Calculation method of operation reliability index of electrified railway traction substation in weak power grid

By using a method for calculating operational reliability indicators of electrified railway traction substations in areas with weak power grids, the problem of insufficient reflection of operational reliability of electrified railway traction substations in areas with weak power grids is solved, and reliability assessment and optimized design of electrified railway traction substations in areas with weak power grids are realized.

CN113034045BActive Publication Date: 2024-11-05CHENGDU AITNENG ELECTRIC TECH CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110426654.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-04-20
Publication Date
2024-11-05
Estimated Expiration
2041-04-20

AI Technical Summary

Technical Problem

Existing technologies cannot effectively reflect the operational reliability level of electrified railway traction substations in areas with weak power grids. Traditional methods, based on IEEE system design, cannot adapt to weak power grids with few power sources and fragile grid topologies.

Method used

A method for calculating the operational reliability index of traction substations in electrified railways with weak power grids is adopted. By acquiring node and component information, the sequential Monte Carlo method is used to simulate and generate the state operation sequence. Combined with the node importance load reduction model, the system power flow is calculated and the power shortage situation of traction substations is statistically analyzed. The power shortage probability, frequency and expected quantity of traction substations are calculated.

Benefits of technology

It can identify traction substations with low operational reliability in weak power grids, provide design optimization solutions, and improve the power supply capacity of the power grid and the operational reliability of traction substations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure BDA0003029775300000021
    Figure BDA0003029775300000021
  • Figure BDA0003029775300000022
    Figure BDA0003029775300000022
  • Figure BDA0003029775300000023
    Figure BDA0003029775300000023
Patent Text Reader

Abstract

The present invention discloses a method for calculating the operating reliability index of an electrified railway traction substation in a weak power grid, the steps of which include: A, obtaining node and component information according to a geographical wiring diagram of a weak power grid; B, obtaining node location information of traction substations along the electrified railway connected to the weak power grid; C, obtaining an operating state sequence of the weak power grid based on the Monte Carlo method according to the node and component information; D, performing a flow calculation on the system according to the operating state sequence and performing corresponding load reduction processing using a node importance load reduction model; E, calculating the system traction load reduction situation; and F, calculating the operating reliability index of the traction substation according to the traction load reduction situation. The present invention can identify traction substations with low operating reliability by calculating the operating reliability index of electrified railway traction substations in weak power grid areas, so as to facilitate design optimization of schemes for connecting these traction substations to weak power grids.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of operation evaluation of electrified railway traction substations, and in particular relates to a method for calculating an operation reliability index of an electrified railway traction substation with a weak power grid. Background Art

[0002] As a primary power load, the electrified railway traction substation requires the power system to provide a stable and reliable external power supply, which requires the external power supply to have a strong power supply capacity. In particular, for electrified railways in weak power grid areas, by calculating the operational reliability index of traction substations along the line, the power supply capacity of the external power supply can be tested, and then the operational reliability level of the traction substation can be improved by improving its power supply capacity.

[0003] However, most of the existing calculation methods for the operational reliability index of electrified railway traction substations are based on the power generation and transmission test system published by IEEE. The power generation and transmission test system has the characteristics of many power supply points, a tough grid topology structure, and good power supply capacity. However, there are few power supply points and a fragile grid topology in weak power grid areas. Therefore, this index calculation method cannot fully reflect the operational reliability level of electrified railway traction substations in weak power grid areas. Summary of the invention

[0004] In order to fully reflect the operational reliability level of electrified railway traction substations in weak power grid areas, the present invention provides a method for calculating operational reliability indexes of electrified railway traction substations in weak power grid areas.

[0005] The method for calculating the operating reliability index of a weak grid electrified railway traction substation of the present invention comprises the following steps:

[0006] A. Obtain node and component information based on the geographical wiring diagram of the weak power grid.

[0007] A1. Node information includes: total number of nodes n, voltage level of node i, active load D on node i, i=1, 2, ..., n i , the active power P injected by the generator at node i gi 、The upper limit of the generator output at node i is P gimax 、The lower limit of the generator output at node i is P gimin , node importance level category DM, and importance weight coefficient α of node i.

[0008] The node importance levels DM are divided into: 1) Important: all nodes connected to traction loads; 2) Secondary: 500kV nodes, 220kV nodes; 3) Ordinary: 110kV nodes.

[0009] A2. Component information includes: total number of lines NL, reactance x of line k, k = 1, 2, ..., NLk , the mean trouble-free working time MTTF and the mean repair time MTTR of line k, the maximum transmission capacity T of line k kmax , the number of generators NG, the mean trouble-free time MTTF and the mean maintenance time MTTR of generator g, g=1,2,…,NG.

[0010] B. Obtain the node location information of the traction substations along the electrified railway that are connected to the weak power grid: that is, a traction substation is connected to the i-th node of the weak power grid, and at this time, node i is connected to the traction load.

[0011] C. Number all the lines and generators of the weak power grid; set the operating life of the weak power grid N0; calculate the failure rate λ and repair rate μ of the lines and generators according to the mean trouble-free working time MTTF and the mean repair time MTTR of the lines and generators; and generate N {x1, x2, …, x ii ,…x m}State running sequence (m = NL + NG), where x ii Is 1 or 0.

[0012] The failure rate and repair rate formula is:

[0013]

[0014] D. Run the sequence {x1, x2, …, x ii ,…x m Adjust system parameters and calculate the power flow of all lines in the system; if the line power flow exceeds the limit, use the node importance-based load reduction model to reduce the load on the system nodes.

[0015] D1. The principle of system parameter adjustment is: x appears in the state operation sequence ii =0, if element ii is a line, the line is disconnected and the line conductance is adjusted to 0; if element ii is a generator, the generator is faulty and the generator output is adjusted to 0.

[0016] D2. The objective function of the load reduction model based on node importance is:

[0017]

[0018] Among them, α j Represents the weight coefficient for the node importance reduction principle; C i is the active load reduction of node i when the weak power grid fails; the subscript i represents the weak power grid node number; j represents the importance level number of the weak power grid node.

[0019] Weight coefficient settings: important nodes α = 1.2; secondary nodes α = 1.1; ordinary nodes α = 1.

[0020] D3. Constraints of the load reduction model based on node importance include node active power balance constraints, node load reduction constraints, generator active output constraints, and transmission line transmission capacity constraints:

[0021]

[0022] Among them, D i is the active load on weak grid node i; P g , D and C are respectively the active power set of the generators at the weak grid nodes, the active load set and the active load reduction set; L(Z) is the relationship matrix between the active power flow of the weak grid lines and the node injection power under the fault state; T k (Z) is the active power flow vector of the weak grid transmission line k.

[0023] The relationship matrix between the active power flow of weak power grid lines and the node injection power under fault conditions is:

[0024] L(Z)=bA T (AbA T ) -1

[0025]

[0026] Among them, b is the weak grid line admittance matrix; A is the node line relationship matrix.

[0027] E. For the N state operation sequences of the weak power grid, the operation status of all traction substations along the electrified railway under each state operation sequence of the weak power grid is counted respectively: if the traction load at a certain node is reduced, the traction substation connected to this node will be short of power, and the number of power shortages N of each traction substation within the simulation period N0 is counted. TPSS With power shortage E LOSS .

[0028] F. Calculate the operating reliability index of traction substations along electrified railways in areas with weak power grids.

[0029] The operational reliability indicators of traction substations include: probability of power shortage in traction substations, frequency of power shortage in traction substations, and expected power shortage amount in traction substations.

[0030] F1. The probability formula of power shortage in traction substation is:

[0031]

[0032] Among them, LOLP is the probability of power outage in a traction substation, which indicates the possibility of power outage in a traction substation due to the failure of a weak grid component.

[0033] F2. The formula for the power shortage frequency of traction substation is:

[0034]

[0035] Among them, LOLF is the power outage frequency of the traction substation, which indicates the average number of power outages in a traction substation per year.

[0036] F3. The expected formula for power shortage of traction substation is:

[0037]

[0038] Among them, EDNS is the expected power shortage of the traction substation, which means the average annual power shortage of a traction substation.

[0039] The beneficial technical effects of the present invention are:

[0040] The present invention can identify traction substations with low operating reliability by calculating the operating reliability index of electrified railway traction substations in weak power grid areas, and facilitates design optimization of solutions for connecting these traction substations to weak power grids. DETAILED DESCRIPTION

[0041] The present invention is further described in detail below in conjunction with specific implementation modes.

[0042] The method for calculating the operating reliability index of a weak grid electrified railway traction substation of the present invention comprises the following steps:

[0043] A. Obtain node and component information based on the geographical wiring diagram of the weak power grid.

[0044] A1. Node information includes: total number of nodes n, voltage level of node i, active load D on node i, i=1, 2, ..., n i , the active power P injected by the generator at node i gi 、The upper limit of the generator output at node i is P gimax 、The lower limit of the generator output at node i is P gimin , node importance level category DM, and importance weight coefficient α of node i.

[0045] The node importance levels DM are divided into: 1) Important: all nodes connected to traction loads; 2) Secondary: 500kV nodes, 220kV nodes; 3) Ordinary: 110kV nodes.

[0046] A2. Component information includes: total number of lines NL, reactance x of line k, k = 1, 2, ..., NLk , the mean trouble-free working time MTTF and the mean repair time MTTR of line k, the maximum transmission capacity T of line k kmax , the number of generators NG, the mean trouble-free time MTTF and the mean maintenance time MTTR of generator g, g=1,2,…,NG.

[0047] B. Obtain the node location information of the traction substations along the electrified railway that are connected to the weak power grid: that is, a traction substation is connected to the i-th node of the weak power grid, and at this time, node i is connected to the traction load.

[0048] C. Number all the lines and generators of the weak power grid; set the operating life of the weak power grid N0; calculate the failure rate λ and repair rate μ of the lines and generators according to the mean trouble-free working time MTTF and the mean repair time MTTR of the lines and generators; based on λ and μ, simulate and generate N {x1, x2, …, x ii ,…x m}State running sequence (m = NL + NG), where x ii Is 1 or 0.

[0049] The failure rate and repair rate formula is:

[0050]

[0051] D. Run the sequence {x1, x2, …, x ii ,…x m Adjust system parameters and calculate the power flow of all lines in the system; if the line power flow exceeds the limit, use the node importance-based load reduction model to reduce the load on the system nodes.

[0052] D1. The principle of system parameter adjustment is: x appears in the state operation sequence ii =0, if element ii is a line, the line is disconnected and the line conductance is adjusted to 0; if element ii is a generator, the generator is faulty and the generator output is adjusted to 0.

[0053] D2. The objective function of the load reduction model based on node importance is:

[0054]

[0055] Among them, α j Represents the weight coefficient for the node importance reduction principle; C i is the active load reduction of node i when the weak power grid fails; the subscript i represents the weak power grid node number; j represents the importance level number of the weak power grid node.

[0056] Weight coefficient settings: important nodes α = 1.2; secondary nodes α = 1.1; ordinary nodes α = 1.

[0057] D3. Constraints of the load reduction model based on node importance include node active power balance constraints, node load reduction constraints, generator active output constraints, and transmission line transmission capacity constraints:

[0058]

[0059] Among them, D i is the active load on weak grid node i; P g , D and C are respectively the active power set of the generators at the weak grid nodes, the active load set and the active load reduction set; L(Z) is the relationship matrix between the active power flow of the weak grid lines and the node injection power under the fault state; T k (Z) is the active power flow vector of the weak grid transmission line k.

[0060] The relationship matrix between the active power flow of weak power grid lines and the node injection power under fault conditions is:

[0061] L(Z)=bA T (AbA T ) -1

[0062]

[0063] Among them, b is the weak grid line admittance matrix; A is the node line relationship matrix.

[0064] E. For the N state operation sequences of the weak power grid, the operation status of all traction substations along the electrified railway under each state operation sequence of the weak power grid is counted respectively: if the traction load at a certain node is reduced, the traction substation connected to this node will be short of power, and the number of power shortages N of each traction substation within the simulation period N0 is counted. TPSS With power shortage E LOSS .

[0065] F. Calculate the operating reliability index of traction substations along electrified railways in areas with weak power grids.

[0066] The operational reliability indicators of traction substations include: probability of power shortage in traction substations, frequency of power shortage in traction substations, and expected power shortage amount in traction substations.

[0067] F1. The probability formula of power shortage in traction substation is:

[0068]

[0069] Among them, LOLP is the probability of power outage in a traction substation, which indicates the possibility of power outage in a traction substation due to the failure of a weak grid component.

[0070] F2. The formula for the power shortage frequency of traction substation is:

[0071]

[0072] Among them, LOLF is the power outage frequency of the traction substation, which indicates the average number of power outages in a traction substation per year.

[0073] F3. The expected formula for power shortage of traction substation is:

[0074]

[0075] Among them, EDNS is the expected power shortage of the traction substation, which means the average annual power shortage of a traction substation.

Claims

1. A method for calculating the operational reliability index of a weak grid electrified railway traction substation, characterized in that: The following steps are involved: A. Obtain node and component information based on the geographical wiring diagram of the weak power grid; A1. Node information includes: total number of nodes n, voltage level of node i, active load D on node i, i=1, 2, ..., n i , the active power P injected by the generator at node i gi , the upper limit of the generator output at node i P gimax 、The lower limit of the generator output at node i is P gimin , node importance level category DM, importance weight coefficient α of node i; The node importance level DM is divided into: 1) important: all nodes connected to traction load; 2) secondary: 500kV nodes, 220kV nodes; 3) ordinary: 110kV nodes; A2. Component information includes: total number of lines NL, reactance x of line k, k = 1, 2, ..., NL k , the mean trouble-free working time MTTF and the mean repair time MTTR of line k, the maximum transmission capacity T of line k kmax , the number of generators NG, the mean time to failure MTTF and the mean time to repair MTTR of generator g, g = 1, 2, ..., NG; B. Obtaining node location information of traction substations connected to weak power grids along electrified railways: that is, a traction substation is connected to the i-th node of the weak power grid, and at this time, node i is connected to traction load; C. Number all the lines and generators of the weak power grid; set the operating life of the weak power grid N0; calculate the failure rate λ and repair rate μ of the lines and generators according to the mean trouble-free working time MTTF and the mean repair time MTTR of the lines and generators; and generate N {x1, x2, …, x ii ,…x m }State running sequence (m = NL + NG), where x ii is 1 or 0; The failure rate and repair rate formula is: D. Run the sequence {x1, x2, …, x ii ,…x m Adjust system parameters and calculate the power flow of all lines in the system; if the line power flow exceeds the limit, use the load reduction model based on node importance to reduce the load of system nodes; D1. The principle of system parameter adjustment is: x appears in the state operation sequence ii =0, if element ii is a line, the line is disconnected and the line conductance is adjusted to 0; if element ii is a generator, the generator fails and the generator output is adjusted to 0; D2. The objective function of the load reduction model based on node importance is: Among them, α j Represents the weight coefficient for the node importance reduction principle; C i is the active load reduction of node i when the weak power grid fails; the subscript i represents the weak power grid node number; j represents the importance level number of the weak power grid node; Weight coefficient setting: important node α = 1.2; secondary node α = 1.1; ordinary node α = 1; D3. Constraints of the load reduction model based on node importance include node active power balance constraints, node load reduction constraints, generator active output constraints, and transmission line transmission capacity constraints: Among them, D i is the active load on weak grid node i; P g , D and C are respectively the active power set of the generators at the weak grid nodes, the active load set and the active load reduction set; T(Z) represents the active power flow of the weak grid transmission line; L(Z) is the relationship matrix between the active power flow of the weak grid line and the node injection power under the fault state; T k (Z) is the active power flow vector of the weak grid transmission line k; The relationship matrix between the active power flow of weak power grid lines and the node injection power under fault conditions is: L(Z)bA T (AbA T ) -1 Among them, b is the weak grid line admittance matrix; A is the node line relationship matrix; E. For the N state operation sequences of the weak power grid, the operation status of all traction substations along the electrified railway under each state operation sequence of the weak power grid is counted respectively: if the traction load at a certain node is reduced, the traction substation connected to this node will be short of power, and the number of power shortages N of each traction substation within the simulation period N0 is counted. TPSS With power shortage E LOSS ; F. Calculate the operational reliability index of traction substations along electrified railways in areas with weak power grids; Traction substation operation reliability indicators include: traction substation power shortage probability, traction substation power shortage frequency, and traction substation power shortage expectation; F1. The probability formula of power shortage in traction substation is: Among them, LOLP is the probability of power outage in a traction substation, which indicates the probability of power outage in a traction substation due to the failure of a weak grid component; F2. The formula for the power shortage frequency of traction substation is: Among them, LOLF is the power outage frequency of traction substation, which means the average number of power outages in a traction substation per year; F3. The expected formula for power shortage of traction substation is: Among them, EDNS is the expected power shortage of the traction substation, which means the average annual power shortage of a traction substation.