A closed tailings pond flood control structure and construction method thereof
By designing steep flood control ridges, main drainage ditches and spillways on the surface of the tailings pond, the problems of difficult management and high maintenance costs of the tailings pond after the tailings pond are closed, and the safe and reliable flood control of the tailings pond is achieved , reducing maintenance costs and construction difficulty.
Patent Information
- Application Number
- CN202110289340.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-03-18
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2041-03-18
AI Technical Summary
The flood drainage system of the existing tailings pond is difficult to maintain and manage after the tailings pond is closed, resulting in a decline in structural quality and a lack of effective flood control measures, which increases safety risks and maintenance costs.
A closed-store tailings pond flood control structure was designed, including steep flood control ridges, main ditch on the beach surface, drainage branch ditch on the beach surface and spillway structures. All of them are located within the visible range of the surface of the tailings pond, which is convenient for observation, management and repair. , through the combination of flood control steep ridges and spillways, effective flood discharge is achieved.
It has improved the flood control safety reserves of tailings ponds, reduced maintenance and management difficulties, shortened construction periods, reduced maintenance costs, and solved the problems of difficult management and high maintenance costs of flood discharge system after the tailings pond is closed.
Smart Images

Figure CN112878456B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tailings ponds, and in particular to a closed tailings pond flood control structure and a construction method thereof. Background Art
[0002] Tailings ponds are an important facility in mining projects. According to relevant requirements, tailings ponds that have reached the final designed stacking elevation or have been stopped in advance due to various reasons should be closed. Figure 1 As shown, the existing tailings pond's flood discharge system is usually composed of drainage wells 111, drainage pipes 222, drainage chutes, tunnels and other structures. Generally, as the tailings pond accumulates, the flood discharge system is completely or partially buried by tailings, which is highly concealed and difficult to intuitively understand its operation. During the operation period of the tailings pond, it is usually practiced to hire a qualified unit to record and inspect the structure of the tailings pond's flood discharge system, which is difficult to manage and requires high investment. After the tailings pond is closed, the safety management is relatively weakened, and the flood discharge system lacks maintenance. In addition, the tailings pond closure project is a permanent project. As time goes by, the structural quality of the flood discharge system will inevitably decline gradually, and the requirements for structural maintenance and management are high, which is a heavy burden. Summary of the invention
[0003] In order to solve the above technical problems, the present invention provides a closed tailings pond flood control structure and a construction method thereof which is safe, reliable, saves investment, and is easy to maintain and manage. The structure is composed of a flood control steep bank, a main beach drainage ditch, a beach drainage branch ditch, a spillway and other structures. All structures are located within the visible range of the surface of the tailings pond area, which is convenient for observation, management and repair.
[0004] To achieve the above object, the present invention is implemented by adopting the following technical solutions:
[0005] On one hand, the present invention provides a closed tailings pond flood control structure, comprising a flood control steep bank arranged at a certain distance from the beach top, a reservoir tail water accumulation area arranged at a position away from the beach top, a beach surface drainage main ditch arranged between the beach surface and the reservoir tail water accumulation area, a plurality of beach surface drainage branch ditches arranged on both sides of the beach surface drainage main ditch, and the beach surface drainage branch ditches can collect water into the beach surface drainage main ditch; the tailings pond is provided with a dam shoulder drainage ditch at the dam shoulder position of the tailings dam, a spillway is connected between the reservoir tail water accumulation area and the dam shoulder drainage ditch, and the beach surface water in the reservoir tail water accumulation area is discharged into the dam shoulder drainage ditch through the spillway.
[0006] In a possible technical solution, the flood control scarp is one or more.
[0007] In a possible technical solution, when there are multiple flood control scarps, the scarp top elevations h1, h2, ..., hn of the first, second, ..., N scarps satisfy h1>h2>...>hn.
[0008] In a possible technical solution, a layer of geomembrane and geotextile is arranged between the contact surface between the flood control steep bank and the tailings, the thickness of the geomembrane is not less than 1.0 mm, and the thickness of the geotextile is not less than 500 g / m 2 The geomembrane and geotextile are embedded in the tailings by no less than 0.5m, a layer of crushed stone protection layer is laid on the geomembrane and geotextile, and a mortar stone protection layer is laid on the crushed stone protection layer.
[0009] In a possible technical solution, the main beach drainage ditch is perpendicular to the axis of the tailings dam.
[0010] In a possible technical solution, the spillway is in the form of an open ditch, and its water inlet is trumpet-shaped.
[0011] In a possible technical solution, a mortar-laid stone guardrail is provided at the water inlet.
[0012] Another aspect of the present invention provides a method for constructing a closed tailings pond flood control structure, comprising the following steps:
[0013] S1. Build the first steep slope at a distance of L1 from the beach top, and compact the tailings within 2m of the steep slope axis to ensure that its relative density Dr>0.6;
[0014] S2. A main drainage ditch and a branch drainage ditch are built between the beach top and the first steep bank. The main drainage ditch is perpendicular to the dam axis and adopts a mortar-stone structure. The branch drainage ditches are distributed on both sides of the main drainage ditch, with high sides and low in the middle.
[0015] S3, constructing a second steep slope at a distance of L2 from the first steep slope, repeating the construction methods in steps S1 and S2, and constructing multiple steep slopes and the main beach drainage ditches and beach drainage branch ditches therebetween;
[0016] S4. Build a spillway with a trumpet-shaped water inlet. One side of the mountain is located on a dense layer, and the tailings side needs to be compacted.
[0017] In a possible technical solution, L1 in step S1 is greater than the minimum dry beach length specified in the specification.
[0018] In a possible technical solution, a layer of geomembrane and geotextile is arranged between the contact surface of the flood control steep bank and the tailings in step S1, the thickness of the geomembrane is not less than 1.0 mm, and the thickness of the geotextile is not less than 500 g / m 2 The geomembrane and geotextile are embedded in the tailings by no less than 0.5m, a layer of crushed stone protection layer is laid on the geomembrane and geotextile, and a mortar stone protection layer is laid on the crushed stone protection layer.
[0019] Compared with the prior art, the invention has the following beneficial effects: the flood control structure of the closed tailings pond is composed of structures such as flood control scarps, beach surface drainage main ditches, beach surface drainage branch ditches, and spillways. The flood control scarps can be one or more. The highest flood level shall not exceed the elevation H1 of the top of the first scarp. Except for the first scarp, the remaining scarps can be temporarily submerged by floods. The beach water is collected by the beach surface drainage branch ditches into the beach surface drainage main ditch, discharged into the reservoir tail water accumulation area through the beach surface drainage main ditch, discharged into the dam shoulder drainage ditch by the spillway, and finally introduced into the downstream. All structures are located within the visible range of the tailings pond surface, which is convenient for observation, management, and repair, thereby improving the flood control safety reserve of the tailings pond, with low construction difficulty, short construction period, convenient management and maintenance, and reduced maintenance personnel requirements after closure, thereby saving costs. The invention solves the problems of high management difficulty and high maintenance cost of the flood discharge system of the existing tailings pond composed of drainage wells, drainage pipes, drainage chutes, tunnels, etc. after the tailings pond is closed. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a schematic diagram of the flood discharge system structure of the existing tailings pond;
[0021] Figure 2 2 is a schematic diagram of the plan layout structure of the closed tailings pond flood control structure according to an embodiment of the present invention;
[0022] Figure 3 It is a schematic diagram of the cross-sectional structure of the flood control steep bank;
[0023] Figure 4 It is a schematic cross-sectional structure diagram of a closed tailings pond flood control structure according to an embodiment of the present invention;
[0024] Figure 5 It is a schematic diagram of the spillway inlet structure;
[0025] Figure numbers: 11-first flood control scarp; 12-second flood control scarp; 13-third flood control scarp; 111-drainage well; 2-main beach drainage ditch; 222-drainage pipe; 31-first beach drainage branch ditch; 32-second beach drainage branch ditch; 33-third beach drainage branch ditch; 4-spillway; 5-dam shoulder drainage ditch; 6-anti-seepage layer; 7-gravel protection layer; 8-mortared stone protection layer; 9-mortared stone protection layer. DETAILED DESCRIPTION
[0026] The specific implementation of the present invention is further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.
[0027] like Figure 2 , Figure 4As shown, the closed tailings pond flood control structure of the embodiment of the present invention has three flood control steep slopes arranged from the beach top to the water accumulation area at the tail of the reservoir, wherein the first flood control steep slope 11 is at a distance L1 from the beach top, the distance between the first flood control steep slope 11 and the second flood control steep slope 12 is L2, and the distance between the second flood control steep slope 12 and the third flood control steep slope 13 is L3; the flood control steep slope is used to increase the flood regulating storage capacity of the tailings pond, improve flood discharge conditions, and increase the flood control safety reserve of the tailings pond; the flood control steep slope can be one or more, which is determined according to flood control needs; when constructing multiple flood control steep slopes, a ladder needs to be formed, and the steep slope top elevations h1, h2...hn of the first, second...N steep slopes must satisfy h1>h2>...>hn; after the flood with the maximum design frequency enters the reservoir, the highest flood level shall not exceed the top elevation h1 of the first flood control steep slope, and the remaining steep slopes may be temporarily submerged; such as Figure 3 As shown, in order to prevent the steep slope from being damaged by long-term soaking of rainwater, an anti-seepage layer 6 is set between the contact surface of the flood control steep slope and the tailings. The anti-seepage layer 6 is a layer of geomembrane and geotextile. The thickness of the geomembrane is not less than 1.0 mm, and the thickness of the geotextile is not less than 500 g / m 2 The geomembrane and geotextile are embedded in the tailings by no less than 0.5m, a gravel protection layer 7 is laid on the geomembrane and geotextile, and a mortar stone protection layer 8 is laid on the gravel protection layer 7; a beach surface drainage main ditch 2 is set between the beach surface and the water accumulation area at the end of the reservoir, and the beach surface drainage main ditch 2 passes through three flood control steep slopes. The beach surface drainage main ditch is generally perpendicular to the dam axis. There is generally one beach surface drainage main ditch, and one or more beach surface drainage branch ditches can be arranged according to the different controlled catchment areas. In this embodiment, a first beach surface drainage branch ditch 31 is set between the beach top and the first flood control steep slope 11 on both sides of the beach surface drainage main ditch, and a second flood control steep slope 12 is set between the first flood control steep slope 11 and the second flood control steep slope 12. The second beach drainage branch ditch 32 is located between the second flood control scarp 12 and the third flood control scarp 13 to set the third beach drainage branch ditch 33; the beach drainage branch ditch is generally high on both sides and low in the middle, and is divergent. The beach drainage main ditch and the beach drainage branch ditch are in the form of open ditches. The beach drainage branch ditch collects water into the beach drainage main ditch. The beach drainage main ditch and the beach drainage branch ditch are used to discharge the flood of the corresponding beach part and introduce it into the reservoir tail water accumulation area; the tailings pond is located at the shoulder of the tailings dam to set the shoulder drainage ditch 5, the reservoir tail water accumulation area and the shoulder drainage ditch 5 are connected to the spillway 4, and the beach water in the reservoir tail water accumulation area is discharged into the shoulder drainage ditch by the spillway and finally introduced into the downstream; Figure 5 As shown, the spillway 4 is in the form of an open ditch, and its water inlet is trumpet-shaped; in order to prevent scouring during flood discharge, a mortar-laid stone guardrail is set at the water inlet.
[0028] The closed tailings pond flood control structure of the present invention is all located within the visible range of the surface of the tailings pond area, which is convenient for observation, management and repair, and improves the flood control safety reserve of the tailings pond. The construction difficulty is small, the construction period is short, and the management and maintenance are convenient. The maintenance personnel requirements after closure are reduced, and costs are saved. The existing tailings pond flood discharge system composed of drainage wells, drainage pipes, drainage chutes, tunnels, etc. is solved. The management difficulty and high maintenance cost after the tailings pond is closed.
[0029] The method for constructing a closed tailings pond flood control structure according to an embodiment of the present invention comprises the following steps:
[0030] 1) Investigate and understand the geographical location, rainfall distribution, original design and other information of the tailings pond;
[0031] 2) Flood calculations are performed based on the catchment area, dry beach slope, beach surface area, etc. when the tailings pond is closed. Through flood control calculations, trial and error methods are used to select the optimal solution to determine relevant parameters, mainly including: the number, location, and structural dimensions of flood control steep slopes, the location, direction, slope, number, and structural dimensions of the main and branch drainage ditches on the beach, and the location, structural dimensions, and direction of the spillway layout;
[0032] 3) The beach surface is flat, forming a slope from high to low from the top of the beach to the reservoir, without reverse slopes or water pits;
[0033] 4) Build the first flood control steep bank 11 at a distance of L1 from the beach top, where L1 is greater than the minimum dry beach length specified in the code; compact the tailings within 2m of the steep bank axis to ensure that its relative density Dr>0.6; prevent large deformation from causing damage to the steep bank; the minimum dry beach length specified in the code is shown in Table 1:
[0034] Table 1 Minimum dry beach length requirements
[0035]
[0036] The height of the flood control steep bank is generally 0.5-3.0m, the top width is 0.5-1.0m, and the mortar masonry structure is adopted; the top elevation H1 and the bottom elevation H1' of the first flood control steep bank 11 are connected with a slope ratio k1 (1:2-1:4) between the top and bottom of the flood control steep bank on the water-facing side for the convenience of construction; in order to prevent the steep bank from being damaged by long-term soaking of rainwater, an anti-seepage layer 6 is set between the tailings contact surface. The anti-seepage layer 6 is a layer, a cloth and a membrane. The thickness of the geomembrane is not less than 1.0mm, and the thickness of the geotextile is not less than 500g / m 2 , one cloth and one membrane embedded in the tailings is not less than 0.5m. A layer of crushed stone protection is laid on the one cloth and one membrane, with a thickness of 150-200mm, d=5-20mm, and a soil content of no more than 10%; the crushed stone layer is mortar-laid stone protection, with a thickness of more than 500mm, the mortar grade is not less than M10, and the block stone strength is not less than MU20;
[0037] 5) A main beach drainage ditch 2 and a first beach drainage branch ditch 31 are constructed between the beach crest and the first flood control steep bank 11. There is generally one main beach drainage ditch, and one or more beach drainage branch ditches can be arranged according to the different catchment areas controlled. The main beach drainage ditch and branch ditch generally adopt mortar-made stone structure, with a wall thickness greater than 500mm, a mortar grade of not less than M7.5, and a stone block strength of not less than MU15, and adopt prefabricated or cast-in-place reinforced concrete structures. In this embodiment, the main beach drainage ditch 2 is arranged to be short and straight, perpendicular to the dam axis, and adopts mortar-made stone structure. Stone structure; thickness greater than 500mm, mortar grade not less than M10, block strength not less than MU20; the slope selection is generally close to the actual sedimentation beach formed to reduce the amount of excavation, and the laying slope is generally 0.5% to 3%; the cross-sectional size is generally rectangular, and the aspect ratio is generally 1 to 1.5; the first beach drainage branch ditch 31 is distributed on both sides of the beach drainage main ditch 2, with high sides and low in the middle; the layout slope is generally 0.3% to 0.5%, merging into the main drainage ditch, the cross-sectional size is generally rectangular, and the aspect ratio is generally 1 to 1.5;
[0038] 6) constructing a second flood control scarp 12 at a distance L2 from the first flood control scarp 11, repeating the construction methods in steps 4) and 5), and constructing multiple scarps and the main beach drainage ditches and branch beach drainage ditches therebetween;
[0039] 7) Build spillway 4. The spillway is in the form of an open ditch with a trumpet-shaped water inlet. One side of the mountain is located on a dense layer, and the tailings side needs to be compacted. The spillway is generally rectangular and adopts a mortar-stone structure. A 0.5m thick mortar-stone guardrail is set at the water inlet. Make full use of the old, and connect the new spillway with the original dam shoulder drainage ditch to discharge the flood smoothly.
[0040] 8) After the construction of the above-mentioned flood drainage facilities is completed, the original flood drainage system will be sealed.
[0041] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A method for constructing a closed tailings pond flood control structure, characterized in that: The invention comprises a closed tailings pond flood control structure, which comprises a flood control steep bank arranged at a certain distance from the beach top, a reservoir tail water accumulation area arranged at a position far from the beach top, a beach surface drainage main ditch arranged between the beach surface and the reservoir tail water accumulation area, a plurality of beach surface drainage branch ditches arranged on both sides of the beach surface drainage main ditch, and the beach surface drainage branch ditches can collect water into the beach surface drainage main ditch; the tailings pond is provided with a dam shoulder drainage ditch at the dam shoulder position of the tailings dam, a spillway is connected between the reservoir tail water accumulation area and the dam shoulder drainage ditch, and the beach surface water in the reservoir tail water accumulation area is discharged into the dam shoulder drainage ditch through the spillway; the flood control steep bank is one or more; when the flood control steep bank is multiple, the first, second, and Nth flood control steep banks are arranged. The top elevations of the steep slope h1, h2...hn satisfy h1>h2>......>hn; an impermeable layer is arranged between the contact surface between the flood control steep slope and the tailings, the impermeable layer is a layer of geomembrane and geotextile, the thickness of the geomembrane is not less than 1.0mm, the geotextile is not less than 500g / ㎡, the geomembrane and geotextile are embedded in the tailings by not less than 0.5m, a layer of crushed stone protection layer is laid on the geomembrane and geotextile, and the crushed stone protection layer is mortar masonry; the main drainage ditch on the beach is perpendicular to the axis of the tailings dam; the spillway is in the form of an open ditch, and its water inlet is trumpet-shaped; the water inlet is provided with a mortar masonry tank; The method comprises the following steps: S1. Build the first steep slope at a distance of L1 from the beach top, and compact the tailings within 2m of the steep slope axis to ensure that its relative density Dr>0.6; S2. A main drainage ditch and a branch drainage ditch are built between the beach top and the first steep bank. The main drainage ditch is perpendicular to the dam axis and adopts a mortar-stone structure. The branch drainage ditches are distributed on both sides of the main drainage ditch, with high sides and low in the middle. S3, constructing a second steep slope at a distance of L2 from the first steep slope, repeating the construction methods in steps S1 and S2, and constructing multiple steep slopes and the main beach drainage ditches and beach drainage branch ditches therebetween; S4. Build a spillway with a trumpet-shaped water inlet. One side of the mountain is located on a dense layer, and the tailings side needs to be compacted.
2. The method for constructing a closed tailings pond flood control structure according to claim 1, characterized in that: In step S1, L1 is greater than the minimum dry beach length specified in the specification.
3. The method for constructing a closed tailings pond flood control structure according to claim 2, characterized in that: In the step S1, a layer of geomembrane and geotextile is arranged between the contact surface between the flood control steep bank and the tailings, the thickness of the geomembrane is not less than 1.0 mm, the geotextile is not less than 500 g / ㎡, the geomembrane and geotextile are embedded in the tailings by not less than 0.5 m, a gravel protection layer is laid on the geomembrane and geotextile, and the gravel protection layer is provided with mortar stone protection.