A treatment device for chlorination furnace chlorine-containing waste gas

Through the multi-stage scrubber and ferrous solution treatment technology connected in series and parallel, the problems of high alkali consumption in the waste gas treatment of the chlorination furnace and incomplete chlorination absorption during failure are solved, cost reduction and safety improvement are achieved, and the chlorination furnace is ensured. Working normally.

CN113663480BActive Publication Date: 2024-11-05YUNNAN GUOTAI TITANIUM METAL CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110966209.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-08-23
Publication Date
2024-11-05
Estimated Expiration
2041-08-23

AI Technical Summary

Technical Problem

The existing chlorination furnace waste gas treatment technology has the problem of ineffective consumption of alkali liquid, high cost and inability to fully absorb the anode chlorine in the event of failure, resulting in the risk of environmental accidents.

Method used

Using a series-parallel process exhaust gas and sanitary exhaust gas treatment unit, the low-priced ferrous solution is used to replace the alkaline solution, and the waste gas is treated through a multi-stage hydrochloric acid and ferrous scrubber, and the ferrous solution concentration is recovered and mixed to ensure that Full wash and cost reduction.

Benefits of technology

It effectively reduces the cost of waste gas treatment, improves the adsorption rate of chlorine, avoids environmental accidents, and ensures the continuous operation of electrolytic cells and the production of sponge titanium.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113663480B_ABST
    Figure CN113663480B_ABST
Patent Text Reader

Abstract

The invention discloses a device for treating chlorine-containing waste gas from a chlorination furnace, and belongs to the technical field of chemical production equipment. In the technical scheme, a low-cost ferrous solution is used to replace an alkaline solution or a FeCl2 solution to wash the chlorine in the waste gas; and two sets of tail gas systems are treated in series and parallel. When a molten salt chlorination furnace fails, the process tail gas and the sanitary tail gas are connected in series to absorb and treat anode chlorine, thereby ensuring the absorption effect of chlorine.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of chemical production equipment, and in particular relates to a device for treating chlorine-containing waste gas from a chlorination furnace. Background Art

[0002] In order to remove Cl2 and HCl from the chlorination furnace exhaust gas, the chlorination furnace exhaust gas is usually introduced into a series of washing towers, acid washing is used to remove TiCl4 and HCl from the chlorination furnace exhaust gas, and alkaline washing or FeCl2 solution washing is used to remove chlorine from the chlorination furnace exhaust gas. However, this technology also has certain problems. The CO2 in the chlorination furnace tail gas reacts with the alkali to generate sodium bicarbonate and sodium carbonate, resulting in ineffective consumption of alkali solution. The generated sodium bicarbonate and sodium carbonate crystal salts are easy to block the tail gas pipeline, affecting the normal production of the chlorination furnace. FeCl2 solution absorbs chlorine, and the effect is also good, but the price of FeCl2 is relatively expensive. When the molten salt chlorination furnace fails, a large amount of chlorine generated by the anode enters the tail gas system for washing. The tail gas washing tower cannot completely absorb the anode chlorine. If the unwashed chlorine is discharged into the atmosphere, it will cause serious safety and environmental accidents. Summary of the invention

[0003] In order to overcome the deficiencies of the above-mentioned prior art, the present invention provides a method for treating chlorine-containing waste gas. The present invention provides a device for automatically controlling cooling water, which aims to reduce the cost of waste gas treatment, improve the adsorption rate of chlorine in the waste gas, avoid environmental accidents, ensure the operation of the electrolytic cell, and also ensure the continuous operation of sponge titanium production.

[0004] The technical solution adopted by the present invention is as follows:

[0005] A device for treating chlorine-containing waste gas from a chlorination furnace, comprising a process tail gas inlet pipe and a sanitary tail gas inlet pipe connected in parallel with a fluorine-containing waste gas inlet pipe, the process tail gas inlet pipe being provided with a valve a and being connected with a process tail gas treatment unit, the process tail gas treatment unit being connected and communicated with the atmosphere through a waste gas pipe a, the sanitary tail gas inlet pipe being provided with a valve b and being connected with a sanitary tail gas treatment unit, the sanitary tail gas treatment unit being communicated with the atmosphere through a second waste gas pipe b, the waste gas pipe a being communicated with the sanitary tail gas inlet pipe through a waste gas pipe c, the waste gas pipe c being provided with a valve c, the waste gas pipe c forming a series connection between the process tail gas treatment unit and the sanitary tail gas treatment unit

[0006] Furthermore, the process tail gas treatment unit includes a first-level hydrochloric acid washing tower, a second-level hydrochloric acid washing tower, a third-level ferrous washing tower, a fourth-level ferrous washing tower and a fifth-level ferrous washing tower which are sequentially connected to the process tail gas inlet pipe, and the outlet of the fifth-level ferrous washing tower is connected to the atmosphere through the exhaust pipe a.

[0007] Furthermore, the sanitary exhaust gas treatment unit includes a six-stage hydrochloric acid washing tower, a seven-stage hydrochloric acid washing tower, an eight-stage ferrous washing tower and a nine-stage iron washing tower which are sequentially connected to the sanitary exhaust gas inlet pipe, and the outlet of the nine-stage iron washing tower is connected to the atmosphere through the exhaust pipe b.

[0008] Furthermore, a valve d is provided on the exhaust pipe b.

[0009] Furthermore, the process tail gas treatment unit also includes a stirring tank for preparing a ferrous saturated solution, and the stirring tank is connected to a third-stage ferrous washing tower, a fourth-stage ferrous washing tower and a fifth-stage ferrous washing tower in sequence to form a closed pipeline loop.

[0010] Furthermore, the Fe 2+ The concentration is 80g / L, and the Fe 2+ The concentration is 100g / L, and the Fe 2+ The concentration is 120g / L.

[0011] In summary, the beneficial effects brought about by the technical solution of the present invention are:

[0012] 1. Using low-priced ferrous solution instead of alkali solution to absorb chlorine avoids the ineffective consumption of alkali solution caused by the reaction of CO2 in the tail gas of the chlorination furnace with alkali to produce sodium bicarbonate and sodium carbonate. Compared with FeCl2, the ferrous solution used is low in price, which effectively reduces the cost of waste gas treatment.

[0013] 2. Two sets of tail gas treatment units are connected in series and in parallel. When the process tail gas treatment unit fails, valve a is closed and valve b is opened, and the sanitary tail gas treatment unit can be switched to wash the chlorine-containing waste gas;

[0014] 3. When the chlorination furnace fails and the process tail gas treatment unit is unable to completely wash the excess chlorine in the exhaust gas, open valve c to connect the process tail gas treatment unit and the sanitary tail gas treatment unit in series, so that the chlorine-containing exhaust gas passes through the process tail gas treatment unit and the sanitary tail gas treatment unit in turn for two washes, so that the anode chlorine can be fully washed, the adsorption rate of chlorine in the exhaust gas can be improved, and environmental accidents can be avoided.

[0015] 4. First, prepare a saturated solution of ferrous solution in a stirring tank. After preparation, pump the solution to a five-stage ferrous washing tower for washing. 2+ After the concentration drops to 120g / L, the solution is placed in a four-stage ferrous washing tower for washing. 2+ After the concentration drops to 100g / L, the solution is placed in a three-stage ferrous washing tower for washing. 2+After the concentration drops to 80g / L, the solution is pumped to the ferrous solution stirring tank to mix with the newly prepared saturated solution and continue to be used to improve the efficiency of the ferrous solution. Finally, the chlorination furnace chlorine-containing waste gas is discharged up to standard. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The present invention will now be described by way of example with reference to the accompanying drawings, in which:

[0017] Figure 1 It is a structural schematic diagram of a chlorine-containing waste gas treatment system in the present invention.

[0018] Among them: 1-fluorine-containing waste gas inlet pipe, 2-process tail gas inlet pipe, 3-sanitary tail gas inlet pipe, 4-waste pipe a, 5-waste pipe b, 6-waste pipe c, 7-first-level hydrochloric acid washing tower, 8-second-level hydrochloric acid washing tower, 9-third-level ferrous washing tower, 10-fourth-level ferrous washing tower, 11-fifth-level ferrous washing tower, 12-sixth-level hydrochloric acid washing tower, 13-seventh-level hydrochloric acid washing tower, 14-eighth-level ferrous washing tower, 15-ninth-level iron washing tower, 16-mixing tank, valve a, valve c, valve b, valve d. DETAILED DESCRIPTION

[0019] To make the purpose, technical scheme and advantages of the embodiments of the present application clearer, the technical scheme in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only a part of the embodiments of the present application, rather than all of the embodiments. The components of the embodiments of the present application usually described and shown in the drawings here can be arranged and designed in various configurations. Therefore, the following detailed description of the embodiments of the present application provided in the drawings is not intended to limit the scope of the application claimed for protection, but merely represents the selected embodiments of the present application. Based on the embodiments of the present application, all other embodiments obtained by those skilled in the art without making creative work belong to the scope of protection of the present application.

[0020] In the description of the embodiments of the present application, it should be noted that the terms "first", "second", "third", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.

[0021] Combine the following Figure 1 The present invention is described in detail.

[0022] A device for treating chlorine-containing waste gas from a chlorination furnace comprises a process tail gas inlet pipe 2 and a sanitary tail gas inlet pipe 3 which are connected in parallel with a fluorine-containing waste gas inlet pipe 1, wherein the process tail gas inlet pipe 2 is provided with a valve a and is connected with a process tail gas treatment unit, wherein the process tail gas treatment unit is connected to the atmosphere through a waste gas pipe a4, wherein the sanitary tail gas inlet pipe 3 is provided with a valve b and is connected with the sanitary tail gas treatment unit, wherein the sanitary tail gas treatment unit is connected to the atmosphere through a second waste gas pipe b5, wherein the waste gas pipe a4 is connected with the sanitary tail gas inlet pipe 3 through a waste gas pipe c6, wherein the waste gas pipe c6 is provided with a valve c, and wherein the waste gas pipe c6 connects the process tail gas treatment unit and the sanitary tail gas treatment unit in series.

[0023] Furthermore, the process tail gas treatment unit includes a primary hydrochloric acid washing tower 7, a secondary hydrochloric acid washing tower 8, a tertiary ferrous washing tower 9, a fourth ferrous washing tower 10 and a fifth ferrous washing tower 11 which are sequentially connected to the process tail gas inlet pipe 2, and the outlet of the fifth ferrous washing tower 11 is connected to the atmosphere through the exhaust pipe a4.

[0024] Furthermore, the sanitary exhaust gas treatment unit includes a six-stage hydrochloric acid washing tower 12, a seven-stage hydrochloric acid washing tower 13, an eight-stage ferrous washing tower 14 and a nine-stage iron washing tower 15 which are sequentially connected to the sanitary exhaust gas inlet pipe 3, and the outlet of the nine-stage iron washing tower 15 is connected to the atmosphere through the exhaust pipe b5.

[0025] During operation: During normal operation, valve a and valve b are opened, and valve c is closed. The exhaust gas is mainly washed by the process tail gas treatment unit, and the sanitary tail gas treatment unit performs auxiliary treatment on the exhaust gas; when the process tail gas treatment unit fails, valve a is closed, valve b is opened, and valve c is closed, and the process tail gas treatment unit is switched to wash the chlorine-containing exhaust gas; when the chlorination furnace fails and the process tail gas treatment unit cannot completely wash the excess chlorine in the exhaust gas, valve a is opened, valve b is closed, and valve c is opened, and the process tail gas treatment unit and the sanitary tail gas treatment unit are connected in series, so that the chlorine-containing exhaust gas passes through the process tail gas treatment unit and the sanitary tail gas treatment unit in turn for two washes, so that the anode chlorine is fully washed, the adsorption rate of chlorine in the exhaust gas is improved, and environmental accidents are avoided.

[0026] In the above embodiment, in order to reduce the cost of waste gas treatment, the process tail gas treatment unit and the sanitary tail gas treatment unit both use the first two-stage washing tower, and adopt acid washing to remove TiCl4 and HCl in the chlorination furnace exhaust gas. The last three or four-stage washing tower adopts ferrous solution washing to remove chlorine in the exhaust gas. This can avoid the ineffective consumption of alkali solution caused by the reaction of CO2 in the chlorination furnace exhaust gas with alkali to generate sodium bicarbonate and sodium carbonate in the alkali washing in the prior art. Compared with FeCl2, the ferrous solution used is cheap, which effectively reduces the cost of waste gas treatment.

[0027] Furthermore, a valve d is provided on the exhaust pipe b5.

[0028] Furthermore, the process tail gas treatment unit also includes a stirring tank 16 for preparing a saturated ferrous solution, and the stirring tank 16 is connected to the third-stage ferrous washing tower 9, the fourth-stage ferrous washing tower 10 and the fifth-stage ferrous washing tower 11 in sequence to form a closed pipeline loop.

[0029] When the stirring tank 16 is working: firstly, a saturated solution of ferrous solution is prepared in the stirring tank 16, and after the preparation is completed, the solution is pumped to the five-stage ferrous washing tower 11 for washing. 2+ After the concentration drops to 120 g / L, the solution is placed in a four-stage ferrous washing tower 10 for washing. 2+ After the concentration drops to 100 g / L, the solution is placed in a three-stage ferrous washing tower 9 for washing. 2+ After the concentration drops to 80 g / L, the solution is pumped to the ferrous solution stirring tank 16 to mix with the newly prepared saturated solution and continue to be used to improve the efficiency of the ferrous solution. Finally, the chlorination furnace chlorine-containing waste gas is discharged up to standard.

[0030] Compared with the prior art, the beneficial effect of the present invention is to reduce the ineffective consumption of liquid alkali by CO2. Compared with FeCl2, the price of ferrous solution is low, which effectively reduces the cost of waste gas treatment. The two sets of tail gas systems are treated in series and parallel to absorb anode chlorine to avoid environmental accidents. The operation of the electrolytic cell is guaranteed, and the continuous operation of sponge titanium production is also guaranteed.

[0031] The above-mentioned embodiments only express the specific implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the protection scope of the present application. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the technical solution concept of the present application, and these all belong to the protection scope of the present application.

Claims

1. A treatment device for chlorination furnace chlorine-containing waste gas, characterized in that: The invention comprises a process tail gas inlet pipe (2) and a sanitary tail gas inlet pipe (3) connected in parallel with a fluorine-containing waste gas inlet pipe (1); the process tail gas inlet pipe (2) is provided with a valve a and is connected to a process tail gas treatment unit; the process tail gas treatment unit is connected to the atmosphere through a waste gas pipe a (4); the sanitary tail gas inlet pipe (3) is provided with a valve b and is connected to the sanitary tail gas treatment unit; the sanitary tail gas treatment unit is connected to the atmosphere through a waste gas pipe b (5); the waste gas pipe a (4) is connected to the sanitary tail gas inlet pipe (3) through a waste gas pipe c (6); the waste gas pipe c (6) is provided with a valve c; the waste gas pipe c (6) connects the process tail gas treatment unit and the sanitary tail gas treatment unit in series; The process tail gas treatment unit comprises a primary hydrochloric acid scrubber (7), a secondary hydrochloric acid scrubber (8), a tertiary ferrous scrubber (9), a quaternary ferrous scrubber (10) and a fifth ferrous scrubber (11) which are sequentially connected to the process tail gas inlet pipe (2), and the gas outlet of the fifth ferrous scrubber (11) is connected to the atmosphere via an exhaust pipe a (4); The sanitary tail gas treatment unit comprises a six-stage hydrochloric acid washing tower (12), a seven-stage hydrochloric acid washing tower (13), an eight-stage ferrous washing tower (14) and a nine-stage iron washing tower (15) which are sequentially connected to the sanitary tail gas inlet pipe (3); the gas outlet of the nine-stage iron washing tower (15) is connected to the atmosphere through the exhaust pipe b (5).

2. A treatment device for chlorination furnace chlorine-containing waste gas according to claim 1, characterized in that: The exhaust pipe b (5) is provided with a valve d.

3. A treatment device for chlorination furnace chlorine-containing waste gas according to claim 1, characterized in that: The process tail gas treatment unit further comprises a stirring tank (16) for preparing a saturated ferrous solution, wherein the stirring tank (16) is connected in sequence with a third-stage ferrous washing tower (9), a fourth-stage ferrous washing tower (10) and a fifth-stage ferrous washing tower (11) to form a closed pipeline loop.

4. A treatment device for chlorination furnace chlorine-containing waste gas according to claim 3, characterized in that: The Fe 2+ The concentration is 80 g / L, and the Fe 2+ The concentration is 100 g / L, and the Fe 2+ The concentration is 120g / L.