A device and method for pouring thin-walled concrete for long-segment double-lining inverted arch of a small-diameter tunnel

By designing a thin-wall concrete pouring device for long sections of small-diameter tunnels, the combination of chutes and rotating gates is used to solve the problems of concrete waste and formwork pollution in the traditional pump pipe pumping method, and efficient pouring operation is achieved. Reduced labor intensity and construction period.

CN111622783BActive Publication Date: 2024-11-22CCTEB INFRASTRUCTURE CONSTR CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010551007.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-06-17
Publication Date
2024-11-22
Estimated Expiration
2040-06-17

AI Technical Summary

Technical Problem

During the pouring of thin-wall concrete for long sections of small-diameter tunnels, traditional pumping methods lead to waste of concrete, formwork pollution and operation difficulty, affecting construction period and cost.

Method used

A casting device including material storage box, chute and transportation trolley is designed. Through the shrinkable chute and the adjustment of the rotary gate, the efficient conveying of concrete is achieved and the number of times of disassembly and connection of the pump pipe is reduced, and labor intensity and waste are reduced.

Benefits of technology

It significantly reduces labor intensity and labor costs, reduces concrete waste, improves pouring efficiency, shortens construction period, and avoids formwork pollution.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111622783B_ABST
    Figure CN111622783B_ABST
Patent Text Reader

Abstract

The invention discloses a thin-walled concrete pouring device for a long section of a small-diameter tunnel with two linings, comprising a material storage box, a chute and a transport trolley, a pump pipe fixing buckle is provided on the upper part of the material storage box, a plurality of discharge ports and a rotating gate are provided on both sides, the chutes on both sides are detachable and foldable, the long section inverted arch is divided into a plurality of short sections according to the length before pouring, and each short section is poured from far to near, when a single short section is poured, a pump pipe is first installed to the starting point of the section, after the material storage box is filled with concrete, the transport trolley loads the material storage box to the pouring position, and then opens the gates on both sides to symmetrically unload, after the unloading is completed, returns to the pump pipe to reload, until the pouring of the short section is completed, after the pouring of a short section is completed, the redundant pump pipe is removed, and the next short section is poured, until the pouring of all the inverted arches is completed. The invention is simple to operate, can avoid the left and right side conversion of the pump pipe during pouring, greatly reduces the number of pump pipe disconnection, effectively improves the pouring efficiency, and shortens the pouring period.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tunnel concrete pouring, in particular to a small-diameter tunnel long-segment double-lining invert thin-wall concrete pouring device and pouring method. Background Art

[0002] When pouring thin-walled concrete for the long-segment secondary lining invert of a small-diameter tunnel, due to the narrow tunnel section, the long pouring length of the invert at one time, the long distance between the pouring points, and the steel pipe supports for reinforcing the formwork on both sides of the invert occupying space, conventional pouring devices cannot be used due to space and distance restrictions. Generally, a method of pumping concrete over a long distance and then manually carrying the end of the pump pipe to align with the pouring port for pouring is adopted. During pouring, in order to make the pouring on both sides of the invert section uniform, the pump pipe needs to be frequently switched between the left and right sides, and after completing the pouring of a small section of the invert, a small section of the pump pipe needs to be removed or spliced ​​before pouring the invert in other areas. When switching the pump pipe between the left and right sides and disconnecting the pump pipe, a large amount of concrete flows on the invert formwork, which greatly wastes concrete and pollutes the invert formwork. In addition, the pump pipe is heavy, and the operation is difficult when switching to the pouring ports on both sides, and many workers are required, which wastes a lot of human resources. At the same time, the frequent disconnection of the pump pipe prolongs the total time consumed for pouring the invert concrete, affecting the construction period.

[0003] Since the secondary lining is thin-walled concrete, the pouring openings on both sides of the formwork are narrow. When pouring by manually carrying the pump pipe end to align with the pouring opening, due to incomplete alignment and excessive flow, a large amount of concrete is easily spilled on the arch formwork, which greatly wastes concrete and pollutes the arch formwork. In general, the traditional pump pipe pumping concrete pouring method has the disadvantages of being time-consuming, material-consuming, and labor-intensive when pouring thin-walled concrete for the secondary lining of a long section of a small-diameter tunnel. Summary of the invention

[0004] In order to overcome the technical defects in the prior art of pouring thin-walled concrete for secondary lining inverts in long sections of small-diameter tunnels, which easily causes concrete waste and pollution to the invert formwork, the present invention provides a device and method for pouring thin-walled concrete for secondary lining inverts in long sections of small-diameter tunnels, which solves the above technical problems.

[0005] The present invention achieves the above-mentioned purpose through the following technical scheme: a small-diameter tunnel long-segment double-lining invert thin-wall concrete pouring device, comprising a material box, a chute and a transport trolley. The material box is placed on the upper part of the transport trolley, and the transport trolley can carry the material box and move in the tunnel.

[0006] The material holding box is a rectangular structure with an opening on the top, a pump pipe fixing buckle is installed on the top, and a hanging point is set at each of the four corners of the top. The bottom plate of the material holding box is set with a slope to facilitate the concrete in the material holding box to flow toward each discharge port during pouring. The bottom plate is a downward slope from the pump pipe fixing buckle side to the other side, which facilitates the concrete flowing out of the pump pipe to flow longitudinally toward the material holding box when the material holding box is loaded.

[0007] Discharge ports are symmetrically arranged on both sides of the material holding box. The bottom height of the discharge port is flush with the height of the bottom plate inside the material holding box. The discharge port is composed of a short round tube and a discharge port flange. The discharge port flange is used to connect with the chute. A revolving gate is arranged at the discharge port. The revolving gate is composed of a circular baffle and a gate handle, which is used to adjust the opening size of the discharge port. The revolving gate is installed on the discharge port flange through a revolving gate shaft. The revolving gate remains closed when not in use. The revolving gate can be opened to the maximum position by turning the gate handle, and the revolving gate can be fixed by inserting the gate fixing pin into the pin hole on the discharge port flange.

[0008] The chute consists of an upper short chute and a lower short chute, which are hinged together by a chute connecting shaft, and the cross-section of the connecting part of the two short chutes is perpendicular to the slope direction of the chute. The lower short chute can be folded around the chute connecting shaft. After the lower short chute is folded open, the bottom is directly opposite to the template casting port. When the casting device is moving, the lower short chute is folded up to reduce the width of the entire concrete casting device. The upper short chute is provided with a chute flange, and the chute flange is provided with chute flange bolt holes. The chute flange is fixedly connected to the discharge port flange by connecting bolts.

[0009] In the above-mentioned small-diameter tunnel long-segment secondary lining invert thin-wall concrete pouring device, the discharge port flange is provided with discharge port flange bolt holes, and the opening position, number and hole diameter are consistent with the chute flange bolt holes.

[0010] In the above-mentioned small-diameter tunnel long-segment double-lining invert thin-wall concrete pouring device, the pump pipe fixing buckle is provided with an arc-shaped small groove.

[0011] The present invention also discloses a method for pouring thin-walled concrete of a long-segment double-lining invert arch of a small-diameter tunnel, comprising the following construction steps:

[0012] S1: Put all the chutes into the material box, use the lifting equipment to lift the material box to the bottom of the working pit, and place it on the transport trolley;

[0013] S2: Divide the long segment invert to be cast into multiple short segments according to the length, cast the short segments in sequence, drive the transport trolley loaded with the chute and the material box, and move along the track laid on the cast section of the invert formwork in the tunnel and the track of the invert formwork itself, to reach the short segment farthest from the concrete pump truck, and stay at the starting point of the short segment, that is, the boundary between the short segment and the next short segment;

[0014] S3: Use connecting bolts to fix the chute flange and the discharge port flange to complete the installation of the chutes on both sides of the material tank;

[0015] S4: Connect the concrete pump pipe to the starting point of the short section;

[0016] S5: Insert the end of the concrete pump pipe into the pump pipe fixing buckle on the material tank, start the concrete pump truck to pump, and stop the pump after the concrete fills the material tank;

[0017] S6: Fold and retract the chutes on both sides of the material box to avoid collision between the chutes and the steel pipe supports on both sides of the formwork during movement, and drive the transport trolley loaded with the material box to move within the section to the farthest end of the short section that has not yet been cast;

[0018] S7: Fold and open the chutes on both sides of the material box. Workers adjust the size of the discharge port by operating the gate handle of the rotating gate. Concrete flows out from the discharge ports on both sides and is transported to the pouring port through the chute. When the rotating gate is opened to the maximum position, the gate fixing pin can be inserted into the pin hole on the discharge port flange to fix the rotating gate;

[0019] S8: After the concrete in the material box is unloaded, the chutes on both sides are folded and retracted, and the transport trolley loaded with the material box is driven to move in the short section and return to the starting position of the short section;

[0020] S9: repeating steps S5 to S8 to complete the casting of the short segment invert;

[0021] S10: Fold and retract the chutes on both sides of the material box to avoid collision between the chutes and the steel pipe supports on both sides of the template during movement, and drive the transport trolley toward the concrete pump truck to move to the starting point of the next short section;

[0022] S11: Remove the redundant concrete pump pipes, connect the concrete pump pipes to the starting point of the next short section, and transport the removed concrete pump pipes out of the tunnel for timely cleaning;

[0023] S12: repeating steps S5-S8 to complete the casting of the short segment invert;

[0024] S13: Repeat steps S10-S12 to complete the pouring of all inverts;

[0025] S14: Remove the chutes on both sides, put the chutes into the material container, transport them out of the tunnel by a transport trolley, hoist them to the ground, and clean the concrete waste on the casting device in time.

[0026] In general, the above technical solutions conceived by the present invention can achieve the following beneficial effects compared with the prior art:

[0027] 1. The invention discloses a thin-walled concrete pouring device for a long-segment double-lining invert arch of a small-diameter tunnel, which is simple to process and simple and flexible to operate, can significantly reduce labor intensity, save labor input, and reduce labor costs. The pouring device chute can be retracted and disassembled to reduce the width of the pouring device to avoid collision with steel pipe supports, and the discharge port gate is flexible to operate, which is particularly suitable for small-diameter tunnels.

[0028] 2. The pouring device described in the present invention can avoid the left and right side switching of the pump pipe during concrete pouring construction, realize symmetrical pouring, reduce the number of pump pipe disconnection times, reduce the waste of concrete spillage, improve the efficiency of small-diameter tunnel secondary lining invert concrete pouring, and save construction time. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] The specific embodiments of the present invention are further described in detail below with reference to the accompanying drawings, wherein:

[0030] Figure 1 It is a schematic diagram of the overall structure of a thin-wall concrete pouring device for a long-segment double-lining invert arch of a small-diameter tunnel according to the present invention;

[0031] Figure 2 It is a schematic diagram of the connection relationship between the material holding box, the chute and the transport trolley of the present invention;

[0032] Figure 3 It is a structural schematic diagram of the material holding box of the present invention;

[0033] Figure 4 It is a schematic diagram of the structure of the discharge port of the present invention;

[0034] Figure 5 It is a structural schematic diagram of the rotating gate of the present invention;

[0035] Figure 6 It is a structural schematic diagram of the chute of the present invention;

[0036] In the figure: 1- material box, 2- chute, 3- transport trolley, 4- concrete pump pipe, 5- inverted arch formwork, 6- steel pipe support, 11- bottom plate, 12- discharge port, 13- revolving gate, 14- hanging point, 15- pump pipe fixing buckle, 16- gate fixing pin, 121- short round tube, 122- discharge port flange, 123- discharge port flange bolt hole, 124- revolving gate shaft, 125- pin hole, 131- round gate, 132- gate handle, 21- upper short chute, 22- lower short chute, 23- chute connecting shaft, 24- chute flange, 25- connecting bolt, 241- chute flange bolt hole. DETAILED DESCRIPTION

[0037] like Figure 1 As shown in FIG. 1 , it is a schematic diagram of the overall structure of a small-diameter tunnel long-segment double-lining invert thin-wall concrete pouring device, which includes a material container 1, a chute 2 and a transport trolley 3. The material container 1 is placed on the upper part of the transport trolley 3, and the transport trolley 3 can carry the material container 1 and move in the tunnel. Figure 2 FIG. 1 is a schematic diagram showing the connection relationship among the material holding box 1 , the chute 2 and the transport trolley 3 according to the present invention.

[0038] The material holding box 1 is a rectangular structure with an opening at the top, with a pump pipe fixing buckle 15 installed on the top, and the pipe fixing buckle 15 is provided with a small arc-shaped groove. A hanging point 14 is provided at each of the four corners on the top of the material holding box 1. The bottom plate 11 of the material holding box 1 is provided with a slope to facilitate the concrete in the material holding box 1 to flow toward each discharge port 12 during pouring. The bottom plate 11 is a downward slope from the pump pipe fixing buckle 15 side to the other side in the longitudinal direction, to facilitate the concrete flowing out of the pump pipe to flow longitudinally toward the material holding box 1 when the material holding box 1 is loaded.

[0039] like Figure 3 and Figure 4 As shown, it is a schematic diagram of the structure of the material holding box 1 and the discharge port 12 of the present invention. The discharge ports 12 are symmetrically arranged on both sides of the material holding box 1. The bottom height of the discharge port 12 is flush with the height of the bottom plate 11 inside the material holding box 1. The discharge port 12 is composed of a short round tube 121 and a discharge port flange 122. The discharge port flange 122 is used to connect with the chute 2. The discharge port 12 is provided with a rotating gate 13. The rotating gate 13 is composed of a circular baffle 131 and a gate handle 132, which is used to adjust the opening size of the discharge port 12. The rotating gate 13 is installed on the discharge port flange 122 through a rotating gate shaft 124. The rotating gate 13 is kept closed when not in use. The rotating gate 13 can be opened to the maximum position by rotating the gate handle 132, and the rotating gate 13 can be fixed by inserting the gate fixing pin 16 into the pin hole 125 on the discharge port flange 122. The structure of the rotating gate 13 is as shown in FIG. Figure 5 shown.

[0040] like Figure 6As shown, it is a schematic diagram of the structure of the chute 5 of the present invention. The chute 2 is composed of an upper short chute 21 and a lower short chute 22. The upper short chute 21 and the lower short chute 22 are hinged together by a chute connecting shaft 23, and the cross-section of the connecting part of the two short chutes is perpendicular to the slope direction of the chute. The lower short chute 22 can be folded around the chute connecting shaft 23. After the lower short chute 22 is folded and opened, the bottom is directly opposite to the template casting port. When the casting device is moving, the lower short chute 22 is folded up to reduce the width of the entire concrete casting device. The upper short chute 21 is provided with a chute flange 24, and the chute flange bolt hole 241 is opened on the chute flange 24. The chute flange 24 is fixedly connected to the discharge port flange 122 by connecting bolts 25.

[0041] The discharge port flange 122 is provided with discharge port flange bolt holes 123 , and the opening position, number and hole diameter of the discharge port flange bolt holes 123 are consistent with those of the chute flange bolt holes 241 .

[0042] The invention discloses a device for pouring thin-walled concrete of a long-segment secondary lining invert arch of a small-diameter tunnel, which mainly completes the pouring operation of thin-walled concrete of a secondary lining invert arch of a small-diameter tunnel through the following construction steps:

[0043] Step 1: Place all the chutes 2 into the material container 1, use a lifting device to lift the material container 1 to the bottom of the working pit, and place it on the transport trolley 3;

[0044] Step 2: Divide the long segment inverted arch to be cast into multiple short segments according to the length, cast the short segments in sequence, drive the transport trolley 3 loaded with the chute 2 and the material box 1, and move along the track laid by the cast section of the inverted arch template 5 in the tunnel and the track of the inverted arch template 5, reach the short segment farthest from the concrete pump truck, and stay at the starting point of the short segment, that is, the boundary between the short segment and the next short segment;

[0045] Step 3: Use the connecting bolts 25 to fix the chute flange 24 and the discharge port flange 122 to complete the installation of the chutes 2 on both sides of the material storage box 1;

[0046] Step 4: Connect the concrete pump pipe 4 to the starting point of the short section;

[0047] Step 5: Insert the end of the concrete pump pipe 4 into the pump pipe fixing buckle 15 on the material tank 1, start the concrete pump truck to pump, and stop the pump after the concrete fills the material tank 1;

[0048] Step 6: Fold and retract the chutes 2 on both sides of the material box 1 to prevent the chutes 2 from colliding with the steel pipe supports 6 on both sides of the template when moving, and drive the transport trolley 3 loaded with the material box 1 to move in the section to the farthest end of the short section that has not yet been cast;

[0049] Step 7: Fold and open the chutes 2 on both sides of the material box 1. The worker adjusts the size of the discharge port 12 by operating the gate handle 132 of the rotating gate 13. Concrete flows out from the discharge ports 12 on both sides and is transported to the pouring port through the chute 2. When the rotating gate 13 is opened to the maximum position, the gate fixing pin 16 can be inserted into the pin hole 125 on the discharge port flange 122 to fix the rotating gate 13.

[0050] Step 8: After the concrete in the material box 1 is unloaded, the chutes 2 on both sides are folded and retracted, and the transport trolley 3 loaded with the material box 1 is driven to move in the short section and return to the starting position of the short section;

[0051] Step nine: repeating steps S5 to S8 to complete the casting of the short segment invert;

[0052] Step 10: Fold and stow the chutes 2 on both sides of the material box 1 to prevent the chutes 2 from colliding with the steel pipe supports 6 on both sides of the template during movement, and drive the transport trolley 3 toward the concrete pump truck to move to the starting point of the next short section;

[0053] Step 11: Remove the redundant concrete pump pipe 4, connect the concrete pump pipe 4 to the starting point of the next short section, and transport the removed concrete pump pipe 4 out of the tunnel for timely cleaning;

[0054] Step 12: Repeat steps 5 to 8 to complete the casting of the short segment invert;

[0055] Step 13: Repeat steps 10 to 12 to complete the pouring of all inverts;

[0056] Step 14: Remove the chutes 2 on both sides, put the chutes 2 into the material container 1, transport them out of the tunnel using the transport trolley 3, hoist them to the ground, and clean the concrete waste on the casting device in time.

[0057] It will be easily understood by those skilled in the art that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A device for pouring thin-walled concrete for a long section of a small-diameter tunnel with a second lining invert, characterized in that: The concrete pouring device comprises a material box (1), a chute (2) and a transport trolley (3), wherein the material box (1) is placed on the upper part of the transport trolley (3), and the transport trolley (3) can carry the material box (1) and move in a tunnel; The material holding box (1) is a rectangular structure with an upper opening, a pump pipe fixing buckle (15) is installed on the top, and a hanging point (14) is arranged at each of the four corners of the top. The bottom plate (11) of the material holding box (1) is provided with a slope, so that the concrete in the material holding box (1) can flow toward each discharge port (12) during pouring. The bottom plate (11) is a downward slope from the pump pipe fixing buckle (15) side to the other side in the longitudinal direction, so that the concrete flowing out of the pump pipe can flow toward the longitudinal direction of the material holding box (1) when the material holding box (1) is loaded. Discharge ports (12) are symmetrically arranged on both sides of the material storage box (1). The bottom height of the discharge ports (12) is flush with the height of the bottom plate (11) inside the material storage box (1). The discharge ports (12) are composed of a short circular tube (121) and a discharge port flange (122). The discharge port flange (122) is used to connect to the chute (2). The discharge port (12) is provided with a rotating gate (13). The rotating gate (13) is composed of a circular baffle (131) and a gate handle ( 132) for adjusting the opening size of the discharge port (12); the rotating gate (13) is mounted on the discharge port flange (122) via a rotating gate shaft (124); the rotating gate (13) is kept closed when not in use; the rotating gate (13) can be opened to the maximum position by rotating the gate handle (132); and the rotating gate (13) can be fixed by inserting the gate fixing latch (16) into the latch hole (125) on the discharge port flange (122); The chute (2) is composed of an upper short chute (21) and a lower short chute (22). The upper short chute (21) and the lower short chute (22) are hinged together through a chute connection shaft (23), and the cross-section of the connection part of the two short chutes is perpendicular to the chute slope direction. The lower short chute (22) can be folded around the chute connection shaft (23). After the lower short chute (22) is folded and opened, the bottom is directly opposite to the template casting port. When the casting device is moving, the lower short chute (22) is folded up to reduce the width of the entire concrete casting device. The upper short chute (21) is provided with a chute flange (24). The chute flange (24) is provided with a chute flange bolt hole (241). The chute flange (24) is fixedly connected to the discharge port flange (122) through a connecting bolt (25).

2. A small diameter tunnel long segment double lining invert thin wall concrete pouring device according to claim 1, characterized in that: The discharge port flange (122) is provided with discharge port flange bolt holes (123), and the opening position, number and hole diameter of the discharge port flange bolt holes (123) are consistent with those of the chute flange bolt holes (241).

3. The device for pouring thin-walled concrete for long-segment double-lining inverted arch of a small-diameter tunnel according to claim 1, characterized in that: The pump tube fixing buckle (15) is provided with an arc-shaped small groove.

4. A method for casting thin-walled concrete for a long section double lining invert arch of a small diameter tunnel according to any one of claims 1 to 3, characterized in that: The pouring method includes the following construction steps: S1: Place all the chutes (2) into the material container (1), use a lifting device to lift the material container (1) to the bottom of the working pit, and place it on a transport trolley (3); S2: Divide the long segment invert to be cast into a plurality of short segments according to the length, cast the short segments in sequence, drive the transport trolley (3) loaded with the chute (2) and the material box (1), and move along the track laid on the cast section of the invert formwork (5) in the tunnel and the track of the invert formwork (5) itself, to reach the short segment farthest from the concrete pump truck, and stop at the starting point of the short segment, that is, the boundary between the short segment and the next short segment; S3: Using connecting bolts (25) to fix the chute flange (24) and the discharge port flange (122), the installation of the chutes (2) on both sides of the material storage box (1) is completed; S4: Connect the concrete pump pipe (4) to the starting point of the short section; S5: insert the end of the concrete pump pipe (4) into the pump pipe fixing buckle (15) on the material container (1), start the concrete pump truck to pump, and stop the pump after the concrete fills the material container (1); S6: Fold and retract the chutes (2) on both sides of the material box (1) to prevent the chutes (2) from colliding with the steel pipe supports (6) on both sides of the template during movement, and drive the transport trolley (3) loaded with the material box (1) to move within the segment to reach the farthest end of the short segment that has not yet been cast; S7: The chutes (2) on both sides of the material storage box (1) are folded open, and the worker adjusts the size of the discharge port (12) by operating the gate handle (132) of the rotating gate (13). Concrete flows out from the discharge ports (12) on both sides and is transported to the pouring port through the chute (2). When the rotating gate (13) is opened to the maximum position, the gate fixing pin (16) can be inserted into the pin hole (125) on the discharge port flange (122) to fix the rotating gate (13); S8: After the concrete in the material box (1) is unloaded, the chutes (2) on both sides are folded and retracted, and the transport trolley (3) loaded with the material box (1) is driven to move in the short section and return to the starting position of the short section; S9: repeating steps S5 to S8 to complete the casting of the short segment invert; S10: Fold and retract the chutes (2) on both sides of the material container (1) to prevent the chutes (2) from colliding with the steel pipe supports (6) on both sides of the template during movement, and drive the transport trolley (3) toward the concrete pump truck to move to the starting point of the next short segment; S11: remove the redundant concrete pump pipe (4), connect the concrete pump pipe (4) to the starting point of the next short section, and transport the removed concrete pump pipe (4) out of the tunnel for timely cleaning; S12: repeating steps S5-S8 to complete the casting of the short segment invert; S13: Repeat steps S10-S12 to complete the pouring of all inverts; S14: dismantle the chutes (2) on both sides, place the chutes (2) into the material container (1), transport them out of the tunnel using a transport trolley (3), hoist them to the ground, and clean the concrete waste on the pouring device in time.