Similarity model test system of earth pressure balance shield tunneling through composite foundation
By designing a similar model test system in which an earth pressure balance shield tunnel penetrates a composite foundation, the problem of complexity and high cost of existing devices is solved, effective control of shield construction parameters is achieved, the settlement of the composite foundation is monitored and reduced, and construction safety is ensured.
Patent Information
- Application Number
- CN202111322005.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-11-09
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2041-11-09
AI Technical Summary
The existing shield model test device has a complex design, high cost, and inconvenient operation. It cannot effectively control the construction parameters of the shield in the composite foundation, resulting in the inability to effectively monitor and control settlement when the shield penetrates the composite foundation.
A similar model test system for an earth pressure balance shield tunneling through a composite foundation was designed, including an earth pressure balance shield propulsion system and a composite foundation model box test system, using an electric telescopic rod device, a reduction motor, a dowel rod, Components such as segments, cutterheads, and measuring rods simulate the shield construction process by adjusting thrust and rotational speed, monitor changes in the surface settlement trough, and provide parameter control.
A shield tunnel model test with simple structure, low cost and easy operation has been realized, which can effectively measure the settlement of the shield tunnel penetrating the composite foundation, provide parameter control to reduce the settlement of the composite foundation, and ensure construction safety.
Smart Images

Figure CN114184401B_ABST
Abstract
Description
Technical field:
[0001] The invention belongs to the technical field of rock and soil similarity model tests, and relates to a similarity model test system for an earth pressure balance shield machine passing through a composite foundation. Background technology:
[0002] With the rapid development of my country's economy, my country's high-speed rail has entered the era of "eight vertical and eight horizontal" from "four vertical and four horizontal". As a key link in high-speed rail construction, high-speed rail subgrade treatment has been widely used in soft soil subgrade treatment in Beijing-Tianjin Intercity Railway, Wuhan-Guangzhou Passenger Dedicated Line, Beijing-Shanghai High-speed Railway, Shanghai-Nanjing Intercity Railway, Zhengzhou-Xi'an High-speed Railway, etc. At present, 42 cities in my country have opened subways, with a total mileage of 5376.89km. With the construction of urban subways, it is inevitable that shields will pass under high-speed rail composite foundations, such as Beijing Subway Line 14 passing under the composite foundation of Beijing-Tianjin Intercity Railway. At the same time, composite foundations have also been widely used in high-rise buildings. It can be foreseen that there will be more such projects, and the working condition of shields passing under composite foundations is bound to be inevitable.
[0003] There are many parameters that need to be controlled during the construction of shield tunneling in soft soil composite foundations. If the construction parameters are not properly controlled, serious consequences will occur, such as large deformation of the high-speed railway track bed resulting in inability to pass normally, and excessive settlement of the foundation of high-rise buildings causing cracks in the building. Therefore, it is necessary to conduct relevant research on the construction of shield tunneling in composite foundations.
[0004] The deformation control mentioned in the current specifications all considers the long-term deformation of the composite foundation, but there are no relevant regulations for the special working condition of shield tunneling. The soft soil composite foundation has a high sensitivity, and it is obviously not enough to control the shield construction parameters only by experience and specifications. Therefore, a test method is needed to provide some reference. The existing shield model test devices are all complex in design, with many devices and high costs, which are extremely inconvenient in actual operation. Therefore, it is necessary to improve the existing shield test devices and model test systems. Summary of the invention:
[0005] The purpose of the present invention is to provide a similar model test system for an earth pressure balance shield machine passing through a composite foundation, which overcomes the problems of complicated design, high cost and inconvenient operation of shield model test devices in the prior art. The present invention has a simple structure, low cost and simple and feasible experimental operation.
[0006] To achieve the above object, the technical solution adopted by the present invention is:
[0007] A similar model test system for an earth pressure balance shield machine passing through a composite foundation, characterized in that it includes an earth pressure balance shield machine propulsion system and a composite foundation model box test system, the earth pressure balance shield machine propulsion system includes a test bench, an upper sliding plate and a lower sliding plate are provided on the test bench, a reduction motor and a pipe segment are fixed on the upper sliding plate, the reduction motor is connected to the cutter disc through a force transmission rod, an electric telescopic rod device and a bracket are fixed on the lower sliding plate, the reduction motor is arranged on one side of the electric telescopic rod device, and the composite foundation model box test system includes a model box body, a crossbeam is provided on the top of the model box body, a dial indicator is fixed on the crossbeam, and measuring rods and experimental material layers are arranged in sequence from top to bottom in the model box body.
[0008] The electric telescopic rod device includes an electric motor. The rotation of the electric motor drives the bearing through the gears to push the threaded screw rod so that the telescopic rod can achieve telescopic movement.
[0009] The experimental material layers include a cushion layer, a micro pile group and soil-similar materials arranged in sequence from top to bottom.
[0010] The cutter disc is made of welded blades.
[0011] The force transmission rod uses bolts to connect the cutter disc and the reduction motor in series.
[0012] The telescopic stroke, thrust and telescopic speed of the electric telescopic rod device are adjustable.
[0013] The reduction motor can rotate forward and reverse, with a speed range of 10 to 500 rpm, and the speed can be directly adjusted through the brake device.
[0014] Similar transformation is used to adjust parameters such as modulus for pipe segments, soil-similar materials, micro pile groups, and cushion layers. Pipe segments are polyethylene plastic pipes or steel pipes, soil-similar materials are made of gypsum, quartz sand, and bentonite, micro pile groups are made of cement and soil, and the cushion layer is fine sand.
[0015] The dial indicators are arranged on the surface of the soil and the composite foundation, with 7 or 9 of them being set.
[0016] Apply lubricating oil between the upper sliding plate and the lower sliding plate.
[0017] Compared with the prior art, the present invention has the following advantages and effects:
[0018] 1. The present invention has a simple structure, is easy to assemble, and has a low cost. All instruments and equipment in the model test can be purchased, and the experimental operation is simple and feasible.
[0019] 2. The present invention provides a similar model test device for various composite foundations such as shield tunneling under high-speed railway composite foundations and building composite foundations, providing a feasibility study plan for such research, which can qualitatively measure the settlement of the shield tunneling under the composite foundation under various working conditions.
[0020] 3. The present invention can provide parameter control for shield construction through experiments to reduce composite foundation settlement, optimize construction parameters, and ensure effective and safe construction. Description of the drawings:
[0021] Figure 1 It is a structural schematic diagram of a similar model test system of an earth pressure balance shield machine passing through a composite foundation according to the present invention;
[0022] Figure 2 It is a structural schematic diagram of the electric telescopic rod device in the present invention;
[0023] Figure 3 It is a structural schematic diagram of the composite foundation model box testing system in the present invention.
[0024] In the figure, 1-earth pressure balance shield propulsion system, 2-composite foundation model box test system; 3-electric telescopic rod device; 4-reduction motor; 5-segment; 6-force transmission rod; 7-bracket; 8-cutter head; 9-upper sliding plate; 10-lower sliding plate; 11-test bench; 12-motor; 13-adapter; 14-gear, 15-clutch, 16-brake, 17-threaded screw, 18-telescopic rod, 19-front joint, 20-electric wire, 21-dial indicator, 22-measuring rod, 23-cushion layer, 24-micro pile group, 25-soil similar material, 26-model box body, 27-crossbeam, 28-tunnel section, 29-dial, 30-needle, 31-measuring head. Specific implementation method:
[0025] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0026] The present invention is a similarity model test system for an earth pressure balance shield machine passing through a composite foundation. The system is mainly aimed at a similarity model test process of an earth pressure balance shield machine passing through a high-speed railway composite foundation and a high-rise building composite foundation. The test provides parameter control for shield construction to reduce composite foundation settlement.
[0027] The present invention includes an earth pressure balance shield propulsion system 1 and a composite foundation model box test system 2. The earth pressure balance shield propulsion system 1 is composed of an electric telescopic rod device 3, a reduction motor 4, a force transmission rod 6, a pipe segment 5, a cutter disc, a bracket 7, and a sliding plate. The earth pressure balance shield propulsion system includes a test bench 11, on which an upper sliding plate 9 and a lower sliding plate 10 are arranged. Lubricating oil is applied between the upper sliding plate 9 and the lower sliding plate 10 to reduce the resistance during the propulsion process. The reduction motor 4 and the pipe segment 5 are fixed on the upper sliding plate 9, and the reduction motor 4 is connected to the cutter disc 8 through the force transmission rod 6. The cutter disc 8 is composed of welded blades, mainly considering the soil cutting blade. The force transmission rod 6 uses bolts to connect the cutter disc 8 and the reduction motor 4 in series. The pipe segment 5 can slide in the propulsion direction, and the reduction motor drives the pipe segment to move forward. The electric telescopic rod device 3 and the bracket 7 are fixed on the lower sliding plate 10, and the reduction motor 4 is arranged on one side of the electric telescopic rod device 3.
[0028] The earth pressure balance shield propulsion system 1 mainly adjusts the shield construction parameters through the electric telescopic rod device 3 and the reduction motor 4. The electric telescopic rod device 3 can adjust the thrust and thus control the thrust of the cutter head 8 to the tunnel face. The reduction motor 4 can adjust the speed and thus control the speed of the shield machine cutter head 8. The shield construction process is simulated by connecting the two. The soil is not discharged during the construction process, thereby simulating the earth pressure balance of the tunnel face. The reduction motor is a 220V AC reduction motor with a rated power of 90W and a current of 0.6A. It can rotate forward and reverse, and the speed range is 10 to 500 revolutions. The speed can be directly adjusted by the brake device. The electric telescopic rod device 3 includes a motor 12. The rotation of the motor 12 drives the bearing through the gear 14, pushing the threaded screw 17 so that the telescopic rod 18 can achieve telescopic movement. The electric telescopic rod device 3 is a DC electric telescopic push rod with a rated voltage of 24V and a telescopic stroke of 60cm. It can provide a maximum thrust of 1000N and a telescopic speed of 12mm / s, wherein the thrust is adjustable.
[0029] The composite foundation model box test system 2 includes a model box body 26, a crossbeam 27 is arranged on the top of the model box body 26, a dial indicator 21 is fixed on the crossbeam 27, and a measuring rod 22, a cushion layer 23, a micro pile group 24 and a soil similar material 25 are arranged in sequence from top to bottom in the model box body 26. The soil similar material 25, the micro pile group 24, the cushion layer 23 and other materials are subjected to similar parameter transformation after the performance test of the on-site materials, and then the materials are selected and configured. The dial indicator test system is fixed on the crossbeam 27, and is arranged on the surface of the soil and the composite foundation respectively. 7 or 9 dial indicators are set to monitor the distribution of the surface settlement trough during the shield construction process, and focus on the influence of the shield construction parameters on it. The segments 5, soil-similar materials 25, micro pile groups 24, and cushion layers 23 use similar transformation to adjust parameters such as modulus. The segments 5 are polyethylene plastic pipes or steel pipes, the soil-similar materials 25 are made of gypsum, quartz sand, bentonite and other materials, the micro pile groups 24 are made of cement and soil, and the cushion layer 23 is fine sand.
[0030] Example:
[0031] like Figure 1 As shown, a similar model test device for an earth pressure balance shield machine passing through a composite foundation includes: an earth pressure balance shield machine propulsion system 1 and a composite foundation model box test system 2.
[0032] like Figure 1 As shown, the earth pressure balance shield propulsion system 1 is composed of an electric telescopic rod device 3, a reduction motor 4, a pipe segment 5, a force transmission rod 6, a bracket 7, a cutter head 8, an upper sliding plate 9, a lower sliding plate 10, and a test bench 11, wherein the reduction motor 4 and the cutter head 8 are connected through the force transmission rod 6, the reduction motor 4 and the pipe segment 5 are fixed to the upper sliding plate 9, the electric telescopic rod device 3 and the bracket 7 are fixed to the lower sliding plate 10, and lubricating oil is applied between the upper and lower sliding plates.
[0033] like Figure 2 As shown, the electric telescopic rod device 3 is composed of a motor 12, an adapter 13, a gear 14, a clutch 15, a brake 16, a threaded screw 17, a telescopic rod 18, a front joint 19, and a wire 20. This device utilizes the rotation of the motor 12 to drive the bearing through the cooperation of the gears 14, and pushes the threaded screw 17 to enable the telescopic rod 18 to achieve telescopic movement. The adapter 13 is used for converting DC power to AC power, the clutch 15 is used for transmitting and cutting off the power of the electric motor, and the brake 16 is used for decelerating and stopping the rotation of the electric motor.
[0034] like Figure 1 and 3As shown, the composite foundation model box test system 2 is composed of a dial indicator 21, a measuring rod 22, a cushion layer 23, a micro pile group 24, a soil-similar material 25, a model box 26, and a crossbeam 27. The cushion layer 23, the micro pile group 24, the soil-similar material 25, etc. are subjected to a similar parameter transformation after the performance test of the on-site materials, and then the materials are selected and configured. The cushion layer 23 is fine sand, the micro pile group 24 is made of cement and soil, and the soil-similar material 25 is made of gypsum, quartz sand, bentonite, etc. The dial indicator 21 is fixed on the crossbeam 27, and a row of dial indicators is 7 or 9, which mainly monitor the changes in the surface settlement trough and the maximum settlement.
[0035] like Figure 3 As shown, the dial indicator monitoring device is mainly composed of a dial 29, a needle 30, a measuring rod 22, and a measuring head 31. This device uses a rack gear or a lever gear transmission to convert the linear displacement of the measuring rod 22 into the angular displacement of the needle 30 to monitor the surface settlement trough changes and the maximum settlement amount during the excavation of the tunnel section 28 below the composite foundation model box test system 2 by the earth pressure balance shield propulsion system 1.
[0036] like Figure 1 As shown, the earth pressure balance shield propulsion system 1 mainly adjusts the shield construction parameters through the electric telescopic rod device 3 and the reduction motor 4. The electric telescopic rod device 3 can adjust the thrust and thus control the thrust of the cutter head tunnel face. The reduction motor 4 can adjust the speed and thus control the speed of the shield machine cutter head. The two are connected to simulate the shield construction process. During the construction process, the soil is not discharged to simulate the earth pressure balance of the tunnel face. Among them, the cutter head 8 is composed of welded blades, mainly considering the soil cutting blade. The force transmission rod 6 uses bolts to connect the cutter head 8 and the reduction motor 4 in series, and the pipe segment 5 is a polyethylene plastic pipe or a steel pipe.
[0037] like Figure 2 As shown, the electric telescopic rod device 3 is a DC electric telescopic push rod, and the telescopic stroke, thrust, and telescopic speed are adjustable.
[0038] like Figure 1 and Figure 3 As shown, the dial indicators 21 are arranged on the surface of the soil and the composite foundation respectively, and 7 or 9 dial indicators are set to monitor the distribution of the surface settlement troughs during the shield construction process, focusing on the influence of the shield construction parameters on it.
[0039] like Figure 1 As shown, the sliding plate is divided into two layers, the upper and lower layers are coated with lubricating oil to reduce the resistance during the propulsion process, the upper sliding plate 9 fixes the reduction motor 4 and the pipe segment 5, and the lower sliding plate 10 fixes the electric telescopic rod device 3 and the bracket 7. The pipe segment 5 can slide in the propulsion direction, and the electric telescopic rod device 3 pushes the reduction motor 4 to make the pipe segment 5 move forward.
[0040] During actual work, first place the model box and shield equipment in the specified position, start the reduction motor 4, adjust the speed, start the electric telescopic rod device 3, adjust the dial indicator 21 and the measuring rod 22 to the initial zero state, and when the cutter head 8 enters the model box, start reading and recording, and read once every 1 cm of excavation. When the cutter head 8 travels more than half of the thickness of the model box, reduce the cutter head speed until it stops. Finally, organize and analyze the monitoring data, and draw the surface settlement trough curve and the measuring point deformation time history curve.
[0041] The above description is only a preferred embodiment of the present invention and is not intended to limit the protection scope of the present invention. Any equivalent structural changes made using the contents of the description and drawings of the present invention should be included in the patent protection scope of the invention.
Claims
1. A similar model test system for an earth pressure balance shield tunneling through a composite foundation. Features: The invention comprises an earth pressure balance shield propulsion system (1) and a composite foundation model box test system (2), wherein the earth pressure balance shield propulsion system comprises a test bench (11), an upper sliding plate (9) and a lower sliding plate (10) are arranged on the test bench (11), a reduction motor (4) and a pipe segment (5) are fixed on the upper sliding plate (9), the reduction motor (4) and a cutter head (8) are connected via a force transmission rod (6), an electric telescopic rod device (3) and a bracket (7) are fixed on the lower sliding plate (10), the reduction motor (4) is arranged on one side of the electric telescopic rod device (3), and the composite foundation model box test system comprises a model box body (26), a crossbeam (27) is arranged on the top of the model box body (26), a dial indicator (21) is fixed on the crossbeam (27), and a measuring rod (22) and an experimental material layer are arranged in sequence from top to bottom in the model box body (26); The electric telescopic rod device (3) comprises an electric motor (12), wherein the rotation of the electric motor (12) drives the bearing through the gear (14), thereby pushing the threaded screw (17) so that the telescopic rod (18) can achieve telescopic movement; The experimental material layer includes a cushion layer (23), a micro pile group (24) and a soil-similar material (25) arranged in sequence from top to bottom; The pipe segments (5), soil-similar materials (25), micro-pile groups (24), and cushion layers (23) are adjusted by similar transformation for parameters such as modulus. The pipe segments (5) are polyethylene plastic pipes or steel pipes. The soil-similar materials (25) are made of gypsum, quartz sand, and bentonite. The micro-pile groups (24) are made of cement and soil. The cushion layers (23) are made of fine sand.
2. A similar model test system for an earth pressure balance shield tunneling under a composite foundation according to claim 1, Features: The cutter disc (8) is composed of welded blades.
3. A similar model test system for an earth pressure balance shield tunneling under a composite foundation according to claim 2, Features: The force transmission rod (6) uses bolts to connect the cutter disc (8) and the reduction motor (4) in series.
4. A similar model test system for an earth pressure balance shield tunneling under a composite foundation according to claim 3, Features: The telescopic stroke, thrust and telescopic speed of the electric telescopic rod device (3) are adjustable.
5. A similar model test system for an earth pressure balance shield tunneling under a composite foundation according to claim 4, Features: The reduction motor (4) can rotate forward and reverse, with a speed range of 10 to 500 rpm, and the speed is directly adjusted by the brake device.
6. A similar model test system for an earth pressure balance shield tunneling under a composite foundation according to claim 5, Features: The dial indicators (21) are arranged on the soil and the composite foundation surface, and 7 or 9 of them are set.
7. A similar model test system for an earth pressure balance shield tunneling under a composite foundation according to claim 6, Features: Lubricating oil is applied between the upper sliding plate (9) and the lower sliding plate (10).