A cable laying pulley device, cable laying system and laying method
By using a retractable cable-laying pulley device and an electric traction system in the cable trench, the problem of insufficient manpower in cable laying was solved, achieving efficient and automated laying, and reducing construction costs and labor intensity.
Patent Information
- Application Number
- CN202110324004.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-03-26
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2041-03-26
AI Technical Summary
In the process of laying cables and optical fibers, existing technologies require a lot of manpower, especially in complex channels where the cable-laying pulleys cannot be effectively utilized, resulting in high construction intensity and low efficiency.
A device including a cable laying pulley and a support body was designed. The support body is fixed to the two side walls of the cable trench through a telescopic structure. Together with an electric traction device and a traction rope, it realizes the automated laying of cables.
It improves cable laying efficiency, reduces manpower input, lowers labor intensity, and adapts to laying needs in complex environments.
Smart Images

Figure CN113044666B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of cable laying, and in particular to a cable laying pulley device, a cable laying system and a laying method. Background Art
[0002] At present, the following characteristics exist in the cable and optical fiber installation in the fields of power engineering, communication engineering, etc.: The diameter of the cable and optical fiber is relatively small, and the diameter generally does not exceed 4cm. During the laying process, the cable is easy to run and deform. During the laying process, human assistance is required in the entire laying channel. If a pay-off pulley is used, it must be a closed pulley to avoid running. The laying channel of cables and optical fibers is relatively complicated. Generally, ground cable trenches are used outdoors, cable shafts are used up and down, and cable trays and cable trough boxes are used indoors. There are many turns in the entire laying channel. During the laying process, personnel assistance must be arranged at each turn of the channel. Because the cable laying channel is complicated, the traditional pay-off pulley cannot be installed and used in the cable channel. The number of cables and optical fibers laid is very large, and the laying repetition rate in the main laying channel is high. If a pay-off pulley is used, the cable should be able to be untied from the pulley after the cable laying is completed. In the current cable laying construction, the manual laying method is basically adopted. The cable reel is laid manually, with personnel arranged at each turn of the channel to assist. The cable head is pulled manually in the forward direction. A large amount of manpower is required in the cable laying, and the construction intensity is very high. The laying of optical fiber is similar. Summary of the invention
[0003] The purpose of the present invention is to solve the shortcomings existing in the prior art and to propose a cable laying pulley device, a cable laying system and a laying method.
[0004] In order to achieve the above object, the present invention adopts the following technical solutions:
[0005] A wire-paying pulley device for a cable trench, the device comprising a wire-paying pulley and a support body, the wire-paying pulley is fixed on the support body, the support body is mounted on two corresponding side walls of the cable trench, the suspension body comprises a support body and a telescopic structure connected to the support body and capable of changing the length of the support body.
[0006] Preferably, the supporting body is a sleeve, and the telescopic structure includes an internal thread and a telescopic screw arranged in the sleeve, the external thread of the telescopic screw is engaged with the internal thread in the sleeve, the telescopic screw is screwed into the sleeve, and the rotation of the telescopic screw can change the length of the supporting body.
[0007] Preferably, the support body further comprises a base, a spherical adjusting element is provided on the base, one end of the telescopic screw is sleeved in the sleeve, and the other end is connected to the base via the adjusting element.
[0008] Preferably, a rotating handle for rotating the telescopic screw is provided at the end of the sleeve.
[0009] The present invention also provides a cable laying system, which includes a laying main road, a cable drum, an electric traction device, a plurality of pay-off pulley devices, and a traction rope. The cable drum and the electric traction device are respectively located on different ports of the laying main road. A laying terminal is provided on the laying main road. The pay-off pulley device is provided with a pay-off pulley. A plurality of the pay-off pulley devices are provided on the laying main road. The cable drum is provided with a cable. The electric traction device includes a first traction machine and a second traction machine. One end of the traction rope is fixed on the first traction machine, and the other end of the traction rope passes through the pay-off pulley and is fixed on the second traction machine. The end of the cable is movably fastened to the traction rope. The traction rope moves under the drive of the first traction machine and the second traction machine. The cable moves with the traction rope and reaches the laying terminal.
[0010] Preferably, the pay-off pulley device is the pay-off pulley device mentioned above;
[0011] Preferably, the main laying road is further provided with a plurality of laying branch roads, and the laying branch roads are provided with laying terminals.
[0012] The present invention also provides a cable laying method, the method comprising the following steps:
[0013] Step 1: Place the cable reel and traction device on different ports of the main laying route;
[0014] Step 2: Install several pay-off pulleys at intervals on the main laying track;
[0015] Step 3: Fix one end of the traction rope on the first traction machine, and pass the other end of the traction rope through the wire-releasing pulley in sequence, and return it to the second traction machine for fixation.
[0016] Step 4: Tie a cable end on the cable drum to the traction rope through a tying piece. The first traction machine rotates forward and the second traction machine rotates reversely. The cable end reaches a laying terminal with the traction rope, and the tying piece is removed to complete a single laying of the cable and the forward conveyance of the traction rope.
[0017] Step 5: Tie another upper cable end on the cable reel to the traction rope again through the binding piece. The first traction machine rotates in the reverse direction and the second traction machine rotates forward. The cable end reaches another laying terminal with the traction rope, removes the binding piece, completes the cable laying, and completes the reverse transportation of the traction rope.
[0018] Preferably, steps 4 and 5 are repeated to complete a cyclic conveying of the traction rope.
[0019] Preferably, the cable laying includes laying of a main channel and laying of a branch channel, and the cable laying is carried out through several cyclic conveying methods.
[0020] The present invention has the following beneficial effects:
[0021] The pay-off pulley device provided by the present invention can be used to install a pay-off pulley in cable laying channels in various complex environments such as cable trenches and cable shafts. Combined with the cable laying system and method provided by the present invention, the cable laying work in the main laying channel is solved, the cable laying efficiency is greatly improved, the manpower input is reduced, and the labor intensity is alleviated. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a structural schematic diagram of the wire-releasing pulley device proposed by the present invention;
[0023] Figure 2 A schematic diagram of a first embodiment of a cable laying system provided by the present invention;
[0024] Figure 3 This is a schematic diagram of a second embodiment of the cable laying system proposed by the present invention;
[0025] Legend:
[0026] In the figure: a cable drum (1, a1, b1, c1), a pay-off pulley device (2, a2, b2, c2), a sleeve 21, a hanging ring 211, a rotating handle 212, a telescopic screw 213, a spherical adjusting element 214, a base 215, a pay-off pulley 22, a first traction machine (31; a31), a second traction machine (32; a32), cables (4, a4, b4, c4), tying parts (5, 5a, 5b, 5c), a main laying channel (6, 6a), a branch laying channel (71; 72; 73; 74; 75; 76; a71; b71; c71), and a traction rope (8; a8). DETAILED DESCRIPTION
[0027] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0028] Reference Figure 1-3 , an embodiment provided by the present invention:
[0029] A wire-laying pulley device 2 for a cable trench, the device comprises a wire-laying pulley 22 and a support body, the wire-laying pulley 22 is fixed on the support body, the support body is mounted on two corresponding side walls of the cable trench, the suspension body comprises a support body and a telescopic structure connected to the support body and capable of changing the length of the support body, wherein the support body is a sleeve 21, the telescopic structure comprises an internal thread arranged in the sleeve 21 and a telescopic screw 213 arranged at both ends of the sleeve 21, the external thread of the telescopic screw 213 is meshed with the internal thread in the sleeve 21, the telescopic screw 213 is screwed into the sleeve 21, and the rotation of the telescopic screw 213 can change the length of the support body. In addition, the support body also comprises a base 215 connected to the telescopic screw 213, a spherical adjusting element 214 is arranged on the base 215, one end of the telescopic screw 213 is sleeved in the sleeve 21, and the other end is connected to the base 215 through the adjusting element. The base 215 is fixed on two corresponding side walls of the cable trench respectively. Since the cable trench walls have different flatness, the direction of the telescopic screw 213 connected thereto can be flexibly adjusted through the spherical adjustment element 214 in the base 215.
[0030] The two ends of the sleeve 21 are provided with a rotating handle 212 for rotating the telescopic screw 213. The rotating handle 212 can screw the sleeve 21 and the telescopic screw 213 together to adjust the length of the support body, thereby adapting to cable trenches of different widths.
[0031] A plurality of hanging rings 211 are also provided below the sleeve 21, and the hanging rings 211 are connected to the pay-off pulley to meet the need of laying multiple groups of cables 4 at the same time. In addition, a hanging ring 211 is also provided above the sleeve 21, so that in a certain environment, the sleeve 21 can be directly hung on a support through the hanging ring 211, and the pay-off pulley is still suspended below the sleeve 21 through the hanging ring 211.
[0032] The present invention also provides a cable laying system, which includes a laying main road 6, a cable drum 1, an electric traction device, a plurality of pay-off pulley devices 2, and a traction rope 8. The cable drum 1 and the electric traction device are respectively located at different ports of the laying main road 6. The laying main road 6 is provided with a plurality of laying terminals. The pay-off pulley device 2 is provided with a pay-off pulley 22. The pay-off pulley device 2 can adapt to various complex environments such as cable trenches and cable shafts through its telescopic structure; the plurality of pay-off pulley devices 2 are arranged on the laying main road 6, the cable drum 1 is provided with a cable 4, the electric traction device includes a first traction machine 31 and a second traction machine 32, one end of the traction rope 8 is fixed on the first traction machine 31, and the other end of the traction rope 8 passes through the pay-off pulley 22 and is fixed on the second traction machine 32. The end of the cable 4 is movably fastened to the traction rope 8, and the traction rope 8 moves under the drive of the first traction machine 31 and the second traction machine 32. The cable 4 moves on the laying main road 6 with the traction rope 8 and reaches the laying terminal.
[0033] The main laying road 6 is also provided with a plurality of laying branch roads (71; 72; 73; 74; 75; 76), and the laying terminal includes both the end of the main laying road and the beginning of the laying branch roads (71; 72; 73; 74; 75; 76).
[0034] The present invention also provides a cable laying method, which comprises the following steps:
[0035] Step 1: Place the cable reel 1 and the traction device on different ports of the laying main road 6 respectively;
[0036] Step 2: Install a number of pay-off pulleys 22 at intervals on the main laying track 6;
[0037] Step 3: Fix one end of the traction rope 8 on the first traction machine 31, and pass the other end of the traction rope 8 through the wire-releasing pulley 22 in sequence, and return to the second traction machine 32 for fixing.
[0038] Step 4: Tie the end of a cable 4 on the cable reel 1 to the traction rope 8 through the binding piece 5, the first traction machine 31 rotates forward, and the second traction machine 32 rotates reversely. The end of the cable 4 reaches a laying terminal with the traction rope 8, and the binding piece 5 is removed to complete the single laying of the cable 4 and the forward conveyance of the traction rope 8.
[0039] Step 5: Tie the end of another upper cable 4 on the cable reel 1 to the traction rope 8 again through the binding piece 5, the first traction machine 31 rotates in the opposite direction, and the second traction machine 32 rotates forward. The end of the cable 4 arrives at another laying terminal with the traction rope 8, and the binding piece 5 is removed to complete the cable laying and the reverse conveying of the traction rope 8. Of course, if it is a unidirectional laying, this step 5 does not need to tie the end of the cable 4, just complete the reverse rotation of the traction rope 8, and then lay the cable 4 in the forward direction.
[0040] Repeat steps 4 and 5 to complete a cycle of conveying of the traction rope 8, laying the main road 6 and laying the branch roads (71; 72; 73; 74; 75; 76), and lay them through several cycle conveying methods.
[0041] Embodiment 1: Now take the cable laying method of a certain cable trench as an example to illustrate as follows:
[0042] 1. Preparation for cable laying: According to the position of the main laying road 6 of the cable laying, a cable drum 1 and a wire-releasing pulley device 2 are set at one end of the main laying road 6; a wire-releasing pulley device 2 is set at intervals of about 30 meters in the straight cable trench of the main laying road 6, and a wire-releasing pulley device 2 is set before and after the turning of the cable trench for assistance; an electric traction device is set at the other end of the main laying road 6, and the electric traction device includes a first traction machine 31 and a second traction machine 32; a traction rope 8 is set according to the laying path, and the traction rope 8 is hung in the wire-releasing pulley. The traction rope 8 is preferably a Dyneema rope with a diameter of 8 to 10 mm according to the size of the laid cable 4 and the path length, and the length of the traction rope 8 is preferably 5 to 10 times the length of the laid cable 4.
[0043] 2. Cable laying: tie the cable 4 to be laid on one side of the traction rope 8. Multiple tying pieces can be provided as needed. Each tying piece ties the cable 4 and the traction rope 8 with a tying belt. The first traction machine 31 acts as a traction machine to traction the cable 4, and the second traction machine 32 acts as a tension machine to assist in laying the traction rope 8. When the cable 4 is pulled into place (i.e., when it reaches the laying terminal, the laying terminal can be the end of the laying main road 6 or the beginning of the laying branch road (71; 72; 73; 74; 75; 76)), the first tying piece can be untied, and the subsequent tying pieces can continue to be pulled by force. After the cable 4 is pulled to a sufficient length, all the tying pieces on the tying pieces are cut off, and the cable 4 is taken out from the opening (each of the tying pulleys 22 is provided with an inlet and outlet opening for the cable 4) hanging on the pay-off pulley 22 (the traction rope 8 continues to remain in the pay-off pulley), and tied to the cable bracket of the cable trench. The end of the cable 4 is cut off after a sufficient length is reserved. The rectification process completed the laying of a cable 4.
[0044] 3. Continuous laying: The second cable 4 is continuously laid in this way. When the traction rope 8 is not long enough to complete the traction, the second traction machine 32 is used as a traction machine to pull the cable 4, and the first traction machine 31 is used as a tension machine to assist in releasing the traction rope 8, and the cable 4 is continuously pulled and laid in the opposite direction to achieve the effect of continuous laying.
[0045] 4. Cable laying expansion: Through the application of the cable-laying pulley device 2 in scenes such as cable trenches, cable shafts, and cable trough boxes, the laying of main laying roads 6 and branch laying roads (71; 72; 73; 74; 75; 76) in various environments can be completed.
[0046] Example 2: Schematic diagram of the simultaneous cable laying scheme between multiple points in the main channel
[0047] The cable laying scheme includes the following devices:
[0048] The cable laying system includes cable drums (a1, b1, c1), cables (a4, b4, c4), binding parts (5a, 5b, 5c), a curved laying main road 6a, a traction rope a8, a first traction machine a31, a second traction machine a32, and a wire-releasing pulley device (a2, b2, c2). The binding parts can be set in multiple places as needed, wherein the first traction machine a31 and the second traction machine a32 are located at one end of the laying main road 6a, the laying main road 6a is provided with several different curved sections, and the cable drums (a1, b1, c1) are located at one end of different curved sections of the laying main road 6a.
[0049] The laying method of the second embodiment is based on the same principle as the first embodiment, and the method is to lay the cables of the cable reels (a1, b1, c1) on their respective curved sections.
[0050] I will not go into details here, and the economic benefits of Example 2 are specifically analyzed below:
[0051] Taking a 220kV substation project as an example, the total length of cable laying is expected to be 100km, of which 80% of the cables need to pass through the main laying road 6a, which is 80km. The manual laying scheme requires 20 workers, working 8 hours a day to lay a length of about 5km. The circular traction cable laying scheme, because the mechanical traction replaces the human traction, only 10 workers are needed, working 8 hours a day. Because the mechanical traction speed is relatively fast, there is no need to rest and the continuity is strong, the efficiency can be increased by more than 3 times compared with the manual laying scheme, and it is expected to lay about 15km.
[0052] Analysis of labor costs for manual cable laying:
[0053] The time required to lay 80 km is 80÷5=16, which means 16 working days. The daily wage for each worker is 400 yuan, and there are 20 workers in total. The total is 400*20*16=128,000 yuan.
[0054] Cost analysis of circular traction cable laying scheme:
[0055] The time required to lay 80 km is 80÷15=5.3, which means 5.3 working days. The daily wage for each worker is 400 yuan, and there are 10 workers in total. The total is 400*10*5.3=21,200 yuan.
[0056] According to the above analysis, 106,800 yuan in labor costs can be saved. If the laying plan is adjusted to adopt a plan of laying multiple cables at the same time or a plan of laying cables simultaneously between multiple points in the main channel, the cable laying efficiency will be doubled and the construction cost will be further reduced.
[0057] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A cable laying method, comprising a pay-off pulley device and a cable laying system, characterized in that: The pay-off pulley device comprises a pay-off pulley and a support body, wherein the pay-off pulley is fixed on the support body, and the support body is mounted on two corresponding side walls of the cable trench, wherein the support body comprises a support body and a telescopic structure connected to the support body and capable of changing the length of the support body, wherein the support body is a sleeve, and a plurality of hanging rings are further arranged below the sleeve, wherein the pay-off pulley is connected to the hanging rings via hanging rings, and wherein the pay-off pulley is provided with an entrance and exit opening for the cable to enter and exit the pay-off pulley; wherein the telescopic structure comprises an internal thread and a telescopic screw arranged in the sleeve, wherein the external thread of the telescopic screw is meshed with the internal thread in the sleeve, and the telescopic screw is screwed into the sleeve, and the rotation of the telescopic screw can change the length of the support body; wherein the support body further comprises a base, wherein a spherical adjusting element is arranged on the base, wherein one end of the telescopic screw is sleeved in the sleeve, and the other end is connected to the base via an adjusting element; The cable laying system comprises a laying main road, a plurality of curved sections, a cable drum, an electric traction device, a plurality of the pay-off pulley devices, and a traction rope. The electric traction device is located at one end of the laying main road, the cable drum is respectively located at the ports of the curved sections, a plurality of the pay-off pulley devices are arranged on the laying main road and the curved sections, the cable drum is provided with a cable, the electric traction device comprises a first traction machine and a second traction machine, one end of the traction rope is fixed on the first traction machine, the other end of the traction rope passes through the pay-off pulley and is fixed on the second traction machine, the end of the cable is movably fastened to the traction rope, the traction rope moves under the drive of the first traction machine and the second traction machine, the cable moves with the traction rope, and reaches the laying terminal; The cable laying method is based on the cable laying system, and the cable laying method comprises the following steps: Step 1: placing the first traction machine and the second traction machine on one port of the main laying road of the cable laying channel, and placing the cable reel on the port of each curved section of the main cable laying road; Step 2: Install several wire-laying pulley devices at intervals on the main laying track and curved sections; Step 3: Fix one end of the traction rope on the first traction machine, and pass the other end of the traction rope through the pay-off pulley of the pay-off pulley device in sequence, and return to the second traction machine for fixation; Step 4: Tie a cable end on the cable drum to the traction rope through a tying piece. The first traction machine rotates forward, and the second traction machine rotates reversely. The cable end arrives at a laying terminal with the traction rope, removes the tying piece, and then passes through the access opening of the pay-off pulley, and takes the cable out of the pay-off pulley and ties it to the cable bracket of the cable trench, completing the single laying of the cable and the forward conveying of the traction rope; Step 5: Tie another cable end on the cable drum to the traction rope again through the tying piece. The first traction machine rotates in the reverse direction, and the second traction machine rotates in the forward direction. The cable end arrives at another laying terminal with the traction rope, and the tying piece is removed. Then, the cable is taken out from the pay-off pulley and tied to the cable bracket of the cable trench. The cable laying is completed, and the reverse conveying of the traction rope is completed. Step 6: Repeat steps 4 and 5 to complete a cyclic conveying of the traction rope. All cables are laid through several of the cyclic conveying methods.
2. A cable laying method according to claim 1, characterized in that: A rotating handle for rotating the telescopic screw is provided at the end of the sleeve.