Concrete interlocking support piles

Through prefabricated and rapidly assembled concrete chain support piles, the complex process, serious pollution and water leakage problems in underground continuous wall construction are solved, and construction is simplified, reducing costs and improving safety is achieved.

CN111691406BActive Publication Date: 2024-11-26TIANJIN JIANCHENGJIYE GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010692703.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-07-17
Publication Date
2024-11-26
Estimated Expiration
2040-07-17

AI Technical Summary

Technical Problem

The existing underground continuous wall support structure has complex construction technology, severe mud pollution, long construction period, high cost, and easy joint formation during concrete pouring, resulting in water leakage.

Method used

Concrete chain support piles are adopted, including crown beam structure, pillar pile structure and conical pile structure. They are prefabricated in the factory and quickly assembled at the construction site, and the integrated pouring of concrete is achieved by using the slot and sliding table structure to save construction period and prevent water leakage.

Benefits of technology

It realizes rapid assembly, simplification of the construction process, reduces pollution, shortens construction period, and reduces costs. It also ensures structural integrity and correct direction through anti-stup holes and plunger structures, avoids misuse and improves construction safety and efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111691406B_ABST
    Figure CN111691406B_ABST
Patent Text Reader

Abstract

The present invention provides a concrete interlocking support pile, including a crown beam structure, a support pile structure and a cone head pile structure. The support pile structure is a concrete square pile with a through hole in the middle. The first side and the second side of the support pile structure are respectively provided with a symmetrically arranged first card slot, and the third side and the fourth side are respectively provided with a symmetrically arranged second card slot and a third card slot. The second card slot and the third card slot are both through slots. The upper end of the support pile structure is provided with an anti-fool hole, which is a blind hole. The upper end of the support pile structure is connected to the crown beam structure through two first card slots, and the second card slot and the third card slot are both connected to the inner side of the crown beam structure. The cone head pile structure is installed at the lower end of the support pile structure. The concrete interlocking support piles described in the present invention can be prefabricated in batches in a factory, and then transported to a designated construction site, and quickly assembled to form an integrated deep pit foundation protection waterproof wall, saving construction time, and the construction process is simple, the structure is strong, and it is safe and reliable.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of support engineering, and in particular relates to a concrete interlocking support pile. Background Art

[0002] As a retaining structure for underground projects, ground-connected walls are widely used in deep foundation pit projects. They can be used as temporary retaining and water-stopping structures, or they can replace the basement exterior walls to become permanent underground structures. The underground continuous wall is set below the ground and has a certain depth. The deeper the underground wall is, the more it is affected by groundwater leakage. The reason is that in order to facilitate the lowering of the joint, a certain gap is left between the joint and the groove wall. When pouring after the steel cage is lowered, the fluid concrete will bypass the joint and flow to another adjacent section of the steel cage. When pouring the next section, the newly poured concrete and the previously bypassed concrete cannot form a whole. The difference in solidification time between the two will lead to the formation of joints, which has become the main cause of water leakage in underground continuous walls. The traditional underground continuous wall support structure has reasonable force, but it has defects such as complex construction technology, serious mud pollution, long construction period, and high cost. Therefore, it has been gradually replaced by cast-in-place pile support structure in recent years.

[0003] Compared with underground continuous walls, cast-in-place pile support structures have the advantages of less pollution, shorter construction period and lower cost. Prefabricated square piles are generally used for foundation pit support, slope support and landslide control. They bear horizontal soil pressure or landslide thrust. They generally require higher reinforcement than foundation piles that bear vertical forces. They are also often used together with anchor rods (cables) (pile-anchor structure).

[0004] Arranging multiple square piles to form a waterproof wall can greatly reduce its construction period. The upper ends of multiple square piles will be poured to form a crown beam as a whole connection. The crown beam mainly plays the following roles: 1. For individual or partial piles that are not strongly stressed, the crown beam is used to distribute the large force they are subjected to to adjacent piles, so that other piles can enter the supporting work; 2. Deformation constraint effect. Once deformation or deformation trend occurs, the work of constraining the deformation of the pile top begins; 3. Prestressed effect. Due to the inevitability of deformation, forces in various directions are generated between the pile tops. The crown beam can serve as a fulcrum for many reaction forces. The existing technology generally connects the upper ends of several square piles in series through a steel cage, and then sets up a formwork and pours concrete. The construction period is very long, so it is necessary to propose a prefabricated crown beam structure, and at the same time equip it with matching square piles, which can be connected in series to form an integrated concrete interlocking support pile through simple operations at the later stage. Summary of the invention

[0005] In view of this, the present invention aims to provide a concrete interlocking support pile to solve the deficiencies of the prior art.

[0006] To achieve the above object, the technical solution of the present invention is achieved as follows:

[0007] A concrete interlocking support pile comprises a crown beam structure, a support pile structure and a cone head pile structure. The support pile structure is a concrete square pile with a through hole in the middle. A first slot is symmetrically arranged on the first side and the second side of the support pile structure, and a symmetrical second slot and third slot are arranged on the third side and the fourth side. The second slot and the third slot are both through slots. An anti-foolproof hole is arranged on the upper end of the support pile structure, and the anti-foolproof hole is a blind hole. The upper end of the support pile structure is connected to the crown beam structure through two first slots, and the second slot and the third slot are both connected to the inner side of the crown beam structure. The cone head pile structure is installed on the lower end of the support pile structure. The crown beam structure, the support pile structure and the cone head pile structure correspond to each other one by one. Concrete is poured between the inner side of the crown beam structure and the upper end of the support pile structure.

[0008] Furthermore, the cone head pile structure includes a cone frame, a base, a cone seat and a first slide. One end of the cone frame is located below the cone seat, and the other end passes through the middle of the cone seat and the middle of the base in sequence and is located in the through hole. The cross-section of the base is a rectangular structure. The upper end of the cone seat is fixedly connected to the lower end of the pillar pile structure through the base. A first slide is provided on one side of the base, and a fourth slot is provided on the other side. The first slide corresponds to the second slot, and the fourth slot is connected to the third slot.

[0009] Furthermore, the cross-section of the cone seat is a trapezoidal structure, the outer dimensions of the upper end of the cone seat correspond to the outer dimensions of the base, the outer dimensions of the cone seat gradually decrease from the upper end to the lower end, a fifth slot is provided on one side of the cone seat, the fifth slot is connected to the fourth slot, the cross-section of the fifth slot is a trapezoidal structure, the dimensions of the upper end of the fifth slot correspond to the dimensions of the fourth slot, and the dimensions of the fifth slot gradually increase from the upper end to the lower end.

[0010] Furthermore, the upper end of the first slide horizontally overlaps with the upper end of the base, and the angle between the lower end of the first slide and one side of the base is an acute angle.

[0011] Furthermore, the crown beam structure includes an upper plate, a first support plate, a second support plate, an anti-fool column, hanging bars and a plunger. A feed hole is provided in the middle of the upper plate. The lower end of the upper plate at the outer edge of the feed hole is fixedly connected to the upper end of the plunger by a plurality of hanging bars. The lower end of the plunger extends into the through hole. The outer diameter of the plunger corresponds to the inner diameter of the through hole. The upper end of the first support plate and the upper end of the second support plate are both fixedly connected to the lower end of the upper plate. The lower end of the first support plate and the lower end of the second support plate are respectively clamped to a first clamping groove. The first support plate and the second support plate are bidirectionally symmetrically arranged. The upper plate, the first support plate and the second support plate constitute a trough plate with a U-shaped cross-section. An anti-fool column is also installed at the lower end of the upper plate. The anti-fool column, a plurality of hanging bars and the plunger are all located in the trough plate. The outer diameter of the anti-fool column corresponds to the inner diameter of the anti-fool hole. Concrete is evenly distributed between the inner side of the trough plate and the upper end of the supporting pile structure.

[0012] Furthermore, the first support plate has the same structure as the second support plate, the first support plate includes a side plate, a second slide and a third slide, the cross-section of the side plate is a rectangular structure, the upper end of the side plate is fixedly connected to the lower end of the upper plate, the second slide is installed on the left side, and a sixth slot is provided on the right side, and the third slide is installed on the inner side of the side plate, the outer size of the third slide corresponds to the inner size of the first slot, and the third slide is connected to a first slot, and the outer size of the second slide corresponds to the inner size of the sixth slot.

[0013] Furthermore, the end surface of the upper end of the side plate is parallel to the end surface of the upper end of the supporting pile structure, and the angle between the lower end of the side plate and one side of the supporting pile structure is an acute angle.

[0014] Compared with the prior art, the concrete interlocking support piles of the present invention have the following advantages:

[0015] (1) The concrete interlocking support piles described in the present invention can be prefabricated in batches in a factory and then transported to a designated construction site for rapid assembly to form an integrated deep pit foundation protection waterproof wall, which greatly saves construction time. In addition, the construction process is simple, the structure has high strength, and it is safe and reliable.

[0016] (2) The concrete interlocking support piles of the present invention, the expansion setting of the fifth slot of the cone head pile structure and the slope setting of the lower end of the first slide are both conducive to the burial of the cone head pile structure, saving energy consumption and avoiding damage to the cone head pile structure caused by excessive impact when burial.

[0017] (3) In the concrete interlocking support piles described in the present invention, the setting of the plunger of the crown beam structure can be used to determine the relative position of the entire crown beam structure and the supporting pile structure, and the plunger blocks the upper end of the through hole to prevent the subsequent concrete from being poured into the through hole and causing waste of materials. After the concrete is poured in the later stage, because the upper end of the plunger extends into the through hole, it is more conducive to the integration of the crown beam structure and the supporting pile structure. The prefabricated crown beam structure saves the concrete pouring period and curing age. The lower supporting pile structure is connected together by pouring cement slurry or concrete, which ensures the integrity of the pile structure and prevents deformation of the pile top.

[0018] (4) The concrete interlocking support piles described in the present invention are provided with fool-proof holes, which make the end faces of the symmetrical supporting pile structures visually different in structure. On the one hand, the workers can visually distinguish the placement direction of the supporting pile structures to ensure that the supporting pile structures are placed in the same direction. On the other hand, the upper cap beam structure is consistent in position and direction with the supporting pile structure to avoid workers mistakenly placing the supporting pile structure and the cap beam structure in the wrong direction, causing unnecessary losses. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] The accompanying drawings constituting a part of the present invention are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the accompanying drawings:

[0020] Figure 1 It is a schematic diagram of the explosion structure of the concrete interlocking supporting piles according to an embodiment of the present invention;

[0021] Figure 2 A top view of the support pile structure according to an embodiment of the present invention;

[0022] Figure 3 This is a schematic diagram of the structure of the cone-head pile according to an embodiment of the present invention;

[0023] Figure 4 It is a front view of the cone head pile structure according to an embodiment of the present invention;

[0024] Figure 5 A side view of the cone-head pile structure according to an embodiment of the present invention;

[0025] Figure 6 This is a schematic diagram of the crown beam structure according to an embodiment of the present invention;

[0026] Figure 7 A bottom view of the crown beam structure according to an embodiment of the present invention;

[0027] Figure 8 This is a schematic diagram of the first support plate structure according to an embodiment of the present invention;

[0028] Fig. 9 A schematic diagram of a structure in which a plurality of supporting pile structures are connected in series according to an embodiment of the present invention;

[0029] Description of reference numerals:

[0030] 1-crown beam structure; 11-upper plate; 12-first support plate; 121-side plate; 122-second slide; 123-sixth slot; 124-third slide; 13-second support plate; 14-anti-fool column; 15-hanging bar; 16-plunger; 17-feeding hole; 2-pillar pile structure; 21-first slot; 22-second slot; 23-anti-fool hole; 24-third slot; 25-through hole; 3-cone head pile structure; 31-cone frame; 32-base; 33-cone seat; 34-first slide; 35-fourth slot; 36-fifth slot; 4-waterproof hole. DETAILED DESCRIPTION

[0031] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments may be combined with each other.

[0032] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and the like are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, features defined as "first", "second", and the like may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.

[0033] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood by specific circumstances.

[0034] The present invention will be described in detail below with reference to the accompanying drawings and in conjunction with embodiments.

[0035] like Figure 1-2 As shown, the concrete interlocking support pile comprises a crown beam structure 1, a support pile structure 2 and a cone head pile structure 3. The support pile structure 2 is a concrete square pile with a through hole 25 in the middle. The first side and the second side of the support pile structure 2 are symmetrically provided with a first card slot 21, and the third side and the fourth side are symmetrically provided with a second card slot 22 and a third card slot 24. The second card slot 22 and the third card slot 24 are both through slots. The upper end of the support pile structure 2 is provided with a foolproof hole 23, which is a blind hole. The upper end of the support pile structure 2 The crown beam structure 1 is clamped by two first clamping grooves 21, and the second clamping groove 22 and the third clamping groove 24 are both connected to the inner side of the crown beam structure 1, and the cone head pile structure 3 is installed at the lower end of the supporting pile structure 2. The crown beam structure 1, the supporting pile structure 2 and the cone head pile structure 3 are all used in a 1:1:1 matching manner during construction. Several concrete interlocking support piles are connected in series, and concrete is poured between the inner side of the crown beam structure 1 and the upper end of the supporting pile structure 2 to form a deep pit foundation protection waterproof wall, with two adjacent concrete interlocking support piles.

[0036] like Figure 3-5As shown in Figure 9, the cone head pile structure 3 includes a cone frame 31, a base 32, a cone seat 33 and a first slide 34. One end of the cone frame 31 is located below the cone seat 33, and the other end passes through the middle of the cone seat 33 and the middle of the base 33 in sequence and is located in the through hole 25. The cross section of the base 32 is a rectangular structure. The upper end of the cone seat 33 is fixedly connected to the lower end of the pillar pile structure 2 through the base 32. A first slide 34 is provided on one side of the base 32, and a fourth slot 35 is provided on the other side. The first slide 34 is located at the port at the bottom end of the second slot 22, and the outer size of the first slide 34 is consistent with the inner size of the second slot 22. When forming a water wall, the cooperation of the first slide 34 and the second slot 22 is used for positioning and correcting the two adjacent mixed soil interlocking support piles, and also plays the role of a locking connection. At the same time, the first slide 34 also removes the medium in the second slot 22. The second slot 22 and the third slot 23 of the two adjacent concrete interlocking support piles constitute a waterproof hole 4, and the waterproof hole 4 is connected to the inner side of the crown beam structure 1. When the staff pours concrete into the inner side of the crown beam structure 1, the concrete flows into the waterproof hole 4. On the one hand, this part of the two adjacent concrete interlocking support piles is connected as a whole, and on the other hand, the waterproof effect of the joint is ensured. In addition, the fourth slot 35 is connected to the third slot 24.

[0037] The cross section of the cone seat 33 is a trapezoidal structure, the periphery of the upper end of the cone seat 33 coincides with the periphery of the lower end of the base 32, and the periphery size of the cone seat 33 gradually decreases from the upper end to the lower end. A fifth clamping groove 36 is provided on one side of the cone seat 33, and the fifth clamping groove 36 is connected to the fourth clamping groove 35. The cross section of the fifth clamping groove 36 is a trapezoidal structure, the upper end of the fifth clamping groove 36 coincides with the lower end of the fourth clamping groove 35, and the size of the fifth clamping groove 36 gradually increases from the upper end to the lower end.

[0038] The upper end of the first slide 34 is horizontally overlapped with the upper end of the base 32, and the angle between the lower end of the first slide 34 and one side of the base 32 is an acute angle. The expansion setting of the fifth slot 36 and the slope setting of the lower end of the first slide are both conducive to the burial of the cone head pile structure 3, saving energy consumption and avoiding damage to the cone head pile structure 3 due to excessive impact when burial.

[0039] like Figure 6-7As shown, the crown beam structure 1 includes an upper plate 11, a first support plate 12, a second support plate 13, an anti-fool column 14, a hanging bar 15 and a plunger 16. A feed hole 17 is provided in the middle of the upper plate 11. The lower end of the upper plate 11 at the outer edge of the feed hole 17 is fixedly connected to the upper end of the plunger 16 through a plurality of hanging bars 15. The lower end of the plunger 16 extends into the through hole 25. The outer diameter of the plunger 16 is the same as the inner diameter of the through hole 25. The setting of the plunger 16 can be used to determine the relative position of the entire crown beam structure 1 and the support pile structure 2. The plunger 16 blocks the upper end of the through hole 25 to prevent the subsequent concrete from being poured into the through hole 25 and causing waste of materials. Moreover, after the concrete is poured in the later stage, because the upper end of the plunger 16 extends into the through hole 25, it is more conducive to the integration of the crown beam structure 1 and the support pile structure 2. The upper end of the first support plate 12 and the upper end of the second support plate 13 are both fixedly connected to the upper plate 11 At the lower end, the lower end of the first support plate 12 and the lower end of the second support plate 13 are respectively connected to a first card slot 21, and the first support plate 12 and the second support plate 13 are symmetrically arranged in both directions. The upper plate 11, the first support plate 12 and the second support plate 13 constitute a slot plate with a U-shaped cross-section. An anti-fool column 14 is also installed at the lower end of the upper plate 11. The anti-fool column 14, a plurality of hanging bars 15 and a plunger 16 are all located in the slot plate. The anti-fool column 14 and the anti-fool hole 23 are coaxial and are used for construction to mark the direction to prevent wrong installation and waste of time and materials. The inner side of the slot plate and the upper end of the supporting pile structure 2 constitute a rectangular structure with a hollow cross-section, and the waterproof hole 4 is connected to the inside thereof. The staff pours concrete (or cement slurry of equal strength) into the hollow rectangular structure through the feed hole 17, so that the crown beam structure system and the supporting pile structure system are connected into a whole, which plays a waterproof and soil retaining role.

[0040] like Figure 8 As shown, the first support plate 12 has the same structure as the second support plate 13. The first support plate 12 includes a side plate 121, a second slide 122 and a third slide 124. The cross-section of the side plate 121 is a rectangular structure. The upper end of the side plate 121 is fixedly connected to the lower end of the upper plate 11. The second slide 122 is installed on the left side, and a sixth slot 123 is provided on the right side. The third slide 124 is installed on the inner side of the side plate 121. The outer size of the third slide 124 is connected to the inner size of the first slot 21, and the third slide 124 is clamped into a first slot 21 for positioning and fixing the crown beam structure 1 and the support pile structure 2. The outer size of the second slide 122 is the same as the inner size of the sixth slot 123. The two adjacent crown beam structures 1 are initially fixed by clamping the second slide 122 to the sixth slot 123 seat for subsequent pouring of concrete.

[0041] The end surface of the upper end of the side plate 121 is parallel to the end surface of the upper end of the supporting pile structure 2, and the angle between the lower end of the side plate 121 and one side of the supporting pile structure 2 is an acute angle, which is conducive to the burial of the crown beam structure 1, saves energy consumption, and avoids damage to the crown beam structure 1 caused by excessive impact when burial.

[0042] The cone frame 31, the base 32, the cone seat 33 and the first slide 34 are an integrated structure of reinforced concrete casting; the upper plate 11, the first support plate 12, the second support plate 13, the anti-fool column 14, the hanging bar 15 and the plunger 16 are an integrated structure of reinforced concrete casting.

[0043] The use process of concrete interlocking support piles:

[0044] The staff prefabricates several crown beam structures 1, supporting pile structures 2 and cone pile structures 3 in the factory, and then transports them to the designated construction location. A cone pile structure 3 is driven half a meter into the ground with a pile driver, and the upper end of the cone pile structure 3 is connected to the supporting pile structure 2. The upper end of the supporting pile structure 2 is hammered with a pile driver, and the supporting pile structure 2 is hammered to a designated depth. During the piling process, the expansion setting of the fifth slot 36 and the slope setting of the lower end of the first slide are both conducive to the burial of the cone pile structure 3, saving energy consumption and avoiding damage to the cone pile structure 3 due to excessive impact when burial. After that, the staff takes another cone pile structure 3, fits the first slide 34 with the second slot 22, determines the relative position of this cone pile structure 3, repeats the above steps to connect several supporting pile structures 2 and cone pile structures 3 in series, and the second slot 22 and the third slot 23 between two adjacent supporting pile structures 2 form a waterproof hole 4. After that, the staff takes A crown beam structure 1 is placed correspondingly to the upper end of a supporting pile structure 2, and it is confirmed that the anti-fool column 14 corresponds to the top of the anti-fool hole 23. The relative position of the crown beam structure 1 and the supporting pile structure 2 is determined by the cooperation of the plunger 16 and the through hole 25, and the cooperation of the third slide 124 and the first slot 21. Repeat the above operation steps to install several crown beam structures 1 to the upper end of the supporting pile structure 2 previously driven into the ground, and the interior of the crown beam structure 1 is connected with several waterproof holes 4. Then the staff pours concrete into the inside of the crown beam structure 1 through the feed hole 17. Before this step, the staff can pre-lay multiple steel bars horizontally in several crown beam structures 1 as reinforcement bars connecting several crown beam structures 1. The concrete is evenly distributed between the inner side of each crown beam structure 1 and the upper end of each supporting pile structure 2 and in each waterproof hole 4. At this point, several crown beam structures 1 and several supporting pile structures 2 are formed into an integrated deep pit foundation waterproof wall by pouring concrete.

[0045] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. Concrete interlocking support piles, characterized by: The invention comprises a crown beam structure (1), a support pile structure (2) and a cone head pile structure (3); the support pile structure (2) is a concrete square pile, a through hole (25) is provided in the middle, a first clamping groove (21) is symmetrically arranged on the first side and the second side of the support pile structure (2), a second clamping groove (22) and a third clamping groove (24) are symmetrically arranged on the third side and the fourth side, the second clamping groove (22) and the third clamping groove (24) are both through grooves, and an anti-fouling hole (23) is provided at the upper end of the support pile structure (2) to prevent fooling. The dead hole (23) is a blind hole. The upper end of the supporting pile structure (2) is connected to the crown beam structure (1) through two first clamping grooves (21), and the second clamping groove (22) and the third clamping groove (24) are both connected to the inner side of the crown beam structure (1). The cone head pile structure (3) is installed at the lower end of the supporting pile structure (2). The crown beam structure (1), the supporting pile structure (2) and the cone head pile structure (3) are all in one-to-one correspondence. Concrete is poured between the inner side of the crown beam structure (1) and the upper end of the supporting pile structure (2). The cone head pile structure (3) comprises a cone frame (31), a base (32), a cone seat (33) and a first slide (34); one end of the cone frame (31) is located below the cone seat (33), and the other end passes through the middle of the cone seat (33) and the middle of the base (32) in sequence and is located in the through hole (25); the cross section of the base (32) is a rectangular structure; the upper end of the cone seat (33) is fixedly connected to the lower end of the pillar pile structure (2) through the base (32); a first slide (34) is arranged on one side of the base (32), and a fourth slot (35) is arranged on the other side; the first slide (34) corresponds to the second slot (22), and the fourth slot (35) is connected to the third slot (24); The cross section of the cone seat (33) is a trapezoidal structure, the outer dimensions of the upper end of the cone seat (33) correspond to the outer dimensions of the base (32), and the outer dimensions of the cone seat (33) gradually decrease from the upper end to the lower end. A fifth clamping groove (36) is provided on one side of the cone seat (33), and the fifth clamping groove (36) is connected to the fourth clamping groove (35). The cross section of the fifth clamping groove (36) is a trapezoidal structure, the dimensions of the upper end of the fifth clamping groove (36) correspond to the dimensions of the fourth clamping groove (35), and the dimensions of the fifth clamping groove (36) gradually increase from the upper end to the lower end. The crown beam structure (1) comprises an upper plate (11), a first support plate (12), a second support plate (13), an anti-fool column (14), a hanging rib (15) and a plunger (16). A feed hole (17) is provided in the middle of the upper plate (11). The lower end of the upper plate (11) at the outer edge of the feed hole (17) is fixedly connected to the upper end of the plunger (16) through a plurality of hanging ribs (15). The lower end of the plunger (16) extends into the through hole (25). The outer diameter of the plunger (16) corresponds to the inner diameter of the through hole (25). The upper end of the first support plate (12) and the upper end of the second support plate (13) are both fixedly connected to the lower end of the upper plate (11). The lower end of the support plate (12) and the lower end of the second support plate (13) are respectively connected to a first slot (21). The first support plate (12) and the second support plate (13) are arranged bidirectionally symmetrically. The upper plate (11), the first support plate (12) and the second support plate (13) form a slot plate with a U-shaped cross-section. An anti-fool column (14) is also installed at the lower end of the upper plate (11). The anti-fool column (14), a plurality of hanging bars (15) and a plunger (16) are all located in the slot plate. The outer diameter of the anti-fool column (14) corresponds to the inner diameter of the anti-fool hole (23). Concrete is evenly distributed between the inner side of the slot plate and the upper end of the support pile structure (2).

2. The concrete interlocking support pile according to claim 1 is characterized in that: The upper end of the first slide (34) horizontally overlaps with the upper end of the base (32), and the angle between the lower end of the first slide (34) and one side of the base (32) is an acute angle.

3. The concrete interlocking support pile according to claim 1 is characterized in that: The first support plate (12) and the second support plate (13) have the same structure. The first support plate (12) comprises a side plate (121), a second slide (122) and a third slide (124). The cross section of the side plate (121) is a rectangular structure. The upper end of the side plate (121) is fixedly connected to the lower end of the upper plate (11). The second slide (122) is installed on the left side. A sixth slot (123) is provided on the right side. The third slide (124) is installed on the inner side of the side plate (121). The outer dimension of the third slide (124) corresponds to the inner dimension of the first slot (21). The third slide (124) is snap-connected to one of the first slots (21). The outer dimension of the second slide (122) corresponds to the inner dimension of the sixth slot (123).

4. The concrete interlocking support pile according to claim 3 is characterized in that: The end surface of the upper end of the side plate (121) is parallel to the end surface of the upper end of the supporting pile structure (2), and the angle between the lower end of the side plate (121) and one side of the supporting pile structure (2) is an acute angle.