Integrated propellant control system for gas-liquid bipropellant rocket engines
By designing a propellant control integrated system for gas-liquid two-component rocket engines, the problem of bulky and complex propellant supply control system in the existing technology is solved, and the system is highly integrated and conveniently operated, which improves the test efficiency and operator work. condition.
Patent Information
- Application Number
- CN202010690117.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-07-17
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2040-07-17
AI Technical Summary
In the field test, the existing rocket engine propellant supply control system is bulky and complex, and the disassembly and reorganization workload is large, resulting in slow test progress and increased operator working intensity.
A gas-liquid dual-component rocket engine propellant control integrated system is designed, adopting a metal square box structure, integrating main pipeline, blow-off pipeline, sensor and valve and other components, connected and fixed by standard parts, for easy disassembly and assembly and transport, built-in filter, flowmeter and main control valve, supports isolation, blow-off and control of gas-liquid media.
It realizes high integration of the system, facilitates disassembly and assembly and inspection, reduces the difficulty of transporting and replacing parts, reduces the working intensity of the operator, improves work efficiency, and is industry-wide, suitable for different types of rocket engine tests.
Smart Images

Figure CN111911316B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of rocket engine auxiliary tools, and in particular to a gas-liquid bi-component rocket engine propellant control integrated system. Background Art
[0002] The propellant supply control system of rocket engines during ground tests is extremely complex. The system includes gas cylinders, buffer containers, propellant tanks, valves, flow meters, filters and other components. Among them, gas cylinders, buffer containers, and propellant tanks are called propellant supply components, and valves, flow meters, and filters are called propellant control components. With the development of the aerospace industry, rocket engines and propellant supply control systems are often required to go to foreign factories for single-machine or joint tests. However, conventional propellant supply control systems have been integrated with test benches. The system is disassembled and reassembled. Because the system is too bulky and complex, and the workload is large, it seriously slows down the progress of field tests, increases the difficulty of implementation, and increases the workload of operators. Summary of the invention
[0003] In view of the deficiencies in the prior art, the present invention provides a gas-liquid bipropellant rocket engine propellant control integrated system.
[0004] The technical solution adopted by the present invention is a gas-liquid bipropellant rocket engine propellant control integrated system, including a square box body, a lifting ring is installed on the top of the square box body, a pulley with a locking function is installed on the bottom, a signal output and power supply interface for docking with a control-digital acquisition system combination is arranged on the outside, a pipe joint interface connected to an external pipeline is arranged on the side of the square box body, the interior of the square box body includes a main line, a blow-off line and a driver line, the main line includes an air line and a liquid line, the propellant enters through the liquid line or the air line, is filtered through a filter and then the flow is fed back through a flowmeter, and finally the propellant output is controlled by a main control valve.
[0005] The square box body is made of metal.
[0006] All components in the square box are fixed on the metal bracket by screw connection.
[0007] The connection between the pipe joint interface and each component adopts a standard 37° tapered pipe joint, and a locking wire is added to the pipe joint position.
[0008] 5MPa nitrogen is introduced into the main pipeline, the purge pipeline and the drive gas pipeline.
[0009] The main pipeline, the blow-off pipeline and the driving gas pipeline are provided with sensors.
[0010] The blowing pipeline includes two paths, which are used to blow off the gas path and the liquid path respectively, and the two blowing pipelines are isolated from each other.
[0011] The beneficial effects of the present invention are as follows: the device is highly integrated with multiple components, convenient for disassembly and assembly, detection, transportation, and replacement of parts. It is easy to use and labor-saving, improves work efficiency, reduces the work intensity of workers, and can be applied to the propellant supply system of cold test and hot test of different types of gas-liquid rocket engines, and has certain industry versatility. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 This is a diagram of the external structure of the box of the gas-liquid bipropellant rocket engine propellant control integrated system of the present invention.
[0013] Figure 2 The diagram is a gas-liquid circuit diagram inside the casing of the gas-liquid bipropellant rocket engine propellant control integrated system of the present invention.
[0014] Markings in the figure: 1-square box body, 2-lifting ring, 3-pulley, 4-pipe joint interface, 5-signal output and power supply interface, 6-flow meter, 7-filter, 8-flow meter, 9-main control valve, 10-sensor, 11-blowing valve, 12-solenoid valve. DETAILED DESCRIPTION
[0015] Now, the invention is further described in conjunction with the accompanying drawings. The device is a metal square box structure, including a square box body 1, a lifting ring 2, a pulley 3, a pipe joint interface 4, a signal output and power supply interface 5, a flowmeter 8, a filter 7, a flowmeter 8, a main control valve 9, a sensor 10, a blow-off valve 11, and a solenoid valve 12; in order to facilitate movement and fixation, a lifting ring 2 is installed on the top of the square box body 1, and a pulley 3 with a tightening function is installed at the bottom. The square box has a specification of about 1000×430×500mm, and the control medium inlet and outlet are all equipped with standard 37° conical pipe joints, which are convenient for docking with the propellant supply component (upstream) and the product (downstream). The flowmeter 8 display window, sensor signal output interface, flowmeter power supply interface, and valve control electrical interface are set on the outside of the square box to facilitate docking with the control-digital acquisition system combination.
[0016] The metal square box is highly integrated with the main control valve 9, the blow-off valve 11, the solenoid valve 12, the filter 7, the flow meter 8, the sensor 10 and the connecting pipeline, and has complete propellant control function, post-processing function, and self-cleaning function. All components in the device are fixed on the metal bracket by screw connection to ensure that the components are connected reliably and meet various ground use environments. The connection between the pipeline and each component adopts standard pipe joint connectors to ensure that the pipeline connection does not change diameter, deform, or leak, and lock wires are added to the pipe joints to ensure that the joints are not loosened due to vibration during transportation and use. In the device, the supply pipeline and the main body of the valve are made of stainless steel, and the sealing structure is made of polytetrafluoroethylene, which is compatible with most propellants (cold test media) in the industry. The outside of the device is equipped with a metal skin, and the medium interface, electrical interface and display window are distributed around the device. Each interface is clearly marked to prevent wrong connection or mixed connection. The propellant (cold test medium) first passes through the filter 7 through the liquid or gas inlet (as needed) to make the propellant (medium) meet the excess requirements of the product, then the flow rate is fed back through the flow meter 8, and finally the propellant (medium) is controlled through the main control valve 9 to control the working state of the product. The purge gas is mainly used to purge the propellant (medium) in the main pipeline. Generally, high-purity nitrogen is selected as the medium. In order to ensure that the two flow channels are completely isolated, the purge devices of the gas and liquid circuits are completely isolated. After the purge gas enters the pipeline, it first enters the filter 7, and then directly purges the pipeline after the main control valve 9 through the purge gas control valve. The drive gas valve is mainly used to control the drive gas, and then control the switch of the main control valve and the purge valve 11. The drive gas generally uses high-purity nitrogen as the medium, and it must also pass through the filter 7 before flowing through the solenoid valve 12 to ensure the cleanliness of the high-purity nitrogen.
[0017] The specific steps are as follows:
[0018] Step 1: Connect the outlet of the propellant (medium) supply pipeline to the corresponding inlet of the device to ensure reliable connection and tightening in place. Connect the drive gas and blow-off gas pipelines to the corresponding inlets and adjust the drive gas and blow-off gas pressures. Connect the rocket engine inlet to the corresponding outlet of the device through a pipeline. Connect the valve control line, flowmeter power supply line and signal output line to the device to complete the connection combination with the control-digital acquisition system. After completing the above work, lock the pulley 3 and fix the square box body 1.
[0019] Step 2: All valves are in the closed state, 5MPa nitrogen is introduced into the main pipeline, the purge pipeline and the drive gas pipeline, and the air tightness of each interface is checked by the soap liquid method. It is required that no soap bubbles are allowed on each joint. After the inspection is qualified, the high-pressure nitrogen in the pipeline is removed. If the inspection fails, unpack and check, and tighten the leaking point.
[0020] Step three, power the valve control, flow meter 8 and sensor 10 output signals, collect zero-point signals, check whether each valve control is normal through valve action, and check whether the sensor 10 and flow meter 8 are normal through the zero point of sensor 10 and flow meter 8. If the inspection fails, unpack and check whether each electrical interface is tightened and intact. After troubleshooting, assemble the square box body 1 intactly.
[0021] Step 4: After the test is completed, continue to purge the main line with nitrogen until there is no residual propellant (medium) in the main line, carry out excess material prevention and control on the open interface, and seal all openings.
Claims
1. A gas-liquid bipropellant rocket engine propellant control integrated system, characterized in that: It includes a square box body, a lifting ring is installed on the top of the square box body, a pulley with a locking function is installed on the bottom, a signal output and power supply interface connected to the control-digital acquisition system combination is arranged on the outside, and a pipe joint interface connected to the external pipeline is arranged on the side of the square box body. The inside of the square box body includes a main line, a blow-off line and a driving air line. The main line includes an air line and a liquid line. The propellant enters through the liquid line or the air line, is filtered through a filter, and then the flow is fed back through a flow meter. Finally, the propellant output is controlled by a main control valve.
2. The gas-liquid bipropellant rocket engine propellant control integrated system according to claim 1, characterized in that: The square box body is made of metal.
3. The gas-liquid bipropellant rocket engine propellant control integrated system according to claim 1, characterized in that: All components in the square box are fixed on the metal bracket by screw connection.
4. The gas-liquid bipropellant rocket engine propellant control integrated system according to claim 1, characterized in that: The connection between the pipe joint interface and each component adopts a standard 37° tapered pipe joint, and a locking wire is added to the pipe joint position.
5. The gas-liquid bipropellant rocket engine propellant control integrated system according to claim 1, characterized in that: 5MPa nitrogen is introduced into the main pipeline, the purge pipeline and the drive gas pipeline.
6. The gas-liquid bipropellant rocket engine propellant control integrated system according to claim 5, characterized in that: The main pipeline, the blow-off pipeline and the driving gas pipeline are provided with sensors.
7. The gas-liquid bipropellant rocket engine propellant control integrated system according to claim 1, characterized in that: The blowing pipeline includes two paths, which are used to blow off the gas path and the liquid path respectively, and the two blowing pipelines are isolated from each other.