A short circuit breaking test method and system for high voltage AC circuit breaker

By introducing a delayed zero-crossing unit and reactor into the short-circuit break test circuit of the high-voltage AC circuit breaker, the closing switch is controlled, and the short-circuit current of more than 100% of the DC component in the high-voltage AC circuit breaker is achieved for a period of time. , solves the problem that the existing technology cannot provide the problem of insufficient DC component in the short circuit breaker test of high-voltage alternator circuit breaker.

CN114325360BActive Publication Date: 2024-11-08XIAN HIGH VOLTAGE APP RES INST CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202011079152.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-10-10
Publication Date
2024-11-08
Estimated Expiration
2040-10-10

AI Technical Summary

Technical Problem

The prior art cannot provide a short circuit current for high-voltage AC circuit breakers with a DC component exceeding 100% over a period of time, especially in the short circuit breaker test of high-voltage alternator circuit breakers.

Method used

Using a short circuit breaker test method including a power supply unit and a delay zero crossing unit, the closing switch is controlled to close at the zero crossing point of the AC power supply voltage and the short circuit current flowing through the high-voltage AC circuit breaker through the series structure of the transformer and reactor. After the preset time is continued, the auxiliary switch closes to obtain a short circuit current of more than 100% of the DC component.

Benefits of technology

It is achieved to provide a short-circuit current with a DC component of more than 100% for a high-voltage AC circuit breaker for a period of time, which meets the design requirements, and by adjusting the ratio of the reactor, the DC component in the short-circuit current cannot be changed suddenly and maintain exponential attenuation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114325360B_ABST
    Figure CN114325360B_ABST
Patent Text Reader

Abstract

The present application discloses a short-circuit breaking test method and system for a high-voltage AC circuit breaker, which provides a short-circuit current with a DC component exceeding 100% for the high-voltage AC circuit breaker TO. The generator system outputs the short-circuit current through the secondary winding of the transformer T1; the primary winding of the transformer T1 is connected to the AC power supply; the first end of the secondary side of T1 is connected to a series structure consisting of an auxiliary switch AB and a reactor L4 through a reactor L3; the second end of the series structure and the second end of the secondary winding of the transformer T1 are grounded, and the high-voltage AC circuit breaker TO is connected in parallel to the series structure. The method includes: controlling the closing switch connected between the AC power supply and the transformer T1 to close at the zero-crossing point of the AC power supply voltage, and then closing AB after the TO current continues for a preset time to obtain a short-circuit current with a DC component exceeding 100%.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of electrical technology, and more specifically to a short-circuit breaking test method and system for a high-voltage AC circuit breaker. Background Art

[0002] In the short-circuit breaking test of ordinary high-voltage AC circuit breakers, the test circuit generally only needs to provide a symmetrical short-circuit current or a DC component not exceeding 75%. The test circuit can obtain such a short-circuit current by adjusting the circuit time constant or by controlling the phase selection of the closing switch.

[0003] However, in the short-circuit breaking test of some special high-voltage AC circuit breakers (such as high-voltage AC generator circuit breakers), the test circuit needs to provide a short-circuit current with a DC component exceeding 100% for a period of time, but the existing technology cannot obtain such a short-circuit current. Summary of the invention

[0004] In view of this, the present invention provides a short-circuit breaking test method and system for a high-voltage AC circuit breaker, so as to provide a short-circuit current with a DC component exceeding 100% for some special high-voltage AC circuit breakers within a period of time.

[0005] A short-circuit breaking test method for a high-voltage AC circuit breaker is applied to a short-circuit breaking test circuit of the high-voltage AC circuit breaker, wherein the short-circuit breaking test circuit comprises a power supply unit and a delayed zero-crossing unit;

[0006] The power supply unit includes n sets of generator systems that independently provide test power; n≥2;

[0007] The i-th generator system outputs short-circuit current through the secondary winding of transformer Ti; i=1, 2, ..., n; the primary windings of transformers T1-Tn are connected in parallel to the AC power supply;

[0008] The delayed zero-crossing unit includes a reactor L3 and a series structure consisting of an auxiliary switch AB and a reactor L4; the first end of the secondary winding of the transformer T1 is connected to the first end of the secondary winding of the transformer T2 through the reactor L3; the second ends of the secondary windings of the transformers T1 and T2 are grounded, the series structure is connected in parallel to the secondary winding of the transformer T2, and the high-voltage AC circuit breaker TO is simultaneously connected in parallel to the secondary windings of the transformers T1, T3 to Tn;

[0009] The short circuit breaking test method comprises:

[0010] Control the closing switch connected between the AC power supply and the transformers T1 to Tn to close at the zero-crossing point of the AC power supply voltage;

[0011] After the short-circuit current flowing through the high-voltage AC circuit breaker TO continues for a preset time, the auxiliary switch AB is controlled to close to obtain a short-circuit current with a DC component exceeding 100%.

[0012] Optionally, the i-th generator system comprises: an impulse generator Gi, a generator circuit breaker GBi, a closing switch MSi, an operating switch MBi, a reactor Li and a transformer Ti; any two phases of the impulse generator Gi are connected to the primary winding of the transformer Ti through the generator circuit breaker GBi, the closing switch MSi, the reactor Li and the operating switch MBi in sequence to form a loop;

[0013] The power supply unit also includes: n-1 lines consisting of a parallel switch PB and a parallel reactor L B The intermediate node between the generator circuit breaker GBj and the closing switch MSj is connected to the intermediate node between the generator circuit breaker GBj+1 and the closing switch MSj+1 through one of the branches; j=1, 2, ..., n-1;

[0014] The closing switches connected between the AC power supply and the transformers T1 to Tn are closing switches MS1 to MSn. Before the closing switches between the AC power supply and the transformers T1 to Tn are closed at the zero-crossing point of the AC power supply voltage, the control further includes:

[0015] Control the generator circuit breakers GB1~GBn and close the operation switches MB1~MBn;

[0016] The excitation impulse generators G1~Gn are then controlled to close all the paralleling switches PB.

[0017] Another short-circuit breaking test method for a high-voltage AC circuit breaker is applied to a short-circuit breaking test circuit for a high-voltage AC circuit breaker, wherein the short-circuit breaking test circuit includes a power supply unit and a delayed zero-crossing unit;

[0018] The power supply unit includes a generator system that independently provides test power;

[0019] The generator system outputs short-circuit current through the secondary winding of transformer T1; the primary winding of transformer T1 is connected to an AC power supply;

[0020] The delayed zero-crossing unit includes a reactor L3 and a series structure consisting of an auxiliary switch AB and a reactor L4; the first end of the secondary winding of the transformer T1 is connected to the first end of the series structure through the reactor L3; the second end of the series structure and the second end of the secondary winding of the transformer T1 are grounded, and the high-voltage AC circuit breaker TO is connected in parallel to the series structure;

[0021] The short circuit breaking test method comprises:

[0022] Control the closing switch connected between the AC power supply and the transformer T1 to close when the AC power supply voltage passes through zero;

[0023] After the short-circuit current flowing through the high-voltage AC circuit breaker TO continues for a preset time, the auxiliary switch AB is controlled to close to obtain a short-circuit current with a DC component exceeding 100%.

[0024] Optionally, the generator system includes: an impulse generator G1, a generator circuit breaker GB1, a closing switch MS1, an operating switch MB1, a reactor L1 and a transformer T1; any two phases of the impulse generator G1 are connected to the primary winding of the transformer T1 after passing through the generator circuit breaker GB1, the closing switch MS1, the reactor L1 and the operating switch MB1 in sequence to form a loop;

[0025] The closing switch connected between the AC power supply and the transformer T1 is the closing switch MS1. Before the auxiliary switch AB is controlled to close after the short-circuit current flowing through the high-voltage AC circuit breaker TO lasts for a preset time, the method further includes:

[0026] Control the generator circuit breaker GB1 and close the operating switch MB1;

[0027] The excitation impulse generator G1 is activated, and then all paralleling switches PB are controlled to close.

[0028] Optionally, in any of the short-circuit breaking test methods disclosed above, the preset time is selected based on the short-circuit current just reaching its peak value when the auxiliary switch AB is closed.

[0029] Optionally, the preset time is 10ms.

[0030] Optionally, in any of the short-circuit breaking test methods disclosed above, the short-circuit breaking test circuit of the high-voltage AC circuit breaker also includes: a current measuring device for measuring the short-circuit current, and a voltage measuring device for measuring the voltage across the high-voltage AC circuit breaker.

[0031] A short-circuit breaking test system for a high-voltage AC circuit breaker comprises a control unit and a short-circuit breaking test circuit for the high-voltage AC circuit breaker, wherein the short-circuit breaking test circuit comprises a power supply unit and a delayed zero-crossing unit;

[0032] The power supply unit includes n sets of generator systems that independently provide test power; n≥2;

[0033] The i-th generator system outputs short-circuit current through the secondary winding of transformer Ti; i=1, 2, ..., n; the primary windings of transformers T1-Tn are connected in parallel to the AC power supply;

[0034] The delayed zero-crossing unit includes a reactor L3 and a series structure consisting of an auxiliary switch AB and a reactor L4; the first end of the secondary winding of the transformer T1 is connected to the first end of the secondary winding of the transformer T2 through the reactor L3; the second ends of the secondary windings of the transformers T1 and T2 are grounded, the series structure is connected in parallel to the secondary winding of the transformer T2, and the high-voltage AC circuit breaker TO is simultaneously connected in parallel to the secondary windings of the transformers T1, T3 to Tn;

[0035] The control unit is used to control the closing switch connected between the AC power supply and the transformers T1~Tn to close at the AC power supply voltage zero point; and then control the auxiliary switch AB to close after the short-circuit current flowing through the high-voltage AC circuit breaker TO continues for a preset time to obtain a short-circuit current with a DC component exceeding 100%.

[0036] Another short-circuit breaking test system for a high-voltage AC circuit breaker comprises a control unit and a short-circuit breaking test circuit for the high-voltage AC circuit breaker, wherein the short-circuit breaking test circuit comprises a power supply unit and a delayed zero-crossing unit;

[0037] The power supply unit includes a generator system that independently provides test power;

[0038] The generator system outputs short-circuit current through the secondary winding of transformer T1; the primary winding of transformer T1 is connected to an AC power supply;

[0039] The delayed zero-crossing unit includes a reactor L3 and a series structure consisting of an auxiliary switch AB and a reactor L4; the first end of the secondary winding of the transformer T1 is connected to the first end of the series structure through the reactor L3; the second end of the series structure and the second end of the secondary winding of the transformer T1 are grounded, and the high-voltage AC circuit breaker TO is connected in parallel to the series structure;

[0040] The control unit is used to control the closing switch connected between the AC power supply and the transformer T1 to close at the AC power supply voltage zero point; and then control the auxiliary switch AB to close after the short-circuit current flowing through the high-voltage AC circuit breaker TO continues for a preset time to obtain a short-circuit current with a DC component exceeding 100%.

[0041] Optionally, the preset time is selected based on the short-circuit current just reaching a peak value when the auxiliary switch AB is closed.

[0042] It can be seen from the above technical solution that the present invention introduces a delayed zero-crossing unit after the power supply system, and the auxiliary switch AB is closed timely and accurately after the short-circuit current appears to introduce the inductor L4 into the test circuit. At this time, the AC component of the short-circuit current flowing through the high-voltage AC circuit breaker TO circuit will be reduced, while the DC component of the short-circuit current flowing through the high-voltage AC circuit breaker TO circuit cannot change suddenly and will maintain exponential decay. In this way, the short-circuit current flowing through the high-voltage AC circuit breaker TO will have a DC component exceeding 100%, which meets the design requirements. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0044] Figure 1a A schematic diagram of a short-circuit breaking test circuit structure of a high-voltage AC circuit breaker disclosed in an embodiment of the present invention;

[0045] Figure 1b A schematic diagram of a short-circuit breaking test circuit structure of another high-voltage AC circuit breaker disclosed in an embodiment of the present invention;

[0046] Figure 2 A flow chart of a short-circuit breaking test method for a high-voltage AC circuit breaker disclosed in an embodiment of the present invention;

[0047] Figure 3 A short-circuit breaking test circuit loop simulation model of a high-voltage AC circuit breaker disclosed in an embodiment of the present invention;

[0048] Figure 4 A test current waveform diagram of a high voltage AC circuit breaker TO disclosed in an embodiment of the present invention;

[0049] Figure 5 A waveform diagram of a test current flowing through a secondary winding of a transformer T1 disclosed in an embodiment of the present invention;

[0050] Figure 6 A waveform diagram of a test current flowing through a shunt inductor L3 disclosed in an embodiment of the present invention;

[0051] Figure 7 A schematic diagram of a short-circuit breaking test circuit structure of another high-voltage AC circuit breaker disclosed in an embodiment of the present invention;

[0052] Figure 8 A flow chart of a short-circuit breaking test method for a high-voltage AC circuit breaker disclosed in an embodiment of the present invention;

[0053] Fig. 9 The present invention is a schematic diagram of a short-circuit breaking test circuit structure of another high-voltage AC circuit breaker disclosed in an embodiment of the present invention. DETAILED DESCRIPTION

[0054] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0055] The embodiment of the present invention discloses a short-circuit breaking test method for a high-voltage AC circuit breaker, which is applied to a short-circuit breaking test circuit of the high-voltage AC circuit breaker to provide a short-circuit current with a DC component exceeding 100% for a period of time for the high-voltage AC circuit breaker TO.

[0056] like Figure 1a or Figure 1b As shown, the short-circuit breaking test circuit of the high-voltage AC circuit breaker includes: a power supply unit 1 and a delayed zero-crossing unit 2.

[0057] The power supply unit 1 includes n sets of generator systems that independently provide test power, n≥2; the i-th generator system outputs short-circuit current through the secondary winding of transformer Ti; i=1, 2, ..., n; the primary windings of transformers T1-Tn are connected in parallel to the AC power supply; Figure 1a Just take n=2 as an example, Figure 1b Just take n=3 as an example;

[0058] Optional, Figure 1a , Figure 1b A specific implementation form of the power supply unit 1 is given in both, which is described as follows:

[0059] The i-th generator system comprises: an impulse generator Gi, a generator circuit breaker GBi, a closing switch MSi, an operating switch MBi, a reactor Li and a transformer Ti; any two phases of the impulse generator Gi are connected to the primary winding of the transformer Ti through the generator circuit breaker GBi, the closing switch MSi, the reactor Li and the operating switch MBi in sequence to form a loop; i=1, 2, ..., n;

[0060] The power supply unit 1 also includes: n-1 lines consisting of a parallel switch PB and a parallel reactor L BThe intermediate node between the generator circuit breaker GBj and the closing switch MSj is connected to the intermediate node between the generator circuit breaker GBj+1 and the closing switch MSj+1 through one of the branches; j=1, 2, ..., n-1.

[0061] The delayed zero-crossing unit 2 includes a reactor L3 and a series structure consisting of an auxiliary switch AB and a reactor L4; the first end of the secondary winding of the transformer T1 is connected to the first end of the secondary winding of the transformer T2 through the reactor L3; the second ends of the secondary windings of the transformers T1 and T2 are grounded, the series structure is connected in parallel to the secondary winding of the transformer T2, and the high-voltage AC circuit breaker TO is also connected in parallel to the secondary windings of the transformers T1, T3~Tn.

[0062] The special high-voltage AC circuit breaker TO is, for example, a high-voltage AC generator circuit breaker. A high-voltage AC generator circuit breaker is a circuit breaker specially installed between the generator outlet and the power system, and is used to switch the generator during power distribution and to isolate the fault point from the generator when the power system fails. Due to the particularity of the installation location, the high-voltage AC generator circuit breaker will break a short-circuit current with a higher DC component than an ordinary high-voltage AC circuit breaker.

[0063] The existing test circuit adopts a method of adjusting the circuit time constant or controlling the phase selection of the closing switch, which can theoretically only provide a short-circuit current with a DC component of up to 100%. The embodiment of the present invention can provide a short-circuit current with a DC component exceeding 100% for a period of time, and by controlling the values ​​of the shunt inductors L3 and L4, it can be conveniently adjusted to a certain DC component value.

[0064] The DC component refers to the ratio of the DC part of the short-circuit current to the AC current. A short-circuit current with a DC component exceeding 100% over a period of time refers to a short-circuit current with delayed zero crossing, that is, a short-circuit current in which the current does not cross zero over a period of time.

[0065] The short-circuit breaking test method of the high-voltage AC circuit breaker includes: controlling a closing switch connected between an AC power source and transformers T1 to Tn to close at the AC power source voltage zero-crossing point; and then controlling an auxiliary switch AB to close after the short-circuit current flowing through the high-voltage AC circuit breaker TO continues for a preset time, so as to obtain a short-circuit current with a DC component exceeding 100%.

[0066] Specifically, Figure 2 As shown, when the power supply unit 1 adopts Figure 1a or Figure 1b When the specific implementation form shown is applied to Figure 1a or Figure 1b The short-circuit breaking test method of the short-circuit breaking circuit shown includes:

[0067] Step S01: Control the generator circuit breakers GB1-GBn and the operating switches MB1-MBn to close.

[0068] Specifically, in the initial state, the impulse generators G1-Gn are not excited, and the generator circuit breakers GB1-GBn, the operating switches MB1-MBn, the n-1 paralleling switches PB, the closing switches MS1-MSn and the auxiliary switch AB are all in the open position.

[0069] Step S02: Excite the generators G1 to Gn, and then control all the paralleling switches PB to close.

[0070] Specifically, after the impulse generators G1 to Gn are excited, the n power supply systems start to operate independently; after the n-1 paralleling switches PB are closed, the n power supply systems change from independent operation to parallel operation.

[0071] Step S03: Control the closing switches MS1-MSn to close at the zero-crossing point of the AC power supply voltage.

[0072] Specifically, after the closing switches MS1 to MSn are closed, the short-circuit current passing through the high-voltage AC circuit breaker TO is provided simultaneously by n sets of power supply systems, and the current is a short-circuit current with a maximum DC component of 100%.

[0073] Step S04: After the short-circuit current flowing through the high-voltage AC circuit breaker TO continues for a preset time, the auxiliary switch AB is controlled to close to obtain a short-circuit current with a DC component exceeding 100%.

[0074] Specifically, after the auxiliary switch AB is closed, a part of the short-circuit current of the second generator system will pass through the reactor L4 to form another circuit in parallel with the circuit flowing through the high-voltage AC circuit breaker TO. At this time, the AC component of the short-circuit current flowing through the high-voltage AC circuit breaker TO circuit will be reduced, while the DC component of the short-circuit current flowing through the high-voltage AC circuit breaker TO circuit cannot change suddenly and will maintain exponential decay. In this way, the short-circuit current flowing through the high-voltage AC circuit breaker TO will have a DC component exceeding 100%.

[0075] The selection of the preset time should ensure that the short-circuit current is at a high amplitude when the auxiliary switch AB is closed, for example, it just reaches the peak value of the short-circuit current, so that the short-circuit current has enough room to fall after the auxiliary switch AB is closed, and it is easier to generate a short-circuit current with a DC component exceeding 100%. For example, based on the power frequency of 50Hz, it is recommended that the preset time be 10ms.

[0076] Taking n=2 as an example, the PSCAD power system simulation software is used to simulate the circuit loop after the auxiliary switch AB is closed, and the following can be obtained: Figure 3 The circuit loop simulation model shown, Figure 3In the equation, E1 and E2 represent voltages. Figure 3 Where I is the test current flowing through the high voltage AC circuit breaker TO, I1 is the test current flowing through the secondary winding of the transformer T1, I2 is the test current flowing through the reactor L3, I=I1+I2, the current waveforms of I, I1, and I2 are as follows: Figure 4 , Figure 5 , Figure 6 shown.

[0077] As can be seen from the above description, the embodiment of the present invention introduces a delayed zero-crossing unit 2 after the power supply system 1, and the auxiliary switch AB closes the circuit timely and accurately after the short-circuit current appears to introduce the reactor L4 into the test circuit. At this time, the AC component of the short-circuit current flowing through the high-voltage AC circuit breaker TO circuit will be reduced, while the DC component of the short-circuit current flowing through the high-voltage AC circuit breaker TO circuit cannot change suddenly, and will also maintain exponential decay. In this way, the short-circuit current flowing through the high-voltage AC circuit breaker TO will have a DC component exceeding 100%, meeting the design requirements. Among them, the ratio of reactors L3 and L4 has a great influence on the DC component in the short-circuit current. It is necessary to ensure that L3 and L4 have a suitable ratio to generate a short-circuit current containing the required DC component.

[0078] In addition, the embodiment of the present invention also discloses another short-circuit breaking test method of a high-voltage AC circuit breaker, which is applied to Figure 7 The short-circuit breaking test circuit of the high-voltage AC circuit breaker shown is used to provide the high-voltage AC circuit breaker TO with a short-circuit current with a DC component exceeding 100% for a period of time. Figure 7 The short-circuit breaking test circuit shown includes a power supply unit 1 and a delayed zero-crossing unit 2.

[0079] The power supply unit 1 includes a generator system that independently provides test power;

[0080] The generator system outputs short-circuit current through the secondary winding of transformer T1; the primary winding of transformer T1 is connected to an AC power supply;

[0081] Figure 7 A specific implementation form of the power supply unit 1 is given in FIG. , which is described as follows:

[0082] The generator system comprises: an impulse generator G1, a generator circuit breaker GB1, a closing switch MS1, an operating switch MB1, a reactor L1 and a transformer T1; any two phases of the impulse generator G1 are connected to the primary winding of the transformer T1 through the generator circuit breaker GB1, the closing switch MS1, the reactor L1 and the operating switch MB1 in sequence to form a loop.

[0083] The delayed zero-crossing unit 2 includes a reactor L3 and a series structure consisting of an auxiliary switch AB and a reactor L4; the first end of the secondary winding of the transformer T1 is connected to the first end of the series structure through the reactor L3; the second end of the series structure and the second end of the secondary winding of the transformer T1 are grounded, and the high-voltage AC circuit breaker TO is connected in parallel to the series structure.

[0084] The short-circuit breaking test method comprises: controlling a closing switch connected between an AC power supply and a transformer T1 to close at the zero-crossing point of the AC power supply voltage; and then controlling an auxiliary switch AB to close after the short-circuit current flowing through the high-voltage AC circuit breaker TO continues for a preset time, so as to obtain a short-circuit current with a DC component exceeding 100%.

[0085] Specifically, when the power supply unit 1 adopts Figure 7 When the specific implementation form shown is applied to Figure 7 The short circuit breaking test method is as follows Figure 8 As shown, including:

[0086] Step S11: Control the generator circuit breaker GB1 and the operating switch MB1 to close;

[0087] Step S12: Excite the generator G1, and then control all parallel switches PB to close;

[0088] Step S13: Control the closing switch MS1 to close at the zero-crossing point of the AC power supply voltage;

[0089] Step S14: After the short-circuit current flowing through the high-voltage AC circuit breaker TO continues for a preset time, the auxiliary switch AB is controlled to close to obtain a short-circuit current with a DC component exceeding 100%.

[0090] Optionally, in any of the above disclosed embodiments, see Figure 7 The short-circuit breaking test circuit of the high-voltage AC circuit breaker also includes a test measurement unit 3. The test measurement unit 3 includes: a current measurement device I for measuring the short-circuit current flowing through the high-voltage AC circuit breaker TO, and a voltage measurement device U for measuring the voltage across the high-voltage AC circuit breaker TO, which is convenient for operating or adjusting the test process.

[0091] Corresponding to the above method embodiment, the embodiment of the present invention also discloses a short-circuit breaking test system for a high-voltage AC circuit breaker, including a control unit and a short-circuit breaking test circuit for the high-voltage AC circuit breaker. Figure 1a Or as shown in 1b, the short-circuit breaking test circuit includes a power supply unit and a delayed zero-crossing unit;

[0092] The power supply unit includes n sets of generator systems that independently provide test power, n≥2; Figure 1a Just take n=2 as an example, Figure 1b Just take n=3 as an example;

[0093] The i-th generator system outputs short-circuit current through the secondary winding of transformer Ti; i=1, 2, ..., n; the primary windings of transformers T1-Tn are connected in parallel to the AC power supply;

[0094] The delayed zero-crossing unit includes a reactor L3 and a series structure consisting of an auxiliary switch AB and a reactor L4; the first end of the secondary winding of the transformer T1 is connected to the first end of the secondary winding of the transformer T2 through the reactor L3; the second ends of the secondary windings of the transformers T1 and T2 are grounded, the series structure is connected in parallel to the secondary winding of the transformer T2, and the high-voltage AC circuit breaker TO is simultaneously connected in parallel to the secondary windings of the transformers T1, T3 to Tn;

[0095] The control unit is used to control the closing switch connected between the AC power supply and the transformers T1~Tn to close at the AC power supply voltage zero point; and then control the auxiliary switch AB to close after the short-circuit current flowing through the high-voltage AC circuit breaker TO continues for a preset time to obtain a short-circuit current with a DC component exceeding 100%.

[0096] Corresponding to the above method embodiment, the embodiment of the present invention also discloses another short-circuit breaking test system for a high-voltage AC circuit breaker, including a control unit and a short-circuit breaking test circuit for the high-voltage AC circuit breaker. Figure 7 As shown, the short-circuit breaking test circuit includes a power supply unit and a delayed zero-crossing unit;

[0097] The power supply unit includes a generator system that independently provides test power;

[0098] The generator system outputs short-circuit current through the secondary winding of transformer T1; the primary winding of transformer T1 is connected to an AC power supply;

[0099] The delayed zero-crossing unit includes a reactor L3 and a series structure consisting of an auxiliary switch AB and a reactor L4; the first end of the secondary winding of the transformer T1 is connected to the first end of the series structure through the reactor L3; the second end of the series structure and the second end of the secondary winding of the transformer T1 are grounded, and the high-voltage AC circuit breaker TO is connected in parallel to the series structure;

[0100] The control unit is used to control the closing switch connected between the AC power supply and the transformer T1 to close at the AC power supply voltage zero point; and then control the auxiliary switch AB to close after the short-circuit current flowing through the high-voltage AC circuit breaker TO continues for a preset time to obtain a short-circuit current with a DC component exceeding 100%.

[0101] Optionally, in any of the short-circuit breaking test systems for high-voltage AC circuit breakers disclosed above, the preset time is selected based on the short-circuit current just reaching its peak value when the auxiliary switch AB is closed.

[0102] The reference numerals "G1", "G2", "GB1", "GB2", "MS1", "L1", "GB1", "T1", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish different objects. For example, the reference numerals "G1", "G2", etc. are used to distinguish different impulse generators, and the reference numerals "GB1", "GB2", etc. are used to distinguish different generator circuit breakers. Moreover, the terms "include", "comprise", or any other variant thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity, or apparatus including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity, or apparatus. In the absence of further restrictions, an element defined by the sentence "includes one" does not exclude the presence of other identical elements in the process, method, commodity, or apparatus including the element.

[0103] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the embodiments of the present invention. Therefore, the embodiments of the present invention will not be limited to the embodiments shown herein, but rather to the widest range consistent with the principles and novel features disclosed herein.

Claims

1. A short-circuit breaking test method for a high-voltage AC circuit breaker, applied to a short-circuit breaking test circuit of a high-voltage AC circuit breaker, characterized in that: The short-circuit breaking test circuit comprises a power supply unit and a delayed zero-crossing unit; The power supply unit includes n sets of generator systems that independently provide test power; n≥2; The i-th generator system outputs a short-circuit current through the secondary winding of the transformer Ti; i=1, 2, ..., n; The primary windings of transformers T1 to Tn are connected in parallel to an AC power source; The i-th generator system comprises: an impulse generator Gi, a generator circuit breaker GBi, a closing switch MSi, an operating switch MBi, a reactor Li and a transformer Ti; any two phases of the impulse generator Gi are connected to the primary winding of the transformer Ti through the generator circuit breaker GBi, the closing switch MSi, the reactor Li and the operating switch MBi in sequence to form a loop; the closing switches connected between the AC power supply and the transformers T1~Tn are closing switches MS1~MSn; The power supply unit also includes: n-1 lines consisting of a parallel switch PB and a parallel reactor L B The intermediate node between the generator circuit breaker GBj and the closing switch MSj is connected to the intermediate node between the generator circuit breaker GBj+1 and the closing switch MSj+1 through one of the branches; j=1, 2, ..., n-1; The delayed zero-crossing unit includes a reactor L3 and a series structure consisting of an auxiliary switch AB and a reactor L4; the first end of the secondary winding of the transformer T1 is connected to the first end of the secondary winding of the transformer T2 through the reactor L3; the second ends of the secondary windings of the transformers T1 and T2 are grounded, the series structure is connected in parallel to the secondary winding of the transformer T2, and the high-voltage AC circuit breaker TO is simultaneously connected in parallel to the secondary windings of the transformers T1, T3 to Tn; The short circuit breaking test method comprises: Control the generator circuit breakers GB1~GBn and close the operation switches MB1~MBn; Excite the generators G1~Gn, and then control all the paralleling switches PB to close; Control the closing switch connected between the AC power supply and the transformers T1 to Tn to close at the zero-crossing point of the AC power supply voltage; After the short-circuit current flowing through the high-voltage AC circuit breaker TO continues for a preset time, the auxiliary switch AB is controlled to close to obtain a short-circuit current with a DC component exceeding 100%.

2. The short-circuit breaking test method of a high-voltage AC circuit breaker according to claim 1, characterized in that: The preset time is selected based on the short-circuit current just reaching the peak value when the auxiliary switch AB is closed.

3. The short-circuit breaking test method of a high-voltage AC circuit breaker according to claim 2, characterized in that: The preset time is 10ms.

4. The short-circuit breaking test method of a high-voltage AC circuit breaker according to claim 1, characterized in that: The short-circuit breaking test circuit of the high-voltage AC circuit breaker also includes: a current measuring device for measuring the short-circuit current, and a voltage measuring device for measuring the voltage across the two ends of the high-voltage AC circuit breaker.

5. A short-circuit breaking test system for a high-voltage AC circuit breaker, characterized in that: A short-circuit breaking test circuit comprising a control unit and a high-voltage AC circuit breaker, wherein the short-circuit breaking test circuit comprises a power supply unit and a delayed zero-crossing unit; The power supply unit includes n sets of generator systems that independently provide test power; n≥2; The i-th generator system outputs a short-circuit current through the secondary winding of the transformer Ti; i=1, 2, ..., n; The primary windings of transformers T1 to Tn are connected in parallel to an AC power source; The i-th generator system comprises: an impulse generator Gi, a generator circuit breaker GBi, a closing switch MSi, an operating switch MBi, a reactor Li and a transformer Ti; any two phases of the impulse generator Gi are connected to the primary winding of the transformer Ti through the generator circuit breaker GBi, the closing switch MSi, the reactor Li and the operating switch MBi in sequence to form a loop; the closing switches connected between the AC power supply and the transformers T1~Tn are closing switches MS1~MSn; The power supply unit also includes: n-1 lines consisting of a parallel switch PB and a parallel reactor L B The intermediate node between the generator circuit breaker GBj and the closing switch MSj is connected to the intermediate node between the generator circuit breaker GBj+1 and the closing switch MSj+1 through one of the branches; j=1, 2, ..., n-1; The delayed zero-crossing unit includes a reactor L3 and a series structure consisting of an auxiliary switch AB and a reactor L4; the first end of the secondary winding of the transformer T1 is connected to the first end of the secondary winding of the transformer T2 through the reactor L3; the second ends of the secondary windings of the transformers T1 and T2 are grounded, the series structure is connected in parallel to the secondary winding of the transformer T2, and the high-voltage AC circuit breaker TO is simultaneously connected in parallel to the secondary windings of the transformers T1, T3 to Tn; The control unit is used to control the generator circuit breakers GB1~GBn and the operating switches MB1~MBn to close; excite the generators G1~Gn, and then control all the parallel switches PB to close; control the closing switches connected between the AC power supply and the transformers T1~Tn to close at the zero point of the AC power supply voltage; and then control the auxiliary switch AB to close after the short-circuit current flowing through the high-voltage AC circuit breaker TO continues for a preset time, so as to obtain a short-circuit current with a DC component exceeding 100%.

6. The short-circuit breaking test system for high-voltage AC circuit breaker according to claim 5, characterized in that: The preset time is selected based on the short-circuit current just reaching the peak value when the auxiliary switch AB is closed.