A method for installing electrical equipment across a weld seam
Through the installation method of electrical equipment with welds, and the use of segmented pre-installation and lifting auxiliary equipment, the increased workload and cycle problems of electrical equipment installation in ship construction are solved, achieving a more efficient installation process and lower hull damage .
Patent Information
- Application Number
- CN202111551563.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-17
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2041-12-17
AI Technical Summary
During the ship construction process, the installation of electrical equipment needs to be hoisted after the hull structure is installed, resulting in a large number of fire operations and process hole openings and sealing holes, increasing the workload and construction cycle.
Using the installation method of electrical equipment with welds, pre-installed electrical equipment and bases in segments, and use lifting auxiliary equipment such as lifting lugs and electric hoists to adjust and move positions to avoid lifting electrical equipment after the hull structure is completed. .
Reduces unnecessary processes and working hours, shortens construction cycles, and reduces damage to the hull.
Smart Images

Figure CN114379736B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of shipbuilding, and in particular to a method for installing electrical equipment across a mounting weld. Background Art
[0002] The FGHR room of the dual-fuel large container ship contains electrical equipment. Due to the reasons of the hull structure construction, some of the electrical equipment is located in the cabin, and the platform where the electrical equipment base is located is in different sections. It is necessary to complete the installation of the section before forming a complete platform.
[0003] However, after the main section is loaded, the cabin forms an enclosed space, and it is necessary to open a temporary process hole above the electrical equipment installation position for hoisting and installing the electrical equipment. This will cause a large amount of hot work and opening and sealing operations of the process holes, increasing the workload and extending the dock period. Summary of the invention
[0004] In order to solve the above technical problems, the present invention provides an installation method for electrical equipment with a cross-mounted weld, which pre-installs the electrical equipment during the segmented construction process, reduces the construction process, and improves the construction efficiency.
[0005] The technical objectives of the present invention are achieved through the following technical solutions:
[0006] A method for installing electrical equipment across a mounting weld, the method comprising:
[0007] Step 1: In the stage of segmentation, the electrical equipment and the electrical equipment base are hoisted, pre-buried and temporarily fixed;
[0008] Step 2: After sandblasting and painting in sections, the whole assembly is loaded;
[0009] Step 3: Adjust the position of the electrical equipment base and install the electrical equipment base;
[0010] Step 4: Adjust the position of the electrical equipment and install the electrical equipment on the electrical equipment base.
[0011] Furthermore, the embedded position of the electrical equipment and the electrical equipment base is consistent with the final installation position in the direction of ship length and ship height, and is biased towards the side of the mounting weld in the direction of ship width. After the section assembly is loaded, the electrical equipment and the electrical equipment base are moved horizontally to a position that spans the section mounting weld.
[0012] Furthermore, the side structures are constructed in sections, and after the side structures are sandblasted and painted, the sections are turned over and assembled into a normal structure.
[0013] Furthermore, auxiliary lifting equipment is installed in the main section, and the position of the electrical equipment is adjusted by means of the auxiliary lifting equipment; the auxiliary lifting equipment includes a lifting lug and an electric hoist, the lifting lug is welded and fixed in the main section, and the electric hoist is installed below the lifting lug.
[0014] Furthermore, the lifting lug includes a first lifting lug and a second lifting lug, a slideway is installed between the first lifting lug and the second lifting lug, an electric hoist is installed below the slideway, and the electric hoist moves along the slideway to realize horizontal movement of the electrical equipment.
[0015] Furthermore, when adjusting the base of the electrical equipment, a lifting device is installed on one side of the base of the electrical equipment, and the base of the equipment is pushed to move by the lifting device.
[0016] Furthermore, the first lifting ear and the second lifting ear have the same structure, including a main board, a belly plate, and an elbow plate. A lifting hole is opened on the main board, and the belly plate is installed parallel to the main board at the position of the lifting hole. Holes are opened on the belly plate corresponding to the position of the lifting hole; the elbow plates are arranged perpendicular to the main board on both sides of the main board.
[0017] Furthermore, when pre-buried electrical equipment and electrical equipment base, the electrical equipment base is spot welded and fixed on the segment, and then the electrical equipment is pre-installed on the electrical equipment base, and the electrical equipment and the electrical equipment base are covered and protected.
[0018] Furthermore, in step 3, the electrical equipment is first lifted off the electrical equipment base, and then the electrical equipment base and the segmented spot welds are cut off to translate the electrical equipment base, and after being translated into place, it is fixed, and then the electrical equipment is lifted and installed on the electrical equipment base.
[0019] Compared with the prior art, the installation method of the present invention can realize the pre-installation of electrical equipment across the mounting welds, avoiding the operations of drilling holes and hoisting above the electrical equipment after the hull structure is built, reducing unnecessary processes, saving working hours, speeding up the construction cycle, and also reducing damage to the hull. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a schematic diagram of pre-embedding the electrical equipment and the electrical equipment base in the present invention.
[0021] Figure 2 It is a schematic diagram of the present invention in which the segments are turned over, placed in a normal state and assembled to form a total segment.
[0022] Figure 3 It is a schematic diagram of the overall section mounting formed after the sections are assembled in the present invention.
[0023] Figure 4 It is a schematic diagram of the installation of the first lifting ear and the second lifting ear in the present invention.
[0024] Figure 5It is a schematic diagram of the lifting ear structure in the present invention.
[0025] In the figure, 1. electrical equipment base; 2. mounting weld; 3. first lifting eye; 4. second lifting eye; 5. main board; 6. belly plate; 7. elbow plate; 8. electrical equipment. DETAILED DESCRIPTION
[0026] The technical solution of the present invention is further described below in conjunction with specific embodiments:
[0027] A method for installing electrical equipment across a mounting weld, the method being applicable to a situation where the electrical equipment is difficult to install at a later stage at a location where the electrical equipment spans across a mounting weld of a main section, the method comprising the following steps:
[0028] Step 1: Segmentation stage, segment side construction, hoist the electrical equipment 8 and the electrical equipment base 1 onto the segment, such as Figure 1 As shown, the position of the electrical equipment base 1 is adjusted so that the pre-buried position of the electrical equipment base is consistent with the final installation position in the direction of the ship length and the direction of the ship height, and is biased towards the side of the carrying weld 2 in the direction of the ship width; then the electrical equipment base 1 is spot welded and fixed on the segment, and then the electrical equipment 8 is pre-installed on the electrical equipment base 1; and then the electrical equipment 8 and the electrical equipment base 1 are covered and protected by three-proof cloth or the like.
[0029] Step 2: After the sections are sandblasted and painted, turn the sections together with the electrical equipment and the electrical equipment base 90 degrees. Figure 2 As shown; then the normal total group between segments, such as Figure 2 As shown, the total section formed by the total group is then loaded, as shown Figure 3 As shown;
[0030] Step 3: After the whole section is loaded, install the lifting auxiliary equipment in the whole section. The electric auxiliary equipment includes lifting lugs and electric hoists. Weld the lifting lugs in the whole section. Figure 4 As shown, a lifting lug is installed below the deck structure of the total section, the lifting lug comprising a first lifting lug and a second lifting lug, a slide is installed between the first lifting lug and the second lifting lug, the slide is such as a wire rope, and then an electric hoist is hung below the slide.
[0031] To adjust the position of the electrical equipment base 1, firstly lift the electrical equipment 8 off the electrical equipment base 1 by means of electric auxiliary equipment, and then cut off the spot welding fixation between the electrical equipment base 1 and the segment.
[0032] A lifting device is then installed on one side of the electrical equipment base 1, and the equipment base is pushed to move by the lifting device. The lifting device is such as a hydraulic cylinder. Under the push of the lifting device, the electrical equipment base 1 moves from one side of the carrying weld to above the carrying weld, such as Figure 3 shown.
[0033] Step 4: adjust the position of the electrical device 8 and install the electrical device 8 on the electrical device base 1.
[0034] When adjusting the position of the electrical device 8 , the electrical device is lifted by the electric hoist, and then the electric hoist moves along the slideway to realize the horizontal movement of the electrical device 8 , and the electrical device 8 is installed on the electrical device base 1 .
[0035] The first lifting ear and the second lifting ear have the same structure. Figure 5 As shown, they all include a main board 5, a web 6, and a toggle plate 7. A lifting hole is provided on the main board 5. The web 6 is installed parallel to the main board 5 at the lifting hole position. The web 6 is welded and fixed to the main board 5. Holes are opened on the web 6 corresponding to the lifting hole position. The toggle plates 7 are perpendicular to the main board 5 and are arranged on both sides of the main board 5. The steel wire rope is passed through the lifting holes of the first lifting eye and the second lifting eye to facilitate the movement of the electric hoist. After the electrical equipment is installed, the lifting eyes can be removed.
[0036] This embodiment is only a further explanation of the present invention, not a limitation of the present invention. After reading this specification, those skilled in the art may make non-creative modifications to this embodiment as needed, but as long as it is within the scope of the claims of the present invention, it will be protected by the patent law.
Claims
1. A method for installing electrical equipment across a mounting weld, characterized in that: The method includes: Step 1: During the block-by-block stage, the electrical equipment and their bases are hoisted, pre-buried in place, and temporarily fixed. The pre-buried position of the electrical equipment and their bases is consistent with the final installation position in the direction of the ship's length and height, and is biased towards the mounting weld in the direction of the ship's width. After the blocks are assembled into a block and the block is mounted, the electrical equipment and their bases are moved horizontally to a position that spans the mounting weld of the block. When pre-buried electrical equipment and electrical equipment bases, the electrical equipment bases are spot welded to the segments, and then the electrical equipment is pre-installed on the electrical equipment bases, and the electrical equipment and electrical equipment bases are covered and protected; Step 2: After sandblasting and painting in sections, the whole assembly is loaded; Step 3: Adjust the position of the electrical equipment base, install auxiliary lifting equipment in the main section, and adjust the position of the electrical equipment using the auxiliary lifting equipment; the auxiliary lifting equipment includes a lifting lug and an electric hoist, the lifting lug is welded and fixed in the main section, and the electric hoist is installed below the lifting lug; The lifting lug includes a first lifting lug and a second lifting lug, a slide is installed between the first lifting lug and the second lifting lug, and an electric hoist is installed below the slide; the electric hoist moves along the slide to realize the horizontal movement of the electrical equipment; Install the electrical equipment base, lift the electrical equipment off the electrical equipment base, then remove the spot welds between the electrical equipment base and the segments to translate the electrical equipment base, and fix it after translation into place; when adjusting the electrical equipment base, install a lifting device on one side of the electrical equipment base, and use the lifting device to push the equipment base to move; Step 4: Adjust the position of the electrical equipment, and then hoist and install the electrical equipment onto the electrical equipment base.
2. The method for installing electrical equipment across a weld seam according to claim 1, wherein: The side parts are constructed in sections, and after sandblasting and painting, the sections are turned over and assembled into normal parts.
3. The method for installing electrical equipment across a weld seam according to claim 1, wherein: The first lifting ear and the second lifting ear have the same structure, including a main board, a web, and an elbow plate. A lifting hole is opened on the main board, and the web is installed parallel to the main board at the position of the lifting hole. Holes are opened on the web corresponding to the position of the lifting hole. The elbow plates are perpendicular to the main board and arranged on both sides of the main board.