Air volume adjustment method, device and electronic equipment

By adjusting the fan operating power of the blower in the central range hood system in real time and determining the air replenishment range according to the exhaust air volume, the problem of insufficient and delay in kitchen air replenishment in the existing technology is solved, and the effective emission of oil fume and users are achieved Improvement of experience.

CN114543139BActive Publication Date: 2024-12-17HANGZHOU ROBAM APPLIANCES CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202210149702.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-02-18
Publication Date
2024-12-17
Estimated Expiration
2042-02-18

AI Technical Summary

Technical Problem

The existing kitchen air replenishment technology has problems such as unclear air replenishment volume, insufficient and delayed, resulting in poor oil fume emissions and affecting the user experience.

Method used

By introducing air volume adjustment methods and devices into the central range hood system, air pressure data is collected using the air replenishment controller and exhaust pressure pickup pipe, and the fan operation power of the air replenishment fan is adjusted in real time to ensure that the air replenishment air is within the preset range. , achieve close linkage with exhaust air volume and ensure effective emission of oil fume.

Benefits of technology

It realizes effective emission of oil fume in the kitchen, improves user experience, ensures close connection between air replenishment and exhaust, and ensures good ventilation in the kitchen environment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114543139B_ABST
    Figure CN114543139B_ABST
Patent Text Reader

Abstract

The embodiment of the present application provides a method, device and electronic device for adjusting air volume, wherein the target air supply fan is operated when a gear position signal sent by a target main control module of a powered-on target terminal is received; the air pressure in the first pipe of the exhaust duct collected by the exhaust pressure taking pipe and the air pressure in the second pipe of the supply duct collected by the supply pressure taking pipe are obtained; the exhaust air volume of the exhaust duct is calculated based on the air pressure in the first pipe, and the supply air volume of the supply air duct is calculated based on the air pressure in the second pipe; the supply air volume interval range is determined according to the exhaust air volume; if the monitored supply air volume is not within the supply air volume interval range, the fan operating power of the target supply air fan is adjusted until the supply air volume is within the supply air volume interval range. In this embodiment, the supply air volume is accurately determined based on the exhaust air volume, and the supply air and exhaust air are closely linked to achieve linkage supply air, which effectively discharges kitchen fumes, thereby improving the user experience.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of intelligent range hoods, and in particular to a method, device and electronic equipment for adjusting air volume. Background Art

[0002] As society progresses, people have higher and higher requirements for the quality of life. A beautifully decorated kitchen with complete kitchen appliances has become an indispensable part of every family, and a range hood is a must-have appliance in the kitchen. Whenever you cook in the kitchen, you will turn on the range hood to exhaust the fumes, and at the same time, you will close the kitchen door to prevent the unexhausted fumes and odors from spreading to the living room or bedroom. However, the kitchen space is generally small. When the range hood is running continuously, the entire kitchen space will be drawn into a negative pressure state by the range hood. At this time, if there is no new air supply source, the exhaust effect of the range hood will be greatly reduced, and even the fumes will hardly be exhausted. At the same time, the polluted gas in the sewer will be sucked into the kitchen environment. Therefore, it is very necessary to replenish the air in the kitchen.

[0003] At present, the purpose of adding air to the kitchen is achieved by opening windows, but the wind outside the window is generally strong, which can easily disturb the airflow in the kitchen and cause oil smoke to escape. In addition, the existing kitchen air supply technology is based on the judgment and control of the indoor and outdoor pressure difference. There are problems such as unclear and insufficient air supply volume and delayed air supply, which is not conducive to oil fume emission and reduces the user experience. Summary of the invention

[0004] In view of this, the purpose of the present invention is to provide a method, device and electronic device for air volume regulation, which can accurately determine the air volume of the kitchen according to the exhaust air volume of the kitchen, effectively discharge the kitchen fumes, and thus improve the user experience.

[0005] In a first aspect, an embodiment of the present invention provides a method for adjusting air volume, wherein the method is applied to the air supply controller of the air supply fans on each floor in a central range hood system, wherein the central range hood system further comprises an exhaust air pressure taking pipe, an air supply pressure taking pipe and a main control module of a terminal machine which are on the same floor as the air supply controller and are communicatively connected thereto, wherein one side of the exhaust air pressure taking pipe is installed in the exhaust air duct of the terminal machine, and the other side is connected to the air supply controller, and one side of the air supply pressure taking pipe is installed in the air supply duct of the air supply fan, and the other side is connected to the air supply controller; the method comprises: receiving a signal from a target terminal machine which is turned on The target supply air fan is operated according to the gear signal sent by the target main control module of the machine; the wind pressure in the first pipe of the exhaust duct of the target terminal machine collected by the exhaust pressure taking pipe and the wind pressure in the second pipe of the supply air duct of the target supply air fan collected by the supply air pressure taking pipe are obtained; the exhaust air volume of the exhaust duct is calculated based on the wind pressure in the first pipe, and the supply air volume of the supply air duct is calculated based on the wind pressure in the second pipe; the supply air volume range is determined according to the exhaust air volume; if the monitored supply air volume is not within the supply air volume range, the fan operating power of the target supply air fan is adjusted until the supply air volume is within the supply air volume range.

[0006] In combination with the first aspect, an embodiment of the present invention provides a first possible implementation method of the first aspect, wherein the step of adjusting the fan operating power of the target make-up air fan until the make-up air volume is within the make-up air volume range includes: querying the first fan operating power corresponding to the make-up air volume from a fan operating power query table; wherein the fan operating power query table stores the correspondence between the make-up air volume and the fan operating power; starting from the first fan operating power, successively adjusting the fan operating power of the target make-up air fan according to a preset power adjustment step until the make-up air volume is within the make-up air volume range.

[0007] In combination with the first aspect, an embodiment of the present invention provides a second possible implementation of the first aspect, wherein the central range hood system also includes a host machine communicatively connected to the air supply controller of the air supply fans on each floor and the main control module of the terminal machine, each terminal machine is connected to the common flue through an exhaust duct, and a power distribution valve is provided on the exhaust duct, and the power distribution valve is communicatively connected to the host machine; the method also includes: sending the exhaust air volume to the host machine to trigger the host machine to determine whether the exhaust air volume is within a preset exhaust air volume range, and if not, adjusting the valve angle of the power distribution valve and / or the host operating power of the host machine until the exhaust air volume is within the preset exhaust air volume range.

[0008] In combination with the second possible implementation of the first aspect, an embodiment of the present invention provides a third possible implementation of the first aspect, wherein the method further includes: triggering the host to receive a gear signal to extract the operating condition information carried in the gear signal; wherein the operating condition information carries the air intake volume and floor information required by the target terminal, and the air intake volume is obtained by the target main control module by obtaining the gear information sent by the control panel of the target terminal and calculating based on the gear information, and the target main control module is pre-configured with the floor information of the target terminal; adjusting the host to the first host operating power according to the air intake volume required by the target terminal; under the first host operating power, adjusting the valve angle of the power distribution valve corresponding to the target terminal to the first valve angle according to the operating condition information.

[0009] In combination with the third possible implementation of the first aspect, an embodiment of the present invention provides a fourth possible implementation of the first aspect, wherein, under the operating power of the first host, the step of adjusting the angle of the valve of the power distribution valve corresponding to the target terminal to the first valve angle according to the operating condition information includes: searching the angle adjustment data table for the first valve angle that matches the operating power and operating condition information of the first host; wherein the angle adjustment data table stores the correspondence between the valve angle of the valve of the power distribution valve and the operating power and operating condition information; adjusting the angle of the valve of the power distribution valve corresponding to the target terminal to the first valve angle.

[0010] In combination with the third possible implementation of the first aspect, the embodiment of the present invention provides a fifth possible implementation of the first aspect, wherein the step of adjusting the valve angle of the power distribution valve and / or the host operating power of the host until the exhaust air volume is within a preset exhaust air volume range includes: if the monitored exhaust air volume is less than the preset exhaust air volume range and the first valve angle is not the maximum valve angle, or the monitored exhaust air volume is greater than the preset exhaust air volume range and the first valve angle is not the minimum valve angle, the angle of the valve of the power distribution valve is adjusted successively according to the preset valve angle adjustment step until the exhaust air volume is within a preset exhaust air volume range. The air volume is within the preset exhaust volume range or the valve angle of the power distribution valve reaches the maximum valve angle or the minimum valve angle; if the monitored exhaust volume is less than the preset exhaust volume range and the first valve angle is the maximum valve angle, or the monitored exhaust volume is greater than the preset exhaust volume range and the first valve angle is the minimum valve angle, adjust the operating power of the host to the second host operating power, and continue to adjust the valve angle of the power distribution valve under the second host operating power until the exhaust volume is within the preset exhaust volume range; wherein, the second host operating power is greater than or less than the first host operating power.

[0011] In combination with the fifth possible implementation of the first aspect, an embodiment of the present invention provides a sixth possible implementation of the first aspect, wherein the step of successively adjusting the angle of the valve of the power distribution valve according to a preset valve angle adjustment step comprises: searching for a first specified angle matching the first valve angle in an angle adjustment data table; wherein the angle adjustment data table also stores a plurality of designated angles corresponding to the valves that increase in stages; and starting from the specified angle, successively adjusting the angle of the valve of the power distribution valve according to the valve angle adjustment step.

[0012] In combination with the second possible implementation of the first aspect, the embodiment of the present invention provides a seventh possible implementation of the first aspect, wherein the air supply fan also includes an air supply fan housing, a pressure equalizing chamber, a pressure equalizing orifice plate, air outlet louvers, an air chamber partition, a fan, a purifier, a reducer and a rain cover, wherein the fan is communicatively connected with an air supply controller, and the air supply controller is installed on the outer side of the air supply fan housing; the pressure equalizing orifice plate is installed in the pressure equalizing chamber and is placed between the air outlet louvers and the air outlet of the fan; the air chamber partition is installed in the air supply fan housing; the fan It is installed on the air chamber partition, and the air outlet is placed in the pressure equalizing chamber; the purifier is installed in the air supply machine casing and placed at the front end of the fan; the air outlet end of the reducer is installed at the air inlet end of the air supply machine casing, and the air inlet end is connected to the air outlet end of the air supply duct; the air inlet end of the air supply duct is connected to the rain cover; the step of receiving the gear signal sent by the target main control module of the powered-on target terminal to run the target air supply fan includes: generating an air supply control instruction corresponding to the gear signal; sending the air supply control instruction to the fan to control the operation of the fan.

[0013] In combination with the seventh possible implementation of the first aspect, an embodiment of the present invention provides an eighth possible implementation of the first aspect, wherein the method further includes: receiving a stop signal sent by the target main control module of the target terminal; triggering the host to receive the stop signal within a preset time, so that the host generates a first stop control instruction corresponding to the stop signal to control the host and the power distribution valve to close, and generates a second stop control instruction corresponding to the stop signal within the preset time to control the fan to stop running.

[0014] In a second aspect, an embodiment of the present invention further provides a device for regulating air volume, wherein the device is applied to the air supply controllers of the air supply fans on each floor in a central range hood system, wherein the central range hood system further comprises an exhaust air pressure taking pipe, an air supply pressure taking pipe and a main control module of a terminal which are on the same floor as the air supply controller and are communicatively connected thereto, wherein one side of the exhaust air pressure taking pipe is installed in the exhaust air duct of the terminal, and the other side is connected to the air supply controller, and one side of the air supply pressure taking pipe is installed in the air supply duct of the air supply fan, and the other side is connected to the air supply controller; the device comprises: a receiving module for receiving a signal sent by the target main control module of the target terminal which is turned on The target supply air fan is operated according to the gear signal; an acquisition module is used to obtain the first pipe inner wind pressure of the exhaust duct of the target terminal collected by the exhaust pressure taking pipe, and the second pipe inner wind pressure of the supply air duct of the target supply air fan collected by the supply air pressure taking pipe; a calculation module is used to calculate the exhaust air volume of the exhaust duct based on the first pipe inner wind pressure, and to calculate the supply air volume of the supply air duct based on the second pipe inner wind pressure; a determination module is used to determine the supply air volume interval according to the exhaust air volume; an adjustment module is used to adjust the fan operating power of the target supply air fan if the monitored supply air volume is not within the supply air volume interval, until the supply air volume is within the supply air volume interval.

[0015] In a third aspect, an embodiment of the present invention further provides an electronic device, which includes a processor and a memory, the memory stores computer-executable instructions that can be executed by the processor, and the processor executes the computer-executable instructions to implement the above method.

[0016] In a fourth aspect, an embodiment of the present invention further provides a computer-readable storage medium, wherein the computer-readable storage medium stores computer-executable instructions, and when the computer-executable instructions are called and executed by a processor, the computer-executable instructions prompt the processor to implement the above method.

[0017] The embodiments of the present invention bring the following beneficial effects:

[0018] The embodiment of the present application provides a method, device and electronic device for adjusting air volume, wherein the target air supply fan is operated when a gear position signal sent by a target main control module of a powered-on target terminal is received; the air pressure in the first pipe of the exhaust duct of the target terminal collected by the exhaust pressure taking pipe and the air pressure in the second pipe of the air supply duct of the target air supply fan collected by the air supply pressure taking pipe are obtained; the exhaust air volume of the exhaust duct is calculated based on the air pressure in the first pipe, and the air supply air volume of the air supply duct is calculated based on the air pressure in the second pipe; the air supply air volume interval range is determined according to the exhaust air volume; if the monitored air supply air volume is not within the air supply air volume interval range, the fan operating power of the target air supply fan is adjusted until the air supply air volume is within the air supply air volume interval range. The present application can adjust the fan operating power of the air supply fan in real time, so that the adjusted air supply air volume is within the air supply air volume interval range determined based on the exhaust air volume. In the present embodiment, the air supply air volume is accurately determined based on the exhaust air volume. The air supply air volume is closely linked with the exhaust air volume to realize linkage air supply, effectively discharge kitchen fumes, and thus improve the user experience.

[0019] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention are realized and obtained by the structures particularly pointed out in the description and the drawings.

[0020] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, preferred embodiments are given below and described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without paying any creative work.

[0022] Figure 1 A schematic structural diagram of a central range hood system provided by an embodiment of the present invention;

[0023] Figure 2 A flow chart of a method for adjusting air volume provided by an embodiment of the present invention;

[0024] Figure 3 A schematic structural diagram of another central range hood system provided by an embodiment of the present invention;

[0025] Figure 4 A schematic diagram of the installation of a central range hood system provided by an embodiment of the present invention;

[0026] Figure 5 A flow chart of another method for adjusting air volume provided by an embodiment of the present invention;

[0027] Figure 6 A schematic structural diagram of a supplementary air fan provided in an embodiment of the present invention;

[0028] Figure 7 A schematic diagram of the structure of an air volume regulating device provided in an embodiment of the present invention;

[0029] Figure 8 A schematic diagram of the structure of an electronic device provided by an embodiment of the present invention.

[0030] icon:

[0031] 100-supply air fan; 101-supply air controller; 102-exhaust air pressure taking pipe; 103-supply air pressure taking pipe; 104-terminal; 105-main control module; 300-host; 301-power distribution valve; 400-host mounting seat; 401-roof plate; 402-public flue; 403-exhaust duct; 404-cooker; 405-supply air duct; 406-ceiling; 600-fan box; 601-equalizing pressure chamber; 602-equalizing pressure orifice plate; 603-air outlet louver; 604-wind chamber partition; 605-fan; 606-purifier; 607-reducing pipe; 608-rain cover. DETAILED DESCRIPTION

[0032] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.

[0033] Taking into account that the existing window-opening for air supply may cause disturbances in the air flow in the kitchen and cause the escape of oil smoke, and that the kitchen air supply based on the indoor and outdoor pressure difference has problems such as unclear and insufficient air supply volume and delayed air supply, based on this, an air volume adjustment method, device and electronic equipment provided in an embodiment of the present invention can adjust the fan operating power of the air supply fan in real time, so that the adjusted air supply volume is within the air supply volume range determined based on the exhaust air volume. In this embodiment, the air supply volume is accurately determined based on the exhaust air volume, and the air supply and exhaust are closely linked to achieve linked air supply, which effectively discharges kitchen oil smoke, thereby improving the user experience.

[0034] To facilitate understanding of this embodiment, the air volume adjustment method provided by the embodiment of the present invention is first described in detail below. The execution subject is the air supply controller, Figure 1A schematic diagram of the structure of a central range hood system is shown. Figure 1 As shown, the system includes an air supply controller 101 of each floor supply fan 100, and also includes an exhaust air pressure taking pipe 102, an air supply pressure taking pipe 103 and a main control module 105 of a terminal 104 on the same floor as the air supply controller 101 and connected to the exhaust air supply controller 101. One side of the exhaust air pressure taking pipe 102 is installed on the exhaust air duct of the terminal 104 ( Figure 1 The other side is connected to the air supply controller 101, and one side of the air supply pressure pipe 103 is installed in the air supply duct of the air supply fan 100 ( Figure 1 (not shown in the figure), and the other side is connected to the air supply controller 101.

[0035] The exhaust air pressure taking pipe 102 and the supply air pressure taking pipe 103 are pipeline equipment capable of measuring pipeline pressure. In this embodiment, each floor is only equipped with one terminal and supply air fan, so it is sufficient to install one exhaust air pressure taking pipe and one supply air pressure taking pipe on each floor, and the supply air fan can be installed at any position of the kitchen space where the terminal is located as required, which is not limited here.

[0036] This embodiment provides a method for adjusting the air volume. Figure 2 A flow chart of a method for adjusting air volume is shown, and the method specifically comprises the following steps:

[0037] Step S202, receiving a gear position signal sent by a target main control module of a powered-on target terminal to operate a target air supply fan;

[0038] In specific applications, a control panel is provided on each terminal, and the control panel may be a touch panel, a mechanical button panel, an infrared control panel or a mobile terminal panel, etc., and a gear button for controlling the air intake volume is provided on the control panel. The turned-on target terminal can obtain the corresponding gear signal by the user controlling the gear button. When the target terminal is turned on for exhaust operation, the target air supply fan also starts to operate for air supply. The target air supply fan and the target terminal are in the same kitchen space.

[0039] Step S203, obtaining the first pipe internal wind pressure of the exhaust duct of the target terminal collected by the exhaust pressure pipe, and the second pipe internal wind pressure of the supply air duct of the target supply air fan collected by the supply air pressure pipe;

[0040] The first in-duct wind pressure mentioned above includes the in-duct total pressure Pta and the in-duct static pressure Psa of the exhaust duct. Similarly, the second in-duct wind pressure includes the in-duct total pressure Ptb and the in-duct static pressure Psb of the supply air duct.

[0041] Step S206, calculating the exhaust air volume of the exhaust duct based on the wind pressure in the first duct, and calculating the supply air volume of the supply air duct based on the wind pressure in the second duct;

[0042] The difference between the total pressure Pta and the static pressure Psa in the first pipe is used to calculate the difference between them, and the difference result Pa is obtained. The difference between the total pressure Ptb and the static pressure Psb in the second pipe is used to calculate the difference between them, and the difference result Pb is obtained. The Pa value is related to the air volume Q1 (m 3 / h) is linearly related to the square of the coefficient, which is recorded as Ka, and the formula is Pa = KaQ1 2 ; Pb value and air volume Q2 (m 3 / h) is linearly related to the square of the coefficient, which is recorded as Kb and expressed as Pb = KbQ2 2 The values ​​of Ka and Kb are generally constants, which are usually pre-stored in the above-mentioned air supply controller and directly called. Here, the inner diameters of the exhaust duct and the air supply duct are designed to be the same, so Ka≈Kb is taken. According to the above formula, the air volume over a period of time is calculated, and the average is taken after filtering out the bad data to obtain the exhaust air volume Qa of the exhaust duct and the supply air volume Qb of the supply air duct.

[0043] Step S208, determining the range of the supply air volume according to the exhaust air volume;

[0044] In this embodiment, in order to ensure effective exhaust volume while maintaining a slight negative pressure in the kitchen space, the make-up air volume Qb is always controlled within a certain air volume range. Therefore, after the exhaust air volume Qa is calculated and determined through step S208, a determined make-up air volume range (0.85Qa~0.95Qa) can be obtained. The above-mentioned make-up air volume range can be set according to actual needs and is not limited here.

[0045] Step S210: If the monitored make-up air volume is not within the make-up air volume interval, adjust the fan operating power of the target make-up air fan until the make-up air volume is within the make-up air volume interval.

[0046] If Qb<0.85Qa, it is determined that the make-up air volume is insufficient, and the fan operating power of the make-up air fan needs to be increased until the make-up air volume Qb is in the range of 0.85Qa~0.95Qa; if Qb>0.95Qa, it is determined that the make-up air volume is too large, and the fan operating power of the make-up air fan needs to be reduced until the make-up air volume Qb is in the range of 0.85Qa~0.95Qa.

[0047] The specific adjustment process can be achieved through steps A1 to A2:

[0048] Step A1, querying the first fan operating power corresponding to the makeup air volume from the fan operating power query table;

[0049] The fan operating power query table stores the correspondence between the makeup air volume and the fan operating power; the correspondence can be set according to actual needs and is not limited here. The fan operating power query table can be used to find the operating power corresponding to the makeup air volume calculated above, and the found operating power is determined as the first fan operating power of the makeup air fan.

[0050] Step A2, starting from the first fan operating power, successively adjusting the fan operating power of the target supplementary air fan according to a preset power adjustment step length until the supplementary air volume is within the supplementary air volume range.

[0051] Usually, there are multiple specific fan operating powers for the make-up air fan, and different specific fan operating powers correspond to different make-up air volumes. The make-up air volume is adjusted by adjusting the fan operating power of the make-up air fan. In this embodiment, a specified power matching the first fan operating power is found from multiple specific fan operating powers, and the fan operating power of the make-up air fan is increased or decreased from the specified power according to a preset power adjustment step until the make-up air volume is within the make-up air volume range. For example, multiple specific fan operating powers are 20W, 50W, 80W, 120W, 150W, 200W, and 220W. Currently, Qb is less than 0.85Qa, and the fan operating power needs to be increased. If the first fan operating power is 50W, the power adjustment step is 1, and the adjusted second fan operating power is 80W. If the make-up air volume corresponding to the current fan operating power is within the make-up air volume range, there is no need to adjust the fan operating power. If the make-up air volume Qb is still less than 0.85Qa, it is necessary to increase the fan operating power. Similarly, the process of adjusting the fan operating power when the supplementary air volume Qb>0.95Qa is the same as above, which will not be described in detail here. The above power adjustment step can be set according to actual needs and is not limited here.

[0052] The embodiment of the present application provides a method for adjusting air volume, wherein the target air supply fan is operated when a gear position signal sent by a target main control module of a powered-on target terminal is received; the wind pressure in the first pipe of the exhaust duct of the target terminal collected by the exhaust pressure taking pipe and the wind pressure in the second pipe of the supply duct of the target air supply fan collected by the supply pressure taking pipe are obtained; the exhaust air volume of the exhaust duct is calculated based on the wind pressure in the first pipe, and the supply air volume of the supply air duct is calculated based on the wind pressure in the second pipe; the supply air volume interval range is determined according to the exhaust air volume; if the monitored supply air volume is not within the supply air volume interval range, the fan operating power of the target supply air fan is adjusted until the supply air volume is within the supply air volume interval range. The present application can adjust the fan operating power of the supply air fan in real time, so that the adjusted supply air volume is within the supply air volume interval range determined based on the exhaust air volume. In the present embodiment, the supply air volume is accurately determined based on the exhaust air volume. The supply air and the exhaust air are closely linked to realize linkage supply air, which effectively discharges kitchen fumes, thereby improving the user experience.

[0053] exist Figure 1 On the basis of Figure 3 Also shown is a schematic diagram of the structure of another central range hood system, such as Figure 3 As shown, the central range hood system also includes a host 300 that is connected to the air supply controller 101 of the air supply fan 100 on each floor and the main control module 105 of the terminal 104. Each terminal 104 is connected to the main control module 105 of the terminal 104 through the exhaust duct ( Figure 3 Not shown) and the public flue ( Figure 3 The exhaust duct is provided with a power distribution valve 301, and the power distribution valve 301 is communicatively connected with the host 300.

[0054] For ease of understanding, Figure 4 A schematic diagram of the installation of a central range hood system is shown. Figure 4 As shown, the installation on one floor is used as a schematic illustration, and the main unit 300 is installed above or on the side of the main unit mounting base 400; the main unit mounting base 400 is cast at the outlet of the public flue 402 above the roof slab 401, and the inner side is connected to the public flue to form a through exhaust passage; the power distribution valve 301 is installed at the opening of the public flue 402 on the floor; one end of the exhaust duct 403 is connected to the power distribution valve 301, and the other end is connected to the terminal 104; one end of the exhaust pressure taking pipe 102 is installed in the middle position of the straight pipe section of the exhaust duct 403, and the other end is connected to the make-up air controller 101; one end of the make-up air pressure taking pipe 103 is installed in the middle position of the straight pipe section of the make-up air duct 405, and the other end is connected to the make-up air controller 101; the terminal 104 is installed above the cooker 404; the make-up air fan 100 is installed at any position in the ceiling 406.

[0055] The above host can realize exhaust air volume control. This embodiment provides another air volume adjustment method, which is implemented on the basis of the above embodiment; this embodiment focuses on describing the specific implementation method of exhaust air volume adjustment. Figure 5 The flow chart of another method for adjusting the air volume is shown in FIG. 1 . The method for adjusting the air volume in this embodiment includes the following steps:

[0056] Step S502, receiving a gear position signal sent by a target main control module of a powered-on target terminal to operate a target air supply fan;

[0057] Figure 6 A schematic diagram of the structure of a supplementary air blower is shown. Figure 6 As shown, the air supply fan also includes an air supply fan housing 600, a pressure equalizing chamber 601, a pressure equalizing orifice plate 602, an air outlet louver 603, an air chamber partition 604, a fan 605, a purifier 606, a reducer 607 and a rain cover 608, wherein the fan 605 is communicatively connected with the air supply controller 101, and the air supply controller 101 is installed on the outer side of the air supply fan housing 600; the pressure equalizing orifice plate 602 is installed in the pressure equalizing chamber 601 and is placed between the air outlet louver 603 and the fan 605. Between the air outlets; the air chamber partition 604 is installed in the air supply machine case 600; the fan 605 is installed on the air chamber partition 604, and the air outlet is placed in the pressure equalization chamber 601; the purifier 606 is installed in the air supply machine case 600 and is placed at the front end of the fan 605; the air outlet end of the reducer 607 is installed at the air inlet end of the air supply machine case 600, and the air inlet end is connected to the air outlet end of the air supply duct 405; the air inlet end of the air supply duct 405 is connected to the rain cover 608.

[0058] After the air supply controller receives the gear signal, it generates an air supply control instruction corresponding to the gear signal; the air supply control instruction is sent to the fan to control the operation of the fan to supply air to the kitchen room; the air supply is mainly powered by the fan in the air supply fan, and the outdoor air passes through the rain cover → air supply duct → reducer → purifier → uniform cavity → equalizing orifice plate → air outlet louver and then enters the kitchen space at a low wind speed.

[0059] Step S504, obtaining the first pipe internal wind pressure of the exhaust duct of the target terminal collected by the exhaust pressure pipe, and the second pipe internal wind pressure of the supply air duct of the target supply air fan collected by the supply air pressure pipe;

[0060] Step S506, calculating the exhaust air volume of the exhaust duct based on the wind pressure in the first duct, and calculating the supply air volume of the supply air duct based on the wind pressure in the second duct;

[0061] Step S508, sending the exhaust air volume to the host to trigger the host to determine whether the exhaust air volume is within a preset exhaust air volume range, and if not, adjusting the valve angle of the power distribution valve and / or the host operating power of the host until the exhaust air volume is within the preset exhaust air volume range;

[0062] The above preset exhaust air volume range can be set according to actual needs and is not limited here. In this embodiment, the above preset exhaust air volume range is set to 600±50m 3 / h, if the exhaust air volume Qa<550m 3 / h, the exhaust air volume is judged to be insufficient, and it is necessary to increase the main engine operating power and / or increase the opening angle of the power distribution valve to increase the exhaust air volume until the exhaust air volume Qa is 600±50m 3 / h range; if the exhaust air volume Qa>650m 3 / h, the exhaust air volume is judged to be too large, and it is necessary to reduce the main engine operating power and / or reduce the opening angle of the power distribution valve to reduce the exhaust air volume until the exhaust air volume Qa is 600±50m 3 / h range.

[0063] In this embodiment, the exhaust air volume can be adjusted through steps B1 to B2:

[0064] Step B1, if the monitored exhaust air volume is less than the preset exhaust air volume interval and the first valve angle is not the maximum valve angle, or the monitored exhaust air volume is greater than the preset exhaust air volume interval and the first valve angle is not the minimum valve angle, the angle of the valve of the power distribution valve is adjusted successively according to the preset valve angle adjustment step until the exhaust air volume is within the preset exhaust air volume interval or the angle of the valve of the power distribution valve reaches the maximum valve angle;

[0065] Among them, the first valve angle and the first host operating power are determined according to the operating condition information carried in the gear signal when the target terminal starts to run. After the host receives the gear signal, the operating condition information carried in the gear signal is extracted; the host is adjusted to the first host operating power according to the air intake volume required by the target terminal; under the first host operating power, the valve angle of the power distribution valve corresponding to the target terminal is adjusted to the first valve angle according to the operating condition information.

[0066] Among them, the working condition information carries the air intake volume required by the target terminal and the floor information where it is located, and the air intake volume is obtained by the target main control module by obtaining the gear information sent by the control panel of the target terminal, and is calculated based on the gear information. The target main control module is pre-configured with the floor information where the target terminal is located; in this embodiment, the main control module of each terminal is pre-configured with the floor information of the floor where the terminal is located, and the floor information can be understood as the unique identification information of the floor, which can be represented by the floor number, and the representation method of the floor information is not limited here. The air intake volume corresponding to the gear signal can be further queried in the air intake query table, wherein the corresponding relationship between the gear signal and the air intake volume is stored in the air intake query table.

[0067] The host pre-stores a host operating power query table in the host operating power query table, which stores the correspondence between the host operating power and the air intake volume. The correspondence can be set according to actual needs and is not limited here. The host operating power corresponding to the air intake volume required by the target terminal can be found through the host operating power query table, and the found host operating power is determined as the first host operating power.

[0068] Determining the first valve angle of the power distribution valve based on the operating power and operating condition information of the first host is also achieved by looking up a table. Specifically, the first valve angle that matches the operating power and operating condition information of the first host is searched in the angle adjustment data table; wherein the angle adjustment data table stores the correspondence between the valve angle of the power distribution valve and the operating power and operating condition information; and adjusting the valve angle of the power distribution valve corresponding to the target terminal to the first valve angle.

[0069] The above correspondence can be understood as different host operating power and working condition information corresponding to the angle of a valve. The correspondence can be set according to actual needs and is not limited here.

[0070] In this embodiment, when the exhaust air volume is less than the preset exhaust air volume interval and the first valve angle is not the maximum valve angle, or the exhaust air volume is greater than the preset exhaust air volume interval and the first valve angle is not the minimum valve angle, the exhaust air volume can be adjusted by adjusting the angle of the valve of the power distribution valve. The specific process of adjusting the valve is: searching for a first specified angle matching the first valve angle in the angle adjustment data table; wherein the angle adjustment data table also stores a plurality of specified angles corresponding to the valves that increase in stages; starting from the specified angle, the angle of the valve of the power distribution valve is adjusted successively according to the valve angle adjustment step.

[0071] For example, the angle adjustment data table stores step-by-step increasing designated angles of 3 degrees, 8 degrees, 10 degrees, 15 degrees, 40 degrees, 70 degrees, 90 degrees, and 100 degrees. If the first designated angle matched by the first angle is 15 degrees, and the exhaust air volume is less than the preset exhaust air volume range, the valve angle needs to be increased. If the valve angle adjustment step is 2, the angle of the valve after the first adjustment is 70 degrees. If the exhaust air volume corresponding to the current valve angle is within the preset exhaust air volume range, there is no need to adjust the valve angle. If the exhaust air volume is still less than the preset exhaust air volume range, the valve angle needs to be increased. Similarly, the process of adjusting the valve angle when the exhaust air volume is greater than the preset exhaust air volume range is the same as above and will not be repeated here. The above valve angle adjustment step can be set according to actual needs and is not limited here.

[0072] Step B2, if the monitored exhaust air volume is less than the preset exhaust air volume interval and the first valve angle is the maximum valve angle, or the monitored exhaust air volume is greater than the preset exhaust air volume interval and the first valve angle is the minimum valve angle, adjust the operating power of the host to the second host operating power, and continue to adjust the valve angle of the power distribution valve under the second host operating power until the exhaust air volume is within the preset exhaust air volume interval; wherein the second host operating power is greater than or less than the first host operating power.

[0073] When the valve angle cannot be adjusted or the exhaust air volume is still not within the preset exhaust air volume range after the valve is adjusted to the maximum valve angle or the minimum valve angle, the exhaust air volume can be adjusted by adjusting the host operating power of the host.

[0074] Under the second operating power, the angle of the valve of the power distribution valve is readjusted until the exhaust air volume is within the preset exhaust air volume range or the angle of the valve of the power distribution valve reaches the maximum valve angle or the minimum valve angle. The process of adjusting the angle of the valve of the power distribution valve is the same as above and will not be repeated here.

[0075] If the exhaust air volume is still not within the preset exhaust air volume range after the valve angle of the power distribution valve is adjusted under the second operating power, the host operating power of the main engine is increased or decreased, and the valve angle of the power distribution valve is readjusted under the increased or decreased host operating power, and the above process is repeated.

[0076] If the second operating power or the increased operating power is the maximum host operating power, if the exhaust air volume is still not within the preset exhaust air volume range, an alarm may be issued to prompt maintenance personnel or users to perform maintenance.

[0077] Step S510, determining the range of the supply air volume according to the exhaust air volume;

[0078] Step S512: If the monitored make-up air volume is not within the make-up air volume interval, adjust the fan operating power of the target make-up air fan until the make-up air volume is within the make-up air volume interval.

[0079] Since the above-mentioned exhaust air volume is adjusted in real time, the determined make-up air volume range will also change accordingly, causing the make-up air volume to be adjusted in real time to meet the make-up air requirements. Since the exhaust and make-up air are carried out in conjunction, the kitchen can be effectively exhausted and made-up, and the fumes can be discharged in time.

[0080] Usually, in order to eliminate the remaining oil smoke in the kitchen as much as possible after the target terminal is shut down, the main unit, the power distribution valve and the air supply fan can be shut down for a period of time after the target terminal is shut down. Specifically, a stop signal sent by the target main control module of the target terminal is received; the host is triggered to receive the stop signal within a preset time, so that the host generates a first stop control instruction corresponding to the stop signal to control the host and the power distribution valve to close, and generates a second stop control instruction corresponding to the stop signal within a preset time to control the fan to stop running.

[0081] Usually, a switch button is also provided on the control panel. After receiving the switch button signal of the switch button, the control panel sends a stop signal corresponding to the switch button signal to the main control module. The main control module sends the stop signal to the air supply controller. The air supply controller can stop the operation of the fan within a preset time. At the same time, after the host receives the stop signal within the preset time, the host and the power distribution valve are closed. The above preset time can be set according to actual needs and is not limited here.

[0082] Corresponding to the above method embodiment, the embodiment of the present invention provides a device for adjusting air volume, wherein the above device is applied to the air supply controller of the air supply fan on each floor in the central range hood system, and the central range hood system also includes an exhaust air pressure taking pipe, an air supply pressure taking pipe and a main control module of the terminal machine on the same floor as the air supply controller and communicatively connected thereto, wherein one side of the exhaust air pressure taking pipe is installed in the exhaust air duct of the terminal machine, and the other side is connected to the air supply controller, and one side of the air supply pressure taking pipe is installed in the air supply duct of the air supply fan, and the other side is connected to the air supply controller; Figure 7 A schematic diagram of the structure of a device for adjusting air volume is shown, Figure 7 As shown, the device comprises:

[0083] The receiving module 702 is used to receive a gear position signal sent by a target main control module of a powered-on target terminal to operate a target air supply fan;

[0084] The acquisition module 704 is used to acquire the first pipe internal wind pressure of the exhaust duct of the target terminal collected by the exhaust pressure pipe, and the second pipe internal wind pressure of the supply air duct of the target supply air fan collected by the supply air pressure pipe;

[0085] A calculation module 706, configured to calculate the exhaust air volume of the exhaust duct based on the wind pressure in the first duct, and to calculate the supply air volume of the supply air duct based on the wind pressure in the second duct;

[0086] A determination module 708 is used to determine a range of the supply air volume according to the exhaust air volume;

[0087] The adjustment module 710 is used to adjust the fan operating power of the target supplementary air fan if the monitored supplementary air volume is not within the supplementary air volume range, until the supplementary air volume is within the supplementary air volume range.

[0088] The embodiment of the present application provides a device for adjusting air volume, wherein the target air supply fan is operated when a gear position signal sent by a target main control module of a powered-on target terminal is received; the first pipe internal wind pressure of the exhaust duct of the target terminal collected by the exhaust pressure taking pipe and the second pipe internal wind pressure of the air supply duct of the target air supply fan collected by the air supply pressure taking pipe are obtained; the exhaust air volume of the exhaust duct is calculated based on the first pipe internal wind pressure, and the supply air volume of the supply air duct is calculated based on the second pipe internal wind pressure; the supply air volume interval range is determined according to the exhaust air volume; if the monitored supply air volume is not within the supply air volume interval range, the fan operating power of the target air supply fan is adjusted until the supply air volume is within the supply air volume interval range. The present application can adjust the fan operating power of the supply air fan in real time, so that the adjusted supply air volume is within the supply air volume interval range determined based on the exhaust air volume. In the present embodiment, the supply air volume is accurately determined based on the exhaust air volume. The supply air and the exhaust air are closely linked to realize linkage supply air, which effectively discharges kitchen fumes, thereby improving the user experience.

[0089] The device for regulating air volume provided in the embodiment of the present invention has the same technical features as the method for regulating air volume provided in the above embodiment, and therefore can solve the same technical problems and achieve the same technical effects.

[0090] The present application also provides an electronic device, such as Figure 8 As shown, it is a schematic diagram of the structure of the electronic device, wherein the electronic device includes a processor 121 and a memory 120, the memory 120 stores computer executable instructions that can be executed by the processor 121, and the processor 121 executes the computer executable instructions to implement the above-mentioned air volume adjustment method.

[0091] exist Figure 8 In the illustrated embodiment, the electronic device further includes a bus 122 and a communication interface 123 , wherein the processor 121 , the communication interface 123 and the memory 120 are connected via the bus 122 .

[0092] Among them, the memory 120 may include a high-speed random access memory (RAM), and may also include a non-volatile memory (non-volatile memory), such as at least one disk storage. The communication connection between the system network element and at least one other network element is realized through at least one communication interface 123 (which can be wired or wireless), and the Internet, wide area network, local area network, metropolitan area network, etc. can be used. The bus 122 can be an ISA (Industry Standard Architecture) bus, a PCI (Peripheral Component Interconnect) bus or an EISA (Extended Industry Standard Architecture) bus, etc. The bus 122 can be divided into an address bus, a data bus, a control bus, etc. For ease of representation, Figure 8 Only one bidirectional arrow is used in the diagram, but this does not mean that there is only one bus or only one type of bus.

[0093] The processor 121 may be an integrated circuit chip with signal processing capabilities. In the implementation process, each step of the above method can be completed by the hardware integrated logic circuit or software instructions in the processor 121. The above processor 121 can be a general-purpose processor, including a central processing unit (CPU), a network processor (NP), etc.; it can also be a digital signal processor (DSP), an application-specific integrated circuit (ASIC), a field-programmable gate array (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components. The general processor can be a microprocessor or the processor can also be any conventional processor. The steps of the method disclosed in the embodiment of the present application can be directly embodied as a hardware decoding processor to be executed, or the hardware and software modules in the decoding processor can be executed. The software module can be located in a mature storage medium in the field such as a random access memory, a flash memory, a read-only memory, a programmable read-only memory or an electrically erasable programmable memory, a register, etc. The storage medium is located in the memory, and the processor 121 reads the information in the memory and completes the steps of the air volume adjustment method of the above-mentioned embodiment in combination with its hardware.

[0094] An embodiment of the present application also provides a computer-readable storage medium, which stores computer-executable instructions. When the computer-executable instructions are called and executed by a processor, the computer-executable instructions prompt the processor to implement the above-mentioned air volume adjustment method. The specific implementation can be found in the aforementioned method embodiment, which will not be repeated here.

[0095] The air volume regulation method, device and computer program product of the central range hood system provided in the embodiments of the present application include a computer-readable storage medium storing program code. The instructions included in the program code can be used to execute the methods described in the previous method embodiments. The specific implementation can be found in the method embodiments, which will not be repeated here.

[0096] Unless otherwise specifically stated, the relative steps, numerical expressions and values ​​of the components and steps set forth in these embodiments do not limit the scope of the present application.

[0097] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a non-volatile computer-readable storage medium that is executable by a processor. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product, which is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk.

[0098] In the description of the present application, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present application. In addition, the terms "first", "second", and "secondary" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.

[0099] Finally, it should be noted that the above-described embodiments are only specific implementation methods of the present application, which are used to illustrate the technical solutions of the present application, rather than to limit them. The protection scope of the present application is not limited thereto. Although the present application is described in detail with reference to the above-described embodiments, ordinary technicians in the field should understand that any technician familiar with the technical field can still modify the technical solutions recorded in the above-described embodiments within the technical scope disclosed in the present application, or can easily think of changes, or make equivalent replacements for some of the technical features therein; and these modifications, changes or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present application, and should be included in the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the protection scope of the claims.

Claims

1. A method for adjusting air volume, characterized in that: The method is applied to the air supply controller of the air supply fan on each floor in the central range hood system, and the central range hood system also includes an exhaust air pressure taking pipe, an air supply pressure taking pipe and a main control module of the terminal which are on the same floor as the air supply controller and are communicatively connected to the air supply controller, wherein one side of the exhaust air pressure taking pipe is installed in the exhaust air duct of the terminal, and the other side is connected to the air supply controller, one side of the air supply pressure taking pipe is installed in the air supply duct of the air supply fan, and the other side is connected to the air supply controller; the method includes: Receive the gear position signal sent by the target main control module of the powered-on target terminal to operate the target air supply fan; Obtaining the first in-pipe wind pressure of the exhaust duct of the target terminal collected by the exhaust pressure-taking pipe, and the second in-pipe wind pressure of the supply air duct of the target supply air fan collected by the supply air pressure-taking pipe; Calculating the exhaust air volume of the exhaust duct based on the wind pressure in the first duct, and calculating the supply air volume of the supply air duct based on the wind pressure in the second duct; Determine the range of the supply air volume according to the exhaust air volume; If the monitored makeup air volume is not within the makeup air volume range, adjust the fan operating power of the target makeup air fan until the makeup air volume is within the makeup air volume range.

2. The method according to claim 1, characterized in that The step of adjusting the fan operating power of the target supply air fan until the supply air volume is within the supply air volume range comprises: Querying a first fan operating power corresponding to the makeup air volume from a fan operating power query table; wherein the fan operating power query table stores a corresponding relationship between the makeup air volume and the fan operating power; The fan operating power of the target supplementary air fan is adjusted successively according to a preset power adjustment step starting from the first fan operating power until the supplementary air volume is within the supplementary air volume range.

3. The method according to claim 1, characterized in that The central range hood system also includes a host computer that is communicatively connected to the air supply controller of the air supply fan on each floor and the main control module of the terminal computer. Each of the terminals is connected to the public flue through the exhaust duct. The exhaust duct is provided with a power distribution valve, and the power distribution valve is communicatively connected to the host computer. The method also includes: The exhaust air volume is sent to the host to trigger the host to determine whether the exhaust air volume is within a preset exhaust air volume range. If not, adjust the valve angle of the power distribution valve and / or the host operating power of the host until the exhaust air volume is within the preset exhaust air volume range.

4. The method according to claim 3, characterized in that The method further comprises: The host is triggered to receive the gear position signal to extract the working condition information carried in the gear position signal; wherein the working condition information carries the air intake volume required by the target terminal and the floor information where the target terminal is located, and the air intake volume is obtained by the target main control module by obtaining the gear position information sent by the control panel of the target terminal and calculating based on the gear position information, and the target main control module is pre-configured with the floor information where the target terminal is located; Adjusting the operating power of the host to the first host according to the air intake volume required by the target terminal; Under the operating power of the first host, the valve angle of the power distribution valve corresponding to the target terminal is adjusted to a first valve angle according to the operating condition information.

5. The method according to claim 4, characterized in that Under the operating power of the first host, the step of adjusting the valve angle of the power distribution valve corresponding to the target terminal to the first valve angle according to the operating condition information includes: Searching for a first valve angle that matches the operating power of the first host and the operating condition information in the angle adjustment data table; wherein the angle adjustment data table stores a correspondence between the valve angle of the power distribution valve and the operating power and operating condition information; The valve angle of the power distribution valve corresponding to the target terminal is adjusted to the first valve angle.

6. The method according to claim 5, characterized in that The step of adjusting the valve angle of the power distribution valve and / or the main engine operating power of the main engine until the exhaust air volume is within the preset exhaust air volume range includes: If the monitored exhaust air volume is less than the preset exhaust air volume interval and the first valve angle is not the maximum valve angle, or, the monitored exhaust air volume is greater than the preset exhaust air volume interval and the first valve angle is not the minimum valve angle, the angle of the valve of the power distribution valve is adjusted successively according to the preset valve angle adjustment step until the exhaust air volume is within the preset exhaust air volume interval or the angle of the valve of the power distribution valve reaches the maximum valve angle or the minimum valve angle; If the monitored exhaust air volume is less than the preset exhaust air volume interval and the first valve angle is the maximum valve angle, or, the monitored exhaust air volume is greater than the preset exhaust air volume interval and the first valve angle is the minimum valve angle, adjust the operating power of the host to the second host operating power, and continue to adjust the valve angle of the power distribution valve at the second host operating power until the exhaust air volume is within the preset exhaust air volume interval; wherein, the second host operating power is greater than or less than the first host operating power.

7. The method according to claim 6, characterized in that The step of adjusting the valve angle of the power distribution valve in sequence according to a preset valve angle adjustment step length comprises: Searching the angle adjustment data table for a first designated angle that matches the first valve angle; wherein the angle adjustment data table also stores a plurality of designated angles corresponding to the valve that increase in stages; Starting from the specified angle, the angle of the valve of the power distribution valve is adjusted successively according to the valve angle adjustment step.

8. The method according to claim 3, characterized in that The air supply fan also includes an air supply fan housing, a pressure equalizing chamber, a pressure equalizing orifice plate, air outlet louvers, an air chamber partition, a fan, a purifier, a reducer and a rain cover, wherein the fan is communicatively connected to the air supply controller, and the air supply controller is installed on the outer side of the air supply fan housing; the pressure equalizing orifice plate is installed in the pressure equalizing chamber and is placed between the air outlet louver and the air outlet of the fan; the air chamber partition is installed in the air supply fan housing; the fan is installed on the air chamber partition, and the air outlet is placed in the pressure equalizing chamber; the purifier is installed in the air supply fan housing and placed at the front end of the fan; the air outlet end of the reducer is installed at the air inlet end of the air supply fan housing, and the air inlet end is connected to the air outlet end of the air supply duct; the air inlet end of the air supply duct is connected to the rain cover; The step of receiving a gear position signal sent by a target main control module of a powered-on target terminal to operate a target air supply fan comprises: generating a supplementary air control instruction corresponding to the gear position signal; The air supply control instruction is sent to the fan to control the operation of the fan.

9. The method according to claim 8, characterized in that The method further comprises: Receiving a stop signal sent by a target main control module of the target terminal; The host is triggered to receive the stop signal within a preset time period, so that the host generates a first stop control instruction corresponding to the stop signal to control the host and the power distribution valve to close, and generates a second stop control instruction corresponding to the stop signal within the preset time period to control the fan to stop running.

10. A device for adjusting air volume, characterized in that: The device is applied to the air supply controller of the air supply fan on each floor in the central range hood system. The central range hood system also includes an exhaust air pressure taking pipe, an air supply pressure taking pipe and a main control module of the terminal on the same floor as the air supply controller and communicatively connected to the air supply controller, wherein one side of the exhaust air pressure taking pipe is installed in the exhaust air duct of the terminal, and the other side is connected to the air supply controller, one side of the air supply pressure taking pipe is installed in the air supply duct of the air supply fan, and the other side is connected to the air supply controller; the device includes: A receiving module, used for receiving a gear position signal sent by a target main control module of a powered-on target terminal to operate a target air supply fan; An acquisition module, used for acquiring a first in-pipe wind pressure of an exhaust duct of the target terminal collected by the exhaust pressure-taking pipe, and a second in-pipe wind pressure of an air supply duct of the target air supply fan collected by the air supply pressure-taking pipe; A calculation module, configured to calculate the exhaust air volume of the exhaust duct based on the wind pressure in the first duct, and to calculate the supply air volume of the supply air duct based on the wind pressure in the second duct; A determination module, used to determine a range of the supply air volume according to the exhaust air volume; The adjustment module is used to adjust the fan operating power of the target make-up air fan if the make-up air volume is not within the make-up air volume interval, until the make-up air volume is within the make-up air volume interval.

11. An electronic device, characterized in that: The invention comprises a processor and a memory, wherein the memory stores computer executable instructions that can be executed by the processor, and the processor executes the computer executable instructions to implement the method according to any one of claims 1 to 9.

12. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer-executable instructions, and when the computer-executable instructions are called and executed by a processor, the computer-executable instructions prompt the processor to implement the method according to any one of claims 1 to 9.

Citation Information

Patent Citations

  • Central range hood system

    CN216868608U