A data-driven SMT manufacturing cycle prediction and correction method
By acquiring and preprocessing data in the SMT manufacturing process, performing feature weighted clustering and residual correction, an SMT production cycle prediction model is constructed, which solves the problem of lack of effective SMT production cycle prediction in the existing technology and achieves more accurate predictions. and resource optimization.
Patent Information
- Application Number
- CN202111571380.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-21
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2041-12-21
AI Technical Summary
The existing technology lacks an effective SMT production cycle prediction method and cannot help enterprises dynamically optimize the allocation of manufacturing resources, precisely control the manufacturing process, and grasp the changing market demands.
By obtaining equipment, product, and quality data in the SMT manufacturing process, preprocessing and feature weighted clustering are performed to construct an SMT production cycle prediction model, and a residual correction mechanism is used to correct the prediction results to obtain a more accurate prediction value.
It provides a method for predicting the SMT production cycle, which helps enterprises dynamically optimize the allocation of manufacturing resources, precisely control the manufacturing process, grasp the changing market demands, and improve the accuracy of prediction.
Smart Images

Figure CN114254827B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of electronic assembly, and more specifically to a data-driven SMT manufacturing cycle prediction and correction method. Background Art
[0002] With the widespread application of intelligent electronic devices in the military and civilian electronics fields, high-density, high-integration, multi-functional products and their core components have put forward higher requirements for the manufacturing efficiency of electronic enterprises. The SMT manufacturing process has many types of equipment, complicated processes, many uncertain factors, and a large number of work-in-progress. Especially in the military electronics industry, the production characteristics are multi-variety, variable batch, batch-research mixed production, many dynamic disturbances, and short delivery cycles. The above characteristics make SMT production cycle prediction a thorny problem. In recent years, the automation and intelligence of SMT workshop equipment have been improved, and manufacturing process data can be collected and transmitted through sensors and data communication networks. Data-driven methods have inspired new ideas for production cycle prediction. The prediction of the production cycle can help enterprises dynamically optimize the allocation of manufacturing resources, finely control the manufacturing process, and grasp the changing market demand.
[0003] In the 29th China Control Conference Proceedings, the document "Research on Optimization Mathematical Model of Electronic Surface Mount Production Line" published by the Engineering Center of Precision Electronic Manufacturing Equipment of the Ministry of Education of South China University of Technology disclosed that starting from the placement order of printed circuit boards (PCBs) and the distribution scheme of component types on different placement machines, the load balancing optimization problem of electronic assembly (SMT) production lines is studied to minimize the time for the production line to complete component placement, thereby improving production efficiency. This problem has the characteristics of assembly line scheduling and general allocation problems. Based on this, an integer programming model is established. The model considers the transmission characteristics of PCB boards between placement machines and the single-machine placement constraints of component types. The model is linearized by variable substitution. For small-scale problems, a linear programming solver can be used to solve the optimal solution to the problem. However, this document does not study the prediction of SMT production cycle. Summary of the invention
[0004] The technical problem to be solved by the present invention is that the existing technology lacks a method for predicting the SMT production cycle, and is unable to help enterprises dynamically optimize the allocation of manufacturing resources, finely control the manufacturing process, and grasp the changing market demands.
[0005] The present invention solves the above technical problems through the following technical means: a data-driven SMT manufacturing cycle prediction and correction method, the method comprising:
[0006] Step 1: Obtain equipment, product, and quality data during the SMT manufacturing process and pre-process the data;
[0007] Step 2: Read the preprocessed data, perform clustering using feature weighting, select the feature closest to the cluster center as the key feature, and construct a key feature subset;
[0008] Step 3: Build an SMT production cycle prediction model and use the key feature subset as the input of the prediction model;
[0009] Step 4: Use the residual correction mechanism to correct the prediction results of the prediction model according to the residual value between the predicted value and the actual value, and evaluate the final prediction accuracy.
[0010] The present invention collects data in the SMT manufacturing process as a data set, clusters the data set to obtain a key feature subset, constructs an SMT production cycle prediction model, uses the key feature subset as the input of the prediction model, obtains a prediction value, and adopts a residual correction mechanism to correct the prediction result of the prediction model according to the residual value between the predicted value and the actual value to obtain a more accurate prediction value. A method for predicting the SMT production cycle is provided, which is helpful for enterprises to dynamically optimize the allocation of manufacturing resources, finely control the manufacturing process, and grasp the changing market demands.
[0011] Furthermore, the step 1 comprises:
[0012] S11: Obtain working / standby / blocking / pause / failure time data, quality abnormality processing time data, production preparation time, and emergency order data of printers, mounters, reflow ovens, SPI inspection equipment, AOI inspection equipment, and X-ray inspection equipment in the SMT manufacturing process through the SECS / GEM protocol of semiconductor equipment or the MES system;
[0013] S12: Delete the missing values or NAN values of the above data. For data of different dimensions, use the formula Perform maximum-minimum normalization processing so that the above data are between (0,1).
[0014] Furthermore, the step 2 includes:
[0015] S21: Read the SMT manufacturing process data processed in step 1, and determine the weight of each feature in the feature set through the Relief algorithm;
[0016] S22: combining the feature weights obtained in step S21 with the fuzzy C-means clustering method, selecting the feature closest to the cluster center as the key feature, and obtaining a key feature subset;
[0017] S23: Perform cluster analysis on the key feature subsets by combining the Calinski-Haraba coefficient and the silhouette coefficient, and adjust the fuzzy threshold and fuzzy weight of the fuzzy C-means clustering according to the clustering results.
[0018] Furthermore, the S21 includes:
[0019] Using the formula
[0020] Determine the weight of each feature in the feature set;
[0021] Where W(F) represents the weight of feature F, m represents the number of random sample extractions, k represents the number of sample extractions, p(C) represents the proportion in the category, p(class(R)) represents the proportion of the category of the randomly selected R sample, diff(A1,R1,R2) represents the distance between samples R1 and R2 on feature F, and M j (C) indicates class The jth nearest neighbor sample in .
[0022] Furthermore, the fuzzy C-means clustering method in S22 is:
[0023] By formula Construct the feature weight-fuzzy C-means clustering objective function, where fc is the number of cluster centers, fn is the number of features, and w j is the weight of the jth feature, fx j is the jth feature, cm is the fuzzy weight ranging from 1 to infinity, u i,j is the membership of the i-th category that contains the j-th feature and
[0024] Among them, cx j For sample x j The cluster center, c i represents the i-th cluster center and i=1,2,…,fc
[0025] i=1,2,.....,fc,j=1,2,…fn, where ε is the fuzzy threshold, is the membership of the jth feature in the i-th category at the t-th iteration.
[0026] Furthermore, the S23 includes:
[0027] By formula Get the Calinski-Haraba coefficients,
[0028] By formula Get the silhouette coefficient,
[0029] in: is the k-th cluster center, is the center of all features, f kare all features belonging to class k, a(i) is the average distance between the ith feature and all features of different clusters, and b(i) is the average distance between the ith feature and all features of the same cluster;
[0030] Cluster analysis is performed on the key feature subset in combination with the Calinski-Haraba coefficient and the silhouette coefficient. If the CH value does not reach the first preset value or the SC value does not reach the second preset value, the fuzzy threshold ε and the fuzzy weight cm in step S22 are adjusted until the above-mentioned set conditions are met and the parameter adjustment is stopped.
[0031] Furthermore, the step three includes:
[0032] S31: taking the key feature subset data obtained in step S23 as a sample data set;
[0033] S32: Constructing an SMT production cycle prediction model by combining residual correction and extreme learning machine, and using the data obtained in step S31 as input to the prediction model;
[0034] S33: construct an objective function and optimize the weights and thresholds of the extreme learning machine prediction model in step 32 to obtain the optimal prediction model.
[0035] Furthermore, the S32 includes:
[0036] By formula Build SMT production cycle prediction model,
[0037] Among them, β i represents the output weight, w i represents the input weight, b i represents the bias of the i-th hidden unit, y pre represents the predicted value, x t Represents the input variable.
[0038] Furthermore, the S33 includes:
[0039] By formula Construct the objective function, y pre (t) represents the predicted value at time t, y real (t) represents the actual value at time t, and l is the set time threshold;
[0040] By formula Calculate the discovery probability; when the discovery probability p is greater than r (a random number between 0 and 1), the formula Update the position and input weight w i and the hidden unit bias b iAutomatically update and iterate continuously. When the objective function reaches the minimum value, stop updating to obtain the optimal prediction model and the optimal input weight w i and the hidden unit bias b i ; where α is the dynamic adaptive step size coefficient and
[0041]
[0042] Among them, p min is the minimum discovery probability, p max is the maximum discovery probability, T is the number of iterations, T max is the maximum number of iterations, represents the position of the i-th particle at time t in the cuckoo algorithm, x best represents the historical optimal position at time t, μ represents the mean, ν represents the variance, μ, ν obey the normal distribution, λ=1, Γ means that the mean and variance are both unbounded and standard gamma functions, α min Represents the minimum value of the dynamic adaptive step size coefficient, α max represents the maximum value of the dynamic adaptive step coefficient, f represents the objective function value, and f min Represents the minimum value of the historical value of the objective function, f avg Represents the average of the historical values of the objective function.
[0043] Furthermore, the step 4 includes:
[0044] S41: By formula e(t)=y real (t)-y pre (t) Calculate the predicted value y pre (t) and the actual value y real The residual e(t) between the two time points is taken as the input of the above SMT production cycle prediction model, and the predicted residual value y at time t is output. err (t), after judging that it meets the tolerance range, the formula y mod (t) = y pre (t)+y pre (t) Superimpose the predicted value y of the above model pre (t) and the predicted residual value y pre (t), output the final prediction result y mod (t);
[0045] S42: The root mean square error N1, mean absolute percentage error N2, and mean absolute error index N3 are used to evaluate the SMT manufacturing cycle prediction accuracy; among them,
[0046] T preis the predicted value after the correction of the SMT production cycle, T real It is the actual value of SMT manufacturing cycle;
[0047]
[0048]
[0049] The advantages of the present invention are:
[0050] (1) The present invention collects data from the SMT manufacturing process as an initial data set, clusters the data set to obtain a key feature subset, constructs an SMT production cycle prediction model, uses the key feature subset as the input of the prediction model, obtains a prediction value, and adopts a residual correction mechanism to correct the prediction result of the prediction model according to the residual value between the predicted value and the actual value to obtain a more accurate prediction value. A method for predicting the SMT production cycle is provided, which is helpful for enterprises to dynamically optimize the allocation of manufacturing resources, finely control the manufacturing process, and grasp the changing market demands.
[0051] (2) There are relatively few studies on the existing SMT production cycle prediction, which mostly relies on statistical analysis, simulation methods or ideal conditions such as production plans and fixed dispatching rules, and lacks consideration of the frequent occurrence of dynamic disturbances in the actual manufacturing process. In the present invention, the SMT production cycle prediction model is constructed based on the data of SMT actual manufacturing process equipment, products, quality, etc., and dynamic disturbance factors are considered to provide a scientific basis for the dynamic allocation of manufacturing resources and task optimization decisions.
[0052] (3) The SMT manufacturing process generates a huge amount of data. On the one hand, the data density is high, but the value density is low. On the other hand, in order to avoid the "curse of dimensionality" problem, the weight of each feature is calculated through the Relief algorithm-fuzzy C-means clustering method, and the features with large weights are guided to cluster as key features, and the key feature subsets that affect the production cycle are screened out to achieve data dimensionality reduction. Considering that the ELM algorithm randomly generates thresholds and weights and is easy to converge locally, the improved cuckoo algorithm is optimized and integrated with ELM to construct the SMT production cycle prediction model. In addition, after the prediction results are output, it is proposed to use a residual correction mechanism to perform residual correction on the predicted value, further reduce the residual between the predicted value and the actual value, and improve the prediction accuracy. BRIEF DESCRIPTION OF THE DRAWINGS
[0053] Figure 1 An algorithm flow chart of a data-driven SMT manufacturing cycle prediction and correction method provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0054] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in combination with the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0055] like Figure 1 As shown, a data-driven SMT manufacturing cycle prediction and correction method is shown. The method is based on SMT multi-process equipment, quality, product and other data, and uses the Relief-fuzzy C-means clustering method to screen out the key feature subsets that affect the SMT production cycle, and evaluate the clustering results. Fusion residual correction, improved cuckoo algorithm, and construction of SMT production cycle prediction model, using the residual correction mechanism, according to the residual between the predicted value and the actual value to further correct the prediction model, improve the accuracy of the prediction model. In this embodiment, the program is written using python software tools, combined with pandas, numpy, sklearn library and other tools to perform data preprocessing, production cycle prediction and correction. The following is a detailed introduction to the method process of the present invention.
[0056] The present invention provides a data-driven SMT manufacturing cycle prediction and correction method, comprising the following steps:
[0057] S1: Obtain equipment, product, and quality data during SMT manufacturing and pre-process the data; the specific implementation process is as follows:
[0058] S11: Obtain working / standby / blocking / pause / failure time data, quality abnormality processing time data, production preparation time, emergency order data, etc. of printers, mounters, reflow ovens, SPI inspections, AOI inspections, and X-ray inspection equipment during the SMT manufacturing process through the SECS / GEM protocol of semiconductor equipment or the MES system. The above data can be transmitted through the OPC UA protocol;
[0059] S12: In order to ensure the consistency of the data, the missing values or NAN values of the above data are deleted, and the maximum-minimum normalization processing is performed on the data of different dimensions so that the above data are between (0,1);
[0060] Maximum-minimum normalization processing:
[0061] S2: Read the preprocessed data, perform clustering using feature weighting, select the feature closest to the cluster center as the key feature, and construct a key feature subset; the specific implementation process is as follows:
[0062] S21: Read the data processed in step S1, perform preliminary classification according to the order number and the inherent properties of SMT (PCB board size, thickness, pin spacing, pads, etc.), use the Relief algorithm to determine the weight of each feature, and rank the importance of the features according to the weight values of the features.
[0063]
[0064] Where: W(F) represents the weight of feature F, m represents the number of random sample extractions, k represents the number of sample extractions, p(C) represents the proportion in the category, and p(class(R)) represents the proportion of the category of the randomly selected R sample. diff(A1,R1,R2) represents the distance between samples R1 and R2 on feature F, M j (C) indicates class The jth nearest neighbor sample in .
[0065] S22: Combine the feature weights obtained in step S21 with the fuzzy C-means clustering method to select the feature closest to the cluster center as the key feature, and obtain a key feature subset.
[0066] By formula Construct the feature weight-fuzzy C-means clustering objective function, where fc is the number of cluster centers, fn is the number of features, and w j is the weight of the jth feature, fx j is the jth feature, cm is the fuzzy weight ranging from 1 to infinity, u i,j is the membership of the i-th category that contains the j-th feature and
[0067] Among them, cx j For sample x j The cluster center, c i represents the i-th cluster center and i=1,2,…,fc
[0068] i=1,2,.....,fc,j=1,2,…fn, where ε is the fuzzy threshold, is the membership degree of the jth feature in the i-th category of the t-th iteration; the clustering objective function value is calculated through the above process, and the clustering process is specifically as follows:
[0069] Initialize k category centers or membership matrices;
[0070] Update the membership matrix and cluster centers;
[0071] Repeat the above two steps until the maximum difference between the t-th and t-1-th membership is less than the fuzzy threshold, that is, , stop the iteration.
[0072] S23: Perform cluster analysis on the key feature subsets by combining the Calinski-Haraba coefficient and the silhouette coefficient, and adjust the fuzzy threshold and fuzzy weight of the fuzzy C-means clustering according to the clustering results.
[0073] By formula Get the Calinski-Haraba coefficients,
[0074] By formula Get the silhouette coefficient,
[0075] in: is the k-th cluster center, is the center of all features, f k are all features belonging to class k, a(i) is the average distance between the ith feature and all features of different clusters, and b(i) is the average distance between the ith feature and all features of the same cluster;
[0076] Combine the Calinski-Haraba coefficient and the silhouette coefficient to perform cluster analysis on the key feature subset. If the CH value does not reach the first preset value or the SC value does not reach the second preset value, adjust the fuzzy threshold ε and the fuzzy weight cm in step S22 until the above-mentioned set conditions are met and stop adjusting the parameters. The CH value is generally around 1000 (the calculated value varies in different specific data situations). The larger the value, the better the clustering effect. SC generally takes a value between -1 and 1. The closer the calculated value is to 1, the better the clustering effect. In this embodiment, the first preset value is 1000 and the second preset value is 1.
[0077] S3: Build an SMT production cycle prediction model and use the key feature subset as the input of the prediction model; the specific implementation process is as follows:
[0078] S31: taking the key feature subset data obtained in step S23 as a sample data set, and dividing it into a training data set and a test data set according to a certain ratio;
[0079] S32: Constructing an SMT production cycle prediction model by combining residual correction and extreme learning machine, and using the data obtained in step S31 as input to the prediction model;
[0080] By formula Build SMT production cycle prediction model,
[0081] Among them, β i represents the output weight, w i represents the input weight, b i represents the bias of the i-th hidden unit, y prerepresents the predicted value, x t Represents the input variable.
[0082] S33: construct an objective function to optimize the weight and threshold of the extreme learning machine prediction model in step 32 by improving the levy flight step coefficient and the discovery probability in the cuckoo algorithm;
[0083] By formula Construct the objective function, y pre (t) represents the predicted value at time t, y real (t) represents the actual value at time t, and l is the set time threshold;
[0084] By formula Calculate the discovery probability; when the discovery probability p is greater than r (a random number between 0 and 1), the formula Update the position and input weight w i and the hidden unit bias b i Automatically update and iterate continuously. When the objective function reaches the minimum value, stop updating to obtain the optimal prediction model and the optimal input weight w i and the hidden unit bias b i ; where α is the dynamic adaptive step size coefficient and
[0085]
[0086] Among them, p min is the minimum discovery probability, p max is the maximum discovery probability, T is the number of iterations, T max is the maximum number of iterations, represents the position of the i-th particle at time t in the cuckoo algorithm, x best represents the historical optimal position at time t, μ represents the mean, v represents the variance, μ, v obey the normal distribution, λ=1, Γ means that the mean and variance are both unbounded and standard gamma functions, α min Represents the minimum value of the dynamic adaptive step size coefficient, α max represents the maximum value of the dynamic adaptive step coefficient, f represents the objective function value, and f min Represents the minimum value of the historical value of the objective function, f avg Represents the average of the historical values of the objective function.
[0087] S4: Adopt the residual correction mechanism to correct the prediction results of the prediction model according to the residual value between the predicted value and the actual value, and evaluate the final prediction accuracy; the specific implementation process is as follows:
[0088] S41: By formula e(t)=y real (t)-y pre(t) Calculate the predicted value y pre (t) and the actual value y real The residual e(t) between the two time points is taken as the input of the above SMT production cycle prediction model, and the predicted residual value y at time t is output. err (t), after judging that it meets the tolerance range, the formula y mod (t) = y pre (t)+y pre (t) Superimpose the predicted value y of the above model pre (t) and the predicted residual value y pre (t), output the final prediction result y mod (t);
[0089] S42: The root mean square error N1, mean absolute percentage error N2, and mean absolute error index N3 are used to evaluate the SMT manufacturing cycle prediction accuracy; among them,
[0090] T pre is the predicted value after the correction of the SMT production cycle, T real It is the actual value of SMT manufacturing cycle;
[0091]
[0092]
[0093] The smaller the root mean square error N1, the mean absolute percentage error N2, and the mean absolute error index N3, the higher the SMT manufacturing cycle prediction accuracy.
[0094] In summary, the above embodiment uses the Relief algorithm-fuzzy C-means classification to perform feature selection, improve the quality of the key feature subset that affects the SMT production cycle, and integrates residual correction, cuckoo algorithm-extreme optimization learning machine to build an SMT production cycle prediction model. The residual correction mechanism is used to further correct the prediction model according to the residual between the predicted value and the actual value, improve the accuracy of the prediction model, provide a scientific basis for production scheduling, dynamic optimization decision-making, and fine control of the manufacturing process in the SMT manufacturing process, and efficiently and effectively ensure the on-time delivery of products.
[0095] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features thereof may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A data-driven SMT manufacturing cycle prediction and correction method, characterized in that: The method comprises: Step 1: Obtain equipment, product, and quality data during the SMT manufacturing process and pre-process the data; Step 2: Read the preprocessed data, perform clustering using feature weighting, select the feature closest to the cluster center as the key feature, and construct a key feature subset; Step 3: Build an SMT production cycle prediction model and use the key feature subset as the input of the prediction model; Step 4: Use the residual correction mechanism to correct the prediction results of the prediction model according to the residual value between the predicted value and the actual value, and evaluate the final prediction accuracy; The second step comprises: S21: Read the SMT manufacturing process data processed in step 1, and determine the weight of each feature in the feature set through the Relief algorithm; S22: combining the feature weights obtained in step S21 with the fuzzy C-means clustering method, selecting the feature closest to the cluster center as the key feature, and obtaining a key feature subset; S23: cluster analysis is performed on the key feature subsets by combining the Calinski-Haraba coefficient and the silhouette coefficient, and the fuzzy threshold and fuzzy weight of the fuzzy C-means clustering are adjusted according to the clustering results; The method of fuzzy C-means clustering in S22 is: By formula Construct the feature weight-fuzzy C-means clustering objective function, where: is the number of cluster centers, is the number of features, To indicate the The weight of the feature, For the Features, is a fuzzy weight ranging from 1 to infinity, The i-th category contains The membership of the features and , ,in, For sample The cluster center of represents the i-th cluster center and ,in, is the fuzzy threshold, The tth iteration contains the The degree of membership of a feature; The S23 includes: By formula Get the Calinski-Haraba coefficients, By formula SC= Get the silhouette coefficient, in: For the Cluster centers, is the center of all features, For All characteristics of the class, For the The average distance between a feature and all features of different clusters; For the The average distance between a feature and all features of the same cluster; Perform cluster analysis on the key feature subset by combining the Calinski-Haraba coefficient and the silhouette coefficient. If the CH value does not reach the first preset value or the SC value does not reach the second preset value, adjust the fuzzy threshold in step S22. and fuzzy weight , and stop adjusting the parameters until the above-mentioned conditions are met.
2. A data-driven SMT manufacturing cycle prediction and correction method according to claim 1, characterized in that: The step one comprises: S11: Obtain working / standby / blocking / pause / failure time data, quality abnormality processing time data, production preparation time, and emergency order data of printers, mounters, reflow ovens, SPI inspection equipment, AOI inspection equipment, and X-ray inspection equipment in the SMT manufacturing process through the SECS / GEM protocol of semiconductor equipment or the MES system; S12: Delete the missing values or NAN values of the above data. For data of different dimensions, use the formula Perform maximum-minimum normalization processing so that the above data are between (0,1).
3. A data-driven SMT manufacturing cycle prediction and correction method according to claim 1, characterized in that: The S21 includes: Using the formula Determine the weight of each feature in the feature set; in, represents the weight of feature F, represents the number of random samples drawn. represents the number of samples drawn, Indicates the proportion in the category. For randomly selected The proportion of the sample category, Representation sample and In Features The distance on Representation Class Middle nearest neighbor samples.
4. A data-driven SMT manufacturing cycle prediction and correction method according to claim 1, characterized in that: The step three comprises: S31: taking the key feature subset data obtained in step S23 as a sample data set; S32: Constructing an SMT production cycle prediction model by combining residual correction and extreme learning machine, and using the data obtained in step S31 as input to the prediction model; S33: construct an objective function and optimize the weights and thresholds of the extreme learning machine prediction model in step 32 to obtain the optimal prediction model.
5. A data-driven SMT manufacturing cycle prediction and correction method according to claim 4, characterized in that: The S32 includes: By formula Build SMT production cycle prediction model, in, represents the output weight, represents the input weight, Indicates hidden unit bias, represents the predicted value, Represents the input variable.
6. A data-driven SMT manufacturing cycle prediction and correction method according to claim 4, characterized in that: The S33 includes: By formula Construct the objective function, represents the predicted value at time t, represents the actual value at time t, is the time threshold set; By formula Calculate the probability of discovery; when the probability of discovery Greater than r, r is a random number between 0 and 1, through the formula Update the position and input the weight and the hidden unit bias Automatically update and iterate continuously. When the objective function reaches the minimum value, stop updating to obtain the optimal prediction model and the best input weight. and the hidden unit bias ;in, is the dynamic adaptive step size coefficient and in, is the minimum discovery probability, is the maximum discovery probability, is the number of iterations, is the maximum number of iterations, represents the position of the i-th particle at time t in the cuckoo algorithm, represents the historical optimal position at time t, μ represents the mean, represents the variance, μ, It follows a normal distribution. , , Indicates that the mean and variance are both unbounded and standard gamma functions, represents the minimum value of the dynamic adaptive step coefficient, represents the maximum value of the dynamic adaptive step size coefficient, represents the objective function value, represents the minimum value in the historical value of the objective function, Represents the average of the historical values of the objective function.
7. A data-driven SMT manufacturing cycle prediction and correction method according to claim 4, characterized in that: The fourth step comprises: S41: By formula Calculate predicted values With actual value The residual between , the residual at time tn is used as the input of the above SMT production cycle prediction model, and the predicted residual value at time t is output After judging that it meets the tolerance range, the formula Superimpose the predictions of the above models And the predicted residual value After that, the final prediction result is output ; S42: The root mean square error N1, mean absolute percentage error N2, and mean absolute error index N3 are used to evaluate the SMT manufacturing cycle prediction accuracy; among them, , It is the predicted value after the correction of SMT production cycle. It is the actual value of SMT manufacturing cycle; ; 。
Citation Information
Patent Citations
CNN algorithm and Lasso regression model-based hot-rolling product quality prediction method
CN110264079A
Demand forecasting in the presence of unobserved lost-sales
US20160155137A1
Cited By
Method for characterizing process characteristics of SMT (Surface Mount Technology) product
CN120781057A