A slot-connected steel-concrete composite rigid frame bridge and construction method thereof

The design of steel-mixed composite rigid-structured bridges connected through slots solves the problems of traditional low construction efficiency and high construction costs, achieves improvement of structural aesthetics and economics, simplifies the construction process, and reduces traffic interference time.

CN112502023BActive Publication Date: 2024-11-19GUANGZHOU MUNICIPAL ENG DESIGN & RES INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202011339386.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-11-25
Publication Date
2024-11-19
Estimated Expiration
2040-11-25

AI Technical Summary

Technical Problem

Traditional cast-in-place construction leads to reduced traffic capacity in the construction area, low construction efficiency and high energy consumption. In addition, large-scale cover beam structures need to be installed in the design of prefabricated steel-concrete composite beams, which increases construction cost and aesthetic problems. The temporary piers are set up for a long time. Affects road traffic and construction efficiency.

Method used

The steel-concrete combination rigid structure bridge design adopts slot connection, including prefabricated main beam segments, pier columns, prefabricated cross beam segments, longitudinal connection segments and transverse connection segments. The pier columns and cover beams are connected through slots to reduce structural height and The amount of steel is used to achieve segmental connection using longitudinal connection steel components to form a dark cross beam structure.

Benefits of technology

It reduces the overall cost, improves the aesthetics, reduces the amount of steel used in the structure, shortens the construction time, achieves fast and convenient construction and industrial production, and reduces traffic interference time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112502023B_ABST
    Figure CN112502023B_ABST
Patent Text Reader

Abstract

The present invention discloses a steel-concrete composite rigid frame bridge connected by slots and a construction method thereof. The steel-concrete composite rigid frame bridge comprises a plurality of prefabricated main beam segments, piers, prefabricated cross beam segments, longitudinal connection segments and transverse connection segments. Adjacent segments are connected longitudinally to form a main beam structure, and adjacent main beam structures are connected by transverse connection segments to form a bridge span structure. The prefabricated pier top segment is divided into a prefabricated pier top segment a and a prefabricated pier top segment b. The prefabricated pier top segment a is arranged directly above the pier column, and there is no pier column directly below the prefabricated pier column segment b. The prefabricated pier top segment a is provided with a slot hole, and an exposed steel bar is arranged above the pier column to insert the slot hole, and high-strength concrete slurry is poured into the slot hole to realize the connection between the prefabricated cross beam and the pier column. The steel-concrete composite rigid frame bridge components connected by slots are convenient to manufacture, transport and construct, which is conducive to giving full play to the structural advantages of the steel-concrete composite beam and the advantages of assembly construction, and can realize industrialized production, segmented transportation and assembly construction, which meets the needs of green development.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of bridges, and in particular to a slot-connected steel-concrete composite rigid frame bridge and a construction method thereof. Background Art

[0002] With the acceleration of urbanization, municipal bridge construction projects have gradually increased. Traditional cast-in-place construction can easily lead to a sharp drop in the traffic capacity of the construction area, affecting the smoothness and safety of the road, and even frequent traffic interruptions, which greatly affects the work and life of residents. In addition, traditional cast-in-place construction has a large amount of on-site work, low construction efficiency, high overall energy consumption, and serious nuisance to residents. Prefabricated bridges can significantly speed up the construction progress, reduce interference with existing traffic, and are beneficial to environmental protection through industrialized manufacturing of components and assembly construction.

[0003] The steel-concrete composite beam takes advantage of the material advantages of both steel and concrete. It is a highly competitive bridge structure and can be easily designed as a prefabricated component, which is convenient for on-site construction. At present, the commonly used design method for prefabricated steel-concrete composite continuous beams is to set the main beam as a longitudinal segmented component, and a large cap beam structure is required, which increases the structural height, increases the construction cost, and greatly reduces the aesthetics. In addition, the splicing between segments is achieved by the support of temporary piers on site. The setting time of temporary piers usually runs through the entire process of bridge construction, which increases the interference of construction on the road traffic below and also increases the investment of the construction unit. Although the temporary piers are removed after the splicing of the steel beams, a large number of templates need to be set up on site, which increases the workload on site. In addition, due to the stability requirements of the steel beam construction process and the characteristics of the steel beam and concrete, the amount of structural steel used increases. Summary of the invention

[0004] The object of the present invention is to provide a slot-connected steel-concrete composite rigid frame bridge and a construction method thereof, so as to solve at least one of the problems raised in the above-mentioned background technology.

[0005] The technical solutions adopted to solve the above technical problems are:

[0006] A steel-concrete composite rigid frame bridge connected by slots, comprising a plurality of prefabricated main beam segments, piers, prefabricated cross beam segments, prefabricated pier top segments, longitudinal connection segments and transverse connection segments, wherein the prefabricated main beam segments comprise prefabricated end segments, prefabricated pier top segments and prefabricated middle beam segments, wherein the prefabricated main beam segments comprise steel beams, beam top concrete slabs, beam bottom concrete and a plurality of shear connectors, wherein the steel beams comprise a first top plate, a first bottom plate and a first web plate, wherein the beam top concrete slab is located above the first top plate, wherein the beam bottom concrete is located in a negative bending moment zone of the first bottom plate, wherein the shear connectors are welded to the negative bending moment zones of the first top plate and the first bottom plate and connect the beam top concrete slab, the beam bottom concrete and the main beam into a whole;

[0007] The prefabricated pier top segment includes a prefabricated pier top segment a and a prefabricated pier top segment b, wherein the prefabricated pier top segment a is arranged directly above the pier column, and there is no pier column directly below the prefabricated pier top segment b;

[0008] The prefabricated pier top segment a comprises a second top plate, a second bottom plate, a second web plate, an outward extending top plate, an outward extending bottom plate, an outward extending web plate, a hole wall steel plate, a transverse partition plate, a longitudinal partition plate, a hole wall steel plate bolt, a first bottom plate bolt and a second bottom plate bolt, the second bottom plate is provided with an opening, the hole wall steel plate is arranged between the second web plates at the opening position, the hole wall steel plate and its second web plate form a slot hole, the hole wall steel plate bolt is arranged inside the slot hole, the second top plate above the slot hole is provided with a grouting hole, an exposed steel bar is arranged above the pier column, the exposed steel bar is inserted into the slot hole, and the grouting hole is used to grout the steel bar into the slot hole. High-strength concrete slurry is poured into the hole to realize the connection between the prefabricated pier top segment a and the pier column; the transverse diaphragm is perpendicular to the second web and multiple pieces are arranged, the first bottom plate bolts are arranged above the second bottom plate between the transverse diaphragm and the hole wall steel plate, and a certain thickness of concrete is poured; the longitudinal diaphragm is arranged in parallel with the second web to enhance the torsional performance of the extended plate of the prefabricated pier top segment a, and the second bottom plate bolts are arranged above the extended bottom plate between the longitudinal diaphragm and the second web, and a certain thickness of concrete is poured to resist the local large pressure;

[0009] The prefabricated pier top segment b comprises a second top plate, a second bottom plate, a second web plate, an outward-extending top plate, an outward-extending bottom plate, an outward-extending web plate, a transverse partition plate, a longitudinal partition plate, a first bottom plate bolt and a second bottom plate bolt. The first bottom plate bolt is arranged above the second bottom plate between the transverse partition plates, and concrete of a certain thickness is poured;

[0010] The prefabricated cross beam segment is arranged between the prefabricated pier top segment a and the prefabricated pier top segment b, and is composed of a third top plate, a third bottom plate, a third web plate and stiffening ribs. The third bottom plate and the extended bottom plate, the third web plate and the extended web plate, and the third top plate and the extended top plate are all connected by welding.

[0011] The prefabricated pier top segment is respectively welded to the prefabricated end segment and the prefabricated middle beam segment to form a main beam structure, and the bridge deck is cast to form a bridge span structure.

[0012] Furthermore, bolt holes are provided at the ends of the extended bottom plate, extended web plate, third bottom plate and third web plate, the third bottom plate and extended bottom plate as well as the third web plate and extended web plate are connected as one through connecting plates and high-strength bolts, and the third top plate and extended top plate are connected as one through welding;

[0013] The top plates between the prefabricated pier top segment and the prefabricated center beam segment, and between the prefabricated end segment and the prefabricated pier top segment are butt-jointed and welded to each other, and the bottom plates and web plates between the prefabricated pier top segment and the prefabricated center beam segment, and between the prefabricated end segment and the prefabricated pier top segment are butt-jointed and fastened by connecting plates and high-strength bolts.

[0014] Furthermore, a temporary hoop is provided above the pier column, and the temporary hoop serves as a support for the prefabricated pier top segment a during the construction phase.

[0015] Furthermore, two longitudinal connecting steel members are arranged above the top plates where the prefabricated pier top segment and the prefabricated middle beam segment are connected, and two longitudinal connecting steel members are arranged above the prefabricated pier top segment, one end of the longitudinal connecting steel member is embedded and fixed in the concrete plate on the top of the beam, the other end of one of the longitudinal connecting steel members extends to the top of the adjacent top plate, and is connected with the longitudinal connecting steel member correspondingly arranged above the adjacent top plate and then welded and fixed, and the other end of the other longitudinal connecting steel member is connected with the longitudinal connecting steel member correspondingly extending out on the adjacent top plate and then welded and fixed; circular holes are arranged on the longitudinal connecting steel members, transverse steel bars are inserted into the circular holes, the cast-in-place longitudinal connecting sections are wet-jointed to form longitudinal connecting sections, and the cast-in-place transverse connecting sections are wet-jointed to form transverse connecting sections, thereby forming a bridge span structure.

[0016] Furthermore, the longitudinal connecting steel member is an angle steel, and the bottom of the angle steel is welded and fixed to the top plate.

[0017] A construction method for a slot-connected steel-concrete composite rigid frame bridge comprises the following steps:

[0018] S1, manufacturing the prefabricated pier top segment a, the prefabricated pier top segment b, the prefabricated end segment, the prefabricated middle beam segment and the prefabricated cross beam segment;

[0019] S2, casting or hoisting pier columns, installing the temporary hoop, hoisting the prefabricated pier top segment a, extending the exposed steel bars of the pier columns into the slots in the prefabricated pier top segment a, setting temporary piers below the interfaces between the prefabricated pier top segment a, the prefabricated pier top segment b, the prefabricated end segments, and the prefabricated middle beam segments, hoisting the prefabricated pier top segment a, the prefabricated pier top segment b, the prefabricated end segments, and the prefabricated middle beam segments, adjusting the main beam line shape and connecting the segments;

[0020] S3, inserting transverse steel bars into the circular holes of the longitudinal connecting steel members and connecting the remaining steel bars, successively pouring the longitudinal connecting section wet joints and the beam bottom concrete, and pouring high-strength concrete slurry into the slots from the top grouting holes to achieve the connection between the prefabricated beam and the pier column;

[0021] S4. Dismantle the above temporary piers;

[0022] S5, pouring the wet joint of the transverse connection section and pouring the prefabricated pier top segment concrete bridge deck;

[0023] S6. Construction of bridge deck and ancillary facilities.

[0024] Furthermore, in step S1, the prefabricated center beam segment is manufactured into a composite beam structure with pre-bending prestress by using the pre-bending principle, and the specific steps are as follows:

[0025] Fixing the beam tops at both ends of the prefabricated middle beam segment by using reaction frames;

[0026] A jack is arranged at the bottom of the prefabricated middle beam segment and a lifting force is applied, and when the lifting force reaches a predetermined value, the bottom support of the mid-span beam is replaced;

[0027] Then pouring the beam top concrete slab on the top of the prefabricated center beam segment;

[0028] After the strength of the concrete slab on the top of the prefabricated middle beam segment meets the requirements, the lifting force is unloaded;

[0029] Pre-bending is completed.

[0030] The beneficial effects of the present invention are as follows: by hiding the cap beam into the main beam structure to form a hidden crossbeam structure, the height of the pier is reduced, the aesthetics is improved, and the overall cost is reduced; slots are arranged inside the prefabricated crossbeam, and shear connectors are arranged in the slots, and the exposed steel bars of the pier are inserted into the slots and the rigid connection between the pier and the cap beam is achieved through high-strength concrete slurry, thereby utilizing the advantages of the system to reduce the amount of steel used in the structure and save cost; longitudinal connecting steel members are used to achieve connection between segments, thereby solving the problem of large segments being difficult to transport and hoist, and thereby giving full play to the structural advantages of the steel-concrete composite beam, and the construction is fast and convenient, and industrialized production, segmented transportation, and assembly construction can be realized, thereby shortening traffic interference time. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] The present invention will be further described below in conjunction with the accompanying drawings and embodiments:

[0032] Figure 1 It is a segmented diagram with a span number of 3;

[0033] Figure 2 It is a side view of the slot;

[0034] Figure 3 A top view of a steel-concrete composite rigid frame bridge with slot connections;

[0035] Figure 4 This is a schematic diagram of the cross section at the slot. DETAILED DESCRIPTION

[0036] Reference Figures 1 to 4 The embodiment of the present invention provides a steel-concrete composite rigid frame bridge connected by a slot, the steel-concrete composite rigid frame bridge includes a plurality of prefabricated main beam segments, piers 11, prefabricated cross beam segments, prefabricated pier top segments, longitudinal connection segments and transverse connection segments, the prefabricated main beam segments include prefabricated end segments, prefabricated pier top segments and prefabricated middle beam segments, the prefabricated main beam segments include steel beams 21, beam top concrete slabs 22, beam bottom concrete 23 and a plurality of shear connectors 24, the steel beam 21 includes a first top slab , a first bottom plate and a first web, the beam top concrete slab 22 is located above the first top plate, the beam bottom concrete 23 is located in the negative bending moment area of ​​the first bottom plate, the shear connector 24 is welded to the negative bending moment area of ​​the first top plate and the first bottom plate and connects the beam top concrete slab 22, the beam bottom concrete 23 and the main beam into a whole; the precast pier top segment includes a precast pier top segment a and a precast pier top segment b, the precast pier top segment a is arranged directly above the pier column 11, and there is no pier column 11 directly below the precast pier top segment b.

[0037] The prefabricated pier top segment a includes a second top plate, a second bottom plate, a second web plate, an extended top plate 36, an extended bottom plate 38, an extended web plate 37, a hole wall steel plate 32, a transverse partition plate 33, a longitudinal partition plate 34, a hole wall steel plate bolt 35, a first bottom plate bolt and a second bottom plate bolt. The second bottom plate is provided with an opening 31, a hole wall steel plate 32 is arranged between the second web plates at the position of the opening 31, the hole wall steel plate 32 and its second web plate form a slot, a hole wall steel plate bolt 35 is arranged inside the slot, and a second hole wall steel plate bolt 35 is arranged above the slot. The top plate is provided with grouting holes, and exposed steel bars 111 are arranged above the pier column 11. The exposed steel bars 111 are inserted into the slots, and high-strength concrete slurry is poured into the slots from the grouting holes to realize the connection between the prefabricated pier top segment a and the pier column 11; the transverse partition 33 is perpendicular to the second web and multiple pieces are arranged, and the first bottom plate bolts are arranged above the second bottom plate between the transverse partition 33 and the hole wall steel plate 32, and a certain thickness of concrete is poured; the longitudinal partition 34 is arranged parallel to the second web to enhance the prefabricated pier top segment a The extended plate has torsion resistance, and a second bottom plate bolt is arranged above the extended bottom plate 38 between the longitudinal partition 34 and the second web, and a certain thickness of concrete is poured to resist the local large pressure; the prefabricated pier top segment b includes a second top plate, a second bottom plate, a second web, an extended top plate 36, an extended bottom plate 38, an extended web 37, a transverse partition 33, a longitudinal partition 34, a first bottom plate bolt and a second bottom plate bolt. The first bottom plate bolt is arranged above the second bottom plate between the transverse partitions 33 The precast cross beam segment is arranged between the precast pier top segment a and the precast pier top segment b, and is composed of a third top plate, a third bottom plate, a third web plate and stiffening ribs. The third bottom plate and the extended bottom plate 38, the third web plate and the extended web plate 37, and the third top plate and the extended top plate 36 are all welded together. The precast pier top segment is welded to the precast end segment and the precast middle beam segment to form a main beam structure, and the bridge deck is cast to form a bridge span structure.

[0038] In some embodiments, bolt holes are provided at the ends of the extended bottom plate 38, the extended web plate 37, the third bottom plate, and the third web plate. The third bottom plate and the extended bottom plate 38 and the third web plate and the extended web plate 37 are connected as a whole through a connecting plate and high-strength bolts. The third top plate and the extended top plate 36 are connected as a whole through welding. The top plates between the prefabricated pier top segment and the prefabricated middle beam segment, and between the prefabricated end segment and the prefabricated pier top segment are butt-jointed and welded, and the bottom plates and web plates between the prefabricated pier top segment and the prefabricated middle beam segment, and between the prefabricated end segment and the prefabricated pier top segment are butt-jointed and fastened by connecting plates and high-strength bolts. The fixed connection between the top plate, web plate, and bottom plate is achieved by bolt connection and welding, which not only ensures strength but also facilitates construction.

[0039] Furthermore, a temporary hoop 13 is provided above the pier column 11, and the temporary hoop 13 serves as a support for the prefabricated pier top segment a during the construction phase.

[0040] In some embodiments, two longitudinal connecting steel members 25 are arranged above the top plates where the prefabricated pier top segment and the prefabricated middle beam segment are connected, and two ends of the longitudinal connecting steel members 25 are embedded and fixed in the beam top concrete slab 22. The other end of one of the longitudinal connecting steel members 25 extends to the top of the adjacent top plate, and is connected with the corresponding longitudinal connecting steel member 25 arranged above the adjacent top plate and then welded and fixed. The other end of the other longitudinal connecting steel member 25 is connected with the corresponding longitudinal connecting steel member 25 extending out from the adjacent top plate and then welded and fixed. Circular holes are arranged on the longitudinal connecting steel members 25, and transverse steel bars are inserted into the circular holes. The cast-in-place longitudinal connecting sections are wet-jointed to form longitudinal connecting sections, and the cast-in-place transverse connecting sections are wet-jointed to form transverse connecting sections, thereby forming a bridge span structure.

[0041] Preferably, the longitudinal connecting steel member 25 is an angle steel, and the bottom of the angle steel is welded and fixed to the top plate.

[0042] In this embodiment, by hiding the cap beam into the main beam structure to form a hidden beam structure, the height of the pier 11 is reduced, the aesthetics is improved, and the overall cost is reduced; a slot is set inside the prefabricated beam, and a shear connector 24 is set in the slot, and the exposed steel bars 111 of the pier 11 are inserted into the slot and the rigid connection between the pier 11 and the cap beam is achieved through high-strength concrete slurry, which takes advantage of the system to reduce the amount of steel used in the structure and saves the cost; the steel-concrete composite rigid frame bridge components connected by the slot are easy to manufacture, transport, and construct, which is conducive to giving full play to the structural advantages of the steel-concrete composite beam and the advantages of prefabricated construction, and can realize industrialized production, segmented transportation, and prefabricated construction, which meets the needs of green development. The bottom of the negative bending moment area of ​​the prefabricated pier top segment is provided with a partition to enhance the torsion resistance of the structure and bolts and beam bottom concrete 23 to improve the local stress.

[0043] At the same time, the use of longitudinal connecting steel members 25 to achieve the connection between segments solves the problem that large segments are difficult to transport and hoist, which is conducive to giving full play to the structural advantages of steel-concrete composite beams, and the construction is fast and convenient, which can realize industrialized production, segmented transportation, and assembly construction, which is conducive to shortening the traffic interference time; the prefabricated main beam segments are bolted between segments to avoid the welding quality problems that may be caused by the bottom plate overhead welding, and the top plate is widened, so that the compression area of ​​the main beam structure is increased; with the longitudinal connecting steel member 25 and the top plate welding, the temporary pier 12 under the longitudinal connecting section can be removed after the welding is completed, which greatly reduces the traffic interference time on the road below; the longitudinal connecting steel member 25 is provided with a circular hole, and the first steel bar is inserted and then poured with concrete, which can effectively connect the prefabricated main beam segment and the beam top concrete slab 22 into a whole under the premise of assembly construction, simplifying the construction. In addition, when making the prefabricated segment, the prefabricated middle beam segment is set as a pre-bent structure, which can make full use of the compression performance of concrete, reduce the amount of steel used, and avoid cracking of the pier top concrete for the prefabricated middle beam.

[0044] The prefabricated main beam segments meet the coordination of engineering building modules, which is conducive to industrial large-scale production. The width of the wet joints in the transverse connecting sections is adjustable, which is suitable for applications with variable width sections.

[0045] The following is a construction method for a slot-connected steel-concrete composite rigid frame bridge, comprising the following steps:

[0046] S1, manufacturing prefabricated pier top segment a, prefabricated pier top segment b, prefabricated end segment, prefabricated middle beam segment and prefabricated cross beam segment;

[0047] S2, cast or hoist the pier column 11, install the temporary hoop 13, hoist the prefabricated pier top segment a, extend the exposed steel bars 111 of the pier column 11 into the slots in the prefabricated pier top segment a, set a temporary pier 12 below the interface between the prefabricated pier top segment a, the prefabricated pier top segment b, the prefabricated end segment, and the prefabricated middle beam segment, hoist the prefabricated pier top segment a, the prefabricated pier top segment b, the prefabricated end segment, and the prefabricated middle beam segment, adjust the main beam line shape and connect the segments;

[0048] S3, insert the transverse steel bar into the circular hole of the longitudinal connecting steel member 25 and connect the remaining steel bars, pour the longitudinal connecting section wet joint and beam bottom concrete 23 in turn, and pour high-strength concrete slurry into the slot from the top grouting hole to achieve the connection between the prefabricated beam and the pier 11;

[0049] S4, dismantling the temporary pier 12;

[0050] S5, pouring wet joints of transverse connection sections and pouring precast pier top segment concrete bridge deck;

[0051] S6. Construction of bridge deck and ancillary facilities.

[0052] Preferably, in step S1, the prefabricated center beam segment is made into a composite beam structure with pre-bending prestress by adopting the pre-bending principle, and the specific steps are:

[0053] The reaction frame is fixed to the beam top at both ends of the prefabricated middle beam segment;

[0054] A jack is set at the bottom of the prefabricated middle beam segment and a lifting force is applied. When the lifting force reaches a predetermined value, the bottom support of the mid-span beam is replaced;

[0055] Then pour the beam top concrete slab 22 on the top of the precast center beam segment;

[0056] After the strength of the beam top concrete slab 22 at the top of the prefabricated middle beam segment meets the requirements, the lifting force is unloaded;

[0057] Pre-bending is completed.

[0058] The embodiments of the present invention are described in detail above in conjunction with the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made within the knowledge scope of ordinary technicians in the technical field without departing from the purpose of the present invention.

Claims

1. A slot-connected steel-concrete composite rigid frame bridge, characterized in that: It comprises a plurality of prefabricated main beam segments, piers, prefabricated cross beam segments, prefabricated pier top segments, longitudinal connecting segments and transverse connecting segments. The prefabricated main beam segments comprise prefabricated end segments, prefabricated pier top segments and prefabricated middle beam segments. The prefabricated main beam segments comprise steel beams, beam top concrete slabs, beam bottom concrete and a plurality of shear connectors. The steel beams comprise a first top plate, a first bottom plate and a first web plate. The beam top concrete slab is located above the first top plate. The beam bottom concrete is located in the negative bending moment area of ​​the first bottom plate. The shear connector is welded to the negative bending moment areas of the first top plate and the first bottom plate and connects the beam top concrete slab, the beam bottom concrete and the main beam into a whole. The prefabricated pier top segment includes a prefabricated pier top segment a and a prefabricated pier top segment b, wherein the prefabricated pier top segment a is arranged directly above the pier column, and there is no pier column directly below the prefabricated pier top segment b; The prefabricated pier top segment a comprises a second top plate, a second bottom plate, a second web plate, an outward extending top plate, an outward extending bottom plate, an outward extending web plate, a hole wall steel plate, a transverse partition plate, a longitudinal partition plate, a hole wall steel plate bolt, a first bottom plate bolt and a second bottom plate bolt, the second bottom plate is provided with an opening, the hole wall steel plate is arranged between the second web plates at the opening position, the hole wall steel plate and its second web plate form a slot hole, the hole wall steel plate bolt is arranged inside the slot hole, the second top plate above the slot hole is provided with a grouting hole, an exposed steel bar is arranged above the pier column, the exposed steel bar is inserted into the slot hole, and the grouting hole is used to grout the steel bar into the slot hole. High-strength concrete slurry is poured into the hole to realize the connection between the prefabricated pier top segment a and the pier column; the transverse diaphragm is perpendicular to the second web and multiple pieces are arranged, the first bottom plate bolts are arranged above the second bottom plate between the transverse diaphragm and the hole wall steel plate, and a certain thickness of concrete is poured; the longitudinal diaphragm is arranged in parallel with the second web to enhance the torsional performance of the extended plate of the prefabricated pier top segment a, and the second bottom plate bolts are arranged above the extended bottom plate between the longitudinal diaphragm and the second web, and a certain thickness of concrete is poured to resist the local large pressure; The prefabricated pier top segment b comprises a second top plate, a second bottom plate, a second web plate, an outward-extending top plate, an outward-extending bottom plate, an outward-extending web plate, a transverse partition plate, a longitudinal partition plate, a first bottom plate bolt and a second bottom plate bolt. The first bottom plate bolt is arranged above the second bottom plate between the transverse partition plates, and concrete of a certain thickness is poured; The prefabricated cross beam segment is arranged between the prefabricated pier top segment a and the prefabricated pier top segment b, and is composed of a third top plate, a third bottom plate, a third web plate and stiffening ribs. The third bottom plate and the extended bottom plate, the third web plate and the extended web plate, and the third top plate and the extended top plate are all connected by welding. The prefabricated pier top segment is respectively welded to the prefabricated end segment and the prefabricated middle beam segment to form a main beam structure, and the bridge deck is cast to form a bridge span structure.

2. The slot-connected steel-concrete composite rigid frame bridge according to claim 1, characterized in that: Bolt holes are provided at the ends of the extended bottom plate, extended web plate, third bottom plate and third web plate. The third bottom plate and extended bottom plate, as well as the third web plate and extended web plate are connected as one through connecting plates and high-strength bolts. The third top plate and extended top plate are connected as one through welding. The top plates between the prefabricated pier top segment and the prefabricated center beam segment, and between the prefabricated end segment and the prefabricated pier top segment are butt-jointed and welded to each other, and the bottom plates and web plates between the prefabricated pier top segment and the prefabricated center beam segment, and between the prefabricated end segment and the prefabricated pier top segment are butt-jointed and fastened by connecting plates and high-strength bolts.

3. The slot-connected steel-concrete composite rigid frame bridge according to claim 2, characterized in that: A temporary hoop is arranged above the pier column, and the temporary hoop serves as a support during the construction phase of the prefabricated pier top segment a.

4. The slot-connected steel-concrete composite rigid frame bridge according to claim 3, characterized in that: Two longitudinal connecting steel members are arranged above the top plates where the prefabricated pier top segment and the prefabricated middle beam segment are connected, and above the prefabricated end segment and the prefabricated pier top segment are connected. One end of the longitudinal connecting steel member is embedded and fixed in the concrete plate on the top of the beam. The other end of one of the longitudinal connecting steel members extends to the top of the adjacent top plate, and is connected with the longitudinal connecting steel member correspondingly arranged above the adjacent top plate and then welded and fixed. The other end of the other longitudinal connecting steel member is connected with the longitudinal connecting steel member correspondingly extending out from the adjacent top plate and then welded and fixed. Circular holes are arranged on the longitudinal connecting steel members, and transverse steel bars are inserted into the circular holes. The cast-in-place longitudinal connecting sections are wet-jointed to form longitudinal connecting sections, and the cast-in-place transverse connecting sections are wet-jointed to form transverse connecting sections, thereby forming a bridge span structure.

5. The slot-connected steel-concrete composite rigid frame bridge according to claim 4, characterized in that: The longitudinal connecting steel member is an angle steel, and the bottom of the angle steel is welded and fixed to the top plate.

6. A construction method for a steel-concrete composite rigid frame bridge with slot connection as claimed in claim 4, characterized in that: The following steps are involved: S1, manufacturing the prefabricated pier top segment a, the prefabricated pier top segment b, the prefabricated end segment, the prefabricated middle beam segment and the prefabricated cross beam segment; S2, casting or hoisting pier columns, installing the temporary hoop, hoisting the prefabricated pier top segment a, extending the exposed steel bars of the pier columns into the slots in the prefabricated pier top segment a, setting temporary piers below the interfaces between the prefabricated pier top segment a, the prefabricated pier top segment b, the prefabricated end segments, and the prefabricated middle beam segments, hoisting the prefabricated pier top segment a, the prefabricated pier top segment b, the prefabricated end segments, and the prefabricated middle beam segments, adjusting the main beam line shape and connecting the segments; S3, inserting transverse steel bars into the circular holes of the longitudinal connecting steel members and connecting the remaining steel bars, successively pouring the longitudinal connecting section wet joints and the beam bottom concrete, and pouring high-strength concrete slurry into the slots from the top grouting holes to achieve the connection between the prefabricated beam and the pier column; S4. Dismantle the above temporary piers; S5, pouring the wet joint of the transverse connection section and pouring the prefabricated pier top segment concrete bridge deck; S6. Construction of bridge deck and ancillary facilities.

7. The construction method according to claim 6, characterized in that: In step S1, the prefabricated center beam segment is manufactured into a composite beam structure with pre-bending prestress by using the pre-bending principle, and the specific steps are as follows: Fixing the beam tops at both ends of the prefabricated middle beam segment by using reaction frames; A jack is arranged at the bottom of the prefabricated middle beam segment and a lifting force is applied, and when the lifting force reaches a predetermined value, the bottom support of the mid-span beam is replaced; Then pouring the beam top concrete slab on the top of the prefabricated center beam segment; After the strength of the concrete slab on the top of the prefabricated middle beam segment meets the requirements, the lifting force is unloaded; Pre-bending is completed.