A support structure for high pile cap on steep land in mountainous area and its construction method

By pre-embedding tunnels and piercing support rods on high pile bearings in steep mountainous areas, a support structure and construction platform are formed, and connecting support mechanisms are used to connect pile foundations. This solves the problem of limited construction space and stability, and achieves an efficient and environmentally friendly solution. construction methods.

CN113152507BActive Publication Date: 2024-10-22CCCC SECOND HARBOR ENGINEERING CO LTD +1
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202110593622.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-05-28
Publication Date
2024-10-22
Estimated Expiration
2041-05-28

AI Technical Summary

Technical Problem

In mountainous and steep areas, the construction space for high pile caps is limited, making it difficult to ensure construction accuracy and overall support stability. In addition, traditional methods have large quantities of work, long construction periods, low degrees of assembly, and risks of damage to the ecological environment.

Method used

Design a support structure, including pre-embedding the first and second channels at the upper end of each pile foundation, passing through support rods and precision-rolled threaded steel bars, and connecting them through support legs and unloading parts to form a beam platform, using a contact support mechanism Connect the support structures between pile foundations to form an overall construction platform.

Benefits of technology

It provides stable support in a limited space, simplifies the construction process, saves cost and construction period, improves the stability and overall support effect of the construction platform, and reduces the impact on the environment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113152507B_ABST
    Figure CN113152507B_ABST
Patent Text Reader

Abstract

The present invention discloses a supporting structure of a high pile foundation on a steep land in a mountainous area and a construction method thereof. The structural characteristics of a plurality of pile foundations are reasonably utilized. A first hole and a second hole are pre-buried at the upper end of the high pile foundation, a supporting rod is passed through the first hole, and supporting legs are arranged at both ends of the supporting rod and are connected upward in sequence to a load-reducing member and a beam platform. A construction platform of the foundation is formed on the upper surface of the beam platform on the top of all the pile foundations. The construction platform can transfer the load to the beam platform, the load-reducing member, the supporting legs, the supporting rod and the pile foundation in sequence. The entire supporting structure can provide stable support for the construction of the foundation without setting up an additional working space around the pile foundation. The entire supporting structure has the advantages of simple and fast manufacture, installation and construction, energy saving and environmental protection, effective cost saving, accelerated installation progress, convenient later turnover and the like.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of high pile cap construction, and more specifically, to a supporting structure of a high pile cap on a steep terrain in a mountainous area and a construction method thereof. Background Art

[0002] In river areas with high water levels and large riverbed erosion all year round, or in hard rock mountainous areas, the substructure of the bridge is often designed as a high pile foundation for the convenience of construction. In view of the two geological and hydrological environments, the former uses steel hanging boxes to block water to form a dry working environment before constructing the foundation, while the latter traditionally constructs the foundation by backfilling and island construction. The backfill method for steep land in mountainous areas has high requirements for equipment and working space, large engineering volume, long construction period, low degree of assembly, and factors such as settlement, which make it difficult to ensure the quality of the project, and it is easy to damage the original ecological environment, and there are safety hazards such as landslides. Summary of the invention

[0003] An object of the present invention is to solve at least the above problems and to provide at least the advantages which will be described hereinafter.

[0004] Another object of the present invention is to provide a supporting structure and a construction method for a high pile cap on steep land in mountainous areas, which rationally utilizes the structural characteristics of multiple pile foundations to solve the technical problems in the prior art that the construction space of the high pile cap on steep land in mountainous areas is limited, it is difficult to simultaneously ensure the construction accuracy between the pile foundations, and it is difficult to ensure the overall support stability of the construction platform of the high pile cap.

[0005] In order to achieve these purposes and other advantages according to the present invention, a support structure for a high pile cap on a steep terrain in a mountainous area is provided, comprising:

[0006] A support assembly, comprising a first channel and a second channel horizontally penetrating the upper end of each pile foundation along the length direction of the cap, the first channel and the second channel of each pile foundation being located in the same radial direction and arranged sequentially from bottom to top, a support rod being passed through each first channel, both ends of the support rod extending out of the corresponding first channel and respectively sleeved with support legs, the support legs at both ends of the support rod being symmetrical to each other and arranged closely against the corresponding pile foundation, a fine-rolled threaded steel bar being passed through the second channel, both ends of the fine-rolled threaded steel bar extending out of the corresponding second channel;

[0007] The unloading piece is symmetrically mounted on both ends of each fine-rolled threaded steel bar. The two ends of the fine-rolled threaded steel bar pass through the unloading piece at the corresponding end and are anchored to make the unloading piece close to the corresponding pile foundation. The bottom of each unloading piece is fixedly connected to the top of the supporting leg on the corresponding side.

[0008] The beam platform is arranged around the upper ends of all pile foundations, the tops of all unloading parts are fixedly connected to the bottom of the beam platform, and the upper surface of the beam platform forms a construction platform of the cap on the tops of all pile foundations.

[0009] Preferably, the beam platform comprises:

[0010] A main crossbeam is arranged parallel to the width direction of the cap, and a main crossbeam is commonly arranged on both sides of all the pile foundations located in the same width direction of the cap, and each main crossbeam is closely attached to all the corresponding pile foundations and the bottom is fixedly connected to the top of all the unloading parts on the corresponding side;

[0011] The distribution beams are arranged parallel to the width direction of the pedestal and a plurality of distribution beams are evenly spaced and fixed on the upper surfaces of all the main beams along the width direction of the pedestal.

[0012] Preferably, each of the pile foundations is provided with connecting struts on both sides in the length direction of the bearing platform, and both ends of each connecting strut are fixedly connected to the main crossbeam at the corresponding end.

[0013] Preferably, support beams are provided at both ends of a row of the pile foundations located in the same length direction of the foundation, and the support beams are fixedly connected to the bottoms of all the distribution beams in a cantilevered state located at the corresponding ends of the pile foundations.

[0014] Preferably, the unloading member comprises:

[0015] A first top plate, which is horizontally arranged and contacts the corresponding side wall of the pile foundation, and the upper surface of the first top plate is fixedly connected to the bottom of the corresponding beam platform;

[0016] A first bottom plate, which is horizontally arranged directly below the first top plate and has a bottom fixedly connected to the top of the corresponding supporting leg;

[0017] A first side plate, which is connected and arranged between the first top plate and the first bottom plate, and the first side plate is arranged vertically and parallel to the axial direction of the precision-rolled threaded steel bar;

[0018] A second side plate is connected between the first top plate and the first bottom plate and is connected to one end of the first top plate close to the corresponding pile foundation and one end of the first top plate away from the corresponding pile foundation, respectively. The first side plate is perpendicular to the axial direction of the precision-rolled threaded steel bar;

[0019] A first pasting plate, which is pasted and arranged on the outer side of the second side plate at one end away from the corresponding pile foundation;

[0020] A first stiffening plate is connected and arranged on the outer sides of the two first side plates in a direction parallel to the second side plates, wherein the upper end of the first stiffening plate is connected to the first top plate, and the lower end of the first stiffening plate is connected to the first bottom plate;

[0021] The end of the precision-rolled threaded steel bar passes through the two second side plates and the first plate in sequence and is connected with an anchor nut.

[0022] Preferably, the supporting legs include:

[0023] a second top plate, which is horizontally arranged and contacts the corresponding side wall of the pile foundation, and the upper surface of the second top plate is fixedly connected to the top of the first bottom plate of the corresponding unloading member;

[0024] a second bottom plate, which is horizontally arranged directly below the first top plate and contacts the corresponding side wall of the pile foundation;

[0025] An ear plate is connected and arranged between the second top plate and the second bottom plate, and the ear plate is arranged vertically and perpendicular to the axial direction of the support rod;

[0026] A second pasting plate is respectively connected to the inner and outer sides of the ear plate, and the inner second pasting plate abuts against the corresponding side wall of the pile foundation;

[0027] The ends of the support rods sequentially pass through the inner second sticking plate, the ear plate, and the outer second sticking plate of the corresponding ends;

[0028] The second stiffening plates are arranged on both sides of the ends of the support rods. The inner side of each second stiffening plate is connected to the ear plate, the upper end is connected to the second top plate, and the lower end is connected to the second bottom plate.

[0029] Preferably, a connection support mechanism is further provided between two adjacent pile foundations located in the length direction of the same cap, and the connection support mechanism comprises:

[0030] A hanger, one of which is respectively provided for each adjacent pile foundation, and the two hangers are arranged facing each other, and the hanger includes a bottom support plate arranged parallel to the length direction of the cap, an end of the bottom support plate close to the corresponding pile foundation is provided with an arc groove matching the shape of the pile foundation, an elastic pad is provided between the bottom of the arc groove and the side wall of the corresponding pile foundation, and the arc groove contacts the side wall of the pile foundation through the elastic pad, and a U-shaped hook with an opening facing downward is connected upwardly to the bottom support plate, and the U-shaped hook is sleeved on the end of the fine-rolled threaded steel bar on the corresponding pile foundation, and mutually meshing plug-in parts are provided at the ends of the two bottom support plates facing each other, and a vertically penetrating cylindrical hole is provided in the middle of one of the plug-in parts;

[0031] A cross brace, comprising a center block, a rotating cylinder is provided at the center of the center block along the length direction of the support platform, the middle of the rotating cylinder is rotatably connected to the center block through a bearing, support cylinders are symmetrically sleeved at both ends of the rotating cylinder, the support cylinders are connected to the rotating cylinder through threads, a guide is provided on the inner side of one end of the support cylinder away from the rotating cylinder, an inverted truncated cone-shaped cavity is provided inside the lower end of the center block, and a first bevel gear is sleeved and fixed on one of the rotating cylinders near the center block;

[0032] A positioning member fixed on the top of the center block, wherein the upper end of the positioning member is provided with a plurality of positioning grooves corresponding to the distribution beam along the width direction of the support platform, wherein the width of the positioning groove is consistent with the width of the distribution beam, and all the positioning grooves are symmetrically distributed along the axis of the rotating drum, and the top of the positioning groove is not higher than the top of the distribution beam and not lower than the bottom of the distribution beam;

[0033] A guide cylinder is sleeved and fixed on the ends of the two corresponding precision-rolled threaded steel bars, the inner wall of the guide cylinder has a groove matched with the precision-rolled threaded steel bars, one end of the guide cylinder close to the corresponding pile foundation abuts against the anchor nut, and a guide groove of the same length as the guide cylinder is opened on the outer wall of the guide cylinder in a direction parallel to the axis, and the guide groove is matched with the guide member;

[0034] An operating rod passes through the cylindrical hole, and the upper end of the operating rod penetrates upward into the truncated cone-shaped cavity and is slidably connected to the side wall of the truncated cone-shaped cavity. A clamping hole is opened on the operating rod at the part close to the bottom support plate, and a clamping strip is inserted into the clamping hole. The length of the clamping strip is greater than the inner diameter of the cylindrical hole. The upper end of the operating rod is sleeved and fixed with a second bevel gear at a position close to the bottom of the center block, and the second bevel gear is meshed with the first bevel gear for transmission.

[0035] The present invention also provides a construction method for a supporting structure of a high pile cap in a steep area in a mountainous area, comprising the following steps:

[0036] S1. During the pile foundation construction, a first hole and a second hole are reserved at the upper end of each pile foundation by burying a PVC pipe;

[0037] S2. Install support rods in the first channel and support legs at both ends of the support rods as the main support system of the construction platform;

[0038] S3. Weld the unloading piece on the top of the supporting leg, insert a fine-rolled threaded steel bar into the two unloading pieces of each pile foundation and the second hole, pull the fine-rolled threaded steel bars and anchor them, so that the unloading pieces at both ends are in close contact with the pile foundation;

[0039] S4. Weld the main beam on the unloading part, weld the connecting brace between the main beams, and then lay the distribution beam on the main beam. The distribution beam at the cantilevered part is firmly welded to the bottom support beam and the main beam to form the overall force system of the construction platform;

[0040] S5. Install the cap construction formwork and guardrail on the construction platform, tie the cap steel bars, and pour the cap concrete;

[0041] S6. After the cap concrete reaches the designed strength, release the anchorage of the fine-rolled threaded steel bars, and dismantle the cap formwork and all distribution beams, main beams, support rods, and support legs from top to bottom;

[0042] S7. Perform grouting treatment on the first and second holes of the pile foundation to complete the appearance repair.

[0043] Preferably, in step S1, during pile foundation construction, several rows of steel mesh are symmetrically buried below the first hole.

[0044] Preferably, in step S3, after the precision-rolled threaded steel bars are inserted, the connection support mechanism is used to support and fix the pile foundations, which specifically includes the following steps:

[0045] S31, installing the hangers, so that the U-shaped hooks of the two hangers are respectively hung on the ends of the corresponding precision-rolled threaded steel bars, the plug-in parts of the two hangers are plugged and meshed with each other, and the arc-shaped groove contacts the side wall of the pile foundation through the elastic pad;

[0046] S32, install the cross brace, pass the lower end of the operating rod downward through the cylindrical hole for positioning, then rotate the two brace cylinders on the rotating cylinder so that the two brace cylinders are inserted into the outside of a guide cylinder, and the guide is located at the entrance of the guide groove, and then insert the clamping strip on the operating rod into the clamping hole;

[0047] S33, rotating the operating rod below the bottom support plate, the second bevel gear rotates to drive the meshed first bevel gear to rotate, and the two support cylinders move linearly along the guide groove until they contact the unloading piece on the corresponding side to perform lateral connection support;

[0048] In step S4, the distribution beam is limited in the horizontal direction by the positioning groove, and then the distribution beam is installed. In step S6, the connection support mechanism is removed before releasing the anchoring of the precision-rolled threaded steel bars.

[0049] The present invention includes at least the following beneficial effects: a supporting structure of a high pile pedestal on steep land in mountainous area and a construction method thereof of the present invention reasonably utilize the structural characteristics of multiple pile foundations, pre-embed a first channel and a second channel at the upper end of the high pile foundation, insert a supporting rod in the first channel, and then provide supporting legs at both ends of the supporting rod and sequentially connect the unloading parts and the beam platform upward, and form a construction platform of the pedestal on the upper surface of the beam platform on the top of all the pile foundations, the construction platform can transfer the load to the beam platform, the unloading parts, the supporting legs, the supporting rods, and the pile foundations in sequence, the entire supporting structure can provide stable support for the construction of the pedestal without the need to set up an additional working space around the pile foundations, the entire supporting structure has the advantages of simple and fast manufacture, installation, and construction, energy saving and environmental protection, effective cost saving, accelerated installation progress, and convenient later turnover, and the supporting structures between the pile foundations are subsequently connected by a connecting support mechanism, and the pile foundations are further utilized to strengthen the stability and tightness of the lateral support of the high pile pedestal on steep land in mountainous area.

[0050] Other advantages, objectives and features of the present invention will be embodied in part through the following description, and in part will be understood by those skilled in the art through study and practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0051] Figure 1 A top view of the structural diagram of the support structure of the high pile cap on steep terrain in mountainous areas of the present invention;

[0052] Figure 2 for Figure 1 AA structural diagram;

[0053] Figure 3 for Figure 1 BB structural diagram;

[0054] Figure 4 This is a front view structural diagram of a load-relief member and a support leg according to an embodiment of the present invention;

[0055] Figure 5 It is a side structural diagram of a load-relief member and a support leg according to an embodiment of the present invention;

[0056] Figure 6 This is a front view structural diagram of a connection support mechanism installed on a pile foundation according to an embodiment of the present invention;

[0057] Figure 7 It is a front view structural diagram of the contact support mechanism of one embodiment of the present invention before the support cylinder contacts the guide cylinder;

[0058] Figure 8 It is a front view structural diagram of the contact support mechanism of one embodiment of the present invention after the support cylinder contacts the guide cylinder;

[0059] Fig. 9 It is a top view of the structure of two adjacent pendants of the present invention;

[0060] Fig.10 It is a side structural diagram of the positioning member of the present invention.

[0061] Description of the accompanying drawings: 1. pile foundation, 2. first hole, 3. second hole, 4. support rod, 5. support leg, 6. precision-rolled threaded steel bar, 7. unloading piece, 8. beam platform, 9. main cross beam, 10. distribution beam, 11. connecting support, 12. supporting beam, 13. first top plate, 14. first bottom plate, 15. first side plate, 16. second side plate, 17. first pasting plate, 18. first stiffening plate, 19. second top plate, 20. second bottom plate, 21. ear plate, 22. Second plate, 23. Second stiffening plate, 24. Anchor nut, 25. Hanger, 26. Bottom support plate, 27. Arc groove, 28. Elastic pad, 29. U-shaped hook, 30. Connecting part, 31. Center block, 32. Rotating cylinder, 33. Support cylinder, 34. Cone-shaped cavity, 35. First bevel gear, 36. Positioning piece, 37. Positioning groove, 38. Guide cylinder, 39. Guide groove, 40. Operating lever, 41. Card strip, 42. Second bevel gear, 100. Support platform. DETAILED DESCRIPTION

[0062] The present invention is further described in detail below in conjunction with the accompanying drawings so that those skilled in the art can implement the invention with reference to the description.

[0063] It should be noted that the construction methods described in the following embodiments are conventional methods unless otherwise specified, and the materials can be obtained from commercial channels unless otherwise specified; in the description of the present invention, the terms "lateral", "longitudinal", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, which are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present invention.

[0064] like Figure 1-3 , Figure 6-8 As shown, the present invention provides a support structure for a high pile cap on a steep terrain in a mountainous area, comprising:

[0065] A support assembly, comprising a first channel 2 and a second channel 3 which are horizontally penetrated and arranged at the upper end of each pile foundation 1 along the length direction of the cap 100, the first channel 2 and the second channel 3 of each pile foundation 1 are located in the same radial direction and are arranged sequentially from bottom to top, a support rod 4 is passed through each first channel 2, both ends of the support rod 4 extend out of the corresponding first channel 2 and are respectively sleeved with support legs 5, the support legs 5 at both ends of the support rod 4 are symmetrical to each other and are arranged closely to the corresponding pile foundation 1, a fine-rolled threaded steel bar 6 is passed through the second channel 3, both ends of the fine-rolled threaded steel bar 6 extend out of the corresponding second channel 3;

[0066] The unloading piece 7 is symmetrically mounted on both ends of each fine-rolled threaded steel bar 6. The two ends of the fine-rolled threaded steel bar 6 pass through the unloading piece 7 at the corresponding end and are anchored to make the unloading piece 7 close to the corresponding pile foundation 1. The bottom of each unloading piece 7 is fixedly connected to the top of the supporting leg 5 on the corresponding side.

[0067] The beam platform 8 is arranged around the upper ends of all the pile foundations 1 , the tops of all the unloading members 7 are fixedly connected to the bottoms of the beam platform 8 , and the upper surface of the beam platform 8 forms a construction platform of the cap 100 on the tops of all the pile foundations 1 .

[0068] During the construction of the pile foundation 1, a PVC pipe radially penetrating the pile foundation 1 is buried at the upper end of the pile foundation 1, and a first hole 2 and a second hole 3 are reserved on the inner side of the PVC pipe. The first hole 2 is used to pass the supporting rod 4, and the second hole 3 is used to pass the fine-rolled threaded steel bar 6. The first hole 2 and the second hole 3 of corresponding diameters are set according to different diameters of the holes to be passed. The diameters of the first hole 2 and the second hole 3 are respectively larger than the diameters of the corresponding supporting rods 4 and fine-rolled threaded steel bars 6. All supporting rods 4 and fine-rolled threaded steel bars 6 are parallel to the length direction of the cap 100, and the lengths of both ends of each supporting rod 4 and fine-rolled threaded steel bars 6 extending out of the pile foundation 1 are equal to ensure the support balance. Then, support legs 5 are mounted on both ends of the supporting rods 4, and the support legs 5 are close to the pile foundation 1. As the main support system of the subsequent construction platform, the construction load is transferred to all pile foundations 1. After that A load-relief piece 7 is welded on the upper surface of the support leg 5, and a load-relief piece 7 is passed through each end of the fine-rolled threaded steel bar 6. The fine-rolled threaded steel bar 6 is symmetrically tensioned and then anchored through the load-relief piece 7, and the load-relief piece 7 is made to fit tightly against the corresponding pile foundation 1. Finally, a beam platform 8 is welded on the load-relief block, and a construction platform of the pedestal 100 is formed on the upper surface of the beam platform 8 on top of all the pile foundations 1. The construction platform mainly transfers the load to the beam platform 8, the load-relief piece 7, the support leg 5, the support rod 4, and the pile foundation 1 in sequence. The support rod 4 is made of steel rods, and fits tightly against the constructed pile foundation 1 through the support leg 5 and the load-relief piece 7 to ensure lateral stability. This serves as the supporting structure of the construction platform of the pedestal 100. The entire construction platform has the advantages of simple and fast manufacture, installation, and construction, energy conservation and environmental protection, effective cost savings, accelerated installation progress, convenient later turnover, and good supporting stability.

[0069] In another technical solution, Figure 1-3 As shown, the beam platform 8 includes:

[0070] A main crossbeam 9 is arranged parallel to the width direction of the cap 100, and a main crossbeam 9 is commonly connected to both sides of all the pile foundations 1 located in the same width direction of the cap 100, and each main crossbeam 9 is closely attached to all corresponding pile foundations 1 and the bottom is fixedly connected to the top of all the unloading members 7 on the corresponding side;

[0071] The distribution beams 10 are arranged parallel to the width direction of the support platform 100 and a plurality of distribution beams 10 are evenly spaced and fixed on the upper surfaces of all the main beams 9 along the width direction of the support platform 100 .

[0072] When constructing the beam platform 8, first weld the main beam 9 on the unloading member 7, the main beam 9 is set close to the pile foundation 1 for limiting, and then weld the distribution beam 10 on the main beam 9 to form an overall construction platform, which serves as a direct overall force-bearing system for the construction of the base 100.

[0073] In another technical solution, Figure 1-3 As shown, each of the pile foundations 1 is closely provided with connecting struts 11 on both sides of the cap 100 in the length direction, and both ends of each connecting strut 11 are fixedly connected to the main crossbeam 9 at the corresponding end.

[0074] By welding connecting beams between the main beams 9, the main beams 9 are connected into a whole, the overall connection of the beam platform 8 is further strengthened, the supporting stability of the beam platform 8 is improved, and the entire beam platform 8 is limited and positioned around the pile foundation 1.

[0075] In another technical solution, Figure 1 , Figure 2 As shown, support beams 12 are provided at both ends of a row of pile foundations 1 located in the same length direction of the cap 100 , and the support beams 12 are fixedly connected to the bottoms of all the distribution beams 10 in a cantilevered state at the corresponding ends of the pile foundations 1 .

[0076] By welding a support beam 12 at the bottom of the distribution beam 10 in a cantilevered state, that is, the distribution beam 10 is only connected to one main beam 9 and the other end is suspended, the connection tightness between all the distribution beams 10 is further strengthened after welding the support beam 12, so that all the distribution beams 10 form a solid overall force-bearing system of the construction platform.

[0077] In another technical solution, Figure 4-5 As shown, the unloading member 7 comprises:

[0078] A first top plate 13, which is horizontally arranged and in contact with the corresponding side wall of the pile foundation 1, and the upper surface of the first top plate 13 is fixedly connected to the bottom of the corresponding beam platform 8;

[0079] A first bottom plate 14, which is horizontally arranged directly below the first top plate 13 and has a bottom fixedly connected to the top of the corresponding supporting leg 5;

[0080] A first side plate 15, which is connected and arranged between the first top plate 13 and the first bottom plate 14, and the first side plate 15 is arranged vertically and parallel to the axial direction of the finished rolled threaded steel bar 6;

[0081] The second side plate 16 is connected between the first top plate 13 and the first bottom plate 14 and is connected to one end of the first top plate 13 close to the corresponding pile foundation 1 and one end away from the corresponding pile foundation 1, respectively. The first side plate 15 is perpendicular to the axial direction of the finished rolled threaded steel bar 6;

[0082] A first side plate 17, which is attached to the outer side of the second side plate 16 at one end away from the corresponding pile foundation 1;

[0083] A first stiffening plate 18 is connected to the outer sides of the two first side plates 15 in a direction parallel to the second side plates 16, wherein the upper end of the first stiffening plate 18 is connected to the first top plate 13, and the lower end is connected to the first bottom plate 14;

[0084] The end of the fine-rolled threaded steel bar 6 passes through the two second side plates 16 and the first contact plate 17 in sequence and is connected to an anchor nut 24 .

[0085] The first top plate 13 is provided to facilitate welding and fixing with the main cross beam 9, and the first bottom plate 14 is provided to facilitate welding and fixing with the support leg 5. Between the first top plate 13 and the first bottom plate 14, vertical support is provided by the vertically provided first side plate 15 and the second side plate 16. The first stiffening plate 18 is provided to further improve the strength and stability of the vertical support of the unloading member 7. The first plate 17 is provided to facilitate tightening the anchor nut 24 on the fine-rolled threaded steel bar 6 to make the unloading member 7 close to the pile foundation 1. The second side plate 16 has a certain distance from the edges of the first top plate 13 and the first bottom plate 14, so as to provide a welding space for welding between the first bottom plate 14 and the support leg 5.

[0086] In another technical solution, Figure 4-5 As shown, the support leg 5 comprises:

[0087] A second top plate 19, which is horizontally arranged and in contact with the corresponding side wall of the pile foundation 1, and the upper surface of the second top plate 19 is fixedly connected to the top of the first bottom plate 14 of the corresponding unloading member 7;

[0088] A second bottom plate 20, which is horizontally arranged directly below the first top plate 13 and contacts the corresponding side wall of the pile foundation 1;

[0089] The ear plate 21 is connected and arranged between the second top plate 19 and the second bottom plate 20, and the ear plate 21 is arranged vertically and perpendicular to the axial direction of the support rod 4;

[0090] A second pasting plate 22 is respectively connected to the inner and outer sides of the ear plate 21, and the inner second pasting plate 22 abuts against the corresponding side wall of the pile foundation 1;

[0091] The ends of the support rods 4 pass through the inner second pasting plate 22, the ear plate 21, and the outer second pasting plate 22 of the corresponding ends in sequence;

[0092] The second stiffening plates 23 are arranged on both sides of the ends of the support rod 4 . The inner side of each second stiffening plate 23 is connected to the ear plate 21 , the upper end is connected to the second top plate 19 , and the lower end is connected to the second bottom plate 20 .

[0093] The second top plate 19 is provided to facilitate welding and fixing with the first bottom plate 14. The ear plate 21 and the second stiffening plate 23 provided between the second top plate 19 and the second bottom plate 20 are connected to form an overall supporting structure of the supporting leg 5. A second patch plate 22 is welded to the inner and outer sides of the ear plate 21 through which the supporting rod 4 passes by means of plug welding, so as to improve the stability of the ear plate 21 supported on the supporting rod 4.

[0094] In another technical solution, Figure 6-10 As shown, a connection support mechanism is further provided between two adjacent pile foundations 1 in the length direction of the same cap 100, and the connection support mechanism includes:

[0095] A hanger 25, one of which is respectively provided for each adjacent pile foundation 1, and the two hangers 25 are arranged facing each other, and the hangers 25 include a bottom support plate 26 arranged parallel to the length direction of the cap 100, and an arc groove 27 matching the shape of the pile foundation 1 is provided at one end of the bottom support plate 26 close to the corresponding pile foundation 1, and an elastic pad 28 is provided between the bottom of the arc groove 27 and the side wall of the corresponding pile foundation 1, and the arc groove 27 contacts the side wall of the pile foundation 1 through the elastic pad 28, and a U-shaped hook 29 with an opening facing downward is connected upwardly to the bottom support plate 26, and the U-shaped hook 29 is sleeved on the end of the finely rolled threaded steel bar 6 on the corresponding pile foundation 1, and mutually meshing plug-in parts 30 are provided at the facing ends of the two bottom support plates 26, and a vertically penetrating cylindrical hole is provided in the middle of one of the plug-in parts 30;

[0096] The cross brace comprises a center block 31. A rotating cylinder 32 is provided at the center of the center block 31 along the length direction of the support platform 100. The middle of the rotating cylinder 32 is rotatably connected to the center block 31 through a bearing. Support cylinders 33 are symmetrically sleeved at both ends of the rotating cylinder 32. The support cylinder 33 is connected to the rotating cylinder 32 through a thread. A guide is provided on the inner side of the end of the support cylinder 33 away from the rotating cylinder 32. An inverted truncated cone-shaped cavity 34 is provided inside the lower end of the center block 31. A first bevel gear 35 is sleeved and fixed on a position of one of the rotating cylinders 32 near the center block 31.

[0097] A positioning member 36 is fixed on the top of the center block 31. A plurality of positioning grooves 37 are arranged at intervals along the width direction of the support platform 100 corresponding to the distribution beam 10 at the upper end of the positioning member 36. The width of the positioning grooves 37 is consistent with the width of the distribution beam 10. All positioning grooves 37 are symmetrically distributed along the axis of the rotating drum 32. The top of the positioning groove 37 is not higher than the top of the distribution beam 10 and not lower than the bottom of the distribution beam 10.

[0098] A guide cylinder 38 is sleeved and fixed on the ends of the two corresponding finished rolled threaded steel bars 6. The inner wall of the guide cylinder 38 has a groove that is arranged in cooperation with the finished rolled threaded steel bars 6. One end of the guide cylinder 38 close to the corresponding pile foundation 1 abuts against the anchor nut 24. A guide groove 39 of the same length as the guide cylinder 38 is opened on the outer wall of the guide cylinder 38 in a direction parallel to the axis. The guide groove 39 is arranged in cooperation with the guide member.

[0099] The operating rod 40 passes through the cylindrical hole, and the upper end of the operating rod 40 penetrates upward into the truncated cone cavity 34 and is slidably connected to the side wall of the truncated cone cavity 34. A clamping hole is opened on the operating rod 40 at the part downward close to the bottom support plate 26, and a clamping strip 41 is inserted into the clamping hole. The length of the clamping strip 41 is greater than the inner diameter of the cylindrical hole. The upper end of the operating rod 40 is sleeved and fixed with a second bevel gear 42 at a position close to the bottom of the center block 31, and the second bevel gear 42 is meshed with the first bevel gear 35 for transmission.

[0100] After the fine-rolled threaded steel bar 6 is inserted, the connection support mechanism is used to support and fix the pile foundation 1. The hanger 25 is installed first, so that the U-shaped hooks 29 of the two hangers 25 are respectively sleeved on the ends of the corresponding fine-rolled threaded steel bars 6, and the arc groove 27 is attached to the side wall of the pile foundation 1. The plug-in parts 30 of the two hangers 25 are arranged relatively, and one of the hangers 25 is moved up and down so that the two plug-in parts 30 are plugged and meshed with each other, and at the same time, the bottoms of the U-shaped hooks 29 of the two hangers 25 are against the ends of the fine-rolled threaded steel bars 6, so that the hanger 25 provides support in the vertical direction through the fine-rolled threaded steel bars 6, and at the same time, the arc groove 27 is passed through The elastic pad 28, such as a sponge pad or a rubber pad, is in close contact with the side wall of the pile foundation 1, has a certain extrusion force, and provides a certain vertical friction force to the hanger 25, so that the hanger 25 is firmly supported between the corresponding two pile foundations 1. In this way, two hangers 25 are supported between each group of two adjacent pile foundations 1, and the two adjacent pile foundations 1 are force-connected as a whole at the position below the supporting leg 5 and provide a certain support function as the subsequent operating rod 40, cross brace, etc.; then install the cross brace, pass the lower end of the operating rod 40 downward through the cylindrical hole for positioning, rotate the entire operating rod 40 and the cross brace so that the center block 31 The positioning member 36 is substantially perpendicular to the horizontal direction of the bearing platform 100, and then the two support cylinders 33 on the rotating cylinder 32 are rotated to move the two support cylinders 33 away from the rotating cylinder 32 and close to the fine-rolled threaded steel bar 6 at the corresponding end, until they are inserted into the outside of the guide cylinder 38 outside the corresponding fine-rolled threaded steel bar 6, and the guide member is located at the entrance of the guide groove 39. At this time, the positioning member 36 is aligned with the fine-rolled threaded steel bar 6 through the rotating cylinder 32 to achieve precise angle adjustment, so that the guide groove 39 is consistent with the horizontal position to be set of the subsequent distribution beam 10, and the elevation of the cross brace is positioned, and then the clamping strip 41 on the operating rod 40 is inserted into the clamping hole, and the lower end of the clamping hole contacts the The upper surface of the plug-in portion 30 of the hanger 25; then, the operating rod 40 is rotated below the bottom support plate 26, and the second bevel gear 42 fixed on the operating rod 40 rotates to drive the meshing first bevel gear 35 to rotate, so that the first bevel gear 35 drives the rotating cylinder 32 to rotate, and the two support cylinders 33, under the action of the guide groove 39 and the guide member, make a linear motion along the guide groove 39 until they contact the second side plate 16 located on the outside of the unloading member 7 on the corresponding side, and perform lateral connection support, further strengthening the role of the unloading member 7 in close contact with the pile foundation 1 in the lateral direction, and at the same time, the positioning groove 37 on the positioning member 36 facilitates the subsequent interval installation of the distribution beam 10.

[0101] The present invention also provides a construction method for a supporting structure of a high pile cap on a steep mountainous area, Figures 1 to 10 As shown, the following steps are included:

[0102] S1. During the construction of the pile foundation 1, a first hole 2 and a second hole 3 are reserved at the upper end of each pile foundation 1 by burying a PVC pipe. Preferably, during the construction of the pile foundation 1, several rows of steel mesh are symmetrically buried below the first hole 2.

[0103] S2. Install the support rod 4 in the first channel 2, and install the support legs 5 at both ends of the support rod 4 as the main support system of the construction platform.

[0104] S3, welding a load-relief piece 7 on the top of the support leg 5, inserting a fine-rolled threaded steel bar 6 in the two load-lief pieces 7 of each pile foundation 1 and in the second channel 3, pulling the fine-rolled threaded steel bars 6 and anchoring them, so that the load-lief pieces 7 at both ends are in close contact with the pile foundation 1; specifically, after inserting the fine-rolled threaded steel bars 6, the connecting support mechanism is used to support and fix the pile foundations 1:

[0105] S31, install the hangers 25 so that the U-shaped hooks 29 of the two hangers 25 are respectively hung on the ends of the corresponding precision-rolled threaded steel bars 6, the plug-in parts 30 of the two hangers 25 are plugged and engaged with each other, and the arc groove 27 contacts the side wall of the pile foundation 1 through the elastic pad 28.

[0106] S32, install the cross brace, pass the lower end of the operating rod 40 downward through the cylindrical hole for positioning, then rotate the two support cylinders 33 on the rotating cylinder 32, so that the two support cylinders 33 are inserted into the outside of a guide cylinder 38, and the guide is located at the entrance of the guide groove 39, and then insert the clamping strip 41 on the operating rod 40 into the clamping hole.

[0107] S33, the operating rod 40 is rotated below the bottom support plate 26, the second bevel gear 42 rotates to drive the meshed first bevel gear 35 to rotate, and the two support cylinders 33 move linearly along the guide groove 39 until they contact the unloading member 7 on the corresponding side for lateral connection support.

[0108] S4. Weld the main beam 9 on the unloading member 7, weld the connecting support 11 between the main beams 9, and then lay the distribution beam 10 on the main beam 9. Use the positioning groove 37 to limit the distribution beam 10 in the horizontal direction, and then install the distribution beam 10. The distribution beam 10 at the cantilevered part is firmly welded to the bottom support beam 12 and the main beam 9 to form an overall force system of the construction platform.

[0109] S5. Install the construction formwork and guardrail of the pedestal 100 on the construction platform, tie the steel bars of the pedestal 100, and pour the concrete of the pedestal 100.

[0110] S6. After the concrete of the pedestal 100 reaches the designed strength, the anchorage of the fine-rolled threaded steel bars 6 is released, and the formwork of the pedestal 100 and all the distribution beams 10, main beams 9, support rods 4, and support legs 5 are removed in sequence from top to bottom. Before releasing the anchorage of the fine-rolled threaded steel bars 6, the connecting support mechanism is removed first.

[0111] S7, grouting treatment is performed on the first hole 2 and the second hole 3 of the pile foundation 1 to complete the appearance repair.

[0112] In summary, the support structure of a high pile pedestal on steep land in mountainous area and the construction method thereof of the present invention reasonably utilize the structural characteristics of multiple pile foundations, pre-embed a first channel and a second channel at the upper end of the high pile foundation, insert a supporting rod in the first channel, and then provide supporting legs at both ends of the supporting rod and connect the unloading parts and the beam platform upward in sequence, and form a construction platform of the pedestal on the upper surface of the beam platform on the top of all the pile foundations, the construction platform can transfer the load to the beam platform, the unloading parts, the supporting legs, the supporting rods, and the pile foundations in sequence, the entire supporting structure can provide stable support for the construction of the pedestal without setting up an additional working space around the pile foundation, the entire supporting structure has the advantages of simple and fast manufacture, installation and construction, energy saving and environmental protection, effective cost saving, accelerated installation progress, convenient later turnover, etc., and the supporting structures between the pile foundations are subsequently connected by a connecting support mechanism, and the pile foundation is further utilized to strengthen the stability and tightness of the lateral support of the high pile pedestal on steep land in mountainous area.

[0113] Although the embodiments of the present invention have been disclosed as above, they are not limited to the applications listed in the specification and the implementation modes, and they can be fully applied to various fields suitable for the present invention. For those familiar with the art, additional modifications can be easily implemented. Therefore, without departing from the general concept defined by the claims and the scope of equivalents, the present invention is not limited to the specific details and the illustrations shown and described herein.

Claims

1. A supporting structure for a high pile cap on a steep terrain in a mountainous area, characterized in that: include: A support assembly, comprising a first channel and a second channel horizontally penetrating the upper end of each pile foundation along the length direction of the cap, the first channel and the second channel of each pile foundation being located in the same radial direction and arranged sequentially from bottom to top, a support rod being passed through each first channel, both ends of the support rod extending out of the corresponding first channel and respectively sleeved with support legs, the support legs at both ends of the support rod being symmetrical to each other and arranged closely against the corresponding pile foundation, a fine-rolled threaded steel bar being passed through the second channel, both ends of the fine-rolled threaded steel bar extending out of the corresponding second channel; The unloading piece is symmetrically mounted on both ends of each fine-rolled threaded steel bar. The two ends of the fine-rolled threaded steel bar pass through the unloading piece at the corresponding end and are anchored to make the unloading piece close to the corresponding pile foundation. The bottom of each unloading piece is fixedly connected to the top of the supporting leg on the corresponding side. The beam platform is arranged around the upper ends of all pile foundations, the tops of all unloading parts are fixedly connected to the bottoms of the beam platform, and the upper surface of the beam platform forms a construction platform of the cap on the tops of all pile foundations; The beam platform comprises: A main crossbeam is arranged parallel to the width direction of the cap, and a main crossbeam is commonly arranged on both sides of all the pile foundations located in the same width direction of the cap, and each main crossbeam is closely attached to all the corresponding pile foundations and the bottom is fixedly connected to the top of all the unloading parts on the corresponding side; A distribution beam, which is arranged parallel to the width direction of the pedestal and a plurality of distribution beams are evenly spaced and fixed on the upper surface of all the main beams along the width direction of the pedestal; Each of the pile foundations is provided with connecting braces on both sides of the cap in the length direction, and both ends of each connecting brace are fixedly connected to the main crossbeam at the corresponding end; The unloading member comprises: A first top plate, which is horizontally arranged and contacts the corresponding side wall of the pile foundation, and the upper surface of the first top plate is fixedly connected to the bottom of the corresponding beam platform; A first bottom plate, which is horizontally arranged directly below the first top plate and has a bottom fixedly connected to the top of the corresponding supporting leg; A first side plate, which is connected and arranged between the first top plate and the first bottom plate, and the first side plate is arranged vertically and parallel to the axial direction of the precision-rolled threaded steel bar; A second side plate is connected between the first top plate and the first bottom plate and is connected to one end of the first top plate close to the corresponding pile foundation and one end of the first top plate away from the corresponding pile foundation, respectively. The first side plate is perpendicular to the axial direction of the precision-rolled threaded steel bar; A first pasting plate, which is pasted and arranged on the outer side of the second side plate at one end away from the corresponding pile foundation; A first stiffening plate is connected and arranged on the outer sides of the two first side plates in a direction parallel to the second side plates, wherein the upper end of the first stiffening plate is connected to the first top plate, and the lower end of the first stiffening plate is connected to the first bottom plate; The end of the fine-rolled threaded steel bar passes through the two second side plates and the first plate in sequence and is connected to an anchor nut; A connecting support mechanism is also provided between two adjacent pile foundations located in the length direction of the same cap, and the connecting support mechanism comprises: A hanger, one of which is respectively provided for each adjacent pile foundation, and the two hangers are arranged facing each other, and the hanger includes a bottom support plate arranged parallel to the length direction of the cap, an end of the bottom support plate close to the corresponding pile foundation is provided with an arc groove matching the shape of the pile foundation, an elastic pad is provided between the bottom of the arc groove and the side wall of the corresponding pile foundation, and the arc groove contacts the side wall of the pile foundation through the elastic pad, and a U-shaped hook with an opening facing downward is connected upwardly to the bottom support plate, and the U-shaped hook is sleeved on the end of the fine-rolled threaded steel bar on the corresponding pile foundation, and mutually meshing plug-in parts are provided at the ends of the two bottom support plates facing each other, and a vertically penetrating cylindrical hole is provided in the middle of one of the plug-in parts; A cross brace, comprising a center block, a rotating cylinder is provided at the center of the center block along the length direction of the support platform, the middle of the rotating cylinder is rotatably connected to the center block through a bearing, support cylinders are symmetrically sleeved at both ends of the rotating cylinder, the support cylinders are connected to the rotating cylinder through threads, a guide is provided on the inner side of one end of the support cylinder away from the rotating cylinder, an inverted truncated cone-shaped cavity is provided inside the lower end of the center block, and a first bevel gear is sleeved and fixed on one of the rotating cylinders near the center block; A positioning member fixed on the top of the center block, wherein the upper end of the positioning member is provided with a plurality of positioning grooves corresponding to the distribution beam along the width direction of the support platform, wherein the width of the positioning groove is consistent with the width of the distribution beam, and all the positioning grooves are symmetrically distributed along the axis of the rotating drum, and the top of the positioning groove is not higher than the top of the distribution beam and not lower than the bottom of the distribution beam; A guide cylinder is sleeved and fixed on the ends of the two corresponding precision-rolled threaded steel bars, the inner wall of the guide cylinder has a groove matched with the precision-rolled threaded steel bars, one end of the guide cylinder close to the corresponding pile foundation abuts against the anchor nut, and a guide groove of the same length as the guide cylinder is opened on the outer wall of the guide cylinder in a direction parallel to the axis, and the guide groove is matched with the guide member; An operating rod passes through the cylindrical hole, and the upper end of the operating rod penetrates upward into the truncated cone-shaped cavity and is slidably connected to the side wall of the truncated cone-shaped cavity. A clamping hole is opened on the operating rod at the part close to the bottom support plate, and a clamping strip is inserted into the clamping hole. The length of the clamping strip is greater than the inner diameter of the cylindrical hole. A second bevel gear is fixedly mounted on the upper end of the operating rod at a position close to the bottom of the center block, and the second bevel gear is meshed with the first bevel gear for transmission.

2. The supporting structure of a high pile cap in a mountainous area according to claim 1, characterized in that: Support beams are also provided at both ends of a row of the pile foundations located in the same length direction of the cap, and the support beams are fixedly connected to the bottoms of all the distribution beams in a cantilevered state located at the corresponding ends of the pile foundations.

3. The supporting structure of a high pile cap in a mountainous area according to claim 1, characterized in that: The supporting legs include: a second top plate, which is horizontally arranged and contacts the corresponding side wall of the pile foundation, and the upper surface of the second top plate is fixedly connected to the top of the first bottom plate of the corresponding unloading member; a second bottom plate, which is horizontally arranged directly below the first top plate and contacts the corresponding side wall of the pile foundation; An ear plate is connected and arranged between the second top plate and the second bottom plate, and the ear plate is arranged vertically and perpendicular to the axial direction of the support rod; A second pasting plate is respectively connected to the inner and outer sides of the ear plate, and the inner second pasting plate abuts against the corresponding side wall of the pile foundation; The ends of the support rods sequentially pass through the inner second sticking plate, the ear plate, and the outer second sticking plate of the corresponding ends; The second stiffening plates are arranged on both sides of the ends of the support rods. The inner side of each second stiffening plate is connected to the ear plate, the upper end is connected to the second top plate, and the lower end is connected to the second bottom plate.

4. The construction method of the support structure of the high pile cap in the mountainous area according to claim 1, characterized in that: The steps include: S1. During the pile foundation construction, a first hole and a second hole are reserved at the upper end of each pile foundation by burying a PVC pipe; S2. Install support rods in the first channel and support legs at both ends of the support rods as the main support system of the construction platform; S3. Weld the unloading piece on the top of the supporting leg, insert a fine-rolled threaded steel bar into the two unloading pieces of each pile foundation and the second hole, pull the fine-rolled threaded steel bars and anchor them, so that the unloading pieces at both ends are in close contact with the pile foundation; S4. Weld the main beam on the unloading part, weld the connecting brace between the main beams, and then lay the distribution beam on the main beam. The distribution beam at the cantilevered part is firmly welded to the bottom support beam and the main beam to form the overall force system of the construction platform; S5. Install the cap construction formwork and guardrail on the construction platform, tie the cap steel bars, and pour the cap concrete; S6. After the cap concrete reaches the designed strength, release the anchorage of the fine-rolled threaded steel bars, and dismantle the cap formwork and all distribution beams, main beams, support rods, and support legs from top to bottom; S7. Perform grouting treatment on the first and second holes of the pile foundation to complete the appearance repair.

5. The construction method of the support structure of the high pile cap in the mountainous area according to claim 4, characterized in that: In step S1, during pile foundation construction, several rows of steel mesh are symmetrically buried below the first hole.

6. The construction method of the support structure of the high pile cap in the mountainous area according to claim 4, characterized in that: In step S3, after the precision-rolled threaded steel bars are inserted, the connection support mechanism is used to support and fix the pile foundations, which specifically includes the following steps: S31, installing the hangers, so that the U-shaped hooks of the two hangers are respectively hung on the ends of the corresponding precision-rolled threaded steel bars, the plug-in parts of the two hangers are plugged and meshed with each other, and the arc-shaped groove contacts the side wall of the pile foundation through the elastic pad; S32, install the cross brace, pass the lower end of the operating rod downward through the cylindrical hole for positioning, then rotate the two brace cylinders on the rotating cylinder so that the two brace cylinders are inserted into the outside of a guide cylinder, and the guide is located at the entrance of the guide groove, and then insert the clamping strip on the operating rod into the clamping hole; S33, rotating the operating rod below the bottom support plate, the second bevel gear rotates to drive the meshed first bevel gear to rotate, and the two support cylinders move linearly along the guide groove until they contact the unloading piece on the corresponding side to perform lateral connection support; In step S4, the distribution beam is limited in the horizontal direction by the positioning groove, and then the distribution beam is installed. In step S6, the connection support mechanism is removed before releasing the anchoring of the precision-rolled threaded steel bars.

Citation Information

Patent Citations

  • Dual-cantilever bearing support structure for large steel pipe and installation method

    CN102392417A

  • Technology and device for erecting steel platform for land bridge foundation construction

    CN103938640A

  • Lift stake reinforcement and use cushion cap construction platform

    CN207685879U

  • Steel -pipe pile concrete cap

    CN208009463U

  • Supporting structure of mountainous area steep ground high pile cap

    CN214940330U