Towed double-material vibrating paver and core wall and filter layer paving method
Through the drag double-material vibration paver synchronously paving and compacting the core wall and the filter layer, the problems of low construction efficiency and difficulty in humidity regulation in the existing technology are solved, and the efficiency and high quality of earth and rock dam construction are achieved.
Patent Information
- Application Number
- CN202010466920.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-05-28
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2040-05-28
AI Technical Summary
In the existing earth and rock dam construction methods, the paving of the center wall and the reverse filter layer materials is different, resulting in irregular junctions, low construction efficiency, and it is difficult to ensure the design size and clay humidity control, which affects the filling effect.
Adopt a drag double-material vibration paver, and the center wall and the filter layer are paved simultaneously through the traction machine and paving device, combined with the vibration motor and humidity adjustment system to achieve synchronous paving and compaction to ensure regular paving and humidity of the materials. control.
It improves construction efficiency, avoids the problem of mutual occupation of the core wall and the reverse filter layer, ensures the accuracy of design dimensions and the regulation of clay humidity, and improves the paving quality of the earth and rock dam.
Smart Images

Figure CN111455936B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of earth-rock dam construction. Background Art
[0002] Earth-rock dams have the advantages of using local materials, not requiring high geological conditions for the dam base, simple structure, saving three materials and easy construction. In recent decades, the number of earth-rock dams built in countries around the world has exceeded that of concrete dams. Dry filling and rolling is a main method of earth-rock dam construction, which involves spreading earth-rock dam materials layer by layer and rolling them after spreading. Figure 1 As shown, the earth-rock dam has slopes 41 on both sides, a core wall 42 filled and compacted with clay in the center, filter layers 43 on both sides of the core wall 42, stone layers 44 on both sides of the filter layer 43, and dam bodies 45 on both sides of the stone layers 44. The dam bodies 45 can be made of rockfill. The filter layer 43 filters the soil and drains water, allowing water to seep out, while preventing the soil of the dam body 45 from flowing away with the water. When paving, paving is carried out in layers from bottom to top, and the core wall 42, filter layer 43, stone layer 44 and dam body 45 corresponding to each layer are paved layer by layer. A road surface 46 is usually built on the top of the earth-rock dam.
[0003] When building an earth-rock dam, the existing paving method has the following defects:
[0004] 1. The core wall 42 material (clay) and the filter layer 43 material (filter material) cannot be spread at the same time. After spreading separately, the connection between the core wall 42 and the filter layer 43 is irregular and the connection surface is unclear. There is a problem of mutual encroachment between the core wall 42 and the filter layer 43. After spreading and rolling, it is difficult to ensure the designed dimensions of the core wall 42 and the filter layer 43.
[0005] 2. Spreading and compaction (rolling) cannot be carried out simultaneously. The core wall 42 and the filter layer 43 are spread separately. In addition to a measurement and layout before filling, a second measurement and layout is required after filling, and manual finishing is also required, all of which result in low construction efficiency.
[0006] 3. When filling the core wall 42, according to different construction requirements, the humidity of the clay material needs to be kept constant within different ranges to achieve better filling effect. The existing construction method cannot adjust the humidity of the clay, and cannot achieve better filling effect of the core wall 42 by adjusting the humidity of the clay.
[0007] 4. During the paving process, the debris in the materials (clay and filter material) cannot be identified. If the clay contains large debris, it will reduce the quality of the core wall 42; if the filter material contains large debris, it will affect the effect of filtering soil and water passing through the filter layer 43. Summary of the invention
[0008] The purpose of the present invention is to provide a towed double-material vibrating paver that can pave the core wall and the filter layer at the same time, avoiding the problem of the core wall and the filter layer occupying each other's space, and completing the two functions of paving and compacting at one time.
[0009] To achieve the above-mentioned purpose, the towed double-material vibrating paver of the present invention comprises a tractor and a paving device, with the forward direction of the tractor being the forward direction;
[0010] The paving device comprises a feed box with an open top, a vertical partition is arranged in the feed box along the front-rear direction, the vertical partition divides the feed box into a clay cavity and a filter cavity on the left and right sides, the width of the filter cavity in the left-right direction is the same as the width of the filter layer, and the width of the clay cavity in the left-right direction is less than or equal to one-half of the width of the top of the core wall;
[0011] The rear end of the feed box is connected to the spreading box, the bottom of the spreading box is flush with the bottom of the feed box, and the height of the spreading box is the same as the predetermined spreading height; the spreading box is connected to the clay cavity and the reverse filter cavity, and the front and rear ends of the spreading box are open; an upper vibration motor is provided on the top wall of the spreading box, and a side vibration motor is provided on the side wall of the spreading box adjacent to the reverse filter cavity;
[0012] The front end of the feed box is hinged with a traction frame, and the front end of the traction frame is hinged with the rear end of the traction machine.
[0013] A material baffle plate is arranged upward at the rear end of the feed box; and a flange is arranged upward at the rear end of the material spreading box.
[0014] The traction frame includes a middle pole, a left pole and a right pole, the rear end of the left pole is hinged to the left front end of the feed box, the rear end of the right pole is hinged to the right front end of the feed box, and the rear end of the middle pole is hinged to the middle front end of the feed box; a fixed connection point is provided at the front of the middle pole, the front end of the left pole is inclined toward the middle pole and fixedly connected to the middle pole at the fixed connection point, the front end of the right pole is inclined toward the middle pole and fixedly connected to the middle pole at the fixed connection point; the front end of the middle pole is hinged to the rear of the traction machine.
[0015] The side wall of the feed box is connected upward with a bracket, and the bracket is connected upward with a filter box, the top of the filter box is open, and the filter box is located directly above the feed box; the filter box is provided with a first chamber and a second chamber at left and right intervals, the bottom end of the filter box at the first chamber is connected downward with a clay drop hopper with a small bottom and a large top, the bottom end of the filter box at the second chamber is connected downward with a reverse filter material drop hopper with a small bottom and a large top, the lower end of the clay drop hopper is open and located directly above the clay cavity, and the lower end of the reverse filter material drop hopper is open and located directly above the reverse filter cavity; the top of the first chamber is connected with a clay filter screen, and the top of the second chamber is connected with a reverse filter material filter screen.
[0016] A water tank is provided on the top of the tractor; a horizontally arranged water spray pipe is provided in the first chamber, the water spray pipe is located below the clay filter and adjacent to the clay filter; a plurality of atomizing nozzles are evenly connected to the water spray pipe; the water spray pipe is connected to a water inlet hose, the water inlet hose extends out of the first chamber and is connected to a variable frequency water pump, and the water inlet pipe of the variable frequency water pump is connected to the bottom of the water tank; a soil moisture sensor is provided at the open lower end of the clay hopper; an electric control device is provided in the tractor, the connection lines of the soil moisture sensor and the connection lines of the variable frequency water pump are respectively connected to the electric control device, and the electric control device is connected to a display screen for displaying the real-time humidity of the clay; the electric control device is connected to the upper vibration motor and the side vibration motor.
[0017] The water spray pipe is arranged around the inner wall of the first chamber.
[0018] The present invention also aims to provide a method for paving a core wall and a filter layer using the above-mentioned towed double-material vibrating paver, which is carried out according to the following steps:
[0019] The first step is a preparation step; the paving device is towed to one end of the core wall of the earth-rock dam and the designed position of the filter material layer on one side by a tractor, and the tractor and the paving device are turned so that the driving direction of the tractor is toward the other end of the earth-rock dam;
[0020] Use a feeding device to fill the clay cavity with clay through the first chamber of the filter box, and use another feeding device to fill the reverse filter cavity with reverse filter material through the second chamber of the filter box at the same time; when adding materials, the feeding devices are located on the left and right sides of the paving device;
[0021] The second step is the paving step of the current layer on one side; the tractor is started to move forward, and during the operation, the clay in the clay cavity and the filter material in the filter material cavity leave the vertical partition at the same time and enter the paving box, forming a regular and flat boundary in the paving box; as the tractor moves forward, the paving box releases the clay and filter material inside it to the designed position of the filter material layer on one side of the core wall and one side, thereby paving the filter material layer on one side of the core wall; when the tractor pulls the paving device to the other end of the earth-rock dam, the paving step of the current layer of the core wall on that side and the filter material layer on that side is completed; during this step, two feeding devices follow the paving device on both sides of the paving device and move forward together, so as to ensure that there is enough clay and filter material in the feed box and add material to the filter material box at any time; the clay filter screen and the filter material filter screen respectively block larger debris in the clay and larger debris in the filter material;
[0022] The third step is the paving step of the current layer on the other side;
[0023] The directions of the tractor and the paving device are turned so that the paving device is located at the other end of the designed position of the core wall of the earth-rock dam and the filter material layer on the other side thereof, and the tractor is started to move forward. During the operation, the clay in the clay cavity and the filter material in the filter material cavity simultaneously leave the vertical partition and enter the paving box, forming a regular and flat boundary in the paving box; as the tractor moves forward, the paving box releases the clay and filter material inside it at the designed positions of the filter material layer on one side of the core wall and the other side, thereby paving the filter material layer on one side of the core wall; when the tractor pulls the paving device to the other end of the earth-rock dam, the paving step of the current layer of the filter material layer on the current side and the current side of the core wall is completed; during this step, two feeding devices follow the paving device on both sides of the paving device and move forward together, so as to ensure that there is enough clay and filter material in the feed box and feed the filter material box at any time;
[0024] The fourth step is the construction of the core-wall joint;
[0025] Use construction machinery to fill clay in the joints of the core walls on both sides of the current layer, and use rolling to ensure that the core walls are flat and dense;
[0026] During the construction of each layer of the earth-rock dam, the first to fourth steps are carried out in sequence to complete the paving work of the core wall and filter material layer of each layer.
[0027] Also included is a clay moisture adjustment method;
[0028] The clay humidity adjustment method is as follows: in the second step and the third step, the electronic control device is started, and a preset soil humidity range is stored in the electronic control device; when clay is added to the first chamber of the filter material box, the electronic control device detects the clay humidity in real time through the soil humidity sensor and displays it on the display screen; when the clay humidity is less than the lower limit of the preset soil humidity range, the variable frequency water pump is started to operate at the lowest frequency, and water is supplied to the water spray pipe through the water inlet hose, and the water in the water spray pipe is evenly sprayed on the clay in the first chamber through each atomizing nozzle to increase the soil humidity;
[0029] The difference between the lowest frequency and the most variable frequency of the variable frequency water pump is X Hz, where X is a real number; after the variable frequency water pump is turned on, the electronic control device detects the clay moisture every 3 seconds. If the clay moisture is still lower than the lower limit of the preset soil moisture range, the operating frequency of the variable frequency water pump is increased by one tenth of X until the detected clay moisture is greater than or equal to the lower limit of the preset soil moisture range, and the operating frequency of the variable frequency water pump is kept unchanged;
[0030] When the variable frequency water pump is turned on, when the clay moisture is greater than the upper limit of the preset soil moisture range, the operating frequency of the variable frequency water pump is reduced by one twenty-fifth of X until the detected clay moisture is less than or equal to the upper limit of the preset soil moisture range, and the operating frequency of the variable frequency water pump is kept unchanged.
[0031] Also included is a vibration compaction method;
[0032] The compaction method is: during the second and third steps, when the traction machine pulls the paving device forward, the upper vibration motor and the side vibration motor are started by the electronic control device, and the vibration generated by the upper vibration motor has a compacting effect on the clay and filter material in the paving box, and the side vibration motor makes the side of the filter layer regular and flat.
[0033] In the second and third steps, heavy objects are placed on the top wall of the material paving box to improve the compaction effect.
[0034] The present invention has the following advantages:
[0035] With the present invention, the core wall and the filter layer are paved at the same time, and the paving and compaction can be carried out at the same time, which greatly improves the construction efficiency. In addition, except for the need to measure the positions of the core wall and the filter layer before paving, there is no need to perform secondary measurement and layout after paving, which further improves the construction efficiency. Since the clay and the filter material are paved away from the vertical partition at the same time, the problem of the core wall and the filter layer encroaching on each other in the past is avoided, and the design size of the core wall and the filter layer is guaranteed.
[0036] The width of the filter cavity in the left-right direction is the same as the width of the filter layer, and the filter layer on one side of the core wall only needs to be paved once. The width of the clay cavity in the left-right direction is less than or equal to half of the width of the top of the core wall, which can prevent the tractor and feed box from being blocked by the paved core wall when the filter layer on one side of the core wall is laid and then the filter layer on the other side of the core wall is laid.
[0037] The baffle plate is used to prevent clay and filter material from being spilled or splashed onto the material paving box when loading clay and filter material into the feed box. The flange set upward at the rear end of the material paving box can protect the items / equipment placed or installed on the top wall of the material paving box, preventing the items / equipment on the top wall of the material paving box (such as stones for pressing materials) from falling backwards due to vibration.
[0038] The traction frame has a simple and firm structure and can evenly distribute the traction force of the traction machine to the left, middle and right parts of the feed box, so that the feed box is evenly stressed when moving forward and runs more smoothly.
[0039] The arrangement of the filter box, clay filter screen, and anti-filter material filter screen can block larger debris on the clay filter screen and the anti-filter material filter screen during feeding, thereby preventing larger debris from entering the core wall or the anti-filter layer and thus having a negative impact on the function of the core wall or the anti-filter layer.
[0040] The clay moisture adjustment method can adjust the clay moisture to the required level, thereby improving the paving quality of the core wall. The staff can observe the real-time clay moisture through the display screen, thereby monitoring the adjustment effect of the electronic control device, and can promptly discover and manually correct the adjustment failure.
[0041] The compaction effect of the upper vibration motor not only improves the paving quality, but also eliminates the need for additional rolling of the compacted core wall and filter layer after paving, thus improving construction efficiency. The side vibration motor solves the problem of irregular and uneven sides of the filter layer in the past. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] Figure 1 It is a schematic diagram of the cross-sectional structure of an earth-rock dam;
[0043] Figure 2 It is a structural schematic diagram of the towed double-material vibrating paver of the present invention;
[0044] Figure 3 It is a top view schematic diagram of a towed double-material vibrating paver without the filter box;
[0045] Figure 4 It is the left view of the feed box and the laying box;
[0046] Figure 5 yes Figure 1 The left view structural diagram of the middle filter box;
[0047] Figure 6 It is a schematic diagram of the top view of the filter box;
[0048] Figure 7 It is a schematic diagram of the structure of the upper vibration motor and the side vibration motor;
[0049] Figure 8 yes Figure 7 Left view of
[0050] Fig. 9 2 is a schematic diagram of the electric control principle of the present invention. DETAILED DESCRIPTION
[0051] like Figures 1 to 9 As shown, the towed double-material vibrating paver of the present invention comprises a tractor 1 and a paving device, with the forward direction of the tractor 1 being the forward direction; the tractor 1 is preferably a crawler bulldozer, such as a SD220 bulldozer; other types of construction vehicles may also be used.
[0052] The paving device comprises a feed box 2 with an open top, a vertical partition 3 is arranged in the feed box 2 along the front-to-back direction, the vertical partition 3 divides the feed box 2 into a clay chamber 4 and a filter chamber 5 on the left and right sides, the width of the filter chamber 5 in the left-right direction is the same as the design width of the filter layer of the earth-rock dam, and the width of the clay chamber 4 in the left-right direction is less than or equal to one-half of the width of the top of the core wall;
[0053] The rear end of the feed box 2 is connected to a material spreading box 6, the bottom end of the material spreading box 6 is flush with the bottom end of the feed box 2, and the height of the material spreading box 6 is the same as the predetermined material spreading height; the material spreading box 6 is connected to the clay cavity 4 and the reverse filter cavity 5, and the front and rear ends of the material spreading box 6 are open; an upper vibration motor 7 is provided on the top wall of the material spreading box 6, and a side vibration motor 8 is provided on the side wall of the material spreading box 6 adjacent to the reverse filter cavity 5;
[0054] The front end of the feed box 2 is hinged with a traction frame, and the front end of the traction frame is hinged with the rear end of the traction machine 1. Preferably, two upper vibration motors 7 are arranged side by side and spaced apart.
[0055] The width of the filter material cavity 5 in the left-right direction is the same as the width of the filter layer, and the filter layer on one side of the core wall only needs to be spread once. The width of the clay cavity 4 in the left-right direction is less than or equal to half of the width of the top of the core wall, which can prevent the tractor 1 and the feed box 2 from being blocked by the paved core wall when the filter layer on one side of the core wall is laid and then the filter layer on the other side of the core wall is laid. The filter material is an existing dam-building material, and will not be described in detail.
[0056] Eccentric wheels 32 are mounted on the motor shafts of the upper vibration motor 7 and the side vibration motor 8 . Figure 7 FIG. 1 is a schematic diagram showing the structure of a motor equipped with an eccentric wheel 32. Figure 8 for Figure 7 Left view of .
[0057] The rear end of the feed box 2 is provided with a material baffle plate 9 upward; the rear end of the material spreading box 6 is provided with a flange 10 upward.
[0058] The baffle plate 9 is used to prevent clay and filter material from being spilled or splashed in large quantities onto the paving box 6 when clay and filter material are loaded into the feed box 2. The flange 10 arranged upward at the rear end of the paving box 6 can protect the items / equipment placed or installed on the top wall of the paving box 6, and prevent the items / equipment (such as stones for pressing materials) on the top wall of the paving box 6 from falling backwards due to vibration.
[0059] The traction frame includes a middle pole 11, a left pole 12 and a right pole 13. The rear end of the left pole 12 is hinged to the left front end of the feed box 2, the rear end of the right pole 13 is hinged to the right front end of the feed box 2, and the rear end of the middle pole 11 is hinged to the middle front end of the feed box 2; a fixed connection point 14 is provided at the front of the middle pole 11, the front end of the left pole 12 is inclined toward the middle pole 11 and is fixedly connected to the middle pole 11 at the fixed connection point 14, the front end of the right pole 13 is inclined toward the middle pole 11 and is fixedly connected to the middle pole 11 at the fixed connection point 14; the front end of the middle pole 11 is hinged to the rear of the traction machine 1.
[0060] The traction frame has a simple and firm structure, and can evenly distribute the traction force of the traction machine 1 to the left, middle and right parts of the feed box 2, so that the feed box 2 is evenly stressed when moving forward and runs more smoothly.
[0061] The side wall of the feed box 2 is connected upward with a bracket 15, and the bracket 15 is connected upward with a filter box 16, the top of the filter box 16 is open, and the filter box 16 is located directly above the feed box 2; the filter box 16 is provided with a first chamber 17 and a second chamber 18 at intervals on the left and right, and the bottom end of the filter box 16 at the first chamber 17 is downwardly connected to a pyramid-shaped clay drop hopper 19 with a small bottom and a large top, and the bottom end of the filter box 16 at the second chamber 18 is downwardly connected to a pyramid-shaped reverse filter material drop hopper 20 with a small bottom and a large top, the lower end of the clay drop hopper 19 is open and located directly above the clay cavity 4, and the lower end of the reverse filter material drop hopper 20 is open and located directly above the reverse filter cavity 5; the top of the first chamber 17 is connected to a clay filter screen 21, and the top of the second chamber 18 is connected to a reverse filter screen 22.
[0062] The arrangement of the filter box 16, the clay filter screen 21 and the reverse filter screen 22 can block larger debris on the clay filter screen 21 and the reverse filter screen 22 during feeding, thereby preventing larger debris from entering the core wall or the reverse filter layer and thus having a negative impact on the function of the core wall or the reverse filter layer.
[0063] The top of the tractor 1 is provided with a water tank 23; a horizontally arranged water spray pipe 24 is provided in the first chamber 17, the water spray pipe 24 is located below the clay filter 21 and adjacent to the clay filter 21; a plurality of atomizing nozzles are evenly connected to the water spray pipe 24; the water spray pipe 24 is connected to a water inlet hose 26, the water inlet hose 26 extends out of the first chamber 17 and is connected to a micro variable frequency water pump 27, the water inlet pipe of the variable frequency water pump 27 is connected to the bottom of the water tank 23; the water outlet direction of the variable frequency water pump 27 is toward the first chamber 17. The atomizing nozzle is a conventional device, not shown in the figure. The micro variable frequency water pump 27 is powered by the battery of the tractor 1.
[0064] A soil moisture sensor 28 is provided at the lower open end of the clay drop hopper 19; an electric control device 29 is provided in the tractor 1, and the connection lines of the soil moisture sensor 28 and the connection lines of the variable frequency water pump 27 are respectively connected to the electric control device 29, and the electric control device 29 is connected to a display screen 30 for displaying the real-time humidity of the clay. The electric control device is connected to the upper vibration motor and the side vibration motor.
[0065] The electric control device 29 can be a single chip microcomputer (such as a 51 single chip microcomputer, a PLC), or an integrated circuit, which is a prior art and will not be described in detail. The electric control device 29 is connected to the battery 31 of the traction machine and is powered by the battery 31 of the traction machine.
[0066] The water spray pipe 24 is disposed around the inner wall of the first chamber 17 .
[0067] The present invention also discloses a method for paving a core wall and a filter layer using the above-mentioned towed double-material vibrating paver, which is carried out according to the following steps:
[0068] The first step is a preparation step; the paving device is towed to one end of the core wall of the earth-rock dam and the design position of the filter material layer on one side thereof by the tractor 1, and the tractor 1 and the paving device are turned so that the driving direction of the tractor 1 is toward the other end of the earth-rock dam;
[0069] Use a feeding device (such as an excavator) to fill the clay cavity 4 with clay through the first chamber 17 of the filter box 16, and use another feeding device to fill the reverse filter cavity 5 with reverse filter material through the second chamber 18 of the filter box 16 at the same time; when adding materials, the feeding devices are located on the left and right sides of the paving device;
[0070] The second step is the paving step of the current layer on one side (left or right side); start the tractor 1 to move forward, and during the operation, the clay in the clay cavity 4 and the filter material in the filter material cavity 5 simultaneously leave the vertical partition 3 and enter the paving box 6, forming a regular and flat boundary in the paving box 6; as the tractor 1 moves forward, the paving box 6 releases the clay and filter material inside it to the designed position of the filter material layer on one side of the core wall and one side, thereby paving the filter material layer on one side of the core wall; when the tractor 1 pulls the paving device to move When reaching the other end of the earth-rock dam, the paving step of the current layer of the core wall and the filter material layer on that side is completed; during this step, two feeding devices follow the paving device on both sides to advance together, so as to ensure that the clay and filter material in the feed box 2 are sufficient and feed the filter material box 16 at any time; the clay filter screen 21 and the filter material filter screen 22 respectively block the larger debris in the clay (debris larger than the mesh of the clay filter screen 21) and the larger debris in the filter material (debris larger than the mesh of the filter material filter screen 22);
[0071] The third step is the paving step of the current layer on the other side (right or left);
[0072] Turn the direction of the tractor 1 and the paving device so that the paving device is located at the other end of the designed position of the core wall of the earth-rock dam and the filter material layer on the other side thereof (i.e., the second step is to pave one side of the core wall and the filter material layer on one side from one end of the earth-rock dam to the other end, and the third step is to pave the other side of the core wall of the earth-rock dam and the filter material layer on the other side in the reverse direction), start the tractor 1 to run forward (opposite to the running direction of the second step), during which the clay in the clay cavity 4 and the filter material in the filter material cavity 5 simultaneously leave the vertical partition 3 and enter the paving box 6, forming a regular and flat surface in the paving box 6. Boundary; as the tractor 1 moves forward, the paving box 6 releases the clay and filter material inside it to the designed position of the filter material layer on one side of the core wall and the other side, so as to pave the filter material layer on one side of the core wall; when the tractor 1 pulls the paving device to the other end of the earth-rock dam, the paving step of the current layer of the filter material layer on the current side and the current side of the core wall is completed; during this step, two feeding devices follow the paving device on both sides to move forward together, so as to ensure that the clay and filter material in the feed box 2 are sufficient and feed the filter material box 16 at any time;
[0073] The fourth step is the construction of the core-wall joint;
[0074] Use construction machinery (such as an excavator) to fill clay in the joints of the core walls on both sides of the current layer, and use rolling to ensure that the core walls are flat and dense;
[0075] During the construction of each layer of the earth-rock dam, the first to fourth steps are carried out in sequence to complete the paving work of each core wall and filter material layer of the earth-rock dam.
[0076] Also included is a clay moisture adjustment method;
[0077] The method for adjusting the humidity of the clay is as follows: in the second step and the third step, the electronic control device 29 is started, and a preset soil humidity range is stored in the electronic control device 29; when clay is added to the first chamber 17 of the filter material box 16, the electronic control device 29 detects the humidity of the clay in real time through the soil humidity sensor 28 and displays it on the display screen 30; when the humidity of the clay is less than the lower limit of the preset soil humidity range, the variable frequency water pump 27 is started to operate at the lowest frequency, and water is supplied to the water spray pipe 24 through the water inlet hose 26, and the water in the water spray pipe 24 is evenly sprayed on the clay in the first chamber 17 through each atomizing nozzle to increase the humidity of the soil;
[0078] The difference between the lowest frequency and the most variable frequency of the variable frequency water pump 27 is X Hz, where X is a real number. After the variable frequency water pump 27 is turned on, the electronic control device 29 detects the clay moisture every 3 seconds. If the clay moisture is still lower than the lower limit of the preset soil moisture range, the operating frequency of the variable frequency water pump 27 is increased by one tenth of X until the detected clay moisture is greater than or equal to the lower limit of the preset soil moisture range, and the operating frequency of the variable frequency water pump 27 is kept unchanged.
[0079] During the start-up process of the variable frequency water pump 27, when the clay moisture is greater than the upper limit of the preset soil moisture range, the operating frequency of the variable frequency water pump 27 is reduced by one twenty-fifth of X until the detected clay moisture is less than or equal to the upper limit of the preset soil moisture range, and the operating frequency of the variable frequency water pump 27 is kept unchanged.
[0080] The clay moisture adjustment method can adjust the clay moisture to a desired level, thereby improving the paving quality of the core wall. The staff can observe the real-time clay moisture through the display screen 30, thereby monitoring the adjustment effect of the electronic control device 29, and can timely discover and manually correct the adjustment failure.
[0081] Also included is a vibration compaction method;
[0082] The compaction method is: during the second and third steps, when the traction machine 1 pulls the paving device forward, the upper vibration motor 7 and the side vibration motor 8 are started through the electronic control device 29, and the vibration generated by the upper vibration motor 7 has a compaction effect on the clay and filter material in the paving box 6, and the side vibration motor 8 makes the side of the filter layer regular and flat.
[0083] The compaction effect of the upper vibration motor 7 improves the paving quality on the one hand, and on the other hand, it is no longer necessary to perform additional rolling on the compacted core wall and filter layer after paving, thereby improving construction efficiency. The side vibration motor 8 solves the problem of irregular and uneven sides of the filter layer in the past.
[0084] In the second step and the third step, heavy objects (such as stones) are placed on the top wall of the paving box 6 to improve the compaction effect.
[0085] The above embodiments are only used to illustrate rather than limit the technical solutions of the present invention. Although the present invention is described in detail with reference to the above embodiments, those skilled in the art should understand that the present invention can still be modified or replaced by equivalents. Any modification or partial replacement that does not depart from the spirit and scope of the present invention should be included in the scope of the claims of the present invention.
Claims
1. Towed double-material vibrating paver, characterized by: It includes a tractor and a paving device, with the forward direction of the tractor being the forward direction; The paving device comprises a feed box with an open top, a vertical partition is arranged in the feed box along the front-rear direction, the vertical partition divides the feed box into a clay cavity and a filter cavity on the left and right sides, the width of the filter cavity in the left-right direction is the same as the width of the filter layer, and the width of the clay cavity in the left-right direction is less than or equal to one-half of the width of the top of the core wall; The rear end of the feed box is connected to the spreading box, the bottom of the spreading box is flush with the bottom of the feed box, and the height of the spreading box is the same as the predetermined spreading height; the spreading box is connected to the clay cavity and the reverse filter cavity, and the front and rear ends of the spreading box are open; an upper vibration motor is provided on the top wall of the spreading box, and a side vibration motor is provided on the side wall of the spreading box adjacent to the reverse filter cavity; The front end of the feed box is hinged with a traction frame, and the front end of the traction frame is hinged with the rear end of the traction machine; The rear end of the feed box is provided with a material baffle plate upward; the rear end of the material spreading box is provided with a flange upward; The traction frame includes a middle pole, a left pole and a right pole, the rear end of the left pole is hinged to the left front end of the feed box, the rear end of the right pole is hinged to the right front end of the feed box, and the rear end of the middle pole is hinged to the middle front end of the feed box; a fixed connection point is provided at the front of the middle pole, the front end of the left pole is inclined toward the middle pole and fixedly connected to the middle pole at the fixed connection point, the front end of the right pole is inclined toward the middle pole and fixedly connected to the middle pole at the fixed connection point; the front end of the middle pole is hinged to the rear of the tractor; The side wall of the feed box is connected upward with a bracket, and the bracket is connected upward with a filter box, the top of the filter box is open, and the filter box is located directly above the feed box; the filter box is provided with a first chamber and a second chamber at left and right intervals, the bottom end of the filter box at the first chamber is connected downward with a clay drop hopper with a small bottom and a large top, the bottom end of the filter box at the second chamber is connected downward with a reverse filter material drop hopper with a small bottom and a large top, the lower end of the clay drop hopper is open and located directly above the clay cavity, and the lower end of the reverse filter material drop hopper is open and located directly above the reverse filter cavity; the top of the first chamber is connected with a clay filter screen, and the top of the second chamber is connected with a reverse filter material filter screen.
2. The towed double-material vibrating paver according to claim 1, characterized in that: A water tank is provided on the top of the tractor; a horizontally arranged water spray pipe is provided in the first chamber, the water spray pipe is located below the clay filter and adjacent to the clay filter; a plurality of atomizing nozzles are evenly connected to the water spray pipe; the water spray pipe is connected to a water inlet hose, the water inlet hose extends out of the first chamber and is connected to a variable frequency water pump, and the water inlet pipe of the variable frequency water pump is connected to the bottom of the water tank; a soil moisture sensor is provided at the open lower end of the clay hopper; an electric control device is provided in the tractor, the connection lines of the soil moisture sensor and the connection lines of the variable frequency water pump are respectively connected to the electric control device, and the electric control device is connected to a display screen for displaying the real-time humidity of the clay; the electric control device is connected to the upper vibration motor and the side vibration motor.
3. The towed double-material vibrating paver according to claim 2, characterized in that: The water spray pipe is arranged around the inner wall of the first chamber.
4. A method for paving a core wall and a filter layer using the towed double-material vibrating paver as claimed in claim 3, characterized in that Follow these steps: The first step is a preparation step; the paving device is towed to one end of the core wall of the earth-rock dam and the designed position of the filter material layer on one side by a tractor, and the tractor and the paving device are turned so that the driving direction of the tractor is toward the other end of the earth-rock dam; Use a feeding device to fill the clay cavity with clay through the first chamber of the filter box, and use another feeding device to fill the reverse filter cavity with reverse filter material through the second chamber of the filter box at the same time; when adding materials, the feeding devices are located on the left and right sides of the paving device; The second step is the paving step of the current layer on one side; the tractor is started to move forward, and during the operation, the clay in the clay cavity and the filter material in the filter material cavity leave the vertical partition at the same time and enter the paving box, forming a regular and flat boundary in the paving box; as the tractor moves forward, the paving box releases the clay and filter material inside it to the designed position of the filter material layer on one side of the core wall and one side, thereby paving the filter material layer on one side of the core wall; when the tractor pulls the paving device to the other end of the earth-rock dam, the paving step of the current layer of the core wall on that side and the filter material layer on that side is completed; during this step, two feeding devices follow the paving device on both sides of the paving device and move forward together, so as to ensure that there is enough clay and filter material in the feed box and add material to the filter material box at any time; the clay filter screen and the filter material filter screen respectively block larger debris in the clay and larger debris in the filter material; The third step is the paving step of the current layer on the other side; The directions of the tractor and the paving device are turned so that the paving device is located at the other end of the designed position of the core wall of the earth-rock dam and the filter material layer on the other side thereof, and the tractor is started to move forward. During the operation, the clay in the clay cavity and the filter material in the filter material cavity simultaneously leave the vertical partition and enter the paving box, forming a regular and flat boundary in the paving box; as the tractor moves forward, the paving box releases the clay and filter material inside it at the designed positions of the filter material layer on one side of the core wall and the other side, thereby paving the filter material layer on one side of the core wall; when the tractor pulls the paving device to the other end of the earth-rock dam, the paving step of the current layer of the filter material layer on the current side and the current side of the core wall is completed; during this step, two feeding devices follow the paving device on both sides of the paving device and move forward together, so as to ensure that there is enough clay and filter material in the feed box and feed the filter material box at any time; The fourth step is the construction of the core-wall joint; Use construction machinery to fill clay in the joints of the core walls on both sides of the current layer, and use rolling to ensure that the core walls are flat and dense; During the construction of each layer of the earth-rock dam, the first to fourth steps are carried out in sequence to complete the paving work of the core wall and filter material layer of each layer.
5. The core wall and filter layer paving method according to claim 4, characterized in that: Also included is a clay moisture adjustment method; The clay humidity adjustment method is as follows: in the second step and the third step, the electronic control device is started, and a preset soil humidity range is stored in the electronic control device; when clay is added to the first chamber of the filter material box, the electronic control device detects the clay humidity in real time through the soil humidity sensor and displays it on the display screen; when the clay humidity is less than the lower limit of the preset soil humidity range, the variable frequency water pump is started to operate at the lowest frequency, and water is supplied to the water spray pipe through the water inlet hose, and the water in the water spray pipe is evenly sprayed on the clay in the first chamber through each atomizing nozzle to increase the soil humidity; The difference between the lowest frequency and the most variable frequency of the variable frequency water pump is X Hz, where X is a real number; after the variable frequency water pump is turned on, the electronic control device detects the clay moisture every 3 seconds. If the clay moisture is still lower than the lower limit of the preset soil moisture range, the operating frequency of the variable frequency water pump is increased by one tenth of X until the detected clay moisture is greater than or equal to the lower limit of the preset soil moisture range, and the operating frequency of the variable frequency water pump is kept unchanged; When the variable frequency water pump is turned on, when the clay moisture is greater than the upper limit of the preset soil moisture range, the operating frequency of the variable frequency water pump is reduced by one twenty-fifth of X until the detected clay moisture is less than or equal to the upper limit of the preset soil moisture range, and the operating frequency of the variable frequency water pump is kept unchanged.
6. The core wall and filter layer paving method according to claim 4, characterized in that: Also included is a vibration compaction method; The compaction method is: during the second and third steps, when the traction machine pulls the paving device forward, the upper vibration motor and the side vibration motor are started by the electronic control device, and the vibration generated by the upper vibration motor has a compacting effect on the clay and filter material in the paving box, and the side vibration motor makes the side of the filter layer regular and flat.
7. The core wall and filter layer paving method according to claim 4, characterized in that: In the second and third steps, heavy objects are placed on the top wall of the material paving box to improve the compaction effect.