installing an integral transverse support, it is often necessary to connect both ends to the component to be installed simultaneously. Therefore, the installation difficulty is high, the installation efficiency is low, and a higher level of installation experience is required for the staff. However, since the transverse support in this embodiment can be bent, it can be installed at both ends sequentially during installation, reducing the installation difficulty, improving the installation efficiency, and reducing the requirement for the installation experience of the staff.
[0042] In this embodiment, as Figure 2 shown, the non-hinged end of the movable section 3 is provided with an inwardly concave docking avoidance area 32 that mates with the end of the main tunnel steel arch 1. During installation, the main tunnel steel arch 1 can be inserted into the docking avoidance area 32 for installation and connection. During construction, it is necessary to unfold the transverse support bent into a "冂" shape for installation. In this embodiment, the rotation plane of the movable section 3 around the hinge point is parallel to the cross-section of the docking avoidance area 32. With this setting method, after directly fixing the intermediate section 2 at the installation position, each movable section 3 can be unfolded and installed in sequence without having to be flipped to the installation surface again. Moreover, since the position of the intermediate section 2 is already fixed during installation, the installation stability, safety, and efficiency will all be significantly improved.
[0043] In this embodiment, the non-hinged end of the movable section 3 is provided with an avoidance notch for avoiding the end of the main tunnel steel arch 1. The bottom of the avoidance notch is provided with a docking steel plate 321 that matches the cross-sectional shape of the end of the main tunnel steel arch 1. The docking steel plate 321 and the avoidance notch enclose the docking avoidance area 32. The two ends of the main tunnel steel arch 1 are respectively fixedly connected to the docking steel plates 321 at both ends of the temporary transverse support. The two wall surfaces of the avoidance notch are in contact with the ends of the main tunnel steel arch 1 and provide support force for it. Compared with simple welding connection, the connection strength of the docking avoidance area 32 is higher and the stability is better.
[0044] In this embodiment, the avoidance gap includes a top opening perpendicular to the end of the main hole steel arch frame 1, an end opening located at the end of the movable joint 3 and a side opening located on the side of the movable joint 3. The side opening is located on the outside of the movable joint 3 when the movable joint 3 is perpendicular to the middle section 2. This structure allows the end of the main hole steel arch frame 1 to directly enter the docking avoidance area 32 from the side opening of the avoidance gap when the movable joint 3 is unfolded. Therefore, there is no need to adjust the end of the main hole steel arch frame 1, which effectively reduces the required installation accuracy and further improves the installation efficiency.
[0045] In this embodiment, Figure 5 As shown, both ends of the middle section 2 are provided with interfaces 21, which are two clamping plates 211 arranged in parallel at the ends of the middle section 2. The hinged end of the movable section 3 is provided with a plug-in plate 31, the width of which is not greater than the spacing between the two clamping plates 211; the plug-in plate 31 is inserted between the two clamping plates 211 of the interface 21 to form a plug-in connection, and is hinged by the inserted hinge shaft. Among them, the outer edges of the interface 21 and the plug-in plate 31 are both semicircular arcs with the hinge point as the center, so as to avoid interference between the plug-in plate 31 and the interface 21 when the movable section 3 rotates around the hinge point, thereby preventing the operation from being obstructed.
[0046] In this embodiment, Figure 3 and Figure 4 As shown, at least one first through hole 311 is provided on the plug plate 31, and a second through hole 212 corresponding to the position of each first through hole 311 is provided on the clamping plate 211 when the intermediate section 2 and the movable section 3 are coaxial, and the intermediate section 2 and the movable section 3 are fixed in a coaxial position by fasteners penetrating the first through hole 311 and the second through hole 212. In this embodiment, in order to improve the axial support strength of the temporary cross support, the corresponding first through holes 311 and the second through holes 212 are both four arranged in a quadrilateral. In other embodiments, other arrangements and numbers of holes may also be used, which will not be described in detail here.
[0047] In this embodiment, the clamping plate 211 is further provided with a third through hole 213 corresponding to the position of each first through hole 311 when the intermediate section 2 and the movable section 3 are vertical, and the intermediate section 2 and the movable section 3 are fixed in a vertical position by fasteners penetrating the first through hole 311 and the third through hole 213. In this embodiment, since the bending form of the horizontal support is for the convenience of transportation and hoisting, the number of the corresponding first through hole 311 and the third through hole 213 is one, and in other embodiments, other arrangements and numbers of holes may also be used, which will not be described in detail here.
[0048] In this embodiment, the temporary cross support is processed in sections and made of composite resin material. Composite resin material has the advantages of light weight and high strength. Therefore, the use of this material to make temporary cross supports can greatly reduce the weight of the cross supports, facilitate transportation and hoisting, and can shorten the production time and improve production accuracy. In this embodiment, photosensitive resin is selected to manufacture temporary cross supports by 3D printing, so the preparation process is simple and the transportation process is convenient. In other embodiments, other resin materials or preparation processes can also be used, which will not be described in detail here.
[0049] The installation method of the temporary cross support constructed by the tunnel step method of the present embodiment has the advantages of simple steps and convenient disassembly, and the steps include:
[0050] S1: Temporary cross supports for tunnel bench construction prefabricated in the factory;
[0051] S2: Rotate the movable joints 3 to make the two movable joints 3 perpendicular to the middle joint 2, insert the fasteners into the first through hole 311 and the third through hole 213 and fasten them, and then transport them to the construction site;
[0052] S3: After the construction of the main tunnel steel arch frame 1 is completed, a groove required for assembling the temporary cross support is pre-excavated, and the middle section 2 of the temporary cross support in step S2 is installed in the groove;
[0053] S4: Remove the fasteners that penetrate into the first through hole 311 and the third through hole 213, rotate the movable section 3 around the hinge point and be coaxial with the intermediate section 2, and use the fasteners to penetrate into the first through hole 311 and the second through hole 212 and tighten;
[0054] S5: Connect the two ends of the movable joint 3 to the ends of the main hole steel arch frame 1;
[0055] S6: Cover the temporary cross support with soil to complete the installation:;
[0056] S7: Before removing the temporary cross support, dig up the soil covering the temporary cross support;
[0057] S8: Remove the fasteners that penetrate into the first through hole 311 and the second through hole 212, rotate the movable section 3 around the hinge point and make it perpendicular to the middle section 2, and penetrate the first through hole 311 and the third through hole 213 with fasteners and tighten them;
[0058] S9: transport the folded temporary cross support to the next excavation section;
[0059] S10: Repeat steps S3 to S9 until the construction is completed.
[0060] The above is only a preferred embodiment of the present invention, and the protection scope of the present invention is not limited to the above embodiments. For those skilled in the art, improvements and changes obtained without departing from the technical concept of the present invention should also be regarded as the protection scope of the present invention.
Claims
1. A method for installing a temporary cross support constructed by a tunnel step method, wherein the temporary cross support constructed by the tunnel step method is supported on a transverse chord of a main tunnel steel arch frame (1) and connected to the main tunnel steel arch frame (1) at both ends, characterized in that: The temporary cross support is a prefabricated rod-shaped cross support, comprising an intermediate section (2) and two sections of movable sections (3), the two sections of the movable sections (3) being hinged to the two ends of the intermediate section (2), respectively, the movable sections (3) being able to rotate about a hinge point and being fixed at a position perpendicular to the intermediate section (2) and being fixed at a position coaxial with the intermediate section (2); both ends of the intermediate section (2) are provided with an interface (21), the interface (21) being two splints (211) arranged in parallel at the ends of the intermediate section (2), the hinged end of the movable section (3) being provided with an inserting plate (31), the width of the inserting plate (31) being no greater than the spacing between the two splints (211); the inserting plate (31) being inserted between the two splints (211) of the interface (21) to form a plug-in connection, and being inserted through a hinge The insert plate (31) is provided with a plurality of first through holes (311); the clamping plate (211) is provided with second through holes (212) corresponding to the positions of the first through holes (311) when the intermediate section (2) and the movable section (3) are coaxial, and the intermediate section (2) and the movable section (3) are fixed in a coaxial position by fasteners penetrating the first through holes (311) and the second through holes (212); the clamping plate (211) is further provided with third through holes (213) corresponding to the positions of the first through holes (311) when the intermediate section (2) and the movable section (3) are vertical, and the intermediate section (2) and the movable section (3) are fixed in a vertical position by fasteners penetrating the first through holes (311) and the third through holes (213); the steps of the installation method include: S1: Temporary cross supports for tunnel bench construction prefabricated in the factory; S2: rotating the movable joints (3) so that the two movable joints (3) are perpendicular to the middle joint (2), inserting fasteners into the first through hole (311) and the third through hole (213) and fastening them, and then transporting them to the construction site; S3: After the construction of the main tunnel steel arch frame (1) is completed, a groove required for assembling the temporary cross support is pre-excavated, and the middle section (2) of the temporary cross support in step S2 is installed in the groove; S4: removing the fasteners that penetrate into the first through hole (311) and the third through hole (213), rotating the movable section (3) around the hinge point and coaxial with the intermediate section (2), and inserting the fasteners into the first through hole (311) and the second through hole (212) and fastening them; S5: Connecting the two ends of the movable joint (3) to the ends of the main hole steel arch frame (1); S6: Cover the temporary cross support with soil to complete the installation; S7: Before removing the temporary cross support, dig up the soil covering the temporary cross support; S8: removing the fasteners that penetrate into the first through hole (311) and the second through hole (212), rotating the movable section (3) around the hinge point and perpendicular to the middle section (2), and inserting the fasteners into the first through hole (311) and the third through hole (213) and fastening them; S9: transport the folded temporary cross support to the next excavation section; S10: Repeat steps S3 to S9 until the construction is completed.
2. The installation method for construction using temporary cross supports constructed using the tunnel step method according to claim 1 is characterized in that: The non-hinged end of the movable joint (3) is provided with an inwardly concave docking avoidance area (32) that cooperates with the end of the main hole steel arch frame (1), and the rotation plane of the movable joint (3) around the hinge point is parallel to the cross section of the docking avoidance area (32).
3. The installation method for construction using temporary cross supports constructed by the tunnel step method according to claim 2 is characterized in that: The non-hinged end of the movable joint (3) is provided with an avoidance notch for avoiding the end of the main hole steel arch frame (1), and the bottom of the avoidance notch is provided with a docking steel plate (321) matching the cross-sectional shape of the end of the main hole steel arch frame (1), and the docking steel plate (321) and the avoidance notch are surrounded to form the docking avoidance area (32).
4. The installation method for construction using temporary cross supports constructed by the tunnel step method according to claim 3 is characterized in that: The avoidance gap comprises a top opening perpendicular to the end of the main hole steel arch frame (1), an end opening located at the end of the movable joint (3) and a side opening located at the side of the movable joint (3), wherein the side opening is located outside the movable joint (3) when the movable joint (3) is perpendicular to the intermediate joint (2).
5. The installation method for construction using temporary cross supports constructed by the tunnel step method according to claim 1 is characterized in that: The outer edges of the interface (21) and the plug plate (31) are both semicircular arcs with the hinge point as the center.
6. The installation method for construction using temporary cross supports constructed by the tunnel step method according to claim 1 is characterized in that: The temporary cross support is made of composite resin material.