Comprehensive energy low-carbon dispatching method and device for power supply party

Through the honey badger algorithm, the comprehensive energy scheduling model of the power supply party is optimized, and the problem of low scheduling efficiency and accuracy of the power supply party is solved, and more efficient and accurate low-carbon energy scheduling is achieved, reducing costs and improving environmental protection performance.

CN114565240BActive Publication Date: 2024-11-05SHIHEZI UNIVERSITY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210137887.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-02-15
Publication Date
2024-11-05
Estimated Expiration
2042-02-15

AI Technical Summary

Technical Problem

In the prior art, the power supply party's comprehensive energy scheduling efficiency is low and the scheduling accuracy is poor, which cannot meet the needs of low-carbon energy development.

Method used

Using the honey badger algorithm combined with the comprehensive energy scheduling model, the target function is constructed and the scheduling plan is solved based on the number of generator sets, operating time period, electricity load, coal consumption, polluted gas emissions and power purchase costs of the target power supply party, and the target function is constructed and the scheduling plan is solved to realize the More efficient and accurate energy dispatch.

Benefits of technology

Through the honey badger algorithm, the energy scheduling efficiency and accuracy of the power supply party has been significantly improved, costs have been reduced, environmental protection performance has been improved, and economic benefits have been enhanced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114565240B_ABST
    Figure CN114565240B_ABST
Patent Text Reader

Abstract

The present invention provides a method and device for comprehensive energy low-carbon scheduling for power suppliers, the method comprising: constructing a comprehensive energy scheduling model based on first target data, constructing a target function corresponding to the comprehensive energy scheduling model based on second target data; solving the comprehensive energy scheduling model based on the honey badger algorithm and the target function, and obtaining a target scheduling scheme; performing comprehensive energy scheduling on the target power supplier based on the target scheduling scheme; wherein the first target data comprises: the number of generator sets of the target power supplier, the number of operating time periods, and the power load of the target power supplier in each operating time period; the second target data comprises: the coal consumption, pollutant gas emissions, and electricity purchase cost of the target power supplier. The method and device for comprehensive energy low-carbon scheduling for power suppliers provided by the present invention can perform more efficient and accurate comprehensive energy low-carbon scheduling on power suppliers, and can minimize costs and improve environmental protection performance.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of energy dispatching, and in particular to a comprehensive energy low-carbon dispatching method and device for a power supplier. Background Art

[0002] Energy is an important material basis for national economic and social development. Electricity is an indispensable means of production for economic activities and a necessity for people's lives. It accounts for a large proportion of all energy consumption areas.

[0003] Generally, the power supplier has multiple generating units, which may include at least one of traditional thermal power generating units, renewable energy generating units and large environmental protection generating units. Comprehensive energy dispatching for power suppliers refers to reasonable dispatching of the electric energy generated by each generating unit by coupling the electric energy generated by each generating unit of the power supplier, so as to achieve dynamic coordination and complementary advantages of the electric energy generated by each generating unit. Comprehensive energy dispatching for power suppliers can not only save resources and protect the environment, but also help to implement energy conservation and emission reduction targets, and also help to accelerate the adjustment of power supply structure and promote the development of renewable energy generating units and large environmental protection generating units.

[0004] With the vigorous development of low-carbon energy, the number and variety of power generators of power suppliers are increasing. The traditional manual comprehensive energy dispatching method can no longer meet the dispatching needs of existing power suppliers. The comprehensive energy dispatching efficiency is low and the dispatching accuracy is poor. Therefore, how to conduct comprehensive energy low-carbon dispatching for power suppliers more efficiently and accurately is an urgent problem to be solved in this field. Summary of the invention

[0005] The present invention provides a comprehensive energy low-carbon scheduling method and device for power suppliers, which are used to solve the defects of low efficiency and poor scheduling accuracy in the prior art for comprehensive energy scheduling of power suppliers, and to achieve more efficient and accurate comprehensive energy low-carbon scheduling of power suppliers.

[0006] The present invention provides a comprehensive energy low-carbon scheduling method for a power supplier, comprising:

[0007] Acquire first target data and second target data;

[0008] Based on the first target data, construct a comprehensive energy scheduling model, and based on the second target data, construct an objective function corresponding to the comprehensive energy scheduling model;

[0009] Based on the honey badger algorithm and the objective function, solving the comprehensive energy scheduling model to obtain a target scheduling solution;

[0010] Based on the target scheduling scheme, comprehensive energy scheduling is performed on the target power supplier;

[0011] Among them, the first target data includes: the number of generator sets of the target power supplier, the number of operating time periods and the power load of the target power supplier in each operating time period; the second target data includes: the coal consumption, pollutant gas emissions and electricity purchase cost of the target power supplier.

[0012] According to a comprehensive energy low-carbon scheduling method for a power supplier provided by the present invention, the comprehensive energy scheduling model is solved based on the honey badger algorithm and the objective function to obtain a target scheduling solution, which specifically includes:

[0013] Step S1, obtaining multiple scheduling schemes based on the comprehensive energy scheduling model and the constraints corresponding to the target power supplier;

[0014] Step S2, initializing the control parameters of the honey badger algorithm to generate a honey badger population, wherein each honey badger individual in the honey badger population corresponds to each of the scheduling schemes;

[0015] Step S3, obtaining the objective function value of each honey badger individual in the honey badger population, and taking the honey badger individual with the smallest objective function value as the optimal honey badger individual in the honey badger population;

[0016] Step S4, based on the position of the best honey badger individual in the honey badger population, updating the position of the honey badger population, obtaining the objective function value of each honey badger individual in the honey badger population after the position is updated, and taking the honey badger individual with the smallest objective function value in the honey badger population after the position is updated as the best honey badger individual in the honey badger population after the position is updated;

[0017] Step S5, based on the optimal honey badger individual in the honey badger population after the position update, the honey badger population after the position update is updated, the honey badger population after the population update is obtained, and steps S2 to S5 are repeated until the number of population updates reaches the maximum number of population updates, and the scheduling plan corresponding to the optimal honey badger individual is obtained as the target scheduling plan.

[0018] According to a comprehensive energy low-carbon scheduling method for power suppliers provided by the present invention, the formula of the objective function is:

[0019] F i =(ω1*g 1,i +ω2*g 2,i +ω3*g 3,i )

[0020]

[0021] Wherein, i is the identifier of the honey badger individual in the honey badger population, i=1, 2, ..., N, N represents the total number of honey badger individuals in the honey badger population; F i represents the objective function value of the i-th honey badger individual in the honey badger population; M represents the total number of generator sets of the target power supplier, m is the identifier of the generator set, m=1, 2, ..., M; T represents the number of operating time periods of the target power supplier, t is the identifier of the operating time period, t=1, 2, ..., T; x i ,y i and z i Respectively represent the three fuel consumption coefficients of the generator set; A m represents the bidding function of the mth generator group; α m,t , β m,t and δ m,t They respectively represent three different pollutant gas emission coefficients corresponding to the mth generator set of the target power supplier in the tth operating time period; 1,i represents the coal consumption of the target power supplier when comprehensive energy scheduling is performed on the target power supplier based on the scheduling scheme corresponding to the i-th honey badger individual; g 2,i represents the electricity purchase cost of the target power supplier when comprehensive energy scheduling is performed on the target power supplier based on the scheduling scheme corresponding to the i-th honey badger individual; g 3,i represents the pollutant gas emissions of the target power supplier when comprehensive energy scheduling is performed on the target power supplier based on the scheduling scheme corresponding to the i-th honey badger individual; represents the power generation of the mth generator set in the tth operating time period when the target power supplier is comprehensively dispatched based on the dispatch plan corresponding to the i-th honey badger individual; ω1 represents g 1,i The corresponding weight, ω2 represents g 2,i The corresponding weight, ω2 represents g 2,i The corresponding weight.

[0022] According to a comprehensive energy low-carbon scheduling method for power supply provided by the present invention, the optimal honey badger individual in the honey badger population after the position update is used to update the honey badger population after the position update, and the honey badger population after the population update is obtained, specifically including:

[0023] Replace the w honey badger individuals with the largest objective function value in the honey badger population after the position is updated with the optimal honey badger individual in the honey badger population after the position is updated, and obtain the honey badger population after the population is updated; wherein w is a positive integer greater than 0 and less than M, and M is the total number of honey badger individuals in the honey badger population.

[0024] According to a comprehensive energy low-carbon scheduling method for power suppliers provided by the present invention, w is positively correlated with M.

[0025] According to a comprehensive energy low-carbon scheduling method for power suppliers provided by the present invention, the constraints corresponding to the comprehensive energy scheduling model include: at least one of: load balance constraints, output constraints, variable power speed constraints and rotating reserve constraints.

[0026] The present invention also provides a comprehensive energy low-carbon dispatching device for a power supplier, comprising:

[0027] A data acquisition module, used to acquire first target data and second target data;

[0028] A model building module, used to build a comprehensive energy scheduling model based on the first target data, and to build an objective function corresponding to the comprehensive energy scheduling model based on the second target data;

[0029] An algorithm solving module, used to solve the comprehensive energy scheduling model based on the honey badger algorithm and the objective function to obtain a target scheduling solution;

[0030] An integrated energy scheduling module, used to perform integrated energy scheduling for a target power supplier based on the target scheduling scheme;

[0031] Among them, the first target data includes: the number of generator sets of the target power supplier, the number of operating time periods and the power load of the target power supplier in each operating time period; the second target data includes: the coal consumption, pollutant gas emissions and electricity purchase cost of the target power supplier.

[0032] The present invention also provides an electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, the steps of any of the above-described integrated energy low-carbon scheduling methods for power suppliers are implemented.

[0033] The present invention also provides a non-transitory computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the steps of any of the above-described integrated energy low-carbon scheduling methods for power suppliers.

[0034] The present invention also provides a computer program product, comprising a computer program, which, when executed by a processor, implements the steps of any of the above-mentioned comprehensive energy low-carbon scheduling methods for power suppliers.

[0035] The comprehensive energy low-carbon scheduling method and device for power suppliers provided by the present invention construct a comprehensive energy scheduling model based on the number of generator sets of the target power supplier, the number of operating time periods, the power load of the target power supplier in each operating time period, and the corresponding constraints of the target power supplier; construct an objective function corresponding to the above comprehensive energy scheduling model based on the coal consumption, pollutant gas emissions, and electricity purchase cost of the target power supplier; solve the comprehensive energy scheduling model based on the honey badger algorithm and the above objective function to obtain the target scheduling algorithm; perform comprehensive energy scheduling on each generator set of the target power supplier based on the target scheduling algorithm; perform more efficient and accurate comprehensive energy low-carbon scheduling on the target power supplier; can maximize the reduction of the target power supplier's investment cost and maximize the improvement of the target power supplier's environmental protection performance through comprehensive energy scheduling; can improve the economic benefits of comprehensive energy scheduling, and has better promotion prospects. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0037] Figure 1 It is one of the flow diagrams of the comprehensive energy low-carbon scheduling method for power supply provided by the present invention;

[0038] Figure 2 This is the second flow chart of the comprehensive energy low-carbon scheduling method for power supply provided by the present invention;

[0039] Figure 3 It is a schematic diagram comparing simulation results of the comprehensive energy low-carbon scheduling method for power suppliers provided by the present invention and the existing scheduling method;

[0040] Figure 4 It is a structural schematic diagram of a comprehensive energy low-carbon dispatching device for a power supplier provided by the present invention;

[0041] Figure 5 It is a structural schematic diagram of the electronic device provided by the present invention. DETAILED DESCRIPTION

[0042] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0043] In the description of the invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0044] It should be noted that the honey badger algorithm is a new heuristic intelligent algorithm, which has good application prospects in the traveling salesman problem, weapon target allocation problem, multi-processor scheduling problem, reliability optimization problem, clustering problem, job scheduling problem, etc. The honey badger algorithm can include the steps of initializing the honey badger algorithm parameters and population, calculating the objective function value of each honey badger individual in the population, calculating the odor intensity of the prey, updating the density factor, updating the location of the honey badger population, etc. Based on the above steps, the optimal solution search can be performed on the solution space for the comprehensive energy low-carbon scheduling of the power supply party.

[0045] In the comprehensive energy low-carbon scheduling method for power suppliers provided by the present invention, the Honey Badger algorithm is applied to solve the comprehensive energy scheduling of power suppliers, which can more accurately and efficiently obtain the most energy-saving and environmentally friendly scheduling scheme. The electric energy generated by the power supplier is scheduled based on the above scheduling scheme, which can maximize the energy-saving goals of the comprehensive energy scheduling. In the case of constantly changing comprehensive energy scheduling environment and scheduling methods, the optimal low-carbon economic scheduling problem of the electric energy generated by the power supplier can be solved.

[0046] Figure 1 This is a flow chart of the comprehensive energy low-carbon scheduling method for power supply provided by the present invention. Figure 1 The present invention describes the comprehensive energy low-carbon dispatching method for power supply parties. Figure 1 As shown, the method includes: step 101, obtaining first target data and second target data;

[0047] Among them, the first target data includes: the number of generator sets of the target power supplier, the number of operating time periods and the power load of the target power supplier in each operating time period; the second target data includes: the coal consumption, pollutant gas emissions and electricity purchase cost of the target power supplier.

[0048] Specifically, the target power supplier is the dispatch target of the comprehensive energy low-carbon dispatch method for power suppliers provided by the present invention. Based on the comprehensive energy low-carbon dispatch method for power suppliers provided by the present invention, the electric energy generated by the target power supplier can be dispatched.

[0049] The target power supplier may include multiple generator sets, which may be thermal power generator sets or other types of generator sets.

[0050] The target power supplier's operating time period refers to the time period during which the target power supplier's generator sets generate electricity. The target power supplier has multiple operating time periods, and the duration of each operating time period is equal.

[0051] For any operating time period, the power load of the target power supplier during the operating time period refers to the total amount of electric power consumed by the power users' electrical equipment from the target power supplier during the operating time period.

[0052] Based on prior knowledge, the number of generator sets and the number of operating time periods of the target power supplier can be obtained as the first target data. Based on actual power demand, the power load of the target power supplier in each operating time period can also be obtained as the first target data.

[0053] Based on real-time monitoring of the target power supplier, the coal consumption, pollutant gas emissions and electricity purchase cost of the target power supplier can be obtained as the second target data.

[0054] Step 102: construct an integrated energy scheduling model based on the first target data, and construct an objective function corresponding to the integrated energy scheduling model based on the second target data.

[0055] Specifically, based on the first target data, a comprehensive energy scheduling model can be constructed. The comprehensive energy scheduling model can be used to generate multiple different scheduling schemes.

[0056] Specifically, based on the second target data, an objective function corresponding to the comprehensive energy scheduling model can be constructed to solve the above-mentioned comprehensive energy scheduling model, so that after the target scheduling scheme is obtained by solving the above-mentioned comprehensive energy scheduling model, when the electric energy generated by each generator set of the target supplier is scheduled based on the above-mentioned target scheduling scheme, the target power supplier's coal consumption is minimized, the pollutant gas emissions are minimized, and the electricity purchase cost is minimized, thereby achieving the optimal low-carbon economic scheduling of the electric energy generated by the target power supplier.

[0057] Step 103: Based on the honey badger algorithm and the objective function, solve the comprehensive energy scheduling model to obtain the target scheduling plan.

[0058] Specifically, based on the objective function corresponding to the honey badger algorithm and the integrated energy scheduling model, the above integrated energy scheduling model can be solved by numerical calculation methods to obtain the target scheduling plan.

[0059] It should be noted that the target scheduling scheme may include the load allocation of each generator set of the target power supplier in each operating time period. For any generator set, the power generation of the generator set in any operating time period needs to be greater than the load allocation of the generator set in the operating time period.

[0060] Step 104: Based on the target scheduling plan, comprehensive energy scheduling is performed on the target power supplier.

[0061] Specifically, after obtaining the target scheduling plan, based on the load distribution of each generator set in each operating time period in the above target scheduling plan, comprehensive energy scheduling can be performed on each generator set of the target power supply party to control the power generation of each generator set of the target power supply party in each operating time period.

[0062] Compared with other scheduling schemes, by scheduling each generator set of the target power supplier based on the target scheduling scheme, the target power supplier can achieve the lowest coal consumption, the lowest pollutant gas emissions and the lowest electricity purchase cost, thereby achieving the lowest investment cost and the best environmental protection performance for the target power supplier.

[0063] It should be noted that the environmental performance of the target power supplier can be evaluated based on the pollutant gas emissions of the target power supplier.

[0064] The embodiment of the present invention constructs a comprehensive energy scheduling model based on the number of generator sets of the target power supplier, the number of operating time periods, the power load of the target power supplier in each operating time period, and the corresponding constraints of the target power supplier. The objective function corresponding to the above comprehensive energy scheduling model is constructed based on the coal consumption, pollutant gas emissions and electricity purchase cost of the target power supplier. The comprehensive energy scheduling model is solved based on the honey badger algorithm and the above objective function to obtain the target scheduling algorithm. Based on the above target scheduling algorithm, comprehensive energy scheduling is performed on each generator set of the target power supplier. More efficient and accurate comprehensive energy low-carbon scheduling can be performed on the target power supplier. Through the comprehensive energy scheduling of the target power supplier, the cost of the target power supplier's investment can be minimized and the environmental protection performance of the target power supplier can be maximized. The economic benefits of comprehensive energy scheduling can be improved, and it has better promotion prospects.

[0065] Based on the contents of the above embodiments, based on the honey badger algorithm and the objective function, the comprehensive energy scheduling model is solved to obtain the target scheduling plan, which specifically includes: step S1, based on the comprehensive energy scheduling model and the constraints corresponding to the target power supply party, multiple scheduling plans are obtained.

[0066] Specifically, based on the comprehensive energy scheduling model, multiple scheduling plans can be randomly generated; based on the above comprehensive energy scheduling model, multiple scheduling plans can also be generated according to preset rules. Among them, the preset rules can be obtained based on prior knowledge, for example: the above preset rules can be obtained based on historical scheduling plans.

[0067] The dispatching scheme may include the load distribution amount of each generator set of the target power supplier in each operation time period. Different dispatching schemes may have different load distribution amounts of each generator set in each operation time period.

[0068] It is understandable that the power supplier relies on the generator set to generate electric energy. In order to ensure the normal operation of the generator set of the target power supplier, the operation of the generator set of the target power supplier can be restricted according to the constraint conditions corresponding to the target power supplier. For example, for any generator set, the power generation of the generator set in any operating time period needs to be greater than the load distribution of the generator set in the operating time period.

[0069] It should be noted that the above constraints may include but are not limited to: at least one of load balance constraints, output constraints, variable power speed constraints and spinning reserve constraints. In the embodiment of the present invention, the constraints corresponding to the target power supplier are not specifically limited.

[0070] Based on the constraints corresponding to the target suppliers, the scheduling plans that do not meet the above constraints can be eliminated, and the scheduling plans that meet the above constraints can be retained.

[0071] Step S2, initializing the control parameters of the honey badger algorithm, generating a honey badger population, and each honey badger individual in the honey badger population corresponds to each scheduling scheme.

[0072] Specifically, the honey badger algorithm is initialized, and control parameters of the honey badger algorithm can be initialized to generate a honey badger population, wherein each honey badger individual in the honey badger population can correspond to each scheduling scheme.

[0073] Optionally, Population (Pop) can be used to represent the honey badger population; N can be used to represent the total number of honey badgers in the honey badger population Pop; i can be used to represent any honey badger individual in the honey badger population, i = 1, 2, ..., N, then the i-th honey badger individual in the honey badger population Pop can be represented as Q i You can use Iter maxIt represents the maximum population update times of the honey badger population Pop. The matrix of any honey badger individual is expressed as Q=M*T, where M represents the total number of generator sets of the target power supply party, m is the identifier of the generator set, m=1,2,…,M; T represents the number of operating time periods of the target power supply party, t is the identifier of the operating time period, t=1,2,…,T.

[0074] The i-th honey badger individual Q in the honey badger population Pop i It can be expressed as:

[0075]

[0076] It should be noted that formula (1) is the Q of honey badger individuals. i The matrix representation of Q i Each element q in can represent the distribution ratio of the load distribution amount of each generator set of the target power supplier in each operating time period. For example: Represents individual Q i In the corresponding dispatching scheme, the allocation ratio corresponding to the load allocation amount of the mth generator set of the target power supplier in the tth operating time period. Among them, the allocation ratio corresponding to the load allocation amount of any generator set in any operating time period is determined based on the load allocation amount of the generator set in the operating time period and the power load of the target power supplier in the operating time period.

[0077] The honey badger population Pop can be expressed as:

[0078]

[0079] Optionally, the total number of honey badgers in the honey badger population Pop N can be between [40,80]; the maximum population update number Iter of the honey badger population Pop max Can be between [80,120].

[0080] Preferably, the total number N of honey badgers in the honey badger population Pop can be 50; the maximum population update number Iter of the honey badger population Pop max It can be 100 times.

[0081] Step S3, obtaining the objective function value of each honey badger individual in the honey badger population, and taking the honey badger individual with the smallest objective function value as the optimal honey badger individual in the honey badger population.

[0082] Specifically, the i-th honey badger individual Q in the honey badger population Pop i The corresponding objective function can be expressed by the following formula:

[0083] F i =(ω1*g 1,i +ω2*g 2,i+ω3*g 3,i ) (3)

[0084]

[0085] Where i is the identifier of the honey badger in the honey badger population, i = 1, 2, ..., N, N represents the total number of honey badger individuals in the honey badger population; F i represents the objective function value of the i-th honey badger in the honey badger population; M represents the total number of generator sets of the target power supplier, m is the identifier of the generator set, m = 1, 2, ..., M; T represents the number of operating time periods of the target power supplier, t is the identifier of the operating time period, t = 1, 2, ..., T; x i ,y i and z i Respectively represent the three fuel consumption coefficients of the generator set; A m represents the bidding function of the mth generator group; α m,t , β m,t and δ m,t They respectively represent three different pollutant gas emission coefficients corresponding to the m-th generator set of the target power supplier in the t-th operating time period.

[0086] g 1,i represents the coal consumption of the target power supplier when the target power supplier is dispatched for comprehensive energy based on the dispatching scheme corresponding to the i-th honey badger individual; g 2,i represents the electricity purchase cost of the target power supplier when the target power supplier is dispatched for comprehensive energy based on the dispatch plan corresponding to the i-th honey badger individual; g 3,i It represents the pollutant gas emission of the target power supplier when the target power supplier is subject to comprehensive energy dispatch based on the dispatch plan corresponding to the i-th honey badger individual; represents the power generation of the mth generator set in the tth operating time period when the target power supplier is comprehensively dispatched based on the dispatch plan corresponding to the i-th honey badger individual; ω1 represents g 1,i The corresponding weight, ω2 represents g 2,i The corresponding weight, ω3 represents g 2,i The corresponding weight.

[0087] It should be noted that ω1, ω2 and ω3 can be determined according to actual conditions. For example, ω1, ω2 and ω3 can be set to 0.35, 0.35 and 0.3 respectively. In the embodiment of the present invention, the specific values ​​of ω1, ω2 and ω3 are not limited.

[0088] Based on formula (3) and formula (4), we can get the individual Q of honey badger: i The objective function value F i .

[0089] It should be noted that honey badger individual Q i The objective function value F i Can be used to describe honey badger individual Q i The comprehensive energy saving target value of the corresponding scheduling scheme. Honey badger individual Q i The objective function value F i The lower the above comprehensive energy-saving target value is, the lower the cost invested by the target power supplier is and the better the environmental protection performance is when the target power supplier is dispatched for comprehensive energy based on the dispatching scheme; otherwise, it means that the cost invested by the target power supplier is greater and the environmental protection performance is worse.

[0090] Optionally, the objective function value of the honey badger population Pop is as follows:

[0091]

[0092] After obtaining the objective function value of each honey badger in the honey badger population Pop through numerical calculation, the objective function value can be minimized by F best The honey badger individual is the optimal honey badger individual Q in the honey badger population Pop best .

[0093] Step S4, based on the position of the best honey badger individual in the honey badger population, update the position of the honey badger population, obtain the objective function value of each honey badger individual in the honey badger population after the position is updated, and take the honey badger individual with the smallest objective function value in the honey badger population after the position is updated as the best honey badger individual in the honey badger population after the position is updated.

[0094] From a bionic perspective, the honey badger's search for honey can include two models, namely the digging stage and the honey collecting stage.

[0095] During the digging phase, the honey badger can use its sense of smell to continuously locate the hive. When approaching the hive, the honey badger can choose a suitable location for digging.

[0096] The honey guide can accurately locate the hive, but cannot open the hive to get the honey. The honey badger can open the hive, but the efficiency of locating the hive is low. The above phenomenon has formed a cooperative relationship between the honey badger and the honey guide. In the honey collection stage, the honey guide will lead the honey badger to the hive, and the honey badger will use its front paws to open the hive. Then both the honey badger and the honey guide will enjoy the rewards of teamwork.

[0097] Honey Badger Individual Q i Corresponding honeycomb odor intensity J i and the above beehive and honey badger individual Q i The distance between the above beehive and the honey badger individual Q iThe distance between them and the optimal honey badger individual Q in the honey badger population Pop best With honey badger individual Q i If the honey badger individual Q i Corresponding honeycomb odor intensity J i The higher the honey badger is, the higher the Q i The faster the movement, the more likely the honey badger i Corresponding honeycomb odor intensity J i The lower the honey badger individual Q i The slower the movement.

[0098] Honey Badger Individual Q i Corresponding honeycomb odor intensity J i It can be expressed by the following formula:

[0099]

[0100] S=(Q i -Q i+1 ) 2 (7)

[0101] d i =Q best -Q i (8)

[0102] Where η is a random number between [0,1]; S represents the source strength; d i represents the optimal honey badger individual Q in the honey badger population Pop best With honey badger individual Q i The distance between.

[0103] In the Honey Badger algorithm, the density factor The time-varying randomization can be controlled to ensure a smooth transition of the honey badger population from the digging phase to the nectar-collecting phase.

[0104] The density factor φ can be obtained by the following formula:

[0105]

[0106] Among them, K is a constant greater than or equal to 1; Iter represents the number of times the current population is updated; Iter max Indicates the maximum number of population updates.

[0107] After each population update of the honey badger population Pop, the density factor φ is updated to obtain the density factor φ corresponding to the current honey badger population, which can reduce randomization over time.

[0108] In honey badger individual Q i In the digging stage, the honey badger individual Q iPerforming a heart-shaped movement, Honey Badger individual Q i The motion trajectory can be simulated by the following formula:

[0109]

[0110]

[0111] in, Indicates the honey badger individual Q after the location update i ; ε represents a random number between [0,1]; θ represents a control coefficient; r1, r2 and r3 represent three different random numbers between [0,1]; density factor It can be obtained based on formula (9).

[0112] In honey badger individual Q i In the honey-collecting stage, the honey badger individual Q i The motion trajectory of following the honey guide to reach the beehive can be simulated by the following formula:

[0113]

[0114] Where ξ is a random value between [0,1]; L can be obtained based on formula (11).

[0115] Based on the optimal honey badger individual Q in the honey badger population Pop best After updating the position of each individual honey badger in the honey badger population Pop, the position of the honey badger population can be updated to obtain the honey badger population Pop′ after the position is updated.

[0116] After obtaining the honey badger population Pop' after the location update, the objective function value of each honey badger individual in the honey badger population Pop' after the location update can be obtained based on formula (3) and formula (4), and the honey badger individual with the largest objective function value can be used as the optimal honey badger individual Q' in the honey badger population Pop' after the location update best .

[0117] Optionally, K may be between [2, 3]; ε may be less than or equal to 0.56; and θ may be between [6, 8].

[0118] Preferably, K may be 2.6 and θ may be 7.

[0119] Step S5, based on the optimal honey badger individual in the honey badger population after the position update, the honey badger population after the position update is updated, the honey badger population after the population update is obtained, and steps S2 to S5 are repeated until the number of population updates reaches the maximum number of population updates, and the scheduling plan corresponding to the optimal honey badger individual is obtained as the target scheduling plan.

[0120] Specifically, after the position of the honey badger population Pop is updated and the honey badger population Pop' after the position update is obtained, the objective function value of each honey badger individual in the honey badger population Pop' after the position update can be obtained based on formula (3) and formula (4), and the honey badger individual with the largest objective function value is used as the optimal honey badger individual Q' in the honey badger population Pop' after the position update best .

[0121] Get the optimal honey badger individual Q′ in the honey badger population Pop' after the location update best Afterwards, we can calculate the optimal honey badger individual Q′ best The honey badger population Pop' after the position update is updated to obtain the honey badger population after the population update, and steps S3 to S5 are repeatedly performed until the number of population updates is greater than the preset maximum number of population updates.

[0122] When the number of population updates is greater than the preset maximum number of population updates, the scheduling plan corresponding to the optimal honey badger individual in the honey badger population after the last population update can be used as the target scheduling plan.

[0123] The embodiment of the present invention solves the comprehensive energy scheduling model based on the objective function corresponding to the honey badger algorithm and the comprehensive energy scheduling model, and can achieve better search for the target scheduling scheme with the lowest comprehensive energy-saving target value through the population evolution of the honey badger population, and can more accurately and efficiently obtain the target scheduling scheme with the lowest comprehensive energy-saving target value, so that the electric energy generated by each generator set of the target power supply party can be scheduled based on the target scheduling scheme, and the target power supply party can achieve the lowest investment cost and the best environmental protection performance through comprehensive energy scheduling. The algorithm result is simple, the steps are obvious, the complexity is low and the robustness is strong.

[0124] Based on the contents of the above embodiments, based on the best honey badger individual in the honey badger population after the position is updated, the honey badger population after the position is updated is updated to obtain the honey badger population after the population is updated, specifically including: replacing the w honey badger individuals with the largest objective function value in the honey badger population after the position is updated with the best honey badger individual in the honey badger population after the position is updated, and obtaining the honey badger population after the population is updated; wherein w is a positive integer greater than 0 and less than M, and M is the total number of honey badger individuals in the honey badger population.

[0125] Specifically, after the position of the honey badger population Pop is updated and the honey badger population Pop' after the position update is obtained, the objective function value of each honey badger individual in the honey badger population Pop' after the position update can be obtained based on formula (3) and formula (4), and the honey badger individual with the largest objective function value is used as the optimal honey badger individual Q' in the honey badger population Pop' after the position updatebest .

[0126] Based on the objective function value of each honey badger individual in the honey badger population Pop' after the position is updated, w honey badger individuals with the largest objective function values ​​in the honey badger population Pop' after the position is updated can also be determined, where w = 1, 2, 3, ..., M.

[0127] Optionally, w may be positively correlated with M.

[0128] Optionally, w can be in the range [2,4].

[0129] Preferably, w can be 3.

[0130] The w honey badger individuals with the smallest objective function value in the honey badger population Pop' after the position update can be replaced by the optimal honey badger individual Q' in the honey badger population Pop' after the position update best , thereby realizing the population update of the honey badger population Pop' after the position is updated, and obtaining the honey badger population after the population update.

[0131] The embodiment of the present invention replaces w honey badger individuals with the smallest objective function value in the honey badger population after the position is updated with the optimal honey badger individual in the honey badger population after the position is updated, thereby achieving population update of the honey badger population after the position is updated, and obtaining the honey badger population after the population update. This can improve the convergence speed of the algorithm, reduce the amount of calculation, and improve the calculation efficiency without affecting the technical accuracy, and can further improve the efficiency of scheduling the electric energy generated by each generator set of the target power supply party.

[0132] Based on the contents of the above embodiments, the constraint conditions corresponding to the comprehensive energy scheduling model include: at least one of: load balance constraint, output constraint, variable power speed constraint and spinning reserve constraint.

[0133] Specifically, the load balancing constraint can be expressed by the following formula:

[0134]

[0135] in, It represents the power generation of the mth generator set in the tth operating time period when the target power supplier is comprehensively dispatched based on the dispatch plan corresponding to the i-th honey badger individual; Q D (t) represents the power load of the target power supplier in the tth operating time period.

[0136] The output constraint can be expressed by the following formula:

[0137]

[0138] in, It represents the upper limit of the output of the mth generator set in the tth operating time period; It represents the lower bound of the output of the mth generator set in the tth operating time period.

[0139] The variable power speed constraint can be expressed by the following formula:

[0140]

[0141] in, represents the loading speed threshold of the mth generator set; Indicates the load shedding speed threshold of the mth generator set.

[0142] The spinning reserve constraint can be expressed by the following formula:

[0143]

[0144] Among them, B t represents the minimum spinning reserve of the target power supplier in the tth operation period; U m,t Indicates the operating status of the mth generator set in the tth operating time period; U m,t =1 means that the mth generator set is in operation during the tth operation period; U m,t =0 indicates that the mth generator set is in shutdown state during the tth operating time period.

[0145] In the embodiment of the present invention, the constraint conditions corresponding to the target power supplier include at least one of load balancing constraint, output constraint, variable power speed constraint and rotating standby constraint. Based on the above constraint conditions, it can ensure that the obtained target scheduling scheme conforms to the actual operating conditions of the target power supplier, protect the various generator sets of the target power supplier, extend the service life of each generator set of the target power supplier, and ensure the power supply safety of the target power supplier.

[0146] In order to facilitate the understanding of the comprehensive energy low-carbon scheduling method for power suppliers provided by the present invention, the comprehensive energy low-carbon scheduling method for power suppliers provided by the present invention is described below by an example. In the above example, the target power supplier includes 4 generator sets and 6 operating time periods.

[0147] The parameters of the four generator sets of the target power supplier are shown in Table 1.

[0148] Table 1 Engine parameters of target power supply party

[0149]

[0150] Table 1 Engine parameters of target power supply party

[0151]

[0152] Figure 2 This is the second flow chart of the comprehensive energy low-carbon scheduling method for power supply provided by the present invention; Figure 2 As shown, after constructing a comprehensive energy scheduling scheme and obtaining multiple scheduling schemes based on the comprehensive energy scheduling scheme, the method includes: step S201, initializing the control parameters of the honey badger algorithm to generate a honey badger population. Specifically, each honey badger individual in the honey badger population Pop corresponds to each scheduling scheme.

[0153] For the i-th honey badger individual Q in the honey badger population Pop i , the power load of each generator set of the target power supplier in each operating period and the individual Q i The corresponding scheduling scheme is shown in Table 2. Honey badger individual Q i The corresponding dispatching plan includes the load distribution amount of each generator set of the target power supplier in each operating time period.

[0154] Table 2 Honey badger individual Q i Corresponding scheduling plan

[0155]

[0156] In order to facilitate calculation, the values ​​in Table 2 can be normalized and mapped to [0,1] to obtain the distribution ratio corresponding to the load distribution of the mth generator set of the target power supply party in the tth operating time period, which is used as the honey badger individual Q i Matrix representation.

[0157]

[0158] Step 202: Obtain the objective function value of each honey badger in the honey badger population. Specifically, the objective function value of each honey badger in the honey badger population can be calculated based on formula (3) and formula (4). The objective function value of the honey badger individual Q can be calculated based on formula (3) and formula (4). i The objective function value F i =2548.77.

[0159] Step 203: Calculate the honeycomb odor intensity. Specifically, the honeycomb odor intensity corresponding to each honey badger individual in the honey badger population can be calculated based on formula (6), formula (7) and formula (8).

[0160] Step 204: Update the density factor. Specifically, the density factor can be updated based on formula (9) to obtain the density factor corresponding to the current honey badger population, and randomization can be reduced over time.

[0161] Step 205: Update the position of the honey badger individual in the digging stage. Specifically, the position of the honey badger individual after the position update can be obtained based on formula (10) and formula (11).

[0162] Step 206: Update the position of the honey badger individual in the honey collecting stage. Specifically, the position of the honey badger individual after the position update can be obtained based on formula (11) and formula (12).

[0163] Step 207, update the population of the honey badger population after the position update. Specifically, replace the w honey badger individuals with the largest objective function value in the honey badger population after the position update with the honey badger individuals with the smallest objective function value in the honey badger population after the position update, so as to implement the population update of the honey badger population after the position update and obtain the honey badger population after the population update.

[0164] Step 208, determine whether the population evolution times reaches the preset maximum population update times. Specifically, if the population update times are not greater than the preset maximum population update times, steps 202 to 207 may be repeated. If the population update times are greater than the preset maximum population update times, the scheduling plan corresponding to the optimal honey badger individual in the honey badger population after the last population update may be used as the target scheduling plan, and the target scheduling plan is output.

[0165] Based on the comprehensive energy low-carbon scheduling method for power suppliers provided by the present invention, comprehensive energy scheduling is performed on power suppliers, and the simulation parameter settings and simulation results are as follows:

[0166] The target power supply includes 4 generators and 6 working periods. The load distribution of each generator and each working period adopts the normalization method. In the honey badger algorithm, the number of honey badgers in the honey badger population is N = 50, and the preset maximum population update number is Iter max =70.

[0167] The frog leaping algorithm, chicken swarm algorithm and simulated annealing algorithm used as comparison algorithms all have 50 individuals in the population and 70 maximum iterations.

[0168] In the comprehensive energy dispatch simulation, comprehensive energy dispatch can be performed on the target power supply party based on the above comparison algorithms.

[0169] Figure 3 : is a schematic diagram comparing the simulation results of the comprehensive energy low-carbon scheduling method for power supply provided by the present invention and the existing scheduling method. Figure 3 As shown, Figure 3The bottom curve is the energy-saving target value curve for comprehensive energy scheduling of the target power supplier based on the comprehensive energy low-carbon scheduling method for power suppliers proposed by the present invention. It can be seen from the algorithm evolution process that the comprehensive energy low-carbon scheduling method for power suppliers provided by the present invention has a significant improvement in performance compared with the scheduling methods based on the other three algorithms, and the solution accuracy and convergence are greatly improved.

[0170] It can be concluded from the simulation results that the comprehensive energy low-carbon scheduling method for power suppliers provided by the present invention can significantly reduce the comprehensive energy saving target value of comprehensive energy scheduling for the target power suppliers.

[0171] Figure 4 This is a schematic diagram of the structure of the comprehensive energy low-carbon dispatching device for power supply provided by the present invention. Figure 4 The comprehensive energy low-carbon scheduling device for power supply provided by the present invention is described. The comprehensive energy low-carbon scheduling device for power supply described below and the comprehensive energy low-carbon scheduling method for power supply provided by the present invention described above can be referred to each other. Figure 4 As shown, the device includes: a data acquisition module 401, a model building module 402, an algorithm solving module 403 and a comprehensive energy scheduling module 404.

[0172] The data acquisition module 401 is used to acquire first target data and second target data.

[0173] The model building module 402 is used to build a comprehensive energy scheduling model based on the first target data, and to build an objective function corresponding to the comprehensive energy scheduling model based on the second target data.

[0174] The algorithm solving module 403 is used to solve the comprehensive energy scheduling model based on the honey badger algorithm and the objective function to obtain the target scheduling solution.

[0175] The comprehensive energy scheduling module 404 is used to perform comprehensive energy scheduling on the target power supplier based on the target scheduling plan.

[0176] The first target data includes: the number of generator sets of the target power supplier, the number of operating time periods and the power load of the target power supplier in each operating time period; the second target data includes: the coal consumption, pollutant gas emissions and electricity purchase cost of the target power supplier.

[0177] Optionally, the data acquisition module 401, the model building module 402, the algorithm solving module 403 and the comprehensive energy scheduling module 404 are electrically connected.

[0178] It should be noted that the comprehensive energy dispatching device can be a cloud server.

[0179] The embodiment of the present invention constructs a comprehensive energy scheduling model based on the number of generator sets of the target power supply, the number of operating time periods, the power load of the target power supply in each operating time period and the corresponding constraints of the target power supply. The objective function corresponding to the above comprehensive energy scheduling model is constructed based on the coal consumption, pollutant gas emissions and electricity purchase cost of the target power supply. The comprehensive energy scheduling model is solved based on the honey badger algorithm and the above objective function to obtain the target scheduling algorithm. Based on the above target scheduling algorithm, each generator set of the target power supply is comprehensively energy scheduled. The target power supply can be more efficiently and accurately comprehensively scheduled. Through the comprehensive energy scheduling of the target power supply, the cost of the target power supply investment can be minimized and the environmental protection performance of the target power supply can be maximized. The economic benefits of comprehensive energy scheduling can be improved, and it has a better promotion prospect.

[0180] Figure 5 An example of a physical structure diagram of an electronic device is shown in FIG. Figure 5 As shown, the electronic device may include: a processor 510, a communication interface 520, a memory 530 and a communication bus 540, wherein the processor 510, the communication interface 520 and the memory 530 communicate with each other through the communication bus 540. The processor 510 may call the logic instructions in the memory 530 to execute the comprehensive energy low-carbon scheduling method for the power supplier, the method comprising: obtaining the first target data and the second target data; constructing a comprehensive energy scheduling model based on the first target data, and constructing the objective function corresponding to the comprehensive energy scheduling model based on the second target data; solving the comprehensive energy scheduling model based on the honey badger algorithm and the objective function, and obtaining the target scheduling scheme; performing comprehensive energy scheduling on the target power supplier based on the target scheduling scheme; the first target data includes: the number of generator sets of the target power supplier, the number of operating time periods and the power load of the target power supplier in each operating time period; the second target data includes: the coal consumption, pollutant gas emissions and electricity purchase cost of the target power supplier.

[0181] In addition, the logic instructions in the above-mentioned memory 530 can be implemented in the form of a software functional unit and can be stored in a computer-readable storage medium when it is sold or used as an independent product. Based on such an understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc. Various media that can store program codes.

[0182] On the other hand, the present invention also provides a computer program product, which includes a computer program. The computer program can be stored on a non-transitory computer-readable storage medium. When the computer program is executed by a processor, the computer can execute the comprehensive energy low-carbon scheduling method for power suppliers provided by the above methods, the method including: obtaining first target data and second target data; constructing a comprehensive energy scheduling model based on the first target data, and constructing an objective function corresponding to the comprehensive energy scheduling model based on the second target data; solving the comprehensive energy scheduling model based on the honey badger algorithm and the objective function to obtain a target scheduling plan; performing comprehensive energy scheduling on the target power supplier based on the target scheduling plan; the first target data includes: the number of generator sets of the target power supplier, the number of operating time periods, and the power load of the target power supplier in each operating time period; the second target data includes: the coal consumption, pollutant gas emissions and electricity purchase cost of the target power supplier.

[0183] On the other hand, the present invention also provides a non-transitory computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, is implemented to execute the comprehensive energy low-carbon scheduling method for power suppliers provided by the above-mentioned methods, the method comprising: obtaining first target data and second target data; constructing a comprehensive energy scheduling model based on the first target data, and constructing an objective function corresponding to the comprehensive energy scheduling model based on the second target data; solving the comprehensive energy scheduling model based on the honey badger algorithm and the objective function to obtain a target scheduling plan; performing comprehensive energy scheduling on the target power supplier based on the target scheduling plan; the first target data comprises: the number of generator sets of the target power supplier, the number of operating time periods, and the power load of the target power supplier in each operating time period; the second target data comprises: the coal consumption, pollutant gas emissions, and electricity purchase cost of the target power supplier.

[0184] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.

[0185] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, it can also be implemented by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiments.

[0186] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A comprehensive energy low-carbon dispatching method for power suppliers, It is characterized in that include: Acquire first target data and second target data; Based on the first target data, construct a comprehensive energy scheduling model, and based on the second target data, construct an objective function corresponding to the comprehensive energy scheduling model; Based on the honey badger algorithm and the objective function, solving the comprehensive energy scheduling model to obtain a target scheduling solution; Based on the target scheduling scheme, comprehensive energy scheduling is performed on the target power supply party; The first target data includes: the number of generator sets of the target power supplier, the number of operating time periods, and the power load of the target power supplier in each operating time period; the second target data includes: the coal consumption, pollutant gas emissions, and electricity purchase cost of the target power supplier; The method of solving the comprehensive energy scheduling model based on the honey badger algorithm and the objective function to obtain the target scheduling plan specifically includes: Step S1, obtaining multiple scheduling schemes based on the comprehensive energy scheduling model and the constraints corresponding to the target power supplier; Step S2, initializing the control parameters of the honey badger algorithm to generate a honey badger population, wherein each honey badger individual in the honey badger population corresponds to each of the scheduling schemes; Step S3, obtaining the objective function value of each honey badger individual in the honey badger population, and taking the honey badger individual with the smallest objective function value as the optimal honey badger individual in the honey badger population; Step S4, based on the position of the best honey badger individual in the honey badger population, updating the position of the honey badger population, obtaining the objective function value of each honey badger individual in the honey badger population after the position is updated, and taking the honey badger individual with the smallest objective function value in the honey badger population after the position is updated as the best honey badger individual in the honey badger population after the position is updated; Step S5, based on the optimal honey badger individual in the honey badger population after the position update, the honey badger population after the position update is updated, the honey badger population after the population update is obtained, and steps S2 to S5 are repeatedly performed until the number of population updates reaches the maximum number of population updates, and the scheduling plan corresponding to the optimal honey badger individual is obtained as the target scheduling plan; The formula of the objective function is: F i =(ω 1 *g 1,i +oh 2 *g 2,i +oh 3 *g 3,i ) Wherein, i is the identifier of the honey badger individual in the honey badger population, i=1, 2, ..., N, N represents the total number of honey badger individuals in the honey badger population; F i represents the objective function value of the i-th honey badger individual in the honey badger population; M represents the total number of generator sets of the target power supplier, m is the identifier of the generator set, m=1, 2, ..., M; T represents the number of operating time periods of the target power supplier, t is the identifier of the operating time period, t=1, 2, ..., T; x i ,y i and z i Respectively represent the three fuel consumption coefficients of the generator set; A m represents the bidding function of the mth generator group; α m,t , β m,t and δ m,t They respectively represent three different pollutant gas emission coefficients corresponding to the mth generator set of the target power supplier in the tth operating time period; 1,i represents the coal consumption of the target power supplier when comprehensive energy scheduling is performed on the target power supplier based on the scheduling scheme corresponding to the i-th honey badger individual; g 2,i represents the electricity purchase cost of the target power supplier when comprehensive energy scheduling is performed on the target power supplier based on the scheduling scheme corresponding to the i-th honey badger individual; g 3,i represents the pollutant gas emissions of the target power supplier when comprehensive energy scheduling is performed on the target power supplier based on the scheduling scheme corresponding to the i-th honey badger individual; represents the power generation of the mth generator set in the tth operating time period when the target power supplier is comprehensively dispatched based on the dispatch plan corresponding to the i-th honey badger individual; ω 1 Indicates g 1,i The corresponding weight, ω 2 Indicates g 2,i The corresponding weight, ω 2 Indicates g 2,i The corresponding weight.

2. The comprehensive energy low-carbon scheduling method for power supply according to claim 1, It is characterized in that The method of updating the population of the honey badger population after the position update based on the best honey badger individual in the honey badger population after the position update to obtain the honey badger population after the population update specifically includes: Replace the w honey badger individuals with the largest objective function value in the honey badger population after the position is updated with the optimal honey badger individual in the honey badger population after the position is updated, and obtain the honey badger population after the population is updated; wherein w is a positive integer greater than 0 and less than M, and M is the total number of honey badger individuals in the honey badger population.

3. The comprehensive energy low-carbon scheduling method for power supply according to claim 2, It is characterized in that w is positively correlated with M.

4. The comprehensive low-carbon energy dispatching method for power supply according to any one of claims 1 to 3, It is characterized in that The constraint conditions corresponding to the comprehensive energy dispatching model include: at least one of load balance constraint, output constraint, variable power speed constraint and spinning reserve constraint.

5. A comprehensive energy low-carbon dispatching device for power supply parties, It is characterized in that include: A data acquisition module, used to acquire first target data and second target data; A model building module, used to build a comprehensive energy scheduling model based on the first target data, and to build an objective function corresponding to the comprehensive energy scheduling model based on the second target data; An algorithm solving module, used to solve the comprehensive energy scheduling model based on the honey badger algorithm and the objective function to obtain a target scheduling solution; An integrated energy scheduling module, used to perform integrated energy scheduling for a target power supplier based on the target scheduling scheme; The first target data includes: the number of generator sets of the target power supplier, the number of operating time periods, and the power load of the target power supplier in each operating time period; the second target data includes: the coal consumption, pollutant gas emissions, and electricity purchase cost of the target power supplier; The algorithm solving module solves the comprehensive energy scheduling model based on the honey badger algorithm and the objective function to obtain the target scheduling solution, which specifically includes: Step S1, obtaining multiple scheduling schemes based on the comprehensive energy scheduling model and the constraints corresponding to the target power supplier; Step S2, initializing the control parameters of the honey badger algorithm to generate a honey badger population, wherein each honey badger individual in the honey badger population corresponds to each of the scheduling schemes; Step S3, obtaining the objective function value of each honey badger individual in the honey badger population, and taking the honey badger individual with the smallest objective function value as the optimal honey badger individual in the honey badger population; Step S4, based on the position of the best honey badger individual in the honey badger population, updating the position of the honey badger population, obtaining the objective function value of each honey badger individual in the honey badger population after the position is updated, and taking the honey badger individual with the smallest objective function value in the honey badger population after the position is updated as the best honey badger individual in the honey badger population after the position is updated; Step S5, based on the optimal honey badger individual in the honey badger population after the position update, the honey badger population after the position update is updated, the honey badger population after the population update is obtained, and steps S2 to S5 are repeatedly performed until the number of population updates reaches the maximum number of population updates, and the scheduling plan corresponding to the optimal honey badger individual is obtained as the target scheduling plan; The formula of the objective function is: F i =(ω 1 *g 1,i +oh 2 *g 2,i +oh 3 *g 3,i ) Wherein, i is the identifier of the honey badger individual in the honey badger population, i=1, 2, ..., N, N represents the total number of honey badger individuals in the honey badger population; F i represents the objective function value of the i-th honey badger individual in the honey badger population; M represents the total number of generator sets of the target power supplier, m is the identifier of the generator set, m=1, 2, ..., M; T represents the number of operating time periods of the target power supplier, t is the identifier of the operating time period, t=1, 2, ..., T; x i ,y i and z i Respectively represent the three fuel consumption coefficients of the generator set; A m represents the bidding function of the mth generator group; α m,t , β m,t and δ m,t They respectively represent three different pollutant gas emission coefficients corresponding to the mth generator set of the target power supplier in the tth operating time period; 1,i represents the coal consumption of the target power supplier when comprehensive energy scheduling is performed on the target power supplier based on the scheduling scheme corresponding to the i-th honey badger individual; g 2,i represents the electricity purchase cost of the target power supplier when comprehensive energy scheduling is performed on the target power supplier based on the scheduling scheme corresponding to the i-th honey badger individual; g 3,i represents the pollutant gas emissions of the target power supplier when the target power supplier is subjected to comprehensive energy scheduling based on the scheduling scheme corresponding to the i-th honey badger individual; Q (m,t)i represents the power generation of the mth generator set in the tth operating time period when the target power supplier is comprehensively dispatched based on the dispatch plan corresponding to the i-th honey badger individual; ω 1 Indicates g 1,i The corresponding weight, ω 2 Indicates g 2,i The corresponding weight, ω 2 Indicates g 2,i The corresponding weight.

6. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, It is characterized in that When the processor executes the program, the steps of the comprehensive energy low-carbon scheduling method for power suppliers as described in any one of claims 1 to 4 are implemented.

7. A non-transitory computer-readable storage medium having a computer program stored thereon, It is characterized in that When the computer program is executed by a processor, the steps of the comprehensive energy low-carbon scheduling method for power suppliers as described in any one of claims 1 to 4 are implemented.

8. A computer program product comprising a computer program, It is characterized in that When the computer program is executed by a processor, the steps of the comprehensive energy low-carbon scheduling method for power suppliers as described in any one of claims 1 to 4 are implemented.