Optimal configuration method of shared energy storage power station in multi-regional integrated energy system

By adopting the asymmetric Nash negotiation model and nonlinear mapping method in the multi-region integrated energy system, a cooperative game model of shared energy storage power stations in multi-region IES is established, which solves the disordered competition problem caused by information asymmetry and realizes storage Optimizing the configuration of energy power stations and maximizing the overall benefits of the energy system improves energy utilization efficiency and the ability to absorb renewable energy.

CN114154739BActive Publication Date: 2024-10-15SHANGHAI UNIVERSITY OF ELECTRIC POWER
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111509290.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-10
Publication Date
2024-10-15
Estimated Expiration
2041-12-10

AI Technical Summary

Technical Problem

In multi-regional integrated energy systems, information asymmetry between energy storage power stations and regional integrated energy systems leads to disorderly competition and reduces market efficiency. Moreover, the utilization efficiency of fixed energy storage devices is low, making it difficult to cope with future supply and demand uncertainties. .

Method used

The asymmetric Nash negotiation model and nonlinear mapping method are used to establish a cooperative game model of shared energy storage power stations in multi-regional IES. Through power sharing optimization configuration, each regional IES interacts with shared energy storage power stations to achieve the optimal investment and operation strategy. Protect privacy and maximize overall effectiveness.

Benefits of technology

It achieves fairness in the interests of all entities and maximizes overall benefits, reduces energy storage investment costs, and improves energy utilization efficiency and the ability to absorb renewable energy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114154739B_ABST
    Figure CN114154739B_ABST
Patent Text Reader

Abstract

The present invention relates to a method for optimizing the configuration of a shared energy storage power station in a multi-regional integrated energy system, which fully considers the problem of optimizing the configuration of a shared energy storage power station in a multi-regional IES, provides energy storage services for the multi-regional IES through a shared energy storage power station, analyzes the internal energy flow and equipment energy conversion relationship of the multi-regional IES, and constructs an asymmetric Nash negotiation model with multi-regional IES and a shared energy storage power station as different interest entities based on the asymmetric Nash negotiation game theory. The method of the present invention achieves the optimization of individual interests and overall interests, while considering that the benefits of each entity are related to its own contribution, which is more fair to each entity. In the case of the rapid development of the sharing economy, energy storage services are provided for the multi-regional integrated energy system through a shared energy storage power station, and the differences and complementarities of the loads of the integrated energy systems in each region are used to minimize the energy storage investment cost. It conforms to the current and future development trend of the power system and has strong theoretical and practical properties.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to an energy technology, and in particular to a method for optimizing the configuration of a shared energy storage power station in a multi-regional integrated energy system. Background Art

[0002] Under the "dual carbon" goal, the growing energy demand and environmental issues have promoted the development of renewable energy technology. How to improve the utilization rate of renewable energy, alleviate resource shortages, and promote energy transformation are issues that need to be addressed urgently. As an extension of the microgrid, the integrated energy system (IES) couples multiple energy sources such as electricity, gas, cooling, and heat. IES utilizes the synergy of multiple energy sources and has been widely recognized in improving overall energy efficiency. Energy storage can alleviate the spatial and temporal imbalance between renewable energy generation and load demand, and is used as a measure to improve the operational flexibility of IES.

[0003] Currently, it is expensive to invest in energy storage. In addition, due to the uncertainty of future energy supply and demand, it is still challenging to fully utilize fixed energy storage devices. In order to meet the challenges, the concept of shared energy storage is introduced in the sharing economy model. In actual operation, the loads of different IES are often different and complementary. Multiple IES are connected through energy storage power stations to form multi-regional IES. Each IES can reduce its dependence on the external power grid by exchanging information and interacting with the energy storage power station, improve the economy of the entire system operation, and promote the local consumption of distributed power generation energy. However, energy storage power stations and IES usually belong to different stakeholders and rationally pursue their own interests. Disorderly competition often occurs due to information asymmetry and other reasons, greatly reducing market efficiency.

[0004] In recent years, game theory methods have been widely used in energy storage sharing or other similar energy sharing problems. They can be divided into cooperative games and non-cooperative games. The use of non-cooperative game models can only achieve the best individual interests, often ignoring the overall social benefits. As a type of cooperative game, non-Nash negotiation takes into account both individual and overall interests, and guarantees the fairness of each participant. The distributed ADMM algorithm is used to solve the problem, which not only protects the privacy of each subject, but also only requires a small amount of information interaction to formulate the optimal investment operation strategy. Summary of the invention

[0005] Aiming at the problem of reasonable allocation and utilization of energy, an optimal configuration method of shared energy storage power stations in multi-regional integrated energy systems is proposed. The optimal configuration of shared energy storage power stations in multi-regional IES is achieved through the sharing of electricity between multi-regional IES and energy storage power stations. A cooperative game model between shared energy storage power stations and multi-regional IES is established based on asymmetric Nash negotiation, which takes into account both individual interests and overall interests. A nonlinear mapping method is used to quantify the different contribution capabilities of IES in each region to participate in bargaining, ensuring the fairness and rationality of all participating entities.

[0006] The technical solution of the present invention is: a method for optimizing the configuration of a shared energy storage power station in a multi-regional integrated energy system, which specifically includes the following steps:

[0007] 1) Considering the power transaction between the multi-regional integrated energy system and the shared energy storage power station, the flexible load on the user side is equivalent to the virtual energy storage resource to participate in the optimization operation, and the multi-regional integrated energy system operation model is established with the goal of minimizing the operation cost, and the shared energy storage power station optimization configuration model is established with the goal of minimizing the sum of investment cost and operation cost;

[0008] 2) According to the different contribution capabilities of regional integrated energy systems and shared energy storage power stations in cooperative operation, a multi-agent cooperative game and asymmetric Nash negotiation model was established, and a nonlinear mapping method was used to quantify the different contribution capabilities of regional IES in bargaining; that is, each regional integrated energy system negotiates with the energy storage power station as a whole to solve the payment fee for electricity sharing. The energy of interaction between each regional integrated energy system and the shared energy storage power station is different. Each regional integrated energy system uses its own contribution as bargaining power, and further distributes the benefits of energy sharing through asymmetric negotiations.

[0009] 3) All parties reach a consensus through Nash negotiation. In order to protect the privacy of each party, the ADMM algorithm is used to solve the social energy cost minimization sub-problem and the asymmetric payment benefit maximization sub-problem, and obtain the optimal solution for the power and capacity configuration of the shared energy storage power station.

[0010] Furthermore, in step 1), in view of the energy consumption differences and complementarities of the actual regional integrated energy systems, each regional integrated energy system is equipped with renewable energy units and energy production and conversion equipment; each regional integrated energy system is connected to the shared energy storage power station through a connecting line, and the user-side reducible load and transferable load are equivalent to virtual energy storage resources to participate in demand response; considering that the multi-regional integrated energy system and the shared energy storage power station belong to different stakeholders, corresponding optimization operation models are established for the multi-regional integrated energy system and the shared energy storage power station.

[0011] Further, the step 2) is implemented by:

[0012] Firstly, a cooperative game model of energy storage power station-multi-regional integrated energy system is established based on Nash negotiation theory. The original optimization problem is transformed into two convex sub-problems through equivalent transformation. Sub-problem 1 is to minimize the social energy cost, and sub-problem 2 is to maximize the asymmetric payment benefit.

[0013] Then, due to the different energies of interaction between the regional integrated energy systems and the shared energy storage power station, a nonlinear mapping method is used to quantify the different contribution capabilities of the regional integrated energy systems in participating in the bargaining process to ensure the fairness of all participating entities.

[0014] Further, the specific implementation steps of step 2) are as follows:

[0015] 2.1) Apply the mathematical expression of the standard Nash negotiation game to establish a cooperative game model of a multi-regional integrated energy system-shared energy storage power station. The mathematical expression is as follows:

[0016]

[0017] Where: C ESS,Δ are the optimal costs of each IES and energy storage power station entity when they do not participate in the cooperative game, and also serve as the Nash negotiation breakdown point. The above inequality constraint ensures that all participating entities can obtain benefits through cooperation.

[0018] 2.2) Since the cooperative game model is essentially a non-convex nonlinear optimization problem, the original optimization problem is transformed into two convex sub-problems through equivalent transformation. The specific equivalent process is as follows:

[0019] According to the mean inequality, the cooperative game model is rewritten as:

[0020]

[0021] in is a constant, so: The smaller the value, the larger the objective function value of the cooperative game model;

[0022] The energy interaction between the multi-regional integrated energy system and the energy storage power station needs to satisfy not only power balance but also revenue and expenditure balance.

[0023]

[0024] Without considering the payment and benefit costs of each entity, the cost of the i-th comprehensive energy system is The cost of the shared energy storage power station is M ESS ,

[0025] make:

[0026]

[0027] M ESS =C inv +C op ,

[0028] The objective function is transformed into the social energy cost minimization subproblem:

[0029]

[0030] By solving the social energy cost minimization subproblem, we can obtain The optimal value of and As a constant, substituting the obtained optimization variables into the cooperative game model, we can get the asymmetric payment benefit maximization subproblem:

[0031]

[0032] The sub-problem of maximizing asymmetric payment benefits is divided into two processes. The first process is that each regional integrated energy system negotiates with the energy storage power station as a whole to solve the payment fee for electricity sharing. The second process is that in fact, the energy interacted between each regional IES and the shared energy storage power station is different. Each regional IES uses its own contribution as bargaining power to further distribute the benefits of energy sharing through asymmetric negotiations.

[0033] Further, the specific steps of step 3) are:

[0034] First, we construct an augmented Lagrangian function and use the ADMM algorithm to solve the social energy cost minimization subproblem. Each subject continuously updates its decision during the iteration process.

[0035] Then, the augmented Lagrangian function is constructed, and the ADMM algorithm is used to solve the asymmetric payment benefit maximization sub-problem. Each subject continuously updates its own decision during the iteration process.

[0036] The beneficial effects of the present invention are as follows: the optimal configuration method of the shared energy storage power station in the multi-regional integrated energy system of the present invention fully considers the optimal configuration problem of the shared energy storage power station in the multi-regional IES, provides energy storage services for the multi-regional IES through the shared energy storage power station, analyzes the internal energy flow relationship and equipment energy conversion relationship of the multi-regional IES, and constructs an asymmetric Nash negotiation model with the multi-regional IES and the shared energy storage power station as different interest subjects based on the asymmetric Nash negotiation game theory. The method proposed in the present invention achieves the optimization of individual interests and overall interests, and at the same time takes into account that the benefits of each subject are related to its own contribution, which is more fair to each subject. Under the rapid development of the sharing economy, by providing energy storage services for the multi-regional integrated energy system through the shared energy storage power station, the difference and complementarity of the loads of the integrated energy systems in each region can minimize the investment cost of energy storage. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] Figure 1 This is a flow chart of the method for optimizing configuration of a shared energy storage power station in a multi-regional integrated energy system according to the present invention;

[0038] Figure 2 This is the structural diagram of IES;

[0039] Figure 3a It is a load and fan output prediction curve diagram of the comprehensive energy system 1 of the present invention;

[0040] Figure 3b It is a load and fan output prediction curve diagram of the integrated energy system 2 of the present invention;

[0041] Figure 3c It is a load and fan output prediction curve diagram of the integrated energy system 3 of the present invention;

[0042] Figure 4 It is a multi-region integrated energy system-shared energy storage power station structure of the present invention;

[0043] Figure 5a It is the objective function value of the comprehensive energy system 1 of the present invention - the multi-agent energy transaction analysis diagram of the energy storage power station;

[0044] Figure 5b It is the objective function value of the integrated energy system 2 of the present invention - the multi-agent energy transaction analysis diagram of the energy storage power station;

[0045] Figure 5c It is the objective function value of the integrated energy system 3 of the present invention - the multi-agent energy transaction analysis diagram of the energy storage power station;

[0046] Figure 5d The objective function value of the energy storage power station of the present invention - the multi-agent energy transaction analysis diagram of the energy storage power station;

[0047] Figure 5e It is the total cost diagram of the operation of the multi-region IES-shared energy storage power station cooperation alliance of the present invention;

[0048] Figure 6a It is a diagram of the optimized dispatching result of the electric power balance of the comprehensive energy system 1 of the present invention;

[0049] Figure 6b It is a diagram of the optimization scheduling result of the thermal power balance of the comprehensive energy system 1 of the present invention;

[0050] Figure 6c It is a diagram of the optimization scheduling result of the cold power balance of the comprehensive energy system 1 of the present invention;

[0051] Figure 6d It is a diagram of the optimized dispatching result of the electric power balance of the comprehensive energy system 2 of the present invention;

[0052] Figure 6e It is a diagram of the optimization scheduling result of the thermal power balance of the comprehensive energy system 2 of the present invention;

[0053] Figure 6f This is a diagram showing the optimal scheduling result of the cold power balance of the integrated energy system 2 of the present invention;

[0054] Figure 6g It is a diagram of the optimized dispatching result of the electric power balance of the comprehensive energy system 3 of the present invention;

[0055] Figure 6h It is a diagram of the optimization scheduling result of the thermal power balance of the comprehensive energy system 3 of the present invention;

[0056] Fig.6I This is a diagram showing the optimal scheduling result of the cold power balance of the integrated energy system 3 of the present invention;

[0057] Figure 7 It is a power interaction diagram of the regional integrated energy system (IES) and the energy storage power station of the present invention. DETAILED DESCRIPTION

[0058] The present invention is described in detail below in conjunction with the accompanying drawings and specific embodiments. This embodiment is implemented based on the technical solution of the present invention, and provides a detailed implementation method and specific operation process, but the protection scope of the present invention is not limited to the following embodiments.

[0059] like Figure 1 The flowchart of the method for optimizing the configuration of the shared energy storage power station in the multi-regional integrated energy system of the present invention is shown, and the method includes the following steps:

[0060] S1 Figure 2 As shown in the structure diagram of the comprehensive energy system, based on the fact that multi-regional IES and energy storage power stations belong to different interest entities, the flexible load on the user side is equivalent to virtual energy storage resources to participate in the optimization operation, and the optimization operation models of the multi-regional IES entity and the energy storage power station entity are established respectively;

[0061] S2 established a multi-agent cooperative game and asymmetric Nash negotiation model based on the different contribution capabilities of IES and shared energy storage power stations in each region to participate in cooperative operation, and used a nonlinear mapping method to quantify the different contribution capabilities of IES in each region to participate in bargaining;

[0062] The various entities in S3 reach a consensus through Nash negotiation. In order to protect the privacy of each entity, the ADMM algorithm is used to solve the social energy cost minimization sub-problem and the asymmetric payment benefit maximization sub-problem;

[0063] S4 To verify the effectiveness of the method proposed in this invention, the total cost of each subject operating independently and participating in cooperation was compared through case analysis, and the performance of the method proposed in this invention was compared with the standard Nash negotiation model.

[0064] In step S1, in view of the energy differences and complementarities of the actual regional IES, each regional IES is equipped with a variety of energy production and conversion equipment such as gas turbines, waste heat boilers, absorption chillers, electric chillers, electric boilers, etc. Some IES are equipped with photovoltaics, and some IES are equipped with wind turbines. The integrated energy system of each region is connected to the energy storage power station through a connecting line. This article does not consider the reverse transmission of electricity from each IES to the power grid. When there is surplus electricity in each regional IES, it will be sold to the shared energy storage power station. The energy interaction between multi-regional IES and shared energy storage power stations further promotes the consumption of renewable energy. And the user-side reducible load and transferable load are equivalent to virtual energy storage resources to participate in demand response. The multi-regional integrated energy system and shared energy storage power station in actual operation often belong to different stakeholders. Therefore, it is necessary to establish corresponding optimization operation models for multi-regional IES and shared energy storage power stations respectively. The specific steps are:

[0065] Step S11: establishing an optimal operation model of multi-region IES with the goal of minimizing the operation cost;

[0066] Considering the power trading between multi-region IES and shared energy storage power stations, the objective function of the i-th integrated energy system is the total operating cost The minimum is the energy purchase cost C of the upper power grid and gas grid. buy,i , virtual energy storage resource management costs C VES,i and the transaction fee Γ with the shared energy storage power station i constitute.

[0067]

[0068]

[0069]

[0070]

[0071]

[0072] Where: are the price of electricity purchased from the grid by the i-th integrated energy system at time t, RMB / (kW·h), the power purchased from the grid, and the price of gas purchased from the gas grid, RMB / (m 3 ), purchase gas power from the gas network; are the compensation costs for managing the load that can be reduced and the load that can be transferred by the end user of the i-th integrated energy system at time t. i>0, the i-th integrated energy system needs to pay the shared energy storage power station, otherwise, Γ i <0, the i-th integrated energy system gains benefits from the shared energy storage power station. They are respectively the unit compensation cost of the electric load that can be reduced, the electric load power that can be reduced, the unit compensation cost of the thermal load that can be reduced, and the thermal load power that can be reduced for the i-th integrated energy system at time t. are the unit compensation cost and power of the transferable electric load of the i-th integrated energy system at time t respectively.

[0073] a. Energy storage constraints

[0074]

[0075]

[0076]

[0077]

[0078]

[0079] Where: are the electric and thermal loads of the i-th integrated energy system at time t before and after considering virtual energy storage resource management, α z is the ratio of the zth type of load that can be reduced (electricity, heat), α e is the proportion of transferable electrical load.

[0080] b. Constraints on power purchase and sales from shared energy storage power stations

[0081]

[0082]

[0083]

[0084]

[0085] Where: are the power sold and purchased by the i-th integrated energy system and the shared energy storage power station at time t, is the interaction power between the i-th integrated energy system and the shared energy storage power station at time t. is the maximum value of the interaction power between the i-th integrated energy system and the shared energy storage power station. They are respectively the electricity selling and purchasing status of the i-th integrated energy system.

[0086] c. Equipment constraints

[0087] GT is the most common power generation equipment, and waste heat is recycled by waste heat boiler. Therefore, the power generation and heating power of gas turbine are:

[0088]

[0089]

[0090] Where: are the electrical power and thermal power output and natural gas consumption rate of the gas turbine in the i-th integrated energy system at time t, respectively, gas is the calorific value of natural gas, η e,GT , They are the gas turbine power generation efficiency and the waste heat boiler recovery efficiency respectively.

[0091] The energy conversion models of electric boilers (EB), electric refrigerators (EC) and absorption refrigerators (AC) are similar, so they can be uniformly modeled using the following formula:

[0092]

[0093] Where: are the input and output powers of EB, EC and AC devices in the i-th integrated energy system at time t, and η is the device conversion efficiency.

[0094] Equipment output limit:

[0095]

[0096] Where: are respectively the minimum and maximum operating output of equipment x in the i-th integrated energy system at time t.

[0097] d. Power balance constraints

[0098]

[0099] e. Power purchase constraints from the upper power grid

[0100]

[0101] Where: It is the maximum power that the i-th integrated energy system can purchase from the superior power grid at time t.

[0102] Step S12: Establishing an optimal configuration model of a shared energy storage power station with the goal of minimizing investment cost and operation cost;

[0103] The objective function of the shared energy storage power station is the total operating cost C ESS Minimum, based on the average daily investment cost of the energy storage power station C inv , Daily operation and maintenance costs Cop It is composed of the sum of the interaction benefits Ψ with multi-region IES electricity.

[0104] min C ESS =C inv +C op -Ψ (21)

[0105]

[0106] Where: are the maximum values ​​of the charging and discharging power and capacity of the shared energy storage power station, μ p , μ E They are the unit power cost of the shared energy storage power station, RMB / (kW) and the unit capacity cost, RMB / (kW·h). T is the maximum service life of the shared energy storage power station.

[0107] Constraints:

[0108]

[0109] Where: δ is the energy multiplier of the shared energy storage power station; Storing energy for shared energy storage power stations, η c , η d are the charge and discharge power and charge and discharge efficiency respectively, η c , η d Take 0.95; They are respectively the charging and discharging status of the shared energy storage power station, and the charging and discharging states cannot occur at the same time.

[0110]

[0111] Where: N is the number of multi-regional IES. The sum of the purchased and sold power of the shared energy storage power station and the multi-regional integrated energy system is equal to the charging and discharging power of the shared energy storage power station.

[0112] Step S2 establishes a multi-agent cooperative game and asymmetric Nash negotiation model based on the different contribution capabilities of multi-regional integrated energy systems and shared energy storage power stations in cooperative operation, and uses a nonlinear mapping method to quantify the different contribution capabilities of IES in each region in bargaining. The specific steps are as follows:

[0113] Step S21: Establishing an asymmetric Nash negotiation model of shared energy storage power station-multi-region IES cooperative game;

[0114] Applying the mathematical expression of the standard Nash negotiation game, a cooperative game model of a multi-regional integrated energy system-shared energy storage power station is established. The mathematical expression is as follows:

[0115]

[0116] Where: C ESS,Δ They are the optimal costs of each IES and shared energy storage power station when they do not participate in the cooperative game, and also serve as the Nash negotiation breakdown point. The above inequality constraint ensures that all participating entities can obtain benefits through cooperation.

[0117] Step S22: Since equation (25) is essentially a non-convex nonlinear optimization problem, the original optimization problem is transformed into two convex sub-problems through equivalent transformation. Sub-problem 1: Minimization of social energy cost; Sub-problem 2: Maximization of asymmetric payment benefits. In order to ensure the fairness of all participating entities, a nonlinear mapping method is used to quantify the different contribution capabilities of each region's IES in bargaining. The specific equivalent process is as follows:

[0118] According to the mean inequality, (25) can be rewritten as:

[0119]

[0120] in is a constant, so: The smaller the value, the larger the value of the objective function of model (25).

[0121] In addition, the energy interaction between the multi-regional integrated energy system and the shared energy storage power station must not only meet the power balance, but also the balance of income and expenditure.

[0122]

[0123] Without considering the payment and benefit costs of each entity, the cost of the i-th comprehensive energy system is The cost of the shared energy storage power station is M ESS .make:

[0124]

[0125]

[0126] The objective function is transformed into the social energy cost minimization subproblem:

[0127]

[0128] By solving formula (30), we can get The optimal value of and As a constant, substituting the obtained optimization variables into formula (25), we can get the asymmetric payment benefit maximization subproblem:

[0129]

[0130] The advantage of asymmetric Nash negotiation over standard Nash negotiation is that the distribution of benefits is fairer. Please note that fairness in this article means that participants obtain corresponding benefits according to their contribution rates. In this invention, asymmetric Nash negotiation is used to fairly distribute the benefits obtained by each participant through cooperation, and the asymmetric payment benefit maximization sub-problem is divided into two processes. Process 1: Each regional integrated energy system negotiates with the shared energy storage power station as a whole to solve the payment fee for shared energy; Process 2: In fact, the energy interacted between each regional IES and the shared energy storage power station is different. Each regional IES uses its own contribution as bargaining power to further distribute the benefits of energy sharing through asymmetric negotiations.

[0131] Process 1: Negotiation of a multi-regional integrated energy system as a whole with shared energy storage power stations:

[0132]

[0133] make: Taking the logarithm of the above formula, we can get:

[0134]

[0135] Process 2: Asymmetric payment negotiation between regional IES:

[0136] The key issue in asymmetric payment negotiations between regional IES is how to determine the contribution rate of each participant, which also determines the fairness of benefit distribution. In energy trading, each participant has two behaviors, namely obtaining / giving energy. Any energy trading behavior between regional IES and shared energy storage power stations can be considered a contribution. Because by participating in sharing, the dependence of the entire system on the external power grid can be reduced, thereby reducing the total operating cost of the system. In addition, participants who neither provide energy nor obtain energy do not contribute to energy trading, and their profits are set to zero. Therefore, this paper adopts a nonlinear energy sharing mapping method to measure the contribution of regional IES. The specific calculation is as follows:

[0137]

[0138] Where: is the total energy sold by the i-th IES to the shared energy storage power station, is the total energy obtained by the i-th IES from the shared energy storage power station. As the maximum reference point. Solve the contribution of each IES:

[0139]

[0140] Where: G i A non-negative number.

[0141] In this invention, it is assumed that the contribution of each regional IES is not 0, so they are all capable of participating in asymmetric negotiations. In summary, the problem of maximizing the asymmetric payment benefits between regional IES is expressed as follows:

[0142] T * is the optimal value.

[0143] Step S3: All entities reach a consensus through Nash negotiation. To protect the privacy of each entity, the ADMM algorithm is used to solve the social energy cost minimization sub-problem and the asymmetric payment benefit maximization sub-problem. Through sequential optimization, it is easy to obtain the optimal solution to the original problem. The specific steps are:

[0144] Step S31: construct an augmented Lagrangian function and use the ADMM algorithm to solve the social energy cost minimization subproblem. Each subject continuously updates its decision during the iteration process.

[0145] Since the transaction volume of electric energy is a coupled variable, when the energy that the i-th IES expects to buy / sell from the shared energy storage power station is equal to the energy that the shared energy storage power station expects to sell / buy to the i-th integrated energy system, that is, the parties have reached a consensus through negotiation. The augmented Lagrangian function is constructed as follows:

[0146]

[0147] Where: ρ i , E are the Lagrange multiplier and penalty factor for buying / selling respectively.

[0148] Using the ADMM algorithm, each subject updates its own decision during the iteration process:

[0149]

[0150] The process of solving the social energy cost minimization subproblem is as follows:

[0151] 1) Initialization: Set the maximum number of iterations k max =100, the convergence accuracy is ε=10 -4 , penalty factor ρ i , E For 10 -4 , the Lagrange multiplier and the amount of electricity that the shared energy storage power station expects to sell to each IES is 0.

[0152] 2) The iterative process of each subject and the update of the Lagrange multiplier are shown in formula (38).

[0153] 3) Determine whether the convergence conditions are met: If not satisfied, return to step 2 and repeat the calculation.

[0154] 4) Update the number of iterations k=k+1.

[0155] Step S32: Construct an augmented Lagrangian function and use the ADMM algorithm to solve the asymmetric payment benefit maximization sub-problem. Each subject continuously updates its own decision during the iteration process.

[0156] because Directly coupling all IES and shared energy storage power stations, directly using ADMM to solve the multi-block coupled convex optimization problem cannot guarantee its convergence. Therefore, the auxiliary variable Z = [Ψ1, Ψ2, ..., Ψ i ,...,Ψ N ].

[0157] make:

[0158] The augmented Lagrangian function is constructed as follows:

[0159]

[0160]

[0161] The iterative solution process of the asymmetric payment benefit maximization sub-problem is as follows:

[0162] 1) Initialization parameters: K 主循环 =k 1(IES) =1; k max =100;P s =0.01;u s =10;IES:T i (k1) = 0; Platform: Z(k) = 0;

[0163] 2) Update T according to formula (40) i (k1); k1 = k1 + 1;

[0164] 3) Update Z(k+1) according to formula (40); k=k+1;

[0165] 4) Determine whether it converges. If not, return to step 2). If converged, end the iteration.

[0166] In step S4, in order to verify the effectiveness of the method proposed in the present invention, the total cost of each subject operating independently and participating in cooperation is compared, and the performance of the method proposed in the present invention is compared with the standard Nash negotiation model. The specific steps are:

[0167] Step S41: To illustrate the performance of cooperative game, take the 24-hour dispatching data of three IES with different energy consumption characteristics as an example. Figure 3a-3cThe typical daily load and renewable energy output curves of IES in each region are shown below. Figure 4 The structure diagram of the multi-region IES-shared energy storage power station is shown in FIG. The Nash negotiation method proposed in the present invention simulates the optimization of two scenarios.

[0168] Scenario 1: Without considering energy cooperation, each IES optimizes energy cost independently.

[0169] Scenario 2: Each regional IES cooperates with shared energy storage power stations to minimize the energy cost of the entire society.

[0170] Figures 5a to 5e The calculation convergence results of the independent operation and cooperative operation of multi-regional IES and shared energy storage power stations. It can be seen from the figure that the calculation has converged after 30 iterations, indicating that the ADMM algorithm can achieve efficient solution. Since the Nash equilibrium has been reached, each entity has found the optimal operation strategy. In the end, the total costs of IES 1, IES 2, and IES 3 were 11,544.7 yuan, 8,511.2 yuan, and 6,569.3 yuan respectively, and the total cost of the shared energy storage power station was 1,160.6 yuan.

[0171] Figures 6a to 6I To optimize the scheduling results of IES in each region, each IES considers managing the virtual energy storage resources on the user side to make the load curve of actual operation smoother. IES 1 has wind turbine output and gas turbine power generation power higher than the power load demand at 1.00-7.00 and 21.00-24.00. Part of the excess electricity is used to meet the heat load demand through electric boilers, and part is used to meet the cold load demand through electric refrigeration. The remaining energy is sold to the energy storage power station to reduce the phenomenon of wind abandonment. Due to the close connection between heat and electricity, IES 2 maintains a high output of CHP units throughout the day. In order to reduce its own costs, it sells excess electricity to the energy storage power station or uses it for heat and cold loads through energy conversion equipment at 3.00-5.00 and 7.00-18.00. IES 3 has a high photovoltaic power generation power during the period of 9.00-17.00, and the excess energy is sold to the energy storage power station. In other periods, it chooses to purchase energy from the energy storage power station to reduce its own operating costs.

[0172] Figure 7 It is the energy interaction between the shared energy storage power station and the IES in each region. When the interaction power between the IES and the shared energy storage power station is positive, it means that the IES sells excess energy to the shared energy storage power station. When it is negative, it means that the IES needs to purchase energy from the shared energy storage power station. When the power of the shared energy storage power station is positive, it means that energy is sold to the IES in each region. In this process, the income of the shared energy storage power station comes from the difference in the energy interaction payment with the IES in each region. Multi-regional IES realizes the time and space transfer of energy through the shared energy storage power station, which ensures the economy of each entity and the overall operation, and improves the absorption capacity of renewable energy.

[0173] Step S42: In order to verify the effectiveness of the method for optimizing the configuration of shared energy storage power stations in multiple regions based on asymmetric Nash negotiation, a comparison is made with the method using symmetric Nash negotiation.

[0174] Table 1 compares the operating costs of the IES-shared energy storage power stations in each region before and after the asymmetric Nash negotiation cooperation, and Table 2 compares the operating costs of the IES-shared energy storage power stations in each region before and after the standard Nash negotiation cooperation. It can be seen that the benefits of the IES and shared energy storage power stations in each region increased by 672.1 yuan, 1037.7 yuan, 534.1 yuan and 311.6 yuan respectively after participating in the negotiations, which is about 5.3%, 10.3% and 7.0% respectively. This shows that the interests of all entities have been significantly improved through cooperative game. At the same time, the asymmetric Nash negotiation is adopted, and the benefit improvement value of each entity is different, which takes into account fairness and rationality compared with the general Nash negotiation model. Finally, it is calculated that the power of the shared energy storage power station to be configured is 680kW and the capacity is 1428kWh.

[0175] Table 1

[0176]

[0177] Table 2

[0178]

[0179] The above-mentioned embodiments only express several implementation methods of the present invention, and the description thereof is relatively specific and detailed, but it cannot be understood as limiting the scope of the invention patent. It should be pointed out that for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be based on the attached claims.

Claims

1. A method for optimizing the configuration of a shared energy storage power station in a multi-regional integrated energy system, characterized in that: The specific steps include: 1) Considering the power transaction between the multi-regional integrated energy system and the shared energy storage power station, the flexible load on the user side is equivalent to the virtual energy storage resource to participate in the optimization operation, and the multi-regional integrated energy system operation model is established with the goal of minimizing the operation cost, and the shared energy storage power station optimization configuration model is established with the goal of minimizing the sum of investment cost and operation cost; 2) According to the different contribution capabilities of regional integrated energy systems and shared energy storage power stations in cooperative operation, a multi-agent cooperative game and asymmetric Nash negotiation model was established, and a nonlinear mapping method was used to quantify the different contribution capabilities of regional IES in bargaining; that is, the regional integrated energy system negotiates with the shared energy storage power station as a whole to solve the payment fee for electricity sharing; the energy of interaction between the regional integrated energy system and the shared energy storage power station is different, and the regional integrated energy system uses its own contribution as bargaining power, and further distributes the benefits of energy sharing through asymmetric negotiations; 3) All parties reach a consensus through Nash negotiation. To protect the privacy of each party, the ADMM algorithm is used to solve the social energy cost minimization sub-problem and the asymmetric payment benefit maximization sub-problem, and obtain the optimal solution for the power and capacity configuration of the shared energy storage power station; The implementation steps of step 2) are as follows: Firstly, a cooperative game model of multi-regional integrated energy system-shared energy storage power station is established based on Nash negotiation theory. Then, the original optimization problem is transformed into two convex sub-problems through equivalent transformation. Sub-problem 1 is to minimize the social energy cost, and sub-problem 2 is to maximize the asymmetric payment benefit. Then, due to the different energy of interaction between the regional integrated energy system and the shared energy storage power station, a nonlinear mapping method is used to quantify the different contribution capabilities of the regional integrated energy system in bargaining to ensure the fairness of all participating entities; The specific implementation steps of step 2) are as follows: 2.1) Apply the mathematical expression of the standard Nash negotiation game to establish a cooperative game model of a multi-regional integrated energy system-shared energy storage power station. The mathematical expression is as follows: Where: C ESS,Δ are the optimal costs of each IES and energy storage power station entity when they do not participate in the cooperative game, and also serve as the Nash negotiation breakdown point. The above inequality constraint ensures that all participating entities can obtain benefits through cooperation; 2.2) Since the cooperative game model is essentially a non-convex nonlinear optimization problem, the original optimization problem is transformed into two convex sub-problems through equivalent transformation. The specific equivalent process is as follows: According to the mean inequality, the cooperative game model is rewritten as: in is a constant, so: The smaller the value, the larger the objective function value of the cooperative game model; The energy interaction between the multi-regional integrated energy system and the shared energy storage power station needs to meet not only power balance but also revenue and expenditure balance; Without considering the payment and benefit costs of each entity, the cost of the i-th comprehensive energy system is The cost of the shared energy storage power station is M ESS : make: M ESS =C inv +C op , The objective function is transformed into the social energy cost minimization subproblem: By solving the social energy cost minimization subproblem, we can obtain M ESS The optimal value of C EES,Δ As a constant, substituting the obtained optimization variables into the cooperative game model, we can get the asymmetric payment benefit maximization subproblem: The sub-problem of maximizing the asymmetric payment benefit is divided into two processes. The first process is that the integrated energy system of each region negotiates with the shared energy storage power station as a whole to solve the payment fee for electricity sharing. The second process is that the energy interacted between the IES in each region and the shared energy storage power station is actually different. The IES in each region uses its own contribution as bargaining power to further distribute the benefits of energy sharing through asymmetric negotiations.

2. The method for optimizing the configuration of a shared energy storage power station in a multi-regional integrated energy system according to claim 1, characterized in that: The step 1) is to configure each regional integrated energy system with renewable energy units and energy production and conversion equipment in view of the energy consumption differences and complementarities of each regional integrated energy system in actual operation; each regional integrated energy system is connected to a shared energy storage power station via a connecting line, and the user-side reducible load and transferable load are equivalent to virtual energy storage resources to participate in demand response; considering that the multi-regional integrated energy system and the shared energy storage power station belong to different stakeholders, corresponding optimization operation models are established for the multi-regional integrated energy system and the shared energy storage power station.

3. The method for optimizing the configuration of a shared energy storage power station in a multi-regional integrated energy system according to claim 1, characterized in that: The specific steps of step 3) are: First, we construct an augmented Lagrangian function and use the ADMM algorithm to solve the social energy cost minimization subproblem. Each subject continuously updates its decision during the iteration process. Then, the augmented Lagrangian function is constructed, and the ADMM algorithm is used to solve the asymmetric payment benefit maximization sub-problem. Each subject continuously updates its own decision during the iteration process.