A method and device for improving the rock sheet on the surface of asphalt coil
By adjusting the angle of the sand coating machine and using dust removal equipment to optimize sand drop, the problem of incomplete coating on the surface of asphalt rolls was solved, achieving efficient coating and stable quality, and reducing the need for manual repairs and production costs.
Patent Information
- Application Number
- CN202111240319.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-10-25
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2041-10-25
AI Technical Summary
In existing technologies, there are many uncoated areas on the surface of asphalt rolls, which require manual repair, resulting in a large workload, low efficiency, and unreliable repair quality. Furthermore, the applied material is prone to peeling off.
Adjust the angle of the sand coating machine, add baffles, and separate sand and ash through the baffles. Utilize dust removal equipment and flow control devices to optimize the fall of sand or schist, ensuring that it reaches the asphalt coating first and fills the gaps.
It improves the surface coating effect of asphalt rolls, reduces the need for manual repairs, increases production efficiency, ensures product quality and aging resistance, and reduces production costs.
Smart Images

Figure CN113909070B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of asphalt coil processing, and in particular relates to a method and a device for improving rock sheets on the surface of an asphalt coil. Background Art
[0002] At present, the mud content of purchased rock chips is 5%-7% due to the influence of external raw materials. The effect of dust removal equipment has not reached the expected effect, and it cannot extract dust from the inner wall of the pipeline. The coating angle and setting of the rock chip covering machine are unreasonable, resulting in a large amount of rock chips / sand on the upper surface of the asphalt coil that cannot be covered due to dust in the coating, seriously affecting the product quality and normal production operation. In order to solve the above problems, the improvement measures are as follows: raising the admission standard of raw materials, which is difficult to implement considering the low price of raw materials and the difficulties in purchasing. The dust removal equipment is modified, but the price is high and economically unreasonable, and the sand covering machine is optimized and modified. However, in the prior art, there are many uncoated areas on the surface of the asphalt coil, which require personnel to repair. The workload is large and the efficiency is low. The quality after repair cannot be guaranteed, and the covered material has the problem of secondary shedding.
[0003] Through the above analysis, the problems and defects of the prior art are as follows: there are many uncoated areas on the surface of the asphalt roll in the prior art, which require personnel to repair, with a large workload and low efficiency. The quality after repair cannot be guaranteed, and the covered material has the problem of secondary falling off.
[0004] The difficulty in solving the above problems and defects is: the mud content of raw materials is greatly affected by national environmental protection policies, making procurement difficult. The cost of environmental protection equipment transformation is too high.
[0005] The significance of solving the above problems and defects is: improving the appearance quality of the product, reducing the labor intensity of production employees, improving production efficiency and reducing production costs. Summary of the invention
[0006] In view of the problems existing in the prior art, the present invention provides a method and device for improving the rock sheet covering the surface of an asphalt coil.
[0007] The present invention is implemented as follows: a method for improving the rock-covered sheet on the surface of an asphalt coil, the method for improving the rock-covered sheet on the surface of an asphalt coil comprising:
[0008] Step 1: Adjust the angle of the sand covering machine and increase the blockage;
[0009] Step 2: allowing the sand or schist containing mud to fall freely and hit the baffle to separate the ash and sand;
[0010] Step 3, after spreading schist or sand backwards, the dust fills the gaps to avoid leakage and oil leakage.
[0011] Furthermore, the angle of the first step sand coating machine is adjusted from horizontal sand coating to 30 degrees, the width of the baffle is 5 cm, the length is 98 cm, and the welding angle is 45 degrees.
[0012] Furthermore, the height of the sand falling in the second step is 40 cm, the distance between the sand falling machine and the baffle is 6 cm, and the angle is 30 degrees; after the sand falls, the sand-covered dust is rebounded and raised from the gap.
[0013] Furthermore, in the third step, the lower edge of the baffle is 6 cm away from the asphalt coating, and is covered with sand backwards. The sand surface quality preferentially reaches the coating for coating, and the fallen ash fills the gaps between the sand particles or rock pieces.
[0014] Furthermore, the device for improving the rock-covered surface of the asphalt coil comprises a sand box, the upper end of which is provided with a sand inlet pipe and a flow rate control baffle, and a delighting and exhaust duct is fixed on one side of the sand box.
[0015] Furthermore, a flow control valve and an electric speed regulator are embedded in the upper part of the sand box, the flow control valve is controlled by the electric speed regulator, a filter is provided in the middle part of the sand box, and an upper baffle and a lower baffle are provided at the bottom.
[0016] Furthermore, the upper baffle plate and the lower baffle plate are connected by a rotating pin shaft, and the flow rate of the lower sand needs to be controlled by a flow control valve.
[0017] Furthermore, a feed inlet channel and a filter outlet channel are correspondingly provided on the flow control valve, and a flow control mechanism for controlling the opening of the feed inlet channel is provided on one side of the flow control valve. The flow control structure includes a linear servo electric cylinder fixedly mounted on the valve body and with its axis perpendicular to the feed inlet channel. An electric speed regulator and a flow control valve are fixedly connected to the piston plug rod of the linear servo electric cylinder, and an adjusting plate for contacting and cooperating with the feed inlet channel port and adjusting the opening of the inlet channel is provided on the flow rate control baffle.
[0018] Combining all the above technical solutions, the advantages and positive effects of the present invention are: the initial coating dust is effectively improved, avoiding the glue material not being able to stick to the mineral particles after dust falling, resulting in large gray spots affecting the product appearance quality and aging resistance. Gray spot products require a lot of repair efficiency and high labor costs seriously affect production efficiency. The equipment used is the production line of Hebei Zhanli, and has been in late cooperation with the production equipment factory.
[0019] In the present invention, rock flakes / sand are prioritized over dust in reaching the asphalt coating. Before improvement: there are many uncoated areas, which require personnel to repair, with a large workload and low efficiency. The quality of the repaired area cannot be guaranteed, and the covered material has the problem of secondary shedding. After improvement: the coating effect on the upper surface is good, no manual repair is required, the efficiency is high, and the bonding effect is good. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1It is a flow chart of a method for improving the surface rock covering of an asphalt coil provided by an embodiment of the present invention.
[0021] Figure 2 It is a schematic diagram of the structure of a device for improving the surface of an asphalt coiled material with rock sheets provided in an embodiment of the present invention.
[0022] In the figure: 1. Sand inlet pipe; 2. Flow rate control baffle; 3. Sand box; 4. Light removal and exhaust duct; 5. Flow control valve; 6. Filter; 7. Upper baffle; 8. Lower baffle; 9. Electric speed regulator. DETAILED DESCRIPTION
[0023] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0024] In view of the problems existing in the prior art, the present invention provides a method and device for improving the rock sheet covering the surface of an asphalt coil. The present invention is described in detail below in conjunction with the accompanying drawings.
[0025] The method for improving the surface of the asphalt coiled material provided by the present invention can also be implemented by other steps by ordinary technicians in the industry. Figure 1 The method for improving the rock sheet covering the surface of the asphalt coil provided by the present invention is only a specific embodiment.
[0026] like Figure 1 As shown, the method for improving the rock sheet on the surface of the asphalt coil provided by the embodiment of the present invention comprises:
[0027] S101: Adjust the angle of the sand covering machine and increase the block;
[0028] S102: allowing sand or schist containing mud to fall freely and hit the baffle to separate the ash and sand;
[0029] S103: After spreading schist or sand backwards, the dust fills the gaps to prevent leakage and oil leaks.
[0030] In the embodiment of the present invention, in step S101, the angle of the sand coating machine is adjusted from horizontal sand coating to 30 degrees, the width of the baffle is 5 cm, the length is 98 cm, and the welding angle is 45 degrees.
[0031] In the embodiment of the present invention, the height of the falling sand in step S102 is 40 cm, the distance between the falling sand machine and the baffle is 6 cm, and the angle is 30 degrees. After the falling sand rebounds, the dust covered with sand is raised from the gap.
[0032] In an embodiment of the present invention, in step S103, the lower edge of the baffle is 6 cm away from the asphalt coating, and sand is covered backwards, and the sand surface quality preferentially reaches the coating for coating, and the fallen ash fills the gaps between the sand particles or rock pieces.
[0033] like Figure 2 As shown, the asphalt coil surface covering sheet improvement device provided by the embodiment of the present invention includes a sand box 3, a sand inlet pipe 1 and a flow rate control baffle 2 are provided at the upper end of the sand box 3, a light removal exhaust pipe 4 is fixed on one side of the sand box 3, a flow control valve 5 and an electric speed governor 9 are embedded on the upper part of the sand box 3, and the flow control valve 5 is controlled by the electric speed governor. A filter screen 6 is provided in the middle of the sand box 3, and an upper baffle 7 and a lower baffle 8 are provided at the bottom. The upper baffle 7 and the lower baffle 8 are connected by a rotating pin shaft. The flow of the lower sand needs to be controlled by the flow control valve 5, and a feed inlet channel and a filter outlet channel are correspondingly provided on the flow control valve 5. A flow control mechanism for controlling the opening of the feed inlet channel is provided on one side of the flow control valve 5. The flow control structure includes a linear servo electric cylinder fixedly mounted on the valve body and with an axis perpendicular to the feed inlet channel. The electric speed governor 9 and the flow control valve 5 are fixedly connected to the piston plug rod of the linear servo electric cylinder. The flow rate control baffle 2 is provided with an adjusting plate that contacts and cooperates with the port of the feed inlet channel and is used to adjust the opening of the inlet channel.
[0034] The technical effects of the present invention are described in detail below in conjunction with experiments.
[0035] Before the improvement, the average daily output of 600 rolls required 4 people to repair for 6 hours, and the labor cost required for repair = 4*230 = 920 yuan. The appearance of the repaired products was inconsistent and the quality was difficult to guarantee. After the improvement, the average daily output was 1,500 rolls, and no manual repair was required. The production efficiency was increased by 2.5 times. The appearance quality is stable.
[0036] The present invention uses a lifting device to lift the raw material to the filtering device for preliminary dust removal. The dust-removed sand / schist enters the sand spreader. The sand / schist containing dust falls freely in the storage box. The falling sand / schist hits the baffle to produce dust-sand separation. A small part of the dust is sucked away by the dust removal fan, and most of it falls to fill the gap after coating, thereby improving the oil leakage phenomenon on the surface.
[0037] The above description is only a specific implementation mode of the present invention, but the protection scope of the present invention is not limited thereto. Any modifications, equivalent substitutions and improvements made by any technician familiar with the technical field within the technical scope disclosed by the present invention and within the spirit and principle of the present invention should be covered by the protection scope of the present invention.
Claims
1. A device for improving the rock sheet on the surface of asphalt coil, characterized in that: The asphalt coil surface rock sheet improvement device comprises a sand box, the upper end of which is provided with a sand inlet pipe and a flow rate control baffle, and a light removal and exhaust pipe is fixed on one side of the sand box; The upper part of the sandbox is inlaid with a flow control valve and an electric speed regulator, the flow control valve is controlled by the electric speed regulator, a filter screen is provided in the middle of the sandbox, and an upper baffle and a lower baffle are provided at the bottom; The upper baffle plate and the lower baffle plate are connected by a rotating pin shaft, and the flow rate of the lower sand needs to be controlled by a flow control valve; The flow control valve is correspondingly provided with a feed inlet channel and a filter outlet channel. A flow control structure for controlling the opening of the feed inlet channel is provided on one side of the flow control valve. The flow control structure is fixed on the valve body and connected to a linear servo electric cylinder whose axis is perpendicular to the feed inlet channel. An electric speed regulator and a flow control valve are fixedly connected to the piston rod of the linear servo electric cylinder. An adjusting plate is provided on the flow rate control baffle for contacting with the port of the feed inlet channel.
2. The device for improving the rock sheet on the surface of asphalt coiled material according to claim 1, characterized in that: The method for improving the rock sheet on the surface of an asphalt coiled material by using the rock sheet improving device on the surface of an asphalt coiled material comprises: Step 1: Adjust the angle of the sand covering machine and increase the blockage; Step 2: allowing the sand or schist containing mud to fall freely and hit the baffle to separate the ash and sand; Step 3, after spreading schist or sand backwards, the dust fills the gaps to avoid leakage and oil leakage.
3. The device for improving the rock sheet on the surface of asphalt coiled material according to claim 2, characterized in that: In the step 1, the angle of the sand coating machine is adjusted from horizontal sand coating to 30 degrees, the width of the baffle is 5 cm, the length is 98 cm, and the welding angle is 45 degrees.
4. The device for improving the rock sheet on the surface of asphalt coiled material according to claim 2, characterized in that: In the step 2, the height of the falling sand is 40 cm, the distance between the falling sand machine and the baffle is 6 cm, and the angle is 30 degrees; after the falling sand rebounds, the sand-covered dust is raised from the gap.
Citation Information
Patent Citations
Asphalt-based granular-surfaced roofing material and method of manufacture
CA2101102A1
Pre-laid TPO waterproof coiled material sand coating device
CN110090787A
Automatic steering machine
CN110614357A
Waterproof device for producing SBS modified asphalt waterproof coiled material
CN212666763U
Asphalt coiled material surface overlying rock sheet
CN216300389U