Transfer device and transfer method suitable for roller AGV trolley
By designing multi-layer docking fixtures and lifting devices, the problems of low efficiency and large floor space of AGV trolleys when loading and unloading materials are solved, and empty and full exchanges are completed at one docking station, improving work efficiency and reducing costs.
Patent Information
- Application Number
- CN202210118207.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-02-08
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2042-02-08
AI Technical Summary
Existing AGV trolleys require multiple positioning and transfers when loading and unloading materials, resulting in low work efficiency, large floor space, and long loading and unloading process time.
A transfer device suitable for drum AGV trolleys is designed, including a multi-layer docking tool and a lifting device. Through the lifting and lowering of the multi-layer docking tool, the empty and full conversion of materials is realized, the number of docking times is reduced, and work efficiency is improved.
It realizes empty and full exchanges at one docking station, reduces the number of positioning times and loading and unloading time of the AGV trolley, saves floor space, and improves work efficiency and cost-effectiveness.
Smart Images

Figure CN114435919B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of AGV trolleys, and in particular, relates to a transfer device suitable for a roller AGV trolley and a transfer method thereof. Background Art
[0002] AGV is also known as unmanned guided vehicle, automatic guided vehicle or laser guided vehicle. AGV has the advantages of high automation, high intelligence and no noise pollution. In recent years, it has gradually been used in industries such as warehousing and manufacturing. The AGV cart is equipped with a loading and unloading mechanism, which can be docked with other logistics equipment such as conveyor belts to automate material loading and unloading. There are usually two existing AGV docking stations. The AGV cart needs to unload the material to a certain station and then transfer it to another station for loading. Multiple stations and supporting equipment occupy a large area, which affects the use of site space. In addition, the AGV cart needs to be positioned and transferred multiple times during the loading and unloading process, which undoubtedly increases the time of the AGV cart loading and unloading process and affects its work efficiency. Summary of the invention
[0003] The present invention aims to solve at least one of the technical problems existing in the prior art. To this end, the present invention provides a transfer device suitable for a roller AGV trolley, the purpose of which is to improve the working efficiency of the AGV trolley.
[0004] In order to achieve the above-mentioned purpose, the technical solution adopted by the present invention is: a transfer device suitable for a roller AGV trolley, including a multi-layer docking tooling for transferring materials from the roller AGV trolley to the rear guide transport line and a lifting device connected to the multi-layer docking tooling and used to control the lifting of the multi-layer docking tooling.
[0005] The lifting device comprises two lifting gantries arranged opposite to each other, and the multi-layer docking tooling is located between the two lifting gantries and connected to the two lifting gantries.
[0006] The lifting gantry includes a vertically arranged channel steel column, an upper slide and a lower slide movably arranged on the channel steel column, and a lifting actuator connected to the lower slide and used to control the lower slide to rise and fall. The upper slide and the lower slide are connected to the multi-layer docking tooling, and the lower slide is located below the upper slide.
[0007] The upper slide seat comprises an upper crossbeam, an upper movable frame connected to the upper crossbeam, and a roller rotatably arranged on the upper movable frame and in contact with the channel steel column, wherein a plurality of rollers are arranged.
[0008] The lower sliding seat comprises a lower crossbeam connected to the lifting actuator, a lower moving frame connected to the lower crossbeam, and a roller rotatably arranged on the lower moving frame and in contact with the channel steel column, wherein a plurality of rollers are arranged.
[0009] The multi-layer docking tooling comprises a docking material rack and a conveying mechanism arranged on the docking material rack. At least two conveying mechanisms are arranged and all conveying mechanisms are arranged in sequence along the vertical direction on the docking material rack.
[0010] The conveying mechanism is composed of a plurality of powered rollers.
[0011] The conveying mechanisms are provided in two or three.
[0012] The present invention also provides a transfer method suitable for a transfer device of a roller AGV trolley, comprising the steps of:
[0013] S1, the multi-layer docking tooling is at the first height position, and the roller AGV trolley moves to the position where it docks with the multi-layer docking tooling;
[0014] S2, the pallet loaded with materials on the roller AGV trolley moves to the multi-layer docking tooling;
[0015] S3, after the multi-layer docking tooling is lowered, the multi-layer docking tooling is at the second height position;
[0016] S4. The empty pallet on the multi-layer docking tooling is moved to the roller AGV trolley;
[0017] S5, the multi-layer docking tooling is at the third height position;
[0018] S6. The pallet carrying the materials on the multi-layer docking tooling is moved to the rear guide transport line, and the rear guide transport line transports the materials to the designated workstation;
[0019] S7, the multi-layer docking tooling is at the fourth height position;
[0020] S8. The rear guide transport line transports the empty pallet to the multi-layer docking tooling.
[0021] S9. After the multi-layer butt joint tooling is raised, the multi-layer butt joint tooling is at the first height position again.
[0022] The present invention also provides another method for transferring a transfer device suitable for a roller AGV trolley, comprising the steps of:
[0023] F1, the multi-layer docking tooling is at the first height position, and the roller AGV trolley moves to the position where it docks with the multi-layer docking tooling;
[0024] F2. After the multi-layer docking tooling is lowered, the multi-layer docking tooling is at the second height position, and then the pallet carrying materials on the roller AGV trolley moves to the multi-layer docking tooling;
[0025] F3. After the multi-layer docking tooling is raised, the multi-layer docking tooling is at the first height position again, and the empty pallet on the multi-layer docking tooling is moved to the roller AGV trolley;
[0026] F4, another roller AGV trolley moves to the position where it docks with the multi-layer docking tooling, and then the tray carrying the material on the roller AGV trolley moves to the multi-layer docking tooling;
[0027] F5. After the multi-layer docking tooling rises, the multi-layer docking tooling is at the third height position again, and another empty pallet on the multi-layer docking tooling is moved to the roller AGV trolley;
[0028] F6, the multi-layer docking tool is at the fourth height position, and the pallet carrying the materials on the multi-layer docking tool is moved to the rear guide transport line, and the rear guide transport line transports the materials to the designated workstation;
[0029] F7. After the multi-layer docking tooling is lowered, the multi-layer docking tooling is at the fifth height position, and another pallet carrying materials on the multi-layer docking tooling is moved to the rear guide transport line, and the rear guide transport line transports the materials to the designated workstation;
[0030] F8. After the multi-layer docking tooling rises, the multi-layer docking tooling is at the fourth height position again, and the rear guide transport line transports the empty pallet to the multi-layer docking tooling.
[0031] F9. After the multi-layer docking tooling rises again, the multi-layer docking tooling is at the sixth height position again, and the rear guide transport line transports another empty pallet to the multi-layer docking tooling.
[0032] The transfer device suitable for the roller AGV trolley of the present invention can complete the empty-full conversion by arranging multi-layer docking tooling, and can improve the working efficiency of the AGV trolley, save costs, reduce floor space, reduce processes, save time, and improve working efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] This specification includes the following drawings, which show the following contents:
[0034] Figure 1 It is a schematic structural diagram of a transfer device suitable for a roller AGV trolley of the present invention;
[0035] Figure 2 It is a structural schematic diagram of the lifting device;
[0036] Figure 3 It is another structural schematic diagram of the lifting device;
[0037] Figure 4 It is a structural schematic diagram of the lower movable frame;
[0038] Figure 5 It is a structural schematic diagram of a multi-layer docking tooling;
[0039] Figure 6 This is a schematic diagram of the lifting mast in the lifting state;
[0040] Figure 7 This is a schematic diagram of the lifting mast in the descending state;
[0041] Figures 8a to 8i It is a state change diagram of the transfer device in the transfer method of Example 1;
[0042] Figures 9a to 9i It is a state change diagram of the transfer device in the transfer method of Example 1;
[0043] The markings in the figure are: 1. Roller AGV trolley; 2. Lifting gantry; 201. Stable base; 202. Channel steel column; 203. Mounting seat; 204. Lifting cylinder; 205. Fixed beam; 206. Lower moving frame; 207. Roller; 208. Connecting strip; 209. Lower crossbeam; 2010. Lower reinforcing rib; 2011. Upper crossbeam; 2012. Avoidance groove; 2013. Upper reinforcing rib; 2014. Fixed clamp; 2015. Lifting top; 2016. Sprocket; 2017. Lifting chain; 2018. Upper moving frame; 3. Multi-layer docking tooling; 301. Power roller; 302. Docking material rack; 4. Pallet; 5. Material; 6. Rear guide transport line; DETAILED DESCRIPTION
[0044] The specific implementation methods of the present invention are further explained in detail below by describing the embodiments with reference to the accompanying drawings, with the aim of helping those skilled in the art to have a more complete, accurate and in-depth understanding of the concept and technical solution of the present invention and facilitating its implementation.
[0045] like Figures 1 to 7 As shown, the present invention provides a transfer device suitable for a roller AGV trolley, including a multi-layer docking tooling 3 for transferring materials from the roller AGV trolley 1 to a rear guide transport line 6 and a lifting device connected to the multi-layer docking tooling 3 and used to control the lifting of the multi-layer docking tooling 3.
[0046] Specifically, if Figures 1 to 4As shown, the lifting device includes two lifting gantries 2 arranged opposite to each other, the lifting gantries 2 are vertically arranged, and the multi-layer docking tool 3 is located between the two lifting gantries 2 and connected to the two lifting gantries 2. The lifting gantries 2 include a vertically arranged channel steel column 202, an upper slide and a lower slide movably arranged on the channel steel column 202, and a lifting actuator connected to the lower slide and used to control the lower slide to rise and fall, the upper slide and the lower slide are connected to the multi-layer docking tool 3, and the lower slide is located below the upper slide. The lifting actuator includes a lifting cylinder 204 and a chain transmission mechanism, the chain transmission mechanism includes a sprocket 2016 connected to a lifting top 2015 at the end of the piston rod of the lifting cylinder 204 and a lifting chain 2017 meshed with the sprocket 2016, and two sprockets 2016 are provided, which are respectively installed on two circular shafts on the lifting top 2015 to ensure that the two sprockets 2016 rotate coaxially. There are also two corresponding lifting chains 2017, which are respectively hung on a sprocket 2016 and cooperate with it for transmission. The lifting chain 2017 is an open long chain. One end of the lifting chain 2017 is connected to the fixed beam 205, and the fixed beam 205 is fixedly connected to the cylinder body of the lifting cylinder 204 through a fixing clamp 2014. The other end of the lifting chain 2017 is connected to the lower sliding seat.
[0047] like Figures 1 to 4 As shown, the lifting gantry 2 also includes a stable base 201 and a mounting seat 203 connected to the stable base 201. Two stable bases 201 are provided. The mounting seat 203 is located and fixedly connected to the two stable bases 201. The lower ends of the channel steel columns 202 of the lifting gantry 2 are respectively fixedly connected to a stable base 201. The fixed beam 205 is fixedly connected to the two channel steel columns 202. The fixed beam 205 is located above the mounting seat 203 and the stable base 201. The lifting cylinder 204 is vertically arranged. After the lifting cylinder 204 is extended, the lower slide seat can be driven to move upward through the lifting chain 2017. The lower slide seat drives the multi-layer docking tool 3 to rise. The channel steel column 202 guides the upper slide seat and the lower slide seat to ensure the stable operation of the multi-layer docking tool 3. When the lifting cylinder 204 is retracted, the multi-layer docking tool 3 is lowered. The lifting gantry 2 drives the multi-layer docking tooling 3 to rise and fall, which can accurately and stably dock the roller AGV trolley 1 with the rear guide transport line 6, and transport the pallet 4 and the materials to the corresponding workstations in time, thereby completing the empty and full conversion of the roller AGV trolley 1 and improving the process efficiency.
[0048] like Figures 1 to 4As shown, the upper slide includes an upper crossbeam 2011, an upper movable frame 2018 connected to the upper crossbeam 2011, and a roller 207 rotatably arranged on the upper movable frame 2018 and in contact with the channel steel column 202, and a plurality of rollers 207 are arranged. The length direction of the upper crossbeam 2011 is parallel to the first direction, and the first direction is the horizontal direction. The two channel steel columns 202 of the lifting gantry 2 are on the same straight line parallel to the first direction. Two upper movable frames 2018 are arranged, and the upper crossbeam 2011 is located between the two upper movable frames 2018. The two ends of the upper crossbeam 2011 are respectively fixedly connected to the two upper movable frames 2018. The two upper movable frames 2018 are respectively sleeved on the two channel steel columns 202. The axis of the roller 207 is parallel to the first direction. The roller 207 Embedded in the slide groove set on the channel steel column 202, the slide groove is a rectangular groove set in the vertical direction on the two opposite outer wall surfaces of the channel steel column 202, all the rollers 207 set on the upper movable frame 2018 are arranged in two rows, and the two rows of rollers 207 are respectively embedded in the two slide grooves on the channel steel column 202, so that the two channel steel columns 202 guide the upper slide seat. When the multi-layer docking tooling 3 drives the upper slide seat to rise and fall in the vertical direction, the rollers 207 roll in the slide groove to form a rolling connection, which can reduce friction.
[0049] like Figures 1 to 4 As shown, the upper slide also includes a connecting bar 208 fixedly connected to the upper movable frame 2018, two connecting bars 208 are provided, and the two connecting bars 208 are respectively fixedly connected to the two upper movable frames 2018, and the two connecting bars 208 are also fixedly connected to the multi-layer docking tooling 3.
[0050] like Figures 1 to 3 As shown, the upper slide seat also includes an upper reinforcing rib 2013 fixedly connected to the upper crossbeam 2011 and the upper movable frame 2018. The arrangement of the upper reinforcing rib 2013 can improve the overall structural strength of the upper slide seat. A plurality of upper reinforcing ribs 2013 are arranged and all of the upper reinforcing ribs 2013 are symmetrically distributed at both ends of the length direction of the upper crossbeam 2011. The upper reinforcing ribs 2013 at each end of the length direction of the upper crossbeam 2011 are fixedly connected to the upper movable frame 2018 connected to the corresponding end of the upper crossbeam 2011.
[0051] like Figures 1 to 4 , Figure 6 and Figure 7As shown, the upper crossbeam 2011 is provided with an avoidance groove 2012 for the lifting chain 2017 and the lifting oil cylinder 204 to pass through. The avoidance groove 2012 is a groove that is arranged on the upper crossbeam 2011 along the thickness direction of the upper crossbeam 2011. The thickness direction of the upper crossbeam 2011 is the vertical direction. The avoidance groove 2012 is located at the middle position in the length direction of the upper crossbeam 2011. During the lowering process of the upper slide, the avoidance groove 2012 arranged on the upper crossbeam 2011 can prevent the lifting oil cylinder 204 and the lifting chain 2017 from colliding with the upper crossbeam 2011 when they move.
[0052] like Figures 1 to 4 As shown, the lower slide seat includes a lower crossbeam 209 connected to the lifting actuator, a lower moving frame 206 connected to the lower crossbeam 209, and a roller 207 rotatably arranged on the lower moving frame 206 and in contact with the channel steel column 202, and a plurality of rollers 207 are arranged. The lower crossbeam 209 is located below the upper crossbeam 2011, and the lifting chain 2017 is fixedly connected to the lower crossbeam 209 at the middle position in the length direction of the lower crossbeam 209, and the length direction of the lower crossbeam 209 is parallel to the first direction, and two lower moving frames 206 are arranged, and the lower crossbeam 209 is located between the two lower moving frames 206, and the two ends of the lower crossbeam 209 are respectively fixedly connected to the two lower moving frames 206, and the two lower moving frames 206 are respectively sleeved on the two channel steel columns 202, The axis of the roller 207 is parallel to the first direction, and the roller 207 is embedded in the slide groove set on the channel steel column 202. All the rollers 207 set on the lower movable frame 206 are arranged in two rows, and the two rows of rollers 207 are respectively embedded in the two slide grooves on the channel steel column 202, so that the two channel steel columns 202 guide the lower sliding seat. When the lower sliding seat drives the multi-layer docking tooling 3 to move up and down in the vertical direction, the roller 207 rolls in the slide groove to form a rolling connection, which can reduce friction.
[0053] like Figures 1 to 4 As shown, the lower slide also includes a connecting bar 208 fixedly connected to the lower moving frame 206 , two connecting bars 208 are provided, and the two connecting bars 208 are respectively fixedly connected to the two lower moving frames 206 , and the two connecting bars 208 are also fixedly connected to the multi-layer docking tooling 3 .
[0054] like Figures 1 to 3 As shown, the lower slide seat also includes a lower reinforcing rib 2010 fixedly connected to the lower cross beam 209 and the lower moving frame 206. The arrangement of the lower reinforcing rib 2010 can improve the overall structural strength of the lower slide seat. A plurality of lower reinforcing ribs 2010 are arranged, and all lower reinforcing ribs 2010 are symmetrically distributed at both ends of the length direction of the lower cross beam 209. The lower reinforcing ribs 2010 at each end of the length direction of the lower cross beam 209 are fixedly connected to the lower moving frame 206 connected to the corresponding end of the lower cross beam 209.
[0055] like Figures 1 to 3 As shown, in this embodiment, two upper reinforcing ribs 2013 and two lower reinforcing ribs 2010 are provided.
[0056] like Figure 1 and Figure 5 As shown, the multi-layer docking tool 3 includes a docking material rack 302 and a conveying mechanism arranged on the docking material rack 302. At least two conveying mechanisms are arranged and all conveying mechanisms are arranged in sequence along the vertical direction on the docking material rack 302. The two lifting gantries 2 are arranged symmetrically. The two lifting gantries 2 are on the same straight line parallel to the second direction. The second direction is a horizontal direction and the second direction is perpendicular to the first direction. The docking material rack 302 is located between the two lifting gantries 2. The docking material rack 302 is fixedly connected to the connecting strip 208 of the upper slide and the lower slide. The conveying mechanism is composed of a plurality of power rollers 301. The axis of the power roller 301 is parallel to the second direction. All the power rollers 301 of each conveying mechanism are on the same straight line parallel to the first direction on the docking material rack 302. The multi-layer docking tooling 3 is located at the feeding end of the rear-leading transport line 6. When the pallet 4 loaded with materials enters one of the conveying mechanisms, the pallet 4 loaded with materials can be conveyed to the rear-leading transport line 6 through the rotation of the powered roller 301 of the conveying mechanism, and then continued to be conveyed by the rear-leading transport line 6.
[0057] The transfer device suitable for roller AGV trolleys of the above structure has the following advantages:
[0058] 1. Low promotion cost: The existing technology requires modification of the roller AGV itself, and all devices of the matching post-guiding process are required, which has a high promotion cost; this transfer device can directly modify the existing technology to a small extent, with low promotion cost and short modification time;
[0059] 2. High work efficiency: The existing loading and unloading process requires two docking stations, and the loading and unloading processes need to be completed separately. Correspondingly, the AGV trolley needs to perform two alignment corrections. This transfer device can complete the empty and full exchange loading and unloading process at one docking station without repeated positioning, reducing the process, saving working time and improving work efficiency.
[0060] 3. Small footprint: This transfer device can complete the loading and unloading process at the same location by setting up a lifting gantry, reducing the footprint and the number of docking stations, thus reducing its footprint and facilitating the addition of more equipment.
[0061] Embodiment 1
[0062] like Figures 5 to 8i As shown, in this embodiment, two conveying mechanisms of the multi-layer butt joint tooling 3 are provided.
[0063] This embodiment also provides a transfer method suitable for a transfer device of a roller AGV, comprising the following steps:
[0064] S1, the multi-layer docking tool 3 is at a first height position, and the roller AGV trolley 1 moves to a position where it docks with the multi-layer docking tool 3;
[0065] S2, the tray 4 carrying materials on the roller AGV trolley 1 moves to the multi-layer docking tooling 3;
[0066] S3, after the multi-layer butt joint tooling 3 is lowered, the multi-layer butt joint tooling 3 is at a second height position;
[0067] S4, the empty pallet 4 on the multi-layer docking tooling 3 is moved to the roller AGV trolley 1;
[0068] S5, the multi-layer docking tool 3 is at the third height position;
[0069] S6, the tray 4 carrying the materials on the multi-layer docking tool 3 moves to the rear guide transport line 6, and the rear guide transport line 6 transports the materials to the designated workstation;
[0070] S7, the multi-layer docking tool 3 is at the fourth height position;
[0071] S8, the rear guide transport line 6 transports the empty pallet 4 to the multi-layer docking tooling 3.
[0072] S9, after the multi-layer butt joint tooling 3 is raised, the multi-layer butt joint tooling 3 is at the first height position again.
[0073] like Figure 8a As shown, in the above step S1, the multi-layer docking fixture 3 has two layers of conveying mechanisms, wherein an empty pallet 4 is placed on the upper conveying mechanism, and the pallet 4 is not loaded with materials, and the conveying mechanism on the lower layer is in an empty state. The multi-layer docking fixture 3 is at a first height position, and the roller AGV trolley 1 moves to a position where it docks with the multi-layer docking fixture 3, and the roller AGV trolley 1 is fully loaded with pallets 4 and materials. At this time, the upper surface of the roller AGV trolley 1 and the lower conveying mechanism of the multi-layer docking fixture 3 are located at the same horizontal plane, and the pallet 4 loaded with materials is located on the upper surface of the roller AGV trolley 1.
[0074] like Figure 8b As shown, in the above step S2, the roller AGV trolley 1 fully loaded with the pallet 4 and the material is docked with the lower conveying mechanism of the multi-layer docking tooling 3, and the pallet 4 and the material are moved to the lower conveying mechanism of the multi-layer docking tooling 3.
[0075] like Figure 8cAs shown, in the above step S3, the lifting cylinder 204 contracts, and the multi-layer docking tooling 3 is in a descending state until the multi-layer docking tooling 3 descends to a second height position, and the height of the second height position is less than the height of the first height position. At this time, the conveying mechanism located on the upper layer of the multi-layer docking tooling 3 is located on the same horizontal plane as the upper surface of the roller AGV trolley 1.
[0076] like Figure 8d As shown, in the above step S4, the upper surface of the roller AGV trolley 1 is docked with the conveying mechanism located on the upper layer of the multi-layer docking tooling 3, and the power roller 301 of the conveying mechanism operates to move the empty pallet 4 on the conveying mechanism to the upper surface of the roller AGV trolley 1.
[0077] like Figure 8e As shown, in the above step S5, the roller AGV trolley 1 carries the empty pallet 4 away to realize the empty-full exchange, and then the lifting cylinder 204 is extended, the lifting gantry 2 is in a lifting state, and the multi-layer docking tooling 3 is raised until the multi-layer docking tooling 3 moves to the third height position. At this time, the upper surface of the roller AGV trolley 1, the conveying mechanism on the lower layer of the multi-layer docking tooling 3 and the rear guide transport line 6 are in the same plane.
[0078] In this embodiment, the height of the third height position is the same as the height of the first height position.
[0079] like Figure 8f As shown, in the above step S6, the pallet 4 on the conveying mechanism located at the lower layer of the multi-layer docking tooling 3 is full of materials, and the power roller 301 of the conveying mechanism operates to move the pallet 4 loaded with materials to the rear guide transport line 6, and the rear guide transport line 6 transports the materials to the designated workstation.
[0080] like Figure 8g As shown, in the above step S7, the multi-layer docking tooling 3 is at the fourth height position, and after unloading is completed, the rear guide transport line 6 transports the empty pallet 4 toward the multi-layer docking tooling 3.
[0081] In this embodiment, the height of the fourth height position is the same as the height of the second height position.
[0082] like Figure 8h As shown, in the above step S8, the conveying mechanism located on the upper layer of the multi-layer docking tooling 3 is located in the same plane as the rear-leading transport line 6, the powered roller 301 operates, and the rear-leading transport line 6 transports the empty pallet 4 to the conveying mechanism located on the upper layer of the multi-layer docking tooling 3.
[0083] like Figure 8iAs shown, in the above step S9, the lifting cylinder 204 is extended, the lifting gantry 2 is in a lifted state, and the multi-layer docking tooling 3 is raised until the multi-layer docking tooling 3 moves to the first height position again. At this time, the conveying mechanism on the lower layer of the multi-layer docking tooling 3 is located in the same plane as the rear guide transport line 6, and the roller AGV trolley 1 carrying new materials docks with the lower conveying mechanism of the multi-layer docking tooling 3, forming a circular process.
[0084] Embodiment 2
[0085] like Figures 9a to 9i As shown, in this embodiment, three conveying mechanisms are provided for the multi-layer docking tooling 3. Compared with the structure of the first embodiment, in this embodiment, the structure of the multi-layer docking tooling 3 is changed from double-layer to triple-layer, so as to realize the empty and full exchange of two roller AGV trolleys 1, change the length of the lifting cylinder 204 and the lifting chain 2017, and make a pit under the multi-layer docking tooling 3.
[0086] This embodiment provides a transfer method suitable for a transfer device of a roller AGV, comprising the following steps:
[0087] F1, the multi-layer docking tool 3 is at the first height position, and the roller AGV trolley 1 moves to the position where it docks with the multi-layer docking tool 3;
[0088] F2. After the multi-layer docking tooling 3 is lowered, the multi-layer docking tooling 3 is at the second height position, and then the tray 4 carrying the material on the roller AGV trolley 1 moves onto the multi-layer docking tooling 3;
[0089] F3. After the multi-layer docking tooling 3 rises, the multi-layer docking tooling 3 is at the first height position again, and the empty pallet 4 on the multi-layer docking tooling 3 moves to the roller AGV trolley 1;
[0090] F4, another roller AGV trolley 1 moves to the position where it docks with the multi-layer docking tooling 3, and then the tray 4 carrying the material on the roller AGV trolley 1 moves to the multi-layer docking tooling 3;
[0091] F5. After the multi-layer docking tooling 3 rises, the multi-layer docking tooling 3 is at the third height position again, and another empty pallet 4 on the multi-layer docking tooling 3 moves to the roller AGV trolley 1;
[0092] F6, the multi-layer docking tool 3 is at the fourth height position, and the tray 4 carrying the materials on the multi-layer docking tool 3 moves to the rear guide transport line 6, and the rear guide transport line 6 transports the materials to the designated workstation;
[0093] F7. After the multi-layer docking tool 3 is lowered, the multi-layer docking tool 3 is at the fifth height position, and another tray 4 carrying materials on the multi-layer docking tool 3 moves to the rear guide conveyor line 6, and the rear guide conveyor line 6 conveys the materials to the designated workstation;
[0094] F8. After the multi-layer docking tooling 3 rises, the multi-layer docking tooling 3 is at the fourth height position again, and the rear guide transport line 6 transports the empty pallet 4 to the multi-layer docking tooling 3.
[0095] F9. After the multi-layer docking tooling 3 rises again, the multi-layer docking tooling 3 is at the sixth height position again, and the rear guide transport line 6 transports another empty pallet 4 to the multi-layer docking tooling 3.
[0096] like Figure 9a As shown, in the above step F1, the three conveying mechanisms on the multi-layer docking tooling 3 are arranged in the upper, middle and lower layers, wherein the conveying mechanisms at the middle and lower layers are placed with empty pallets 4, which are not loaded with materials, and the conveying mechanisms at the upper layer are in an empty state. The multi-layer docking tooling 3 is at the first height position, and the roller AGV trolley 1 fully loaded with pallets 4 and materials moves to the position where it docks with the multi-layer docking tooling 3. At this time, the upper surface of the roller AGV trolley 1 and the middle-layer conveying mechanism of the multi-layer docking tooling 3 are located at the same horizontal plane.
[0097] like Figure 9b As shown, in the above step F2, the lifting cylinder 204 contracts, and the multi-layer docking tooling 3 is in a descending state until the multi-layer docking tooling 3 descends to a second height position, and the height of the second height position is less than the height of the first height position. At this time, the conveying mechanism located on the upper layer of the multi-layer docking tooling 3 and the upper surface of the roller AGV trolley 1 are located on the same horizontal plane, and the roller AGV trolley 1 fully loaded with pallet 4 and materials are docked with the upper conveying mechanism of the multi-layer docking tooling 3, and the pallet 4 loaded with materials is moved to the upper conveying mechanism of the multi-layer docking tooling 3.
[0098] like Fig.9c As shown, in the above step F3, the lifting cylinder 204 is extended, the lifting gantry 2 is in a lifting state, and the multi-layer docking tooling 3 is raised until the multi-layer docking tooling 3 moves to the first height position. At this time, the upper surface of the roller AGV cart 1 and the conveying mechanism located in the middle layer of the multi-layer docking tooling 3 are located in the same plane, and the power roller 301 of the conveying mechanism operates to move the empty pallet 4 on the conveying mechanism to the upper surface of the roller AGV cart 1.
[0099] like Figure 9dAs shown, in the above step F4, another roller AGV trolley 1 fully loaded with a pallet 4 and materials moves to a position where it docks with the multi-layer docking tooling 3. At this time, the upper surface of the roller AGV trolley 1 and the middle-level conveying mechanism of the multi-layer docking tooling 3 are located on the same horizontal plane, and then the pallet 4 loaded with materials is moved to the middle-level conveying mechanism of the multi-layer docking tooling 3.
[0100] like Fig.9e As shown, in the above step F5, the lifting cylinder 204 is extended, the lifting gantry 2 is in a lifted state, and the multi-layer docking tooling 3 is raised until the multi-layer docking tooling 3 moves to the third height position. The height of the first height position is less than the height of the third height position. At this time, the upper surface of the roller AGV trolley 1 is docked with the conveying mechanism on the lower layer of the multi-layer docking tooling 3, and the power roller 301 of the conveying mechanism operates to move the empty pallet 4 on the conveying mechanism to the upper surface of the roller AGV trolley 1.
[0101] like Figure 9f As shown, in the above step F6, the lifting cylinder 204 contracts and the multi-layer docking tooling 3 is in a descending state until the multi-layer docking tooling 3 descends to the fourth height position. At this time, the conveying mechanism located in the middle layer of the multi-layer docking tooling 3 is located at the same horizontal plane as the upper surface of the rear guide transport line 6. The power roller 301 of the conveying mechanism operates to move the pallet 4 carrying the material to the rear guide transport line 6, and the rear guide transport line 6 transports the material to the designated workstation.
[0102] In this embodiment, the height of the fourth height position is the same as the height of the first height position.
[0103] like Figure 9g As shown, in the above step F7, the lifting cylinder 204 continues to contract, and the multi-layer docking tooling 3 is in a descending state until the multi-layer docking tooling 3 descends to the fifth height position, and the height of the fifth height position is greater than the height of the fourth height position. At this time, the conveying mechanism located on the upper layer of the multi-layer docking tooling 3 and the upper surface of the rear guide transport line 6 are located on the same horizontal plane, and the power roller 301 of the upper layer conveying mechanism operates to move the pallet 4 carrying the material to the rear guide transport line 6, and the rear guide transport line 6 transports the material to the designated workstation.
[0104] In this embodiment, the height of the fifth height position is the same as the height of the second height position.
[0105] like Figure 9hAs shown, in the above step F8, after unloading is completed, the rear guide transport line 6 transports the empty pallet 4 toward the multi-layer docking tooling 3; at the same time, the lifting cylinder 204 extends, the lifting gantry 2 is in a lifting state, and the multi-layer docking tooling 3 rises until the multi-layer docking tooling 3 moves to the fourth height position again. At this time, the conveying mechanism located in the middle layer of the multi-layer docking tooling 3 is located in the same plane as the rear guide transport line 6, and finally the empty pallet 4 on the rear guide transport line 6 is transported to the conveying mechanism located in the middle layer of the multi-layer docking tooling 3.
[0106] like Figure 9i As shown, in the above step F9, the lifting cylinder 204 continues to extend, the lifting gantry 2 is in a lifting state, and the multi-layer docking tool 3 rises again until the multi-layer docking tool 3 moves to the sixth height position again, and the height of the sixth height position is greater than the height of the fifth height position. At this time, the conveying mechanism on the lower layer of the multi-layer docking tool 3 is located in the same plane as the rear guide transportation line 6, and finally another empty pallet 4 on the rear guide transportation line 6 is conveyed to the conveying mechanism on the lower layer of the multi-layer docking tool 3. Then the multi-layer docking tool 3 descends again, and steps F1-F9 are continuously executed in a cycle.
[0107] In this embodiment, the height of the sixth height position is the same as the height of the third height position.
[0108] The present invention is described above by way of example in conjunction with the accompanying drawings. Obviously, the specific implementation of the present invention is not limited to the above-mentioned methods. As long as various non-substantial improvements are made using the method concept and technical solution of the present invention; or the above concept and technical solution of the present invention are directly applied to other occasions without improvement, they are all within the protection scope of the present invention.
Claims
1. A transfer method for a transfer device for a roller AGV trolley, wherein the transfer device for the roller AGV trolley comprises a multi-layer docking tooling for transferring materials from the roller AGV trolley to a rear guide transport line and a lifting device connected to the multi-layer docking tooling and used to control the lifting of the multi-layer docking tooling; It is characterized in that The transfer method of the transfer device suitable for the roller AGV trolley comprises the following steps: F1, the multi-layer docking tooling is at the first height position, and the roller AGV trolley moves to the position where it docks with the multi-layer docking tooling; F2. After the multi-layer docking tooling is lowered, the multi-layer docking tooling is at the second height position, and then the pallet carrying materials on the roller AGV trolley moves to the multi-layer docking tooling; F3. After the multi-layer docking tooling is raised, the multi-layer docking tooling is at the first height position again, and the empty pallet on the multi-layer docking tooling is moved to the roller AGV trolley; F4, another roller AGV trolley moves to the position where it docks with the multi-layer docking tooling, and then the tray carrying the material on the roller AGV trolley moves to the multi-layer docking tooling; F5. After the multi-layer docking tooling rises, the multi-layer docking tooling is at the third height position, and another empty pallet on the multi-layer docking tooling is moved to the roller AGV trolley; F6, the multi-layer docking tool is at the fourth height position, and the pallet carrying the materials on the multi-layer docking tool is moved to the rear guide transport line, and the rear guide transport line transports the materials to the designated workstation; F7. After the multi-layer docking tooling is lowered, the multi-layer docking tooling is at the fifth height position, and another pallet carrying materials on the multi-layer docking tooling is moved to the rear guide transport line, and the rear guide transport line transports the materials to the designated workstation; F8. After the multi-layer docking tooling is raised, the multi-layer docking tooling is at the fourth height position again, and the rear guide transport line transports the empty pallet to the multi-layer docking tooling; F9. After the multi-layer docking tooling rises again, the multi-layer docking tooling is at the sixth height position, and the rear guide transport line transports another empty pallet to the multi-layer docking tooling; The multi-layer docking tooling includes a docking material rack and a conveying mechanism arranged on the docking material rack. Three conveying mechanisms are arranged and all conveying mechanisms are arranged in sequence along the vertical direction on the docking material rack.
2. The method for transferring a transfer device suitable for a roller AGV according to claim 1, It is characterized in that The lifting device comprises two lifting gantries arranged opposite to each other, and the multi-layer docking tooling is located between the two lifting gantries and connected to the two lifting gantries.
3. The method for transferring a transfer device suitable for a roller AGV according to claim 2, It is characterized in that The lifting gantry includes a vertically arranged channel steel column, an upper slide and a lower slide movably arranged on the channel steel column, and a lifting actuator connected to the lower slide and used to control the lower slide to rise and fall. The upper slide and the lower slide are connected to the multi-layer docking tooling, and the lower slide is located below the upper slide.
4. The method for transferring a transfer device suitable for a roller AGV according to claim 3, It is characterized in that The upper slide seat comprises an upper crossbeam, an upper movable frame connected to the upper crossbeam, and a roller rotatably arranged on the upper movable frame and in contact with the channel steel column, wherein a plurality of rollers are arranged.
5. The method for transferring a transfer device suitable for a roller AGV according to claim 3, It is characterized in that The lower sliding seat comprises a lower crossbeam connected to the lifting actuator, a lower moving frame connected to the lower crossbeam, and a roller rotatably arranged on the lower moving frame and in contact with the channel steel column, wherein a plurality of rollers are arranged.
6. A method for transporting a transport device suitable for a roller AGV trolley according to any one of claims 1 to 5, It is characterized in that The conveying mechanism is composed of a plurality of powered rollers.
