Waste-to-energy boiler
By adopting a double unloading plate structure and a variety of auxiliary devices in the waste power generation boiler, the problem of instability in the temperature and pressure in the combustion chamber is solved, the combustion efficiency is improved and the power generation cost is reduced.
Patent Information
- Application Number
- CN202210004041.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-01-04
- Publication Date
- 2025-02-18
- Estimated Expiration
- 2042-01-04
AI Technical Summary
Existing combustion power generation boilers will flow out a large amount of hot air at the feed and ash discharge positions, resulting in unstable temperature and pressure in the combustion chamber, low combustion performance and high power generation costs.
A waste power generation boiler is designed, using a dual discharge plate structure and infrared thermal imaging camera, air inlet and ash discharge device, slag removal device and slag removal combustion device to achieve optimization of feed, ash discharge and combustion state.
By reducing the discharge of hot air, the heat consumption in the combustion chamber is reduced, the combustion efficiency is improved, the temperature and pressure in the boiler are stable, and the power generation cost is reduced.
Smart Images

Figure CN114278945B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of boiler manufacturing, and in particular to a garbage power generation boiler. Background Art
[0002] At present, a large amount of hot air generated in the combustion chamber of the combustion power generation boiler will flow out at the feeding and ash discharge positions. When providing air to the combustion chamber for combustion assistance, the temperature difference between the cold air and the air in the combustion chamber consumes a certain amount of heat energy, making the combustion temperature and pressure in the combustion chamber unstable. In addition, the state in the combustion chamber cannot be clearly grasped and timely adjustments cannot be made, resulting in low combustion performance and high power generation costs. Summary of the invention
[0003] The technical problem to be solved by the present invention is to provide a garbage power generation boiler which is convenient for unloading and observing the combustion state, and can also reduce energy consumption and improve combustion efficiency.
[0004] The technical solution of the present invention is as follows:
[0005] A garbage power generation boiler comprises a feed hopper, a combustion chamber, an ash discharge pipe and a furnace arranged in the combustion chamber, an inclined wall is arranged on one side of the feed hopper, a first inspection hole is arranged on the other side, a transition inclined wall is arranged on the inclined wall, a first discharge plate is hinged in the first inspection hole, a first counterweight block is arranged at the hinged end of the first discharge plate, a mounting hole is arranged at the non-hinged end of the first discharge plate, an elastic device connected to a first roller is arranged in the mounting hole, and the wheel surface of the first roller is in contact with the transition inclined wall; A second inspection hole is provided at a position below the first inspection hole, a second unloading plate having the same structure as the first unloading plate is hinged in the second inspection hole, a second counterweight is provided at the hinged end of the second unloading plate, a mounting hole is also provided at the non-hinged end of the second unloading plate, a spring device connected to the second roller is provided in the mounting hole, and the spring device has the same structure as the elastic device; a push plate connected to the cylinder is provided at the discharge end of the feed hopper, a partition is provided at the lower end of the inclined wall, and the lower end surface of the partition is in contact with the upper end surface of the push plate;
[0006] A bracket is provided on the outer wall of the combustion chamber, a stepper motor is provided on the upper end of the bracket, a through hole is provided on the bracket, a spherical support is provided in the through hole, a cooling water sleeve is detachably provided on the spherical support, a fixing hole is provided at one end of the cooling water sleeve, the fixing hole is sleeved and fixed with one end of a hollow heat dissipation shaft, the other end of the heat dissipation shaft passes through the cooling water sleeve and extends into the combustion chamber, a heat-resistant glass is provided at the hollow position of the end through which the heat dissipation shaft passes; a positioning flange is also provided on the cooling water sleeve, a mounting hole is provided on the positioning flange at a position corresponding to the heat dissipation shaft, an infrared thermal imaging camera is provided in the mounting hole, a transmission ball shaft is provided on the positioning flange, a wire hole connected to the mounting hole is provided in the transmission ball shaft, the wires of the infrared thermal imaging camera are electrically connected to the monitor via the wire hole, the outer side wall of the transmission ball shaft is sleeved with one end of a first connecting rod, a first transmission rod is inserted at the other end of the first connecting rod, and one end of the first transmission rod is connected to the output end of the stepper motor;
[0007] An air inlet and ash removal device is provided below the furnace bed, a slag removal device is provided at the discharge end of the furnace bed, and a slag removal and combustion-aiding device is provided on the ash discharge pipe. The air inlet and ash removal device includes an exhaust pipe connected to the ash hopper and a lower box body, the slag removal device includes a first air outlet pipe connected to the exhaust pipe, and the slag removal and combustion-aiding device includes a through hole provided on the receiving trough and connected to the lower box body. While effectively reducing the discharge of hot air, it is also convenient to preheat the input air and reduce the heat consumption in the combustion chamber.
[0008] With the above structure, the first unloading plate serves as a supporting plate for feeding, and the wheel surface of the first roller is in contact with the transition inclined wall. In this way, the first unloading plate isolates the interior of the boiler from the outside air. When the garbage feeding reaches a certain weight, the garbage pushes the first unloading plate to rotate counterclockwise, the first roller is separated from the transition inclined wall, and the garbage quickly falls onto the second unloading plate, and the wheel surface of the second roller is in contact with the inclined wall. The second unloading plate can also isolate the interior of the boiler from the outside air. Similarly, when the garbage feeding reaches a certain weight, it pushes the second unloading plate to quickly fall into the boiler. Then, under the action of the gravity of the first counterweight block, the first unloading plate quickly rotates clockwise, and the wheel surface of the first roller is in contact with the transition inclined wall again until the corresponding position of the elastic device moves When the second roller stops rotating, the first discharge plate stops rotating, and the boiler is restored to the state of isolation between the inside and the outside air. During this process, the garbage is automatically and orderly put in according to weight. As the weight of the garbage falls into the boiler, the load on the first discharge plate gradually decreases. That is, after the first discharge plate rotates to a certain displacement position, it begins to gradually rotate and move back, and gradually reduces the distance between the second roller and the transition inclined wall, instead of rotating and moving back after the garbage enters. This reduces the period and area of contact between the outside air and the air inside the boiler. In addition, the isolation barrier formed by the depth of garbage accumulation during feeding and the small capacity of air heat exchange ensure the stability of the temperature and pressure in the boiler. The garbage dropped into the boiler enters the combustion chamber through the push of the push plate.
[0009] A bracket is arranged on the outer wall of the boiler at a position corresponding to the combustion chamber, a spherical bracket is arranged on the bracket, a cooling water shaft sleeve is arranged on the spherical bracket, a heat dissipation shaft extending into the combustion chamber is penetrated on the cooling water shaft sleeve, an infrared thermal imaging camera takes pictures of the combustion chamber through the hollow position of the heat dissipation shaft, and the infrared thermal imaging camera is arranged on a positioning flange connected to the transmission ball shaft, the output end of the stepper motor drives the first transmission rod and the first connecting rod to rotate, the transmission ball shaft sleeved on the first connecting rod makes an adaptive spherical rotation, and synchronously drives the spherical bracket to make an adaptive spherical rotation on the bracket, that is, drives the heat dissipation shaft to rotate with the spherical shaft. The support frame rotates synchronously with the rotation of the support frame. During the rotation process, the insertion positions of the first connecting rod and the first transmission rod will produce adaptive length changes with the rotation of the output end of the stepper motor, thereby increasing the range of the rotation angle, so as to achieve a certain wide-angle lens use effect and expand the range of the observation angle; the heat-resistant glass can prevent the ash from entering the heat dissipation shaft to avoid affecting the camera effect; the infrared thermal imaging camera can not only observe the combustion situation in the combustion chamber through video, but also distinguish the temperature distribution in the combustion chamber, and can timely adjust the combustion gas supply and related combustion parameters to improve the combustion efficiency and avoid the occurrence of insufficient combustion;
[0010] The air intake and ash discharge device formed a spiral upward cyclone, which increases the air intake pressure and can quickly enter the combustion chamber from the gap of the furnace bed. The air intake volume is increased and an automatic ash discharge device is set at the lower end of the ash hopper. It can not only prevent the outflow of air intake, but also ensure the timely discharge of ash under the premise of sufficient combustion; the slag removal device can not only preheat the intake temperature, but also assist in the evacuation of ash, thereby improving the utilization efficiency of the boiler; the slag removal and combustion-aiding device can also preheat the intake temperature, ensure the combustion temperature in the boiler combustion chamber, and maintain orderly slag removal, thereby improving the utilization efficiency of the boiler.
[0011] In order to simplify the structure and facilitate installation, preferably, an elastic device is provided in the mounting hole, which elastic device includes a first support plate and a second support plate arranged in the mounting hole, a first guide sleeve is sleeved on the first support plate, a fixing sleeve is sleeved on the second support plate, a second guide sleeve is sleeved on one side of the fixing sleeve, and a first mounting sleeve is sleeved on the other side, a groove is provided on one side of the first mounting sleeve, the groove is sleeved on the first guide sleeve, a first connecting rod connected to the first roller is sleeved on the first guide sleeve, a boss is provided on one side of the first connecting rod, and the first mounting sleeve, the fixing sleeve and the second guide sleeve are successively passed through the other side from the outside to the inside, the boss abuts against the end face of the corresponding end of the first guide sleeve, a first compression spring is sleeved on the first connecting rod, one end of the first compression spring abuts against the inner wall of the first mounting sleeve, and the other end abuts against the inner wall of the fixing sleeve.
[0012] In order to control the rotation arc of the unloading plate, it is convenient for unloading and can also assist in controlling the flow rate of air exchange inside and outside the boiler. Preferably, a limit pin is provided on the hole wall of the two inspection holes, and a limit groove is provided at the position corresponding to the limit pin on each unloading plate, and a bending section is provided on each counterweight block. When unloading, the unloading plate at the corresponding position rotates and makes the limit groove sleeve on the limit pin for upper limit. After unloading, the wheel surfaces of the first roller and the second roller are respectively in contact with the transition inclined wall and the inclined wall, and the outer side wall of the bending section at the corresponding position is in contact with the limit pin for limit.
[0013] In order to facilitate maintenance and ensure the sealing of the boiler, preferably, a cover is provided at the position corresponding to the two inspection holes on the feed hopper, and a sealing cover is provided on the cover.
[0014] In order to simplify the structure and facilitate use, preferably, the spherical support bracket includes a spherical shell, a placement hole is provided on the spherical shell, a fixing bracket is provided on the hole wall of the placement hole, and a connecting ear is provided on the cooling water shaft sleeve at a position corresponding to the fixing bracket, and the connecting ear is screwed and fixed on the fixing bracket.
[0015] In order to ensure smooth rotation, preferably, placement grooves are provided at the upper and lower ends of the bracket, a lubrication sleeve is provided in each placement groove, and an arc surface segment is provided on the lubrication sleeve, and the arc surface segments at corresponding positions fit and slide with the outer wall of the spherical shell.
[0016] In order to ensure the installation stability of the lubricating sleeve and avoid rotation interference of the spherical support, preferably, the lubricating sleeve is threaded and fixed in the placement groove.
[0017] In order to increase the heat dissipation area, preferably, spiral blades are provided on the heat dissipation shaft along the axial direction.
[0018] In order to facilitate disassembly and assembly of the camera, preferably, a connecting bracket is provided on the infrared thermal imaging camera, and the connecting bracket is screwed and fixed on the positioning flange.
[0019] In order to ensure the cooling effect, preferably, the cooling water sleeve is filled with coolant.
[0020] In order to ensure the rotation space of the heat dissipation shaft and avoid rotation interference, preferably, a clearance hole is provided on the side wall of the combustion chamber at the position corresponding to the heat dissipation shaft. The clearance hole is a trumpet-shaped structure which is small on the outside and large on the inside. A magnesium aluminum silicate sleeve which is adapted to the shape of the clearance hole is provided in the clearance hole. The magnesium aluminum silicate sleeve is sleeved on the outer side wall of the cooling water shaft sleeve.
[0021] In order to facilitate installation and simplify the structure, preferably, a connecting guide hole is provided on the first connecting rod, a connecting guide rod is inserted into the connecting guide hole, and a first transmission rod is provided on the connecting guide rod.
[0022] In order to ensure the air intake efficiency and the stability of the air supply volume, preferably, the air intake and ash removal device includes an ash hopper arranged below the furnace bed, and an air distribution sleeve connected to the exhaust pipe is arranged in the ash hopper, each of the air distribution sleeves includes a support frame and a sleeve core, an outer shell is connected to the support frame, and at least two fan blades are circumferentially connected between the sleeve core and the support frame, and two adjacent fan blades and corresponding positions of the inner wall of the outer shell are combined to form a cavity structure, and a connecting hole is provided on the inner wall of the outer shell at a position corresponding to each cavity, and a corresponding connecting hole is provided on the outer wall of the outer shell. A curved air injection pipe is connected to the position of each of them; an automatic ash discharge device is provided at the discharge position of the ash hopper, and the automatic ash discharge device includes a support seat, an ash storage cylinder is provided on the support seat, a feed port is provided on one side of the ash storage cylinder, and a discharge port is provided on the other side; an upper box body connected to the feed port is provided at the upper end of the support seat, and a lower box body connected to the discharge port is provided at the lower end; the upper box body is connected and fixed to the discharge end of the ash hopper, and an ultrasonic positioning probe is provided in the upper box body, one end of the ash storage cylinder is connected to the output end of the servo motor, and the ultrasonic positioning probe and the servo motor are both connected to the PLC controller.
[0023] In order to facilitate the guidance of the intake air and ensure the air flow velocity of the air supply, preferably, six fan blades are arranged around the outer wall of the sleeve core in the circumferential direction, each of the fan blades is an arc-shaped structure, and a curved jet pipe is connected along the external tangent direction of the fan blade at the position corresponding to the connecting hole on the outer wall of the outer shell.
[0024] In order to better guide the intake air flow and avoid airflow obstruction at the air inlet, preferably, a conical block with a larger upper portion and a smaller lower portion is provided at the bottom of the sleeve core, and the diameter of the large diameter end of the conical block is the same as the diameter of the sleeve core.
[0025] In order to reduce weight and facilitate disassembly and assembly, preferably, the sleeve core is a hollow structure.
[0026] In order to facilitate installation and ensure sealing, preferably, the curved air jet pipe is screwed on the outer side wall of the shell, a step hole is provided on the curved air jet pipe, and a sealing ring is provided at the connection between the shell and the curved air jet pipe. The bolt is inserted from the step hole and passes through the corresponding positions of the shell, the sealing ring and the curved air jet pipe from the outside to the inside in sequence. The nut end face of the bolt is abutted and tightened against the step surface of the step hole to fix the shell and the curved air jet pipe.
[0027] In order to avoid damage due to impact and ensure detection accuracy, preferably, a second mounting sleeve extending horizontally into the box is provided on one side of the upper box body, a vertically downward bending section is provided at the extending end of the second mounting sleeve, an ultrasonic positioning probe is provided in the second mounting sleeve, an opening is provided at the lower end of the bending section, and the detection position of the ultrasonic positioning probe is located at the opening position.
[0028] In order to ensure smooth rotation of the ash barrel and facilitate timely discharge of ash, preferably, an arc-shaped groove is provided on the outer wall of the ash barrel, and an arc-shaped graphite lubricating plate is provided in the groove, the curvature of the outer wall of the graphite lubricating plate is the same as the curvature of the outer wall of the ash barrel, and the outer wall of the graphite lubricating plate is flush with the outer wall of the ash barrel; a fixing groove is provided on the support seat at a position corresponding to the graphite lubricating plate, a pressure block with a steel ball is provided in the fixing groove, and a second compression spring is provided between the pressure block and the bottom of the fixing groove, the steel ball rolls and abuts against the outer wall of the graphite lubricating plate, and makes the pressure block abut and squeeze the second compression spring in the fixing groove.
[0029] In order to simplify the structure and facilitate installation, preferably, a second transmission rod is fixedly connected to the output end of the servo motor, one end of the second transmission rod is hinged to one end of the second connecting rod, the other end of the second connecting rod is hinged to one end of the second connecting rod, and the other end of the second connecting rod is fixedly connected to one side of the ash storage barrel.
[0030] In order to avoid direct connection between the ash hopper and the ash discharge main pipe and ensure the supply of air intake, preferably, the angle between the axial center line of the feed port and the axial center line of the discharge port is 135°.
[0031] In order to better lubricate the feed and discharge ports of the ash storage barrel and ensure smooth turning, preferably, lubrication blocks are provided at the discharge position of the upper box body and the feed position of the lower box body. When the ash storage barrel rotates, the corresponding end faces of the lubrication blocks on the two boxes are in contact with the corresponding positions of the outer wall of the ash storage barrel.
[0032] In order to prevent the ash on the moving row group from sticking and accumulating, improve the efficiency of discharging the ash, and at the same time, in order to facilitate the use of the ash temperature to preheat the intake temperature, as a preference, the furnace bed includes a moving row group, and the slag removal device includes a first rotating shaft connected and fixed to the furnace bed at the ash discharge end of the moving row group, and a first bracket and a second bracket fixed to the inner wall of the boiler are arranged in sequence between the moving row group and the first rotating shaft along the ash discharge direction, a transition plate is hinged on the first bracket, a notch is arranged on one side of the transition plate, a transition grate is arranged at the notch position, a rotation pin is passed through the transition grate and the transition plate, and the rotation pin is passed through the transition grate and the transition plate. The protruding end of the pin is inserted into the second bracket, so that the transition grate and the transition plate are hinged on the second bracket at the same time, one side of the transition plate overlaps the upper end surface of the moving grate group, and the corresponding position of the other side overlaps the upper end surface of the transition grate; the middle part of the first rotating shaft is a hollow structure, one end of the first rotating shaft is connected to the first air inlet pipe, and the other end is connected to the first air outlet pipe connected to the exhaust pipe; a ratchet sleeve is sleeved on the outer side of the first rotating shaft, and an ash guide cone is respectively provided at the two end positions of the first rotating shaft corresponding to the ratchet sleeve, and the non-hinged end of the transition grate overlaps the outer side wall of the ratchet sleeve.
[0033] In order to simplify the structure and facilitate installation, preferably, the transition grate includes a straight section, an extension section extending obliquely downward is provided on one side of the straight section, an arc surface is provided at the lower end of the extended end of the extension section, a rounded corner structure is provided between the arc surface and the extension section, and the straight section, extension section, arc surface and rounded corner structure together form a structure with a ratchet-shaped cross-section.
[0034] In order to facilitate the limiting of the rotating shaft and prevent reverse ash leakage, preferably, the ratchet sleeve is evenly provided with six gear teeth in the circumferential direction, and a groove with a recessed bottom is provided at the tooth top of the gear tooth. When the first rotating shaft rotates clockwise, the arc surface of the transition grate overlaps with the groove wall of the groove. When the first rotating shaft rotates counterclockwise, the rounded corner structure of the transition grate abuts against the groove wall at the corresponding position of the groove to prevent the first rotating shaft from reversing.
[0035] In order to prevent dust accumulation in the ratchet sleeve and facilitate the abutment and limiting between the transition grate and the ratchet sleeve, preferably, a ratchet pressure plate is threaded in the tooth groove of the ratchet sleeve.
[0036] In order to simplify the structure and satisfy the swinging and giving way requirement, preferably, the upper end wall of the notch on the transition plate overlaps the upper end surface of the straight section.
[0037] The ash discharge port is an airtight container, and the ash discharge port is a ...
[0038] In order to facilitate assembly and ensure the efficiency of ash discharge, preferably, a sealing ring is screwed on the inner wall of the box body, and two first partitions, two second partitions and two third partitions are symmetrically provided on the second rotating shaft. The six partitions are all provided with sealing sleeves extending outward. When the second rotating shaft rotates, the end face of the extending end of the sealing sleeve at the corresponding position abuts against the outer wall of the sealing ring.
[0039] In order to facilitate the removal and replacement of the sealing sleeve, preferably, a connecting through hole is provided on each of the partitions, and a connecting clearance hole is provided at the position of the corresponding connecting through hole on the sealing sleeve at the corresponding position. Bolts are passed through the connecting clearance hole and the connecting through hole from top to bottom, and the protruding end of the bolt is riveted by a nut so that the nut of the bolt presses the sealing sleeve to the partition.
[0040] In order to adapt to the structure of the box body and ensure the sealing of the combustion chamber, preferably, the six partitions are evenly arranged along the circumferential direction on the second rotating shaft.
[0041] In order to ensure the service life and keep the sealing sleeve fitting smoothly, it is preferred that the sealing ring is made of copper-impregnated graphite.
[0042] Beneficial effects: The present invention is provided with a discharge plate, an infrared thermal imaging camera, an air intake and ash removal device, a slag discharging device and a slag removal and combustion-supporting device, which effectively reduces the discharge of hot air and facilitates the preheating of the input air, thereby reducing the heat consumption in the combustion chamber under the premise of orderly ash discharge and improving the combustion efficiency of the boiler. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] Figure 1 It is a structural schematic diagram of the present invention.
[0044] Figure 2 It is a schematic diagram of the structure of the feed hopper.
[0045] Figure 3 for Figure 2 Enlarged view of point A in .
[0046] Figure 4 This is a diagram showing the usage status of the first unloading plate and the second unloading plate.
[0047] Figure 5 Schematic diagram of the structure of the bracket and cooling water sleeve
[0048] Figure 6 This is the installation structure diagram of the spherical shell and the infrared thermal imaging camera.
[0049] Figure 7 It is a schematic diagram of the structure of the spherical shell.
[0050] Figure 8 This is a diagram of the cooling water sleeve in use in the vertical direction.
[0051] Fig. 9 The diagram shows the cooling water sleeve in use in the horizontal and oblique directions.
[0052] Fig.10 It is a structural schematic diagram of the air intake and dust removal device.
[0053] Fig.11This is a schematic diagram of the structure of the air distribution sleeve.
[0054] Fig.12 It is a schematic diagram of the installation structure of the shell and the core sleeve.
[0055] Fig.13 Exploded view of the air distribution sleeve.
[0056] Fig.14 It is a schematic diagram of the installation structure of the support frame and the shell.
[0057] Fig.15 for Fig.10 Enlarged view of point B in .
[0058] Fig.16 Schematic diagram of the installation structure of the graphite lubrication plate and the pressing block.
[0059] Fig.17 This is a schematic diagram of the appearance and structure of the automatic ash discharge device.
[0060] Fig.18 It is a structural schematic diagram of the slag removal device.
[0061] Fig.19 for Fig.18 Enlarged view of point C in the figure.
[0062] Fig. 20 It is a schematic diagram of the installation structure of the transition plate and the transition grate.
[0063] Fig.21 It is a schematic diagram of the installation structure of the first rotating shaft and the ash accumulation cone.
[0064] Fig. 22 This is a schematic diagram of the structure of the slag removal and combustion-supporting device.
[0065] Fig.23 for Fig. 22 Enlarged view of point D in .
[0066] Fig.24 This is a schematic diagram of the installation structure of the receiving trough.
[0067] Fig.25 Schematic diagram of the working status of the discharge valve. DETAILED DESCRIPTION
[0068] The present invention will be further described below in conjunction with the accompanying drawings.
[0069] Depend on Figures 1 to 4As shown, the present invention includes a feed hopper 1, a combustion chamber 2, an ash discharge pipe 6 and a furnace bed arranged in the combustion chamber 2, an inclined wall 111 is provided on one side of the feed hopper 1, and a first inspection hole 121 is provided on the other side, a transition inclined wall 112 is provided on the inclined wall 111, a first discharge plate 131 is hinged in the first inspection hole 121, a first counterweight block 141 is provided at the hinged end of the first discharge plate 131, a mounting hole is provided at the non-hinged end of the first discharge plate 131, an elastic device connected to the first roller 151 is provided in the mounting hole, the elastic device includes a first support plate 161 and a second support plate 162 arranged in the mounting hole, a first guide sleeve 163 is sleeved on the first support plate 161, a fixing sleeve 164 is sleeved on the second support plate 162, and a first guide sleeve 163 is sleeved on the second support plate 162. A second guide sleeve 165 is sleeved on one side of the fixing sleeve 164, and a first mounting sleeve 166 is sleeved on the other side. A groove is provided on one side of the first mounting sleeve 166, and the groove is sleeved on the first guide sleeve 163. A first connecting rod 153 connected to the first roller 151 is sleeved on the first guide sleeve 163. A boss 154 is provided on one side of the first connecting rod 153, and the other side is passed through the first mounting sleeve 166, the fixing sleeve 164 and the second guide sleeve 165 in sequence from outside to inside. The boss 154 abuts against the end surface of the corresponding end of the first guide sleeve 163. A first compression spring 1531 is sleeved on the first connecting rod 153, and one end of the first compression spring 1531 abuts against the inner wall of the first mounting sleeve 166, and the other end abuts against the inner wall of the fixing sleeve 164.
[0070] A second inspection hole 122 is provided on the feed hopper 1 at a position below the first inspection hole 121, and a second discharge plate 132 with the same structure as the first discharge plate 131 is hinged in the second inspection hole 122, and a second counterweight block 142 is provided at the hinged end of the second discharge plate 132. A mounting hole is also provided at the non-hinged end of the second discharge plate 132, and a spring device connected to the second roller 152 is provided in the mounting hole, and the spring device has the same structure as the elastic device.
[0071] A limit pin 1211 is provided on the hole wall of the two inspection holes, a limit groove 1312 is provided at the position corresponding to the limit pin 1211 on each unloading plate, and a bending section 1411 is provided on each counterweight block. When unloading, the unloading plate at the corresponding position rotates and makes the limit groove 1312 sleeved on the limit pin 1211 for the upper limit position. After unloading, the wheel surfaces of the first roller 151 and the second roller 152 are respectively fitted and abutted against the transition inclined wall 112 and the inclined wall 111, and the outer wall of the bending section 1411 at the corresponding position abuts against the limit pin 1211 for limit position.
[0072] A cover shell 13 is provided at the positions corresponding to the two inspection holes on the feed hopper 1, and a sealing cover 14 is provided on the cover shell 13; a push plate 17 connected to the cylinder is provided at the discharge end of the feed hopper 1, and a partition plate 18 is provided at the lower end of the inclined wall 111, and the lower end surface of the partition plate 18 is in contact with the upper end surface of the push plate 17.
[0073] Depend on Figure 1 , Figures 5 to 9 As shown, a bracket 21 is provided on the outer wall of the combustion chamber 2, a stepper motor 26 is provided at the upper end of the bracket 21, a through hole is provided on the bracket, a spherical bracket is provided in the through hole, the spherical bracket includes a spherical shell 211, a placement hole is provided on the spherical shell 211, a fixed bracket 214 is provided on the hole wall of the placement hole, a connecting ear 215 is provided at a position corresponding to the fixed bracket 214 on the cooling water shaft sleeve 22, and the connecting ear 215 is screwed and fixed to the fixed bracket 214; placement grooves are provided at the upper and lower ends of the bracket 21, and a lubricating sleeve 216 is screwed in each placement groove, and an arc segment is provided on the lubricating sleeve 216, and the arc segment at the corresponding position fits and slides with the outer wall of the spherical shell 211.
[0074] A fixing hole is provided at one end of the cooling water sleeve 22, and the fixing hole is fixed to one end of the hollow heat dissipation shaft 221. The other end of the heat dissipation shaft 221 passes through the cooling water sleeve 22 and extends into the combustion chamber. Heat-resistant glass is provided at the hollow position of the passing end of the heat dissipation shaft 221, and a spiral blade 2211 is provided on the heat dissipation shaft 221 along the axial direction.
[0075] The cooling water sleeve 22 is filled with coolant, and a positioning flange 23 is provided on the cooling water sleeve 22. A mounting hole is provided on the positioning flange 23 at a position corresponding to the heat dissipation shaft 221, and an infrared thermal imaging camera 24 is provided in the mounting hole. A connecting bracket is provided on the infrared thermal imaging camera 24, and the connecting bracket is screwed and fixed on the positioning flange 23.
[0076] A transmission ball shaft 25 is provided on the positioning flange 23, and a wire hole 251 connected to the mounting hole is provided in the transmission ball shaft 25. The wires of the infrared thermal imaging camera 24 are electrically connected to the monitor through the wire hole 251. The outer wall of the transmission ball shaft 25 is sleeved with one end of the first connecting rod 252. A connecting guide hole is provided on the first connecting rod 252, and a connecting guide rod is inserted in the connecting guide hole. A first transmission rod 253 is provided on the connecting guide rod, and one end of the first transmission rod 253 is connected to the output end of the stepper motor 26.
[0077] A clearance hole is provided on the side wall of the combustion chamber 2 at a position corresponding to the heat dissipation shaft 221. The clearance hole is a trumpet-shaped structure that is small on the outside and large on the inside. A magnesium aluminum silicate sleeve 2212 that matches the shape of the clearance hole is provided in the clearance hole. The magnesium aluminum silicate sleeve 2212 is sleeved on the outer wall of the cooling water shaft sleeve 22.
[0078] Depend on Figure 1 , Figures 10 to 17 As shown, the air intake and ash removal device includes an ash hopper 311 arranged below the furnace bed, an air distribution sleeve connected to the exhaust pipe 32 is arranged in the ash hopper 311, each of the air distribution sleeves includes a support frame 321 and a sleeve core 322 of a hollow core structure, a conical block 3221 with a larger upper part and a smaller lower part is arranged at the bottom of the sleeve core 322, and the diameter of the large diameter end of the conical block 3221 is the same as the diameter of the sleeve core 322; a shell 327 is connected to the support frame 321, and a shell 327 is connected to the sleeve core 322 and the support frame 321. Six fan blades 323 are connected and arranged around the support frames 321 along the circumferential direction, and each of the fan blades 323 is an arc-shaped structure. Two adjacent fan blades 323 and the corresponding positions of the inner wall of the shell 327 enclose a cavity structure, and a connecting hole 324 is provided on the inner wall of the shell 327 at the position corresponding to each cavity, and a curved jet pipe 325 is provided on the outer wall of the shell 327 at the position corresponding to the connecting hole 324 along the external tangent direction of the fan blade 323.
[0079] The curved jet pipe 325 is screwed on the outer side wall of the outer shell 327, a step hole is provided on the curved jet pipe 325, a sealing ring 326 is provided at the connection between the outer shell 327 and the curved jet pipe 325, a bolt is inserted from the step hole, and passes through the corresponding positions of the outer shell 327, the sealing ring 326 and the curved jet pipe 325 from the outside to the inside in sequence, the nut end face of the bolt abuts against the step surface of the step hole to be fastened to fix the outer shell 327 and the curved jet pipe 325.
[0080] An automatic ash discharge device is provided at the discharge position of the ash hopper 311, and the automatic ash discharge device includes a support seat 33, an ash storage barrel 331 is provided on the support seat 33, an arc-shaped groove is provided on the outer wall of the ash storage barrel 331, and an arc-shaped graphite lubricating plate 332 is provided in the groove, the curvature of the outer wall of the graphite lubricating plate 332 is the same as the curvature of the outer wall of the ash storage barrel 331, and the outer wall of the graphite lubricating plate 332 is flush with the outer wall of the ash storage barrel 331; a fixing groove is provided at the position corresponding to the graphite lubricating plate 332 on the support seat 33 A pressure block 333 with a steel ball 335 is provided in the fixed groove, and a second compression spring 334 is provided between the pressure block 333 and the bottom of the fixed groove. The steel ball 335 rolls and abuts against the outer wall of the graphite lubrication plate 332, and makes the pressure block 333 abut and squeeze the second compression spring 334 in the fixed groove; lubrication blocks 344 are provided at the discharge position of the upper box body 341 and the feed position of the lower box body 342. When the ash storage barrel 331 rotates, the corresponding end faces of the lubrication blocks 344 on the two boxes are in contact with the corresponding positions of the outer wall of the ash storage barrel 331.
[0081] A feed port 3311 is provided on one side of the ash storage cylinder 331, and a discharge port 3312 is provided on the other side, and the angle between the axial center line of the feed port 3311 and the axial center line of the discharge port 3312 is 135°; an upper box body 341 connected to the feed port 3311 is provided at the upper end of the support seat 33, and a lower box body 342 connected to the discharge port 3312 is provided at the lower end, the upper box body 341 is connected and fixed to the discharge end of the ash hopper 311, and a mounting sleeve 3411 extending horizontally into the box is provided on one side of the upper box body 341, a vertically downward bending section is provided at the extending end of the mounting sleeve 3411, an ultrasonic positioning probe 343 is provided in the mounting sleeve 3411, and an opening is provided at the lower end of the bending section, and the detection position of the ultrasonic positioning probe 343 is located at the opening position.
[0082] A second transmission rod 351 is fixedly connected to the output end of the servo motor 35, one end of the second transmission rod 351 is hinged to one end of a connecting rod 352, the other end of the connecting rod 352 is hinged to one end of a second connecting rod 336, and the other end of the second connecting rod 336 is fixedly connected to one side of the ash storage barrel 331; the ultrasonic positioning probe 343 and the servo motor 35 are both connected to a PLC controller (not marked).
[0083] Depend on Figure 1 , Figure 18 to Figure 21As shown, the furnace bed includes a moving row group 41, and the slag removal device includes a first rotating shaft 42 which is arranged and fixed to the furnace bed at the ash discharge end of the moving row group 41, and a first bracket 411 and a second bracket 412 which are fixed on the inner wall of the boiler are arranged in sequence between the moving row group 41 and the first rotating shaft 42 along the ash discharge direction, and a transition plate 421 is hinged on the first bracket 411, and a notch is arranged on one side of the transition plate 421, and a transition grate 422 is arranged at the position of the notch, and the transition grate 422 includes a straight section 4221, and an extension section 4222 which extends obliquely downward is arranged on one side of the straight section 4221, and a circular arc surface 4223 is arranged at the lower end of the extended end of the extension section 4222, and a rounded corner structure is arranged between the circular arc surface 4223 and the extension section 4222, and the straight section 4221, the extension section 4222, the circular arc surface 4223 and the rounded corner structure together form a structure with a ratchet-shaped cross section.
[0084] A turn pin 4121 is provided between the transition grate 422 and the transition plate 421, and the protruding end of the turn pin 4121 is inserted into the second bracket 412, so that the transition grate 422 and the transition plate 421 are hinged to the second bracket 412 at the same time, one side of the transition plate 421 overlaps with the upper end surface of the moving row group 41, and the upper end wall of the notch position set on the other side overlaps with the upper end surface of the transition grate 422.
[0085] The middle portion of the first rotating shaft 42 is a hollow structure. One end of the first rotating shaft 42 is connected to a first air inlet pipe 431 , and the other end is connected to a first air outlet pipe 432 that is connected to the exhaust pipe 32 .
[0086] A ratchet sleeve 44 is sleeved on the outer side of the first rotating shaft 42, and an ash guide cone 441 is respectively provided at the two end positions of the first rotating shaft 42 corresponding to the ratchet sleeve 44, and the non-hinged end of the transition grate 422 is overlapped on the outer side wall of the ratchet sleeve 44; the ratchet sleeve 44 is evenly provided with six gear teeth along the circumferential direction, and a groove with a recessed groove bottom is provided on the tooth top of the gear teeth. When the first rotating shaft 42 rotates clockwise, the arc surface of the transition grate 422 overlaps with the groove wall of the groove. When the first rotating shaft 42 rotates counterclockwise, the rounded structure of the transition grate 422 abuts against the groove wall at the corresponding position of the groove to prevent the first rotating shaft 42 from reversing; a ratchet pressure plate 442 is screwed in the tooth groove of the ratchet sleeve 44.
[0087] Depend on Figure 1 , Figure 22 to Figure 25 As shown, the slag removal and combustion-aiding device includes a material receiving trough 52 with an opening upward provided at the slag discharge position of the furnace bed, and a double helical shaft 53 is provided in the material receiving trough 52 along the axial direction. The double helical shaft 53 is a hollow structure, and one end of the double helical shaft 53 is connected to a second air inlet pipe 531, and the other end is connected to a second air outlet pipe 532 connected to the exhaust pipe 32.
[0088] A through hole 521 is provided on the groove wall of the material receiving groove 52, and the through hole 521 is connected to the material outlet of the lower box body 342. An ash outlet 522 is provided at the groove bottom of the material receiving groove 52, and a discharge valve is provided at the lower end of the ash outlet 522.
[0089] The discharge valve includes a box body 54, on which a discharge port connected to the ash discharge pipe 6 is provided, and a sealing ring 561 made of copper-impregnated graphite is screwed on the inner wall of the box body 54, and a second rotating shaft 541 connected to the power motor is provided in the box body 54, and two first baffles 551, two second baffles 552 and two third baffles 553 are symmetrically provided on the second rotating shaft 541, and the six baffles are all sleeved with sealing sleeves 56 extending outwards, and when the second rotating shaft 541 rotates, the sealing sleeves 56 at the corresponding positions The end face of the protruding end is fitted and abutted against the outer wall of the sealing ring 561. When the second rotating shaft 541 rotates, the protruding end of the sealing sleeve 56 at the corresponding position is fitted and abutted against the outer wall of the sealing ring 561, ensuring that the combustion chamber and the discharge port are always kept in an isolated state; a connecting through hole is provided on each of the partitions, and a connecting clearance hole is provided at the position corresponding to the connecting through hole on the corresponding position of the sealing sleeve. Bolts are inserted from top to bottom through the connecting clearance hole and the connecting through hole, and the protruding end of the bolt is riveted by a nut so that the nut of the bolt presses the sealing sleeve tightly and fixes it on the partition.
[0090] The partitions are evenly arranged along the circumferential direction on the second rotating shaft 541 .
[0091] The method of use of the present invention is as follows:
[0092] like Figures 1 to 4 As shown, a second discharge plate 132 is additionally provided below the first discharge plate 131, and a cavity structure is enclosed between the two discharge plates and the feed hopper 1. When in use, the first discharge plate 131 serves as a support plate for feeding, the wheel surface of the first roller 151 is in contact with the transition inclined wall 112, and the wheel surface of the second roller 152 is in contact with the inclined wall 111. In this way, the first discharge plate 131 and the second discharge plate 132 realize double isolation of the inside of the boiler from the outside air. When the garbage feed reaches a certain weight, the garbage pushes the first discharge plate 131 to rotate counterclockwise (such as Figure 4The first roller 151 is separated from the transition inclined wall 112, and the garbage quickly falls into the cavity structure. Then, under the gravity of the first counterweight 141, the first discharge plate 131 quickly rotates in the clockwise direction, and the wheel surface of the first roller 151 is again in contact with the transition inclined wall 112, and the boss 154 abuts against the first guide sleeve 163, driving the first mounting sleeve 166 to squeeze the first compression spring 1531. When the first compression spring 1531 is squeezed to the limit position, the first roller 151 stops rotating, that is, the first discharge plate 131 stops moving, and the boiler is restored to the initial isolation state between the inside and the outside air (as shown in FIG. Figure 3 and Figure 4 In this process, the garbage is automatically and orderly put in according to its weight. As the weight of the garbage falls into the cavity structure, the load on the first discharge plate 131 gradually decreases, that is, after the first discharge plate 131 rotates to a certain displacement position, it begins to gradually rotate and move back, and gradually reduces the distance between the first roller 151 and the transition inclined wall 112, instead of rotating and moving back after all the garbage enters. This reduces the period and area of contact between the outside air and the air inside the boiler. In addition, the depth of the garbage accumulation forms an isolation barrier during feeding, and the capacity of air heat exchange is small, which together ensures the stability of the temperature and pressure in the boiler.
[0093] At this time, the garbage is accumulated on the second unloading plate 132, and the outside air is only connected to the cavity structure. Then, the first unloading plate 131 rotates rapidly under the gravity of the first counterweight block 141. In this process, the weight of the garbage pushes the second unloading plate 132 to rotate in the counterclockwise direction (such as Figure 4 The second unloading plate 132 stops moving, and the first unloading plate 131 stops moving.
[0094] During the above-mentioned use, when the two unloading plates rotate to unload, in order to prevent the opening arc from being too large and prolonging the air connection period, the limit groove 1312 at the corresponding position is sleeved and abutted on the limit pin 1211, so as to ensure the unloading capacity and at the same time ensure that the rotation period of the unloading plate is consistent. Similarly, in order to prevent the roller from moving too much and causing the boiler seal to fail, the bending section position on the counterweight block is turned and abutted against the limit pin to ensure the fit between the roller surface and the two inclined walls; the sealing cover (14) ensures the sealing of the inspection hole position, and opening the sealing cover 14 is also convenient for inspection.
[0095] In summary, the two discharge plates are alternately opened and closed in the feed hopper 1, which can not only unload the garbage in an orderly manner, but also effectively ensure the relative sealing of the boiler combustion chamber, greatly reduce the entry of air, reduce the heat energy consumption required for air heat exchange, and improve combustion efficiency.
[0096] like Figures 5 to 9 As shown, a bracket 21 is arranged at a position corresponding to the combustion chamber on the outer wall of the boiler, a spherical shell 211 is arranged on the bracket 21, four fixed brackets 214 are arranged in the spherical shell 211, four connecting ears 215 are arranged correspondingly on the cooling water shaft sleeve 22, the four connecting ears 215 are screwed on the fixed brackets 214 at the corresponding positions, a heat dissipation shaft 221 extending into the combustion chamber is penetrated on the cooling water shaft sleeve 22, an infrared thermal imaging camera 24 screwed and fixed in the positioning flange 23 takes pictures of the combustion chamber through the hollow position of the heat dissipation shaft 221, and the positioning flange 23 is screwed and fixedly connected to the transmission ball shaft 25.
[0097] When in use, the output end of the stepper motor 26 drives the first transmission rod 253 and the first connecting rod 252 to rotate. At the same time, the transmission ball shaft 25 sleeved on the first connecting rod 252 makes an adaptive spherical rotation at the sleeved position, and synchronously drives the spherical shell 211 to make an adaptive spherical rotation on the bracket 21, which is similar to the use effect of a universal swivel, that is, drives the heat dissipation shaft 221 to rotate synchronously with the rotation of the spherical shell 211. During the rotation process, the distance between the first connecting rod 252 and the first transmission rod 253 at the inserted position will produce an adaptive length change with the rotation of the output end of the stepper motor, and the connecting guide rod will adaptively reciprocate in the connecting guide hole, thereby increasing the range of the rotation angle, so as to achieve a certain wide-angle lens use effect and expand the range of the observation angle (such as Figure 8 and Fig. 9 The captured image data is transmitted to a monitor (not shown) by a data line passing through the wire hole 251 and displayed on the display screen of the monitor, which can not only detect faults but also serve as a high temperature warning, greatly improving production efficiency and production safety.
[0098] The heat-resistant glass provided can prevent furnace ash from entering the heat dissipation shaft 221 to avoid affecting the camera effect; the infrared thermal imaging camera 24 can not only observe the combustion conditions in the combustion chamber by video, but also distinguish the temperature distribution in the combustion chamber, and can timely adjust the combustion air supply and related combustion parameters to improve combustion efficiency and avoid incomplete combustion. It has a simple and compact structure and is easy to use.
[0099] It should be noted that the magnesium aluminum silicate sleeve 2212 used in this embodiment is embedded in the clearance hole and is sleeved on the outer wall of the cooling water shaft sleeve 22 (such as Figure 6 As shown), since magnesium aluminum silicate is a material with a very developed internal microporous system, in addition to being resistant to high temperatures, it has a strong deformation ability. During the rotation of the cooling water sleeve 22, it can not only be well sleeved on the outer wall of the cooling water sleeve 22, but also can realize pressure-yielding deformation in the clearance hole, which can not only realize the sealing effect in the clearance hole, but also avoid the rotation interference of the cooling water sleeve 22.
[0100] like Figures 10 to 17 As shown, the moving row and the fixed row in the furnace are arranged obliquely to facilitate ash discharge, wherein the fixed row and the moving row are arranged at intervals, the fixed row is fixed, and the moving row is moved back and forth in an oblique direction by a transmission device, so that the raw materials are fully burned and the burned ash is turned over and piled out of the furnace in sequence; in this process, six cavity structures are formed in each air distribution sleeve by the corresponding positions of the fan blades 323 and the inner wall of the shell 327, forming six air circulation branches, each of which is connected to the curved injection pipe 325 at the corresponding position through the connecting hole 324, and under the guidance of the curved pipeline of the curved injection pipe 325 , a spiral air flow is formed in the ash hopper 311 and circulates upward. Since the wind path is divided into multiple parts, multiple spiral air flows converge upward to form a strong penetrating wind pressure, which enhances the penetrating power of the air supply and is more conducive to the incoming air to blow away the ash accumulated in the gap between two adjacent moving row blocks, thereby quickly transporting it to the combustion chamber above the furnace bed, ensuring the incoming air volume and sufficient combustion of the garbage; at the same time, part of the cyclone formed is reflected on the inner wall of the ash hopper 311 to form a wind force blowing vertically downward, which is more conducive to pushing the remaining ash on the inner wall of the ash hopper 311 to the ash storage cylinder 331 at the lower end of the ash hopper 311, so as to facilitate the collection and discharge of ash.
[0101] At the same time, an ultrasonic positioning probe 343 is arranged at the lower end of the ash hopper 311, and detection parameters are set on the PLC controller. The height value of the ash accumulation in the upper box body 341 is detected to send a signal to the PLC, and the PLC controller starts the servo motor 35 in a timely manner to drive the ash accumulation barrel 331 to rotate. Before the rotation, the feed port 3311 is connected with the upper box body 341, and the discharge port 3312 faces the lower left side of the inner wall of the lower box body 342 and is separated from the lower box body 342. At this time, the ash accumulation barrel 331, the upper box body 341 and the ash hopper 311 are connected, and are not connected with the lower box body 342. After the second transmission rod 351 drives the second connecting rod 336 to rotate counterclockwise ( Fig.15 The feed port 3311 is toward the upper left side of the inner wall of the upper box body 341 and is separated from the upper box body 341, and the discharge port 3312 is connected to the lower box body 342. At this time, the upper box body 341 is connected to the ash hopper 311, but not to the lower box body 342. After the ash storage cylinder 331 has discharged all the ash, the servo motor 35 rotates, and the feed port 3311 is connected to the upper box body 341, and the discharge port 3312 is separated from the lower box body 342. There will be a period of connection between the feed port 3311 and the discharge port 3312 when they are turned over. This period of time can be controlled by setting the rotation speed of the servo motor 35 to ensure that not too much air is discharged from the ash hopper 311, thereby ensuring the stability of the air supply.
[0102] During use, if Fig.15 As shown, eight grooves are symmetrically arranged on the outer wall of the ash accumulation barrel 331, and a graphite lubricating plate 332 is arranged in each groove to ensure the consistency of the rotational lubrication state and prevent the ash accumulation barrel 331 from forming a cam rotation state, so as to avoid the insufficient communication area between the discharge port 3312 and the lower box body 342, thereby blocking the ash discharge and affecting the ash discharge efficiency; grooves are arranged at the discharge end of the upper box body 341 and the feed end of the lower box body 342, and lubricating blocks 344 are embedded in the grooves. Fig.15 and 16 It can be seen that the lubricating block 344 is in contact with the outer wall of the ash storage cylinder 331, and the air in the ash hopper 311 can only flow out through the ash storage cylinder 331. Therefore, when the discharge port 3312 is not transferred to the feeding end of the lower box body 342, the ash storage cylinder is always in a partition state with the lower box body 342, and no air will flow out. Fig.16 As shown, the steel ball 335 and the outer wall of the ash storage cylinder 31 are both arc surfaces, and three pressure blocks 333 are respectively provided at the position corresponding to each graphite lubricating plate 332 along the circumferential direction on the support seat 33. As the graphite lubricating plate 332 wears, the pressure blocks 333 are always squeezed by the elastic force of the second compression spring 334 to roll and abut against the outer wall of the ash storage cylinder 331. The symmetrical force on the left and right reduces the rotational resistance, thereby ensuring the smooth rotation of the ash storage cylinder 331. In order to maintain a consistent lubrication state, the lubricating blocks 344 are also made of graphite material.
[0103] There is an angle of 135° between the feed port 3311 and the discharge port 3312. After the ash storage cylinder 331 is rotated into place, the ash hopper 311 is not connected to the outside world, which effectively prevents the outflow of intake air and ensures sufficient combustion air supply.
[0104] like Figure 18 to Figure 21 As shown, a ratchet sleeve 44 is provided on the first rotating shaft 42, and the ash removed by the moving row group 41 is moved to the ratchet sleeve 44 and retained in the tooth grooves of the ratchet sleeve 44 in batches. The temperature of the ash is transferred to the ratchet sleeve 44 and the heat is transferred to the air input by the first intake pipe 431 through the first rotating shaft 42, and the waste heat of the ash is used to increase the intake temperature of the combustion chamber. The preheated air flows into the exhaust pipe 32 through the first outlet pipe 432 and enters the combustion chamber, so that the heat loss in the boiler is reduced and the stability of the combustion temperature can be ensured.
[0105] During this process, the transition plate 421 and the transition grate 422 block the gap between the moving row group 41 and the first rotating shaft 42, and can assist in the discharge of ash. The hinged transition grate 422 overlaps the outer wall of the ratchet sleeve 44. As the ratchet sleeve 44 rotates, the non-hinged end of the transition grate 422 swings in the upward and downward directions with the rotation of the ratchet sleeve 44, that is, when the ratchet sleeve 44 rotates, the arc surface 4223 swings along the shape of the groove position of the tooth groove and the tooth top position, which helps to shake off the ash so that it can be fully burned and avoid accumulation into blocks, which is beneficial to the discharge of ash. At the same time, since the ratchet pressure plate 442 is screwed in the tooth groove, the depth of the tooth groove becomes shallower, which not only reduces the accumulation of ash, but also facilitates disassembly and cleaning. In addition, the conical surface of the ash guide cone 441 also guides the ash to gather towards the middle of the ratchet sleeve 44 during movement to prevent the ash from leaking out.
[0106] Since the transition plate 421 is also hinged on the first bracket 411, and the hinged end of the transition grate 422 is located at the notch position of the transition plate 421, and the upper end wall at the notch position overlaps the upper end surface of the straight section 4221, thereby, in addition to preventing the ash from leaking out, the swinging of the transition grate 422 also drives the transition plate 421 which is hinged on the second bracket 412 to also produce a small range of displacement, and the transition plate 421 forms a rhythmic angle change at the overlapping position with the moving row group 41. When the angle is large, that is, the transition plate 421 is at the position of the maximum displacement when it swings counterclockwise, the transition plate 421 forms a scraping effect on the upper end surface of the moving row group 41. As the swinging continues, an intermittent scraping action is formed, which can prevent the ash on the moving row group 41 from sticking and accumulating, and improve the efficiency of discharging the ash. The structure is simple and compact, and the use effect is good.
[0107] Depend on Figure 22 to Figure 25As shown, a double helix shaft 53 with a hollow structure is arranged in the receiving trough 52, and the ash in the combustion chamber falls into the receiving trough 52 through the dynamic row group 41, and the ash in the ash hopper 311 also falls and moves into the receiving trough 52 through the ash main pipe (not shown) and the through hole 521. The temperature of the ash is transferred to the double helix shaft 53, and the heat is transferred to the air input by the second air inlet pipe 531 through the double helix shaft. The air preheated by the waste heat of the ash is discharged into the exhaust pipe 32 through the second air outlet pipe 532 and enters the combustion chamber 2. On the one hand, the intake temperature of the combustion chamber is increased and the heat loss in the incinerator is reduced. On the other hand, the stability of the combustion temperature can be guaranteed.
[0108] At the same time, the starting motor drives the double spiral shaft 53 to rotate, and the spiral blades are used to concentrate the furnace ash at both ends of the receiving trough 52 to the middle of the receiving trough 52, and fall into the box body 54 through the ash outlet 522. A second rotating shaft 541 with a partition is provided in the box body 4, and two first partitions 551, two second partitions 552 and two third partitions 553 are symmetrically provided on the second rotating shaft 541. The six partitions are evenly arranged along the circumferential direction, and each partition is provided with a sealing sleeve. The specific working principle is:
[0109] A cavity groove structure is formed between two adjacent partitions and the second rotating shaft 541. At this time, the furnace ash falls into the three cavity grooves in the upper part of the box body 54, and the sealing sleeves 56 on the two second partitions 552 are in contact with the outer wall of the sealing ring 561, and the combustion chamber and the discharge port at the lower end of the box body 54 are in a partitioned state; when the second rotating shaft 541 continues to rotate counterclockwise, the sealing sleeves 56 on the two first partitions 551 and the second partition 552 are in contact with the sealing ring 561, and the furnace ash only falls into the two cavity grooves in the upper part of the box body 54, and the combustion chamber and the discharge port at the lower end of the box body 54 are still in a partitioned state (such as Fig.25 As shown in Figure e); the second rotating shaft 541 continues to rotate counterclockwise, at this time, the sealing sleeve 56 on the second partition plate 552 leaves the position of the sealing ring 561, and a gap is exposed in the cavity groove at the lower left of the box body 54, and the ash inside it begins to be discharged outside the discharge port, while the ash falling from the ash outlet 522 still falls into the two cavity grooves at the upper part of the box body 54, and the sealing sleeves 56 on the third partition plate 553 and the first partition plate 551 are both in contact with the sealing ring 561, and the combustion chamber is still in a partitioned state with the outside world (as shown in Figure e); the second rotating shaft 541 continues to rotate counterclockwise, at this time, the sealing sleeve 56 on the second partition plate 552 leaves the position of the sealing ring 561, and the cavity groove at the lower left of the box body 54 reveals a gap, and the ash inside begins to be discharged outside the discharge port, and the ash falling from the ash outlet 522 still falls into the two cavity grooves at the upper part of the box body 54, and the sealing sleeves 56 on the third partition plate 553 and the first partition plate 551 are both in contact with the sealing ring 561, and the combustion chamber is still in a partitioned state with the outside world (as shown in Figure e); the second rotating shaft 541 continues to rotate counterclockwise, at this time, the sealing sleeve 56 on the second partition plate 552 leaves the position of ... Fig.25 As shown in Figure f in the figure), the second rotating shaft 541 rotates continuously in this way, which can not only discharge the ash in batches, but also ensure that the combustion chamber 2 is always isolated from the outside world, that is, further ensure the stability of the combustion temperature in the combustion chamber 2 and improve the utilization efficiency.
[0110] It should be noted that a plurality of ash hoppers 311 are provided under the furnace bed, so a plurality of through holes 521 are provided in the receiving trough 52 to communicate with the ash hoppers 311 at corresponding positions. The number of through holes 521 shown in the figure is not unique and should be adapted to the specific boiler specifications; the sealing ring 561 is made of copper-impregnated graphite, which can not only reduce the rotational wear of the sealing sleeve 56, but also ensure the better rotational smoothness of the sealing sleeve 56; the number of partitions should be set according to the span of the feed port and the discharge port of the box body 54 to meet the use requirements. This embodiment is not unique.
[0111] In addition, the upper end of the combustion chamber 2 is connected to a smoke chamber (omitted and not marked here). In order to facilitate adjustment of the position of the motor-driven double screw shaft 53, it is appropriate to adopt a pulley drive and adaptable installation. The parts not described in the present invention are consistent with the prior art and will not be repeated here.
Claims
1. A waste-to-energy boiler, comprising a feed hopper (1), a combustion chamber (2), an ash discharge pipe (6), and a furnace bed arranged in the combustion chamber (2), characterized in that: A sloping wall (111) is provided on one side of the feed hopper (1), and a first inspection hole (121) is provided on the other side; a transition sloping wall (112) is provided on the sloping wall (111); a first discharge plate (131) is hinged in the first inspection hole (121); a first counterweight (141) is provided at the hinged end of the first discharge plate (131); a mounting hole is provided at the non-hinged end of the first discharge plate (131); an elastic device connected to a first roller (151) is provided in the mounting hole; the wheel surface of the first roller (151) is in close contact with the transition sloping wall (112); a first roller (151) is provided at a position below the first inspection hole (121) on the feed hopper (1). A second inspection hole (122) is provided, in which a second discharge plate (132) having the same structure as the first discharge plate (131) is hingedly connected, a second counterweight (142) is provided at the hinged end of the second discharge plate (132), a mounting hole is also provided at the non-hinged end of the second discharge plate (132), a spring device connected to the second roller (152) is provided in the mounting hole, and the spring device has the same structure as the elastic device; a push plate (17) connected to a cylinder is provided at the discharge end of the feed hopper (1), a partition plate (18) is provided at the lower end of the inclined wall (111), and the lower end surface of the partition plate (18) is in contact with the upper end surface of the push plate (17); A bracket (21) is provided on the outer wall of the combustion chamber (2), a stepper motor (26) is provided at the upper end of the bracket (21), a through hole is provided on the bracket, a spherical bracket is provided in the through hole, a cooling water shaft sleeve (22) is detachably provided on the spherical bracket, a fixing hole is provided at one end of the cooling water shaft sleeve (22), the fixing hole is sleeved and fixed to one end of a hollow heat dissipation shaft (221), the other end of the heat dissipation shaft (221) passes through the cooling water shaft sleeve (22) and extends into the combustion chamber, and heat-resistant glass is provided at the hollow position of the passing end of the heat dissipation shaft (221); a positioning flange (23) is also provided on the cooling water shaft sleeve (22), and a positioning flange (23) is provided on the positioning flange (23). A mounting hole is provided on the flange (23) at a position corresponding to the heat dissipation shaft (221), an infrared thermal imaging camera (24) is provided in the mounting hole, a transmission ball shaft (25) is provided on the positioning flange (23), a wire hole (251) is provided in the transmission ball shaft (25) and is connected to the mounting hole, and the wires of the infrared thermal imaging camera (24) are electrically connected to the monitor through the wire hole (251), an outer wall of the transmission ball shaft (25) is sleeved with one end of a first connecting rod (252), a first transmission rod (253) is inserted into the other end of the first connecting rod (252), and one end of the first transmission rod (253) is connected to the output end of the stepping motor (26); An air inlet and ash discharge device is provided below the furnace bed, a slag discharge device is provided at the discharge end of the furnace bed, and a slag removal and combustion-supporting device is provided on the ash discharge pipe (6). The air inlet and ash discharge device comprises an exhaust pipe (32) connected to the ash hopper (311) and a lower box (342). The slag discharge device comprises a first exhaust pipe (432) connected to the exhaust pipe (32). The slag removal and combustion-supporting device comprises a through hole (521) provided on the receiving trough (52) and connected to the lower box (342). While effectively reducing the discharge of hot air, it is also convenient to preheat the input air and reduce the heat consumption in the combustion chamber (2).
2. The waste-to-energy boiler according to claim 1, characterized in that: An elastic device is provided in the mounting hole, the elastic device comprising a first support plate (161) and a second support plate (162) provided in the mounting hole, a first guide sleeve (163) being sleeved on the first support plate (161), a fixing sleeve (164) being sleeved on the second support plate (162), a second guide sleeve (165) being sleeved on one side of the fixing sleeve (164), and a first mounting sleeve (166) being sleeved on the other side, a groove being provided on one side of the first mounting sleeve (166), the groove being sleeved on the first guide sleeve (163), and a fixing sleeve (165) being sleeved on the fixing sleeve (164). A first connecting rod (153) connected to the first roller (151) is provided, a boss (154) is provided on one side of the first connecting rod (153), and a first mounting sleeve (166), a fixing sleeve (164) and a second guide sleeve (165) are sequentially passed through the other side from the outside to the inside, the boss (154) abuts against the end surface of the corresponding end of the first guide sleeve (163), and a first compression spring (1531) is sleeved on the first connecting rod (153), one end of the first compression spring (1531) abuts against the inner wall of the first mounting sleeve (166), and the other end abuts against the inner wall of the fixing sleeve (164).
3. The waste-to-energy boiler according to claim 1, characterized in that: A limit pin (1211) is provided on the hole wall of the two inspection holes, a limit groove (1312) is provided at a position corresponding to the limit pin (1211) on each unloading plate, and a bending section (1411) is provided on each counterweight block. When unloading, the unloading plate at the corresponding position rotates and the limit groove (1312) is sleeved on the upper limit position of the limit pin (1211). After unloading, the wheel surfaces of the first roller (151) and the second roller (152) are respectively fitted and abutted against the transition inclined wall (112) and the inclined wall (111), and the outer side wall of the bending section (1411) at the corresponding position abuts against the limit pin (1211) for limiting.
4. The waste-to-energy boiler according to claim 1, characterized in that: A cover shell (13) is provided at positions corresponding to the two inspection holes on the feed hopper (1), and a sealing cover (14) is provided on the cover shell (13).
5. The waste-to-energy boiler according to claim 1, characterized in that: The spherical support frame comprises a spherical shell (211), a placement hole is provided on the spherical shell (211), a fixing bracket (214) is provided on the hole wall of the placement hole, and a connecting lug (215) is provided on the cooling water shaft sleeve (22) at a position corresponding to the fixing bracket (214), and the connecting lug (215) is screwed and fixed on the fixing bracket (214).
6. The waste-to-energy boiler according to claim 1, characterized in that: The upper end and the lower end of the bracket (21) are both provided with placement grooves, each placement groove is provided with a lubricating sleeve (216), and the lubricating sleeve (216) is provided with an arc surface segment, and the arc surface segments at corresponding positions fit and slide with the outer wall of the spherical shell (211).
7. The waste-to-energy boiler according to claim 6, characterized in that: The lubrication sleeve (216) is threadedly fixed in the placement groove.
8. The waste-to-energy boiler according to claim 1, characterized in that: A spiral blade (2211) is provided on the heat dissipation shaft (221) along the axial direction.
9. The waste-to-energy boiler according to claim 1, characterized in that: A connecting bracket is provided on the infrared thermal imaging camera (24), and the connecting bracket is screwed and fixed on the positioning flange (23).
10. The waste-to-energy boiler according to claim 1, characterized in that: The cooling water sleeve (22) is filled with coolant.
11. The waste-to-energy boiler according to claim 1, characterized in that: A clearance hole is provided on the side wall of the combustion chamber (2) at a position corresponding to the heat dissipation shaft (221); the clearance hole is a trumpet-shaped structure that is small on the outside and large on the inside; an aluminum-magnesium silicate sleeve (2212) that matches the shape of the clearance hole is provided in the clearance hole; the aluminum-magnesium silicate sleeve (2212) is sleeved on the outer side wall of the cooling water shaft sleeve (22).
12. The waste-to-energy boiler according to claim 1, characterized in that: A connecting guide hole is provided on the first connecting rod (252), a connecting rod is inserted into the connecting guide hole, and a transmission rod (253) is provided on the connecting rod.
13. The waste-to-energy boiler according to claim 1, characterized in that: The air intake and ash discharge device comprises an ash hopper (311) arranged below the furnace bed, an air distribution sleeve connected to the exhaust pipe (32) is arranged in the ash hopper (311), each of the air distribution sleeves comprises a support frame (321) and a sleeve core (322), an outer shell (327) is connected to the support frame (321), at least two fan blades (323) are arranged and connected in a circumferential direction between the sleeve core (322) and the support frame (321), two adjacent fan blades (323) and corresponding positions of the inner wall of the outer shell (327) are combined to form a cavity structure, a connection hole (324) is provided on the inner side wall of the outer shell (327) at a position corresponding to each cavity, and a curved jet pipe (325) is provided on the outer side wall of the outer shell (327) at a position corresponding to the connection hole (324); An automatic ash discharge device is provided at the discharge position of the hopper (311), the automatic ash discharge device comprising a support seat (33), an ash storage cylinder (331) being provided on the support seat (33), a feed port (3311) being provided on one side of the ash storage cylinder (331), and a discharge port (3312) being provided on the other side, an upper box body (341) being provided at the upper end of the support seat (33) and being communicated with the feed port (3311), and a lower box body (342) being provided at the lower end and being communicated with the discharge port (3312), the upper box body (341) being communicated and fixed with the discharge end of the ash hopper (311), an ultrasonic positioning probe (343) being provided in the upper box body (341), one end of the ash storage cylinder (331) being connected to the output end of the servo motor (35), and both the ultrasonic positioning probe (343) and the servo motor (35) being connected to a PLC controller.
14. The waste-to-energy boiler according to claim 13, characterized in that: Six blades (323) are arranged around the outer wall of the sleeve core (322) in a circumferential direction, each of the blades (323) is an arc-shaped structure, and a curved jet pipe (325) is provided at a position corresponding to the connecting hole (324) on the outer wall of the shell (327) along the external tangent direction of the blade (323).
15. The waste-to-energy boiler according to claim 13, characterized in that: A conical block (3221) that is larger at the top and smaller at the bottom is provided at the bottom of the sleeve core (322), and the diameter of the large-diameter end of the conical block (3221) is the same as the diameter of the sleeve core (322).
16. The waste-to-energy boiler according to claim 13, characterized in that: The sleeve core (322) is a hollow structure.
17. The waste-to-energy boiler according to claim 13, characterized in that: The curved surface jet pipe (325) is screwed onto the outer side wall of the outer shell (327); a step hole is provided on the curved surface jet pipe (325); a sealing ring (326) is provided at the connection between the outer shell (327) and the curved surface jet pipe (325); a bolt is inserted from the step hole and passes through corresponding positions of the outer shell (327), the sealing ring (326) and the curved surface jet pipe (325) in sequence from outside to inside; the nut end face of the bolt abuts against the step surface of the step hole and is fastened to fix the outer shell (327) and the curved surface jet pipe (325).
18. The waste-to-energy boiler according to claim 13, characterized in that: A second installation sleeve (3411) is provided on one side of the upper box body (341) and extends horizontally into the box; a curved section extending vertically downward is provided at the extending end of the second installation sleeve (3411); an ultrasonic positioning probe (343) is provided in the second installation sleeve (3411); an opening is provided at the lower end of the curved section; and the detection position of the ultrasonic positioning probe (343) is located at the opening.
19. The waste-to-energy boiler according to claim 13, characterized in that: An arc-shaped groove is provided on the outer wall of the ash accumulation barrel (331), and an arc-shaped graphite lubricating plate (332) is provided in the groove; the curvature of the outer wall of the graphite lubricating plate (332) is the same as the curvature of the outer wall of the ash accumulation barrel (331), and the outer wall of the graphite lubricating plate (332) is flush with the outer wall of the ash accumulation barrel (331); a fixing groove is provided on the support seat (33) at a position corresponding to the graphite lubricating plate (332), a pressing block (333) with a steel ball (335) is provided in the fixing groove, and a second compression spring (334) is provided between the pressing block (333) and the bottom of the fixing groove; the steel ball (335) rolls against the outer wall of the graphite lubricating plate (332), and causes the pressing block (333) to abut against and squeeze the second compression spring (334) in the fixing groove.
20. The waste-to-energy boiler according to claim 13, characterized in that: A second transmission rod (351) is fixedly connected to the output end of the servo motor (35); one end of the second transmission rod (351) is hinged to one end of a second connecting rod (352); the other end of the second connecting rod (352) is hinged to one end of a second connecting rod (336); and the other end of the second connecting rod (336) is fixedly connected to one side of the ash storage cylinder (331).
21. The waste-to-energy boiler according to claim 13, characterized in that: The angle between the axial centerline of the feed port (3311) and the axial centerline of the discharge port (3312) is 135°.
22. The waste-to-energy boiler according to claim 13, characterized in that: A lubrication block (344) is provided at the discharge position of the upper box body (341) and at the feed position of the lower box body (342); when the ash accumulation barrel (331) rotates, corresponding end surfaces of the lubrication blocks (344) on the two boxes fit into corresponding positions on the outer wall of the ash accumulation barrel (331).
23. The waste-to-energy boiler according to claim 1, characterized in that: The furnace bed comprises a moving row group (41); the slag removal device comprises a first rotating shaft (42) which is arranged at an ash discharge end of the moving row group (41) and is connected and fixed to the furnace bed; a first bracket (411) and a second bracket (412) which are fixed to the inner wall of the boiler are arranged in sequence between the moving row group (41) and the first rotating shaft (42) along the ash discharge direction; a transition plate (421) is hingedly connected to the first bracket (411); a notch is arranged on one side of the transition plate (421); a transition grate (422) is arranged at the position of the notch; a rotation pin (4121) is passed through between the transition grate (422) and the transition plate (421); the protruding end of the rotation pin (4121) is plugged into the second bracket (412) so that the transition grate (422) and the transition plate (421) are connected to each other. The plate (421) is hinged on the second bracket (412), one side of the transition plate (421) overlaps the upper end surface of the moving grate group (41), and the corresponding position of the other side overlaps the upper end surface of the transition grate (422); the middle part of the first rotating shaft (42) is a hollow structure, one end of the first rotating shaft (42) is connected to the first air inlet pipe (431), and the other end is connected to the first air outlet pipe (432) connected to the exhaust pipe (32); a ratchet sleeve (44) is sleeved on the outer side of the first rotating shaft (42), and an ash guide cone (441) is respectively provided at the positions of the two ends of the first rotating shaft (42) corresponding to the ratchet sleeve (44), and the non-hinged end of the transition grate (422) overlaps the outer side wall of the ratchet sleeve (44).
24. The waste-to-energy boiler according to claim 23, characterized in that: The transition grate (422) comprises a straight section (4221), an extension section (4222) extending obliquely downward is provided on one side of the straight section (4221), a circular arc surface (4223) is provided at the lower end of the extending end of the extension section (4222), a rounded corner structure is provided between the circular arc surface (4223) and the extension section (4222), and the straight section (4221), the extension section (4222), the circular arc surface (4223) and the rounded corner structure together form a structure with a ratchet-shaped cross section.
25. The waste-to-energy boiler according to claim 23, characterized in that: The ratchet sleeve (44) is evenly provided with six gear teeth along the circumferential direction, and a groove with a groove bottom concave is provided at the tooth top of the gear teeth. When the first rotating shaft (42) rotates clockwise, the arc surface of the transition grate (422) overlaps with the groove wall of the groove. When the first rotating shaft (42) rotates counterclockwise, the rounded structure of the transition grate (422) abuts against the groove wall at the corresponding position of the groove, thereby preventing the first rotating shaft (42) from rotating backward.
26. The waste-to-energy boiler according to claim 23, characterized in that: A ratchet pressure plate (442) is threadedly connected in the tooth groove of the ratchet sleeve (44).
27. The waste-to-energy boiler according to claim 23, characterized in that: The upper end wall of the notch on the transition plate (421) overlaps the upper end surface of the straight section (4221).
28. The waste-to-energy boiler according to claim 1, characterized in that: The slag removal and combustion-supporting device comprises a material receiving trough (52) with an opening upwardly provided at a slag discharge position of a furnace bed, a double helical shaft (53) provided in the material receiving trough (52) along an axial direction, the double helical shaft (53) being a hollow structure, one end of the double helical shaft (53) being connected to a second air inlet pipe (531), and the other end of the double helical shaft (53) being connected to a second air outlet pipe (532) connected to an exhaust pipe (32); a through hole (521) being provided on a trough wall of the material receiving trough (52), the through hole (521) being connected to a material discharge port of a lower box body (342), and an ash discharge port (522) being provided at a trough bottom of the material receiving trough (52). ), the lower end of the ash outlet (522) is connected to a discharge valve, the discharge valve comprising a box body (54), the box body (54) being provided with a discharge port connected to the ash discharge pipe (6), the box body (54) being provided with a second rotating shaft (541) connected to the power motor, at least two sealing sleeves extending outwardly are detachably provided on the outer side wall of the second rotating shaft (541) along the circumferential direction, when the second rotating shaft (541) rotates, the extended ends of the sealing sleeves at corresponding positions are in contact with the corresponding positions of the inner wall of the box body (54), thereby ensuring that the combustion chamber and the discharge port are always kept in an isolated state.
29. The waste-to-energy boiler according to claim 28, characterized in that: A sealing ring (561) is screwed onto the inner wall of the box body (54); two first partitions (551), two second partitions (552) and two third partitions (553) are symmetrically arranged on the second rotating shaft (541); and each of the six partitions is sleeved with a sealing sleeve (56) extending outward; when the second rotating shaft (541) rotates, the end surface of the extending end of the sealing sleeve (56) at the corresponding position abuts against the outer wall of the sealing ring (561).
30. The waste-to-energy boiler according to claim 29, characterized in that: A connecting through hole is provided on each of the partitions, and a connecting clearance hole is provided at the position corresponding to the connecting through hole on the corresponding position of the sealing sleeve. Bolts are passed through the connecting clearance hole and the connecting through hole from top to bottom, and the protruding end of the bolt is riveted by a nut so that the nut of the bolt presses the sealing sleeve to fix it on the partition.
31. The waste-to-energy boiler according to claim 29, characterized in that: The six partitions are evenly arranged along the circumferential direction on the second rotating shaft (541).
32. The waste-to-energy boiler according to claim 29, characterized in that: The sealing ring (561) is made of copper-impregnated graphite.
Citation Information
Patent Citations
Garbage power generation boiler
CN216644227U