Power system resilience assessment method considering cascading failure evolution under typhoon disasters
By simulating the evolution process of transmission line failure and chain failure under typhoon disasters in the elastic evaluation of the power system, the problem of optimistic assessment results in the existing technology is solved, and a more accurate assessment and recovery strategy for the power system's ability to deal with typhoon disasters is achieved. Formulate.
Patent Information
- Application Number
- CN202210397176.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-04-15
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2042-04-15
AI Technical Summary
The existing elastic evaluation methods of power system fail to fully consider the evolution of chain failures, resulting in optimistic assessment results and failure to accurately perceive the power system's ability to deal with typhoon disasters.
By generating a transmission line fault model under typhoon disasters during the elastic evaluation of the power system, the chain failure evolution process on short and long time scales is simulated, combined with the power system recovery model, the sequential Monte Carlo simulation method is used to evaluate the elastic index of the power system.
It has achieved a more comprehensive and objective description of the power system failure scenarios under typhoon disasters, improved the accuracy of the evaluation results, helped power grid operators more accurately evaluate the power system's ability to deal with typhoon disasters and formulated targeted recovery strategies.
Smart Images

Figure CN114840982B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of power system analysis, and in particular to a power system resilience assessment method considering the evolution of cascading failures under typhoon disasters. Background Art
[0002] Rising global temperatures will lead to a higher frequency of typhoon disasters, significantly increasing the risk of large-scale power outages in the power system, seriously affecting the healthy development of the social economy and the normal production and life of the people. Therefore, in order to accurately assess the ability of the power system to cope with increasingly frequent typhoon disasters, it is urgent to deepen the research on power system resilience assessment. Based on the problem that the existing power system resilience assessment research does not fully consider the evolution process of cascading failures, it can be seen that considering the evolution process of cascading failures in the process of power system resilience assessment is of great significance for accurately perceiving the ability of the power system to cope with typhoon disasters.
[0003] Patent 202011599832.1 "A high-resolution grid resilience assessment method" and Patent 202110659995.2 "A power system resilience assessment method and system under extreme disaster conditions" do not consider possible cascading failures and their evolution process in the resilience assessment method; Patent 201910295707.2 "Multi-time scale cascading failure prediction method for power systems under typhoon weather conditions" does not consider the fault recovery process and does not assess the resilience of the power system. Based on the defects and deficiencies in the above-mentioned assessment methods or systems, it is necessary to improve the resilience assessment method for power systems under typhoon disasters. Summary of the invention
[0004] In order to solve the problem that the existing power system resilience assessment methods do not take the evolution process of cascading failures into consideration sufficiently, resulting in optimistic resilience assessment results, the present invention takes into account the possible evolution process of cascading failures in the power system resilience assessment process, and provides a power system resilience assessment method that takes the evolution of cascading failures into consideration under typhoon disasters.
[0005] Figure 1 is the performance change of power system under typhoon disaster, T 0 The moment when the typhoon begins to attack the system, T 1 is the moment when the system performance starts to decline, T 2 is the system derating operation time, T 3 is the time when system performance starts to recover, T 4 For typhoon disaster departure time, T 5 When the system performance returns to normal, the power system status can be divided into four stages according to the development process of typhoon disasters: pre-disaster prevention, disaster resistance and reduced-rate operation, and post-disaster recovery. I(t) is the ideal system performance curve without failure, S(t) is the actual system performance curve under typhoon disaster, and the shaded area is the system performance loss situation. The present invention uses load supply to describe system performance.
[0006] The present invention is realized through the following technical solutions: a method for evaluating the resilience of a power system under typhoon disasters taking into account the evolution of cascading failures, mainly generating fault scenarios through a transmission line fault model under typhoon disasters; simulating cascading failures and their evolution processes caused by transient stability and thermal stability problems through cascading failure evolution models of short and long time scales respectively; short time usually refers to the electromechanical transient process just after the fault occurs, which reaches a steady state in a few seconds or more than ten seconds and is related to the stability of the power system; long time is usually 0.5 to 1 hour, and 0.5 hours is taken in the present invention; combined with the power system recovery model, the sequential Monte Carlo simulation method is used to evaluate the resilience index value of the power system according to the system performance. Specifically including the following steps:
[0007] Step 1: Input power system data and typhoon disaster forecast information, set the simulated typhoon round n = 1, and the initial simulation time t k The time when the typhoon starts to affect the power system is T 0 , T 0 is the moment when the typhoon begins to attack the system, and the simulation time interval is Δt;
[0008] Step 2: Update t k Based on the typhoon disaster situation and load level at the time, the transmission line fault model under typhoon disaster is used to calculate the damage load of the affected transmission line in the time period (t k ,t k +Δt), the transmission line fault set is obtained by sampling method and is used as t k New faults are added all the time; for example, if the probability of a line failure is 0.1, a random number between 0 and 1 is generated. If the random number is less than 0.1, the line is considered to be faulty, and if it is greater than 0.1, the line is not faulty;
[0009] Specifically, the transmission line fault model under typhoon disaster is:
[0010] (1) Based on the relationship between the typhoon and the affected transmission lines, 1 is the radius of the typhoon impact area, r 2 is the radius of the typhoon maximum wind speed area, v t (t) is the typhoon moving speed. The failure probability of the affected transmission line changes with the movement of the typhoon. In order to obtain the most accurate transmission line failure probability, each transmission line is segmented with an average spacing of 0.5 km, and the meteorological conditions in each segment are assumed to be the same. The nth segment of the lth transmission line L l,n The effective wind speed at time t is:
[0011]
[0012]
[0013] Where: (σ x (t),σ y (t)) is the coordinate of the typhoon center; (x, y) is the transmission line L l,n The center coordinates of l,n (t) is the distance from the typhoon center to the transmission line L l,n The distance; α 1 and α 2 are the two maximum wind speed parameters of the typhoon; γ 1 and γ 2 is the typhoon attenuation parameter; β(t) is the transmission line L l,n The angle with the typhoon's orbit direction;
[0014] (2) Transmission line L under typhoon disaster l,n The approximate relationship between the effective wind speed and the failure probability is:
[0015]
[0016] Where: p l,n (t) is the failure probability of the transmission line per unit length, in units of 1 / (50km·h); v d is the designed wind speed for the transmission line; a and b are model parameters obtained by statistically analyzing historical data;
[0017] (3) The hourly failure probability of the lth transmission line at time t is:
[0018]
[0019] Where: L′ l,n For the transmission line L l,n The length of the n is the number of sections of the transmission line l;
[0020] (4) Transmission line l in time period (t k ,t k +Δt) is:
[0021]
[0022] Step 3: Determine whether there is a fault in the system. If so, perform a cascading fault evolution analysis based on the power system cascading fault evolution model to detect whether a cascading fault occurs. The time when the system performance starts to decline can be obtained. 1 and system derating operation time T 2, update the system status according to the fault situation, if it does not exist, go directly to step 5;
[0023] In order to accurately simulate the rapid development process of cascading failures caused by electrical stability problems and the slow development process of cascading failures caused by thermal stability problems, a cascading failure simulation model that alternates between transient and steady states is adopted to simulate the evolution process of cascading failures on two time scales.
[0024] In order to detect t k The possible chain failures and their evolution process of the system after the initial failure at time t k ,t k The cascading failure evolution process within the time scale of +Δt) is divided into short and long time scales. The short time scale cascading failure process is simulated first, and then the long time scale cascading failure process is simulated. During the long time scale cascading failure process, the line overload situation is judged and necessary overload control measures are taken.
[0025] Specifically, the evolution model process of power system cascading failures is as follows:
[0026] (1) Determine t k Whether there is a new fault at the moment, if yes, proceed to step (2), if not, go to step (3) to analyze whether there is a new overload line after the load change;
[0027] (2) The simulation process of short-time scale cascading failure is as follows:
[0028] a. In the process of simulating short-time scale cascading faults caused by power stability problems, first determine whether the faulty line is correctly removed to obtain the outage line situation. If the faulty line protection fails to operate or fails due to a hidden fault, the fault is removed by shutting down the adjacent lines. It is assumed that the probability of failure to operate due to a hidden fault in the faulty line protection is p. h , other protections are all operating correctly;
[0029] b. Then, the system fault condition is input into the transient simulation module. The transient simulation module will simulate the system operation and determine the protection action. If the system is unstable, emergency control measures will be taken. The protection considered is the protection of generator voltage over-limit and frequency over-limit. The emergency control measures are system stability measures of low-voltage load reduction and low-frequency load reduction. If the system is stable, the simulation will end; Generator voltage and frequency protection: When the voltage or frequency deviation of the generator is too large, the generator must be cut off to protect the safety of the equipment; System low-voltage load reduction and low-frequency load reduction protection: When a fault or disturbance occurs in the system and causes the voltage or frequency to exceed the stable operation boundary, the low-voltage load reduction and low-frequency load reduction protection will cut off part of the load to maintain system stability.
[0030] (3) Identify the system status according to the fault situation, obtain the subsystem status by identifying the system connectivity, and make power balance adjustments to ensure the power balance of each subsystem. When power imbalance occurs, balance the power by adjusting the generator output, cutting the machine or shedding the load;
[0031] (4) Calculate the power flow of each subsystem, compare the power flow of each line with the upper limit of the normal value of the power flow, and check whether there is an overloaded line. If so, overload control is performed through the line overload control model. If not, the system status is recorded and the simulation is terminated.
[0032] The line overload control model is:
[0033] The line overload is controlled by means of generator dispatching and load reduction. The optimal power flow model based on DC power flow is used to calculate the minimum load reduction. The objective function is:
[0034]
[0035] The constraints are:
[0036]
[0037]
[0038]
[0039]
[0040]
[0041] Where: F l 、F max,l are the lower and upper limits of the active power of the ith generator, the active power flow of the lth line, and the active power flow limit of the line; η is the control strength of the power grid operator on the line overload; P i G , are the active output of the i-th generator and the load demand at the j-th node respectively; is the load reduction at the jth node; is the load demand at the jth node; p lf is the probability of outage of the lth line; x l ,θ fl ,θ tl are the reactance of line l, the voltage phase angles at the beginning and end nodes of line l respectively; μ L,l is the state variable of the transmission line, μ L,l =1 for operation, μ L,l =0 means shutdown; μG,i is the generator state variable, μ G,i =1 for operation, μ G,i =0 means out of service; N G 、N D 、N L are the collections of generators, load nodes, and transmission lines respectively;
[0042] (5) The overload line failure probability is calculated according to the outage probability formula of line l based on the power flow, and the fault set is obtained by sampling. If the set is a non-empty set, the fault set is used as a new fault to simulate the short-time scale cascading failure process. If the set is an empty set, the system state is recorded and the simulation ends;
[0043] Ignoring the failure rate of the line itself, the outage probability formula of line l based on power flow is:
[0044]
[0045] Where: is the upper limit of the normal value of the power flow on line l, F max,l is the power flow limit value of line l,
[0046] Step 4: Then, according to the power system fault recovery model, the fault and load recovery conditions are obtained, and the system status is updated according to the fault conditions, and T 3 , T 3 The system performance recovery moment begins. It is assumed that the load removed due to emergency control measures can be restored at the next simulation moment, and the load lost due to component outage can be restored at the next simulation moment after the outage component is restored. It is assumed that the outage line will be repaired from the moment the typhoon no longer affects the outage line, and it is assumed that sufficient recovery resources can be used to restore multiple outage components at the same time. It is assumed that the generator has a fast start and stop function, and the time to reconnect to the grid after outage is set to 4 hours.
[0047] The recovery time after a non-instantaneous outage of a transmission line follows a log-normal distribution. The log-normal distribution is selected as the recovery model for the outage line, and its probability density function is:
[0048]
[0049] Where: μ and σ are the mean and variance of the lognormal distribution respectively;
[0050] Step 5, enter the next simulation time (a typhoon is a process that needs to be simulated in sections. For example, a typhoon lasts for 20 hours, and simulation can be performed in 0.5 hour and 0.5 hour time periods). Repeat steps 2 to 4 until the power system performance returns to normal after the typhoon leaves, and the typhoon disaster departure time T can be obtained. 4, the system performance returns to normal state at time T 5 ; S I (t) is the ideal system performance curve without failure, S(t) is the actual system performance curve under typhoon disaster, the shaded area is the system performance loss, the load supply is used to describe the system performance, and the elasticity index r under the kth round of typhoon disaster is k for:
[0051]
[0052] Where: r k ∈[0,1],r k The larger the value is, the stronger the system's ability to cope with the kth round of typhoon disasters is;
[0053] Step 6: Conduct the next round of typhoon simulation (a typhoon process is accidental and requires repeated tests), and repeat steps 2 to 5 until the preset typhoon simulation round is reached;
[0054] Step 7: Calculate the power system resilience index value: Evaluate the power system resilience by simulating the typhoon process multiple times, and calculate the power system resilience index r under the kth round of typhoon disaster. k , the power system resilience index considering the disaster duration is:
[0055]
[0056] Where: N MCS To simulate the total number of typhoon rounds; R∈[0,1], the larger the R, the stronger the system's ability to cope with typhoon disasters.
[0057] Compared with the prior art, the present invention has the following beneficial effects: the power system resilience assessment method considering the evolution of cascading failures under typhoon disasters provided by the present invention can effectively simulate the initial fault conditions caused by typhoon disasters, and simulate the cascading failures and their evolution processes caused by transient stability and thermal stability problems through cascading failure evolution models of short and long time scales respectively. The characterization of the fault scenario is more comprehensive and objective, and closer to the actual fault development of the power system under typhoon disasters, thereby making the resilience assessment results more accurate, which is beneficial for power grid operators to accurately assess the ability of the power system to cope with typhoon disasters and formulate more targeted recovery strategies. BRIEF DESCRIPTION OF THE DRAWINGS
[0058] Figure 1 This is a schematic diagram of the power system status under typhoon disasters in the present invention.
[0059] Figure 2 This is the power system resilience assessment process considering the evolution of cascading failures under typhoon disasters of the present invention.
[0060] Figure 3 This is a schematic diagram of the location of typhoons and power transmission lines in the present invention.
[0061] Figure 4 This is a simulation of the short-time scale cascading failure process of the present invention.
[0062] Figure 5 This is a simulation of the long-time scale cascading failure process of the present invention.
[0063] Figure 6 It is a geographical topology diagram of the power system involved in the specific embodiment.
[0064] Figure 7 It is the IEEE 39-node system line number involved in the specific embodiment.
[0065] Figure 8 This is a step-type daily load fluctuation diagram of the IEEE 39-bus system involved in the specific embodiment.
[0066] Fig. 9 is the probability of failure of some transmission lines during a typhoon period involved in the specific embodiment.
[0067] Fig.10 It is the system load curve under the kth typhoon scenario involved in the specific embodiment.
[0068] Fig.11 This is a relationship diagram between the elasticity index value and the typhoon round involved in a specific embodiment. DETAILED DESCRIPTION
[0069] The present invention is further described below in conjunction with specific embodiments.
[0070] This embodiment uses the IEEE39 system as an example for simulation analysis, assuming that it is located in the coastal area of South my country. Figure 6 As shown in the figure, the numbers are node numbers, and the dotted lines are typhoon paths set according to the historical typhoon data of the meteorological department; the longitude and latitude of each node are set in Table 1, and the line numbers are set in Appendix Figure 7 .
[0071] Table 1 Node longitude and latitude table
[0072]
[0073] Figure 1 is the performance change of power system under typhoon disaster, T 0 The moment when the typhoon begins to attack the system, T 1 is the moment when the system performance starts to decline, T 2 is the system derating operation time, T 3 is the time when system performance starts to recover, T 4 For typhoon disaster departure time, T5 When the system performance returns to normal, the power system status can be divided into four stages according to the development process of typhoon disasters: pre-disaster prevention, disaster resistance and reduced-rate operation, and post-disaster recovery. I (t) is the ideal system performance curve without failure, S(t) is the actual system performance curve under typhoon disaster, and the shaded area is the system performance loss situation. This embodiment uses load supply to describe system performance.
[0074] The present embodiment provides a method for evaluating the resilience of a power system under typhoon disasters considering the evolution of cascading failures. The process is as follows: Figure 2 As shown, the fault scenario is mainly generated through the transmission line fault model under typhoon disasters; the cascading failure evolution model based on short and long time scales is used to analyze the cascading failures that may occur in the power system. The short time usually refers to the electromechanical transient process just after the fault occurs, which reaches a steady state in a few seconds or more than ten seconds, which is related to the stability of the power system; the long time is usually 0.5 to 1 hour, and 0.5 hours is taken in this embodiment; combined with the power system recovery model, the sequential Monte Carlo simulation method is used to evaluate the power system resilience index value according to the system performance. Specifically, it includes the following steps:
[0075] Step 1: Input power system data and typhoon disaster forecast information, set the simulated typhoon round n = 1, and the initial simulation time t k The time when the typhoon starts to affect the power system is T 0 , T 0 is the moment when the typhoon begins to attack the system, and the simulation time interval is Δt;
[0076] Step 2: Update t k Based on the typhoon disaster situation and load level at the time, the transmission line fault model under typhoon disaster is used to calculate the damage load of the affected transmission line in the time period (t k ,t k +Δt), the transmission line fault set is obtained by sampling method and is used as t k New faults are added all the time;
[0077] Specifically, the transmission line fault model under typhoon disaster is:
[0078] (1) Based on the relationship between the typhoon and the affected transmission lines, such as Figure 3 As shown, r 1 is the radius of the typhoon impact area, r 2 is the radius of the typhoon maximum wind speed area, v t (t) is the typhoon moving speed. The failure probability of the affected transmission line changes with the movement of the typhoon. In order to obtain the most accurate transmission line failure probability, each transmission line is segmented with an average spacing of 0.5 km, and the meteorological conditions in each segment are assumed to be the same. The nth segment of the lth transmission line Ll,n The effective wind speed at time t is:
[0079]
[0080]
[0081] Where: (σ x (t),σ y (t)) is the coordinate of the typhoon center; (x, y) is the transmission line L l,n The center coordinates of l,n (t) is the distance from the typhoon center to the transmission line L l,n The distance; α 1 and α 2 are the two maximum wind speed parameters of the typhoon; γ 1 and γ 2 is the typhoon attenuation parameter; β(t) is the transmission line L l,n The angle with the typhoon's orbit direction;
[0082] (2) Transmission line L under typhoon disaster l,n The approximate relationship between the effective wind speed and the failure probability is:
[0083]
[0084] Where: p l,n (t) is the failure probability of the transmission line per unit length, in units of 1 / (50km·h); v d is the designed wind speed for the transmission line; a and b are model parameters obtained by statistically analyzing historical data;
[0085] (3) The hourly failure probability of the lth transmission line at time t is:
[0086]
[0087] Where: L′ l,n For the transmission line L l,n The length of the n is the number of sections of the transmission line l;
[0088] (4) Transmission line l in time period (t k ,t k +Δt) is:
[0089]
[0090] Step 3: Determine whether there is a fault in the system. If so, perform a cascading fault evolution analysis based on the power system cascading fault evolution model to detect whether a cascading fault occurs. The time when the system performance starts to decline can be obtained.1 and system derating operation time T 2 , update the system status according to the fault situation, if it does not exist, go directly to step 5;
[0091] Specifically, the evolution process of the power system cascading failure model is as follows: Figure 4 As shown:
[0092] (1) Determine t k Whether there is a new fault at the moment, if yes, proceed to step (2), if not, go to step (3) to analyze whether there is a new overload line after the load change;
[0093] (2) The specific process of simulating the short-time scale cascading failure process is as follows:
[0094] a. In the process of simulating short-time scale cascading faults caused by power stability problems, first determine whether the faulty line is correctly removed to obtain the outage line situation. If the faulty line protection fails to operate or fails due to a hidden fault, the fault is removed by shutting down the adjacent lines. It is assumed that the probability of failure to operate due to a hidden fault in the faulty line protection is p. h , other protections are all operating correctly;
[0095] b. Then, the system fault condition is input into the transient simulation module, which will simulate the system operation and determine the protection action. If the system is unstable, emergency control measures are taken. The protections considered are the generator voltage over-limit and frequency over-limit protections. The emergency control measures are the system stability measures of low-voltage load shedding and low-frequency load shedding. If the system is stable, the simulation ends.
[0096] (3) Identify the system status according to the fault situation, obtain the subsystem status by identifying the system connectivity, and make power balance adjustments to ensure the power balance of each subsystem. When power imbalance occurs, balance the power by adjusting the generator output, cutting the machine or shedding the load;
[0097] (4) Calculate the power flow of each subsystem, compare the power flow of each line with the upper limit of the normal value of the power flow, and check whether there is an overloaded line. If so, the line overload control model is used to control the line overload. If not, the system status is recorded and the simulation is terminated:
[0098] The line overload control model is:
[0099] The line overload is controlled by means of generator dispatching and load reduction. The optimal power flow model based on DC power flow is used to calculate the minimum load reduction. The objective function is:
[0100]
[0101] The constraints are:
[0102]
[0103]
[0104]
[0105]
[0106]
[0107] Where: F l 、F max,l are the lower and upper limits of the active power of the ith generator, the active power flow of the lth line, and the active power flow limit of the line; η is the control strength of the power grid operator on the line overload; P i G , are the active output of the i-th generator and the load demand at the j-th node respectively; is the load reduction at the jth node; is the load demand at the jth node; p lf is the probability of outage of the lth line; x l ,θ fl ,θ tl are the reactance of line l, the voltage phase angles at the beginning and end nodes of line l respectively; μ L,l is the state variable of the transmission line, μ L,l =1 for operation, μ L,l =0 means shutdown; μ G,i is the generator state variable, μ G,i =1 for operation, μ G,i =0 means out of service; N G 、N D 、N L are the collections of generators, load nodes, and transmission lines respectively;
[0108] (5) The overload line failure probability is calculated according to the outage probability formula based on the power flow of line l, and the fault set is obtained by sampling. If the set is a non-empty set, the fault set is used as a new fault to simulate the short-time scale cascading failure process. If the set is an empty set, the system state is recorded and the simulation ends:
[0109] Ignoring the failure rate of the line itself, the outage probability formula of line l based on power flow is:
[0110]
[0111] Where: is the upper limit of the normal value of the power flow on line l, F max,l is the power flow limit value of line l,
[0112] Step 4: Then, according to the power system fault recovery model, the fault and load recovery conditions are obtained, and the system status is updated according to the fault conditions, and T 3 , T 3 The system performance recovery moment begins. It is assumed that the load removed due to emergency control measures can be restored at the next simulation moment, and the load lost due to component outage can be restored at the next simulation moment after the outage component is restored. It is assumed that the outage line will be repaired from the moment the typhoon no longer affects the outage line, and it is assumed that sufficient recovery resources can be used to restore multiple outage components at the same time. It is assumed that the generator has a fast start and stop function, and the time to reconnect to the grid after outage is set to 4 hours.
[0113] The recovery time after a non-instantaneous outage of a transmission line follows a log-normal distribution. The log-normal distribution is selected as the recovery model for the outage line, and its probability density function is:
[0114]
[0115] Where: μ and σ are the mean and variance of the lognormal distribution respectively;
[0116] Step 5: Enter the next simulation time and repeat steps 2 to 4 until the power system performance returns to normal after the typhoon leaves. The typhoon disaster departure time T can be obtained. 4 , the system performance returns to normal state at time T 5 ; S I (t) is the ideal system performance curve without failure, S(t) is the actual system performance curve under typhoon disaster, the shaded area is the system performance loss, the load supply is used to describe the system performance, and the elasticity index r under the kth round of typhoon disaster is k for:
[0117]
[0118] Where: r k ∈[0,1],r k The larger the value is, the stronger the system's ability to cope with the kth round of typhoon disasters is;
[0119] Step 6: Perform the next round of typhoon simulation, and repeat steps 2 to 5 until the preset typhoon simulation round is reached;
[0120] Step 7: Calculate the power system resilience index value: Evaluate the power system resilience by simulating the typhoon process multiple times, and calculate the power system resilience index r under the kth round of typhoon disaster. k, the power system resilience index considering the disaster duration is:
[0121]
[0122] Where: N MCS To simulate the total number of typhoon rounds; R∈[0,1], the larger the R, the stronger the system's ability to cope with typhoon disasters.
[0123] In this embodiment, by balancing the calculation accuracy and efficiency, the simulation time interval is set to 0.5h. The step-by-step daily load fluctuation diagram is shown in Figure 8 . Other parameter settings are shown in Table 2. Considering the difference in recovery time of different outage lines, the parameters of the outage lines caused by typhoons are set to μ=3.7 and σ=2.4, and the parameters of the outage lines due to cascading failures are set to μ=3.2 and σ=1.4. This embodiment uses the dynamic simulation model of the power grid and protection system for transient simulation analysis, the load adopts a constant impedance model, and uses Matpower software for steady-state simulation analysis.
[0124] Table 2 Parameter settings
[0125]
[0126] The transient simulation takes into account the generator voltage and frequency protection, system low voltage load reduction and low frequency load reduction protection, specifically:
[0127] The overvoltage and undervoltage protection action thresholds set in this embodiment are 1.3pu and 0.8pu respectively, and the action time limit is 1.0s; the high-frequency and low-frequency protection action thresholds are set to 51Hz and 48Hz respectively, and the action time limit is 10.0s. For each load node, the action threshold of low-voltage load reduction set in this embodiment is 0.87pu, the action time limit is 0.5s, and the load reduction is 25%; the low-frequency load reduction action threshold is set to 48Hz., the action time limit is 0.5s, and the load reduction is 25%.
[0128] Assume that the typhoon starts to attack the system at 0:00 on the first day, and the path is as follows Figure 6 As shown in the figure, the failure probability of different affected lines during the typhoon is obtained by calculation. The failure probability of the five most severely affected transmission lines is as follows: Figure 7 shown.
[0129] During the kth round of typhoon simulation, lines L41, L7, and L25 were affected by the typhoon and failed at different times. Fault scenarios were generated from the perspectives of not considering and considering possible cascading failures, and were set as scenario 1 and scenario 2, respectively. The specific fault conditions are shown in Tables 3 and 4.
[0130] Table 3 Power system failure conditions in scenario 1
[0131]
[0132] Table 4 Power system failure conditions in scenario 2
[0133]
[0134] The load changes between scenario 1 and scenario 2 are as follows: Figure 8 As shown in the figure, through analysis, it can be seen that the load supply conditions of the two scenarios are similar, and they are only different during the time period (18.5h, 30h). The area enclosed by the dotted line is the load shortage caused by the cascading failure. It can be seen that the method proposed in this embodiment can not only simulate the initial failure scenario under the typhoon disaster, but also simulate the subsequent evolution process of the cascading failure. The characterization of the failure scenario is closer to the actual situation, which verifies the feasibility and objectivity of the method proposed in this embodiment.
[0135] By simulating multiple typhoon processes, and calculating elasticity index values according to the traditional elasticity evaluation method that does not consider the evolution process of cascading failures (hereinafter referred to as the traditional evaluation method) and the evaluation method of the present invention, the calculation results are as follows: Fig. 9 The elasticity evaluation results are shown in Table 5. Fig. 9 As can be seen from Table 5, the elasticity of the traditional evaluation method is higher than that of the evaluation method of the present invention. This is because the traditional evaluation method only considers the initial failure when describing the fault scenario, and does not consider the subsequent cascading failures, which makes the elasticity evaluation result optimistic. The evaluation result of the evaluation method of the present invention is more objective, which verifies the effectiveness of the method proposed in the present invention.
[0136] Table 5 Power system resilience assessment results
[0137]
[0138] The scope of protection claimed by the present invention is not limited to the above specific embodiments. For those skilled in the art, the present invention may have various deformations and changes. Any modifications, improvements and equivalent substitutions made within the concept and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A method for evaluating the resilience of a power system under typhoon disasters considering the evolution of cascading failures, characterized in that: Generate fault scenarios through the transmission line fault model under typhoon disasters; use the cascading failure evolution model based on short and long time scales to simulate the possible cascading failures and their evolution process of the power system; combine the power system recovery model and use the sequential Monte Carlo simulation method to evaluate the power system resilience index value according to the system performance; The specific steps include: Step 1: Input power system data and typhoon disaster forecast information, set the simulated typhoon round n = 1, and the initial simulation time t k is the time when the typhoon starts to affect the power system, T0 is the time when the typhoon starts to attack the system, and the simulation time interval is Δt; Step 2: Update t k Based on the typhoon disaster situation and load level at the time, the transmission line fault model under typhoon disaster is used to calculate the damage load of the affected transmission line in the time period (t k ,t k +Δt), the transmission line fault set is obtained by sampling method and is used as t k New faults are added all the time; Specifically, the transmission line fault model under typhoon disaster is: (1) Based on the relationship between the typhoon and the affected transmission line, r1 is the radius of the typhoon affected area, r2 is the radius of the typhoon maximum wind speed area, and v t (t) is the typhoon moving speed. The failure probability of the affected transmission line changes with the movement of the typhoon. 0.5 km is the average span for segmenting each transmission line. The nth segment of the lth transmission line is L l,n The effective wind speed at time t is: Where: (σ x (t),σ y (t)) is the coordinate of the typhoon center; (x, y) is the transmission line L l,n The center coordinates of l,n (t) is the distance from the typhoon center to the transmission line L l,n distance; α1 and α2 are the two maximum wind speed parameters of the typhoon; γ1 and γ2 are the typhoon attenuation parameters; β(t) is the transmission line L l,n The angle with the typhoon's orbit direction; (2) Transmission line L under typhoon disaster l,n The approximate relationship between the effective wind speed and the failure probability is: Where: p l,n (t) is the failure probability of the transmission line per unit length, in units of 1 / (50km·h); v d is the designed wind speed for the transmission line; a and b are model parameters obtained by statistically analyzing historical data; (3) The hourly failure probability of the lth transmission line at time t is: Where: L l ' ,n For the transmission line L l,n The length of the n is the number of sections of the transmission line l; (4) Transmission line l in time period (t k ,t k +Δt) is: Step 3: Determine whether there is a fault in the system. If so, perform a cascading fault evolution analysis based on the power system cascading fault evolution model to detect whether a cascading fault occurs. The system performance start-down time T1 and the system derating time T2 can be obtained. Update the system status according to the fault situation. If there is no fault, directly proceed to step 5. Specifically, the evolution model process of power system cascading failures is as follows: (1) Determine t k Whether there is a new fault at the moment, if yes, proceed to step (2), if not, go to step (3) to analyze whether there is a new overload line after the load change; (2) The specific process of simulating the short-time scale cascading failure process is as follows: a. In the process of simulating short-time scale cascading faults caused by power stability problems, first determine whether the faulty line is correctly removed to obtain the outage line situation. If the faulty line protection fails to operate or fails due to a hidden fault, the fault is removed by shutting down the adjacent lines. It is assumed that the probability of failure to operate due to a hidden fault in the faulty line protection is p. h , other protections are all operating correctly; b. Then, the system fault condition is input into the transient simulation module, which will simulate the system operation and determine the protection action. If the system is unstable, emergency control measures are taken. The protections considered are the generator voltage over-limit and frequency over-limit protections. The emergency control measures are the system stability measures of low-voltage load shedding and low-frequency load shedding. If the system is stable, the simulation ends. (3) Identify the system status according to the fault situation, obtain the subsystem status by identifying the system connectivity, and make power balance adjustments to ensure the power balance of each subsystem. When power imbalance occurs, balance the power by adjusting the generator output, cutting the machine or shedding the load; (4) Calculate the power flow of each subsystem, compare the power flow of each line with the upper limit of the normal value of the power flow, and check whether there is an overloaded line. If so, overload control is performed through the line overload control model. If not, the system status is recorded and the simulation is terminated. The line overload control model is: The line overload is controlled by means of generator dispatching and load reduction. The optimal power flow model based on DC power flow is used to calculate the minimum load reduction. The objective function is: The constraints are: Where: F l 、F max,l They are respectively the lower and upper limits of the active power of the i-th generator, the active power flow of the l-th line and the active power flow limit of the line; η is the control strength of the power grid operator on line overload; P i G , are the active output of the i-th generator and the load demand at the j-th node respectively; is the load reduction at the jth node; is the load demand at the jth node; p lf is the probability of outage of the lth line; x l ,θ fl ,θ tl are the reactance of line l, the voltage phase angles at the beginning and end nodes of line l respectively; μ L,l is the state variable of the transmission line, μ L,l =1 for operation, μ L,l =0 means shutdown; μ G,i is the generator state variable, μ G,i =1 for operation, μ G,i =0 means out of service; N G 、N D 、N L are the collections of generators, load nodes, and transmission lines respectively; (5) The overload line failure probability is calculated according to the outage probability formula of line l based on the power flow, and the fault set is obtained by sampling. If the set is a non-empty set, the fault set is used as a new fault to simulate the short-time scale cascading failure process. If the set is an empty set, the system state is recorded and the simulation ends; Ignoring the failure rate of the line itself, the outage probability formula of line l based on power flow is: Where: is the upper limit of the normal value of the power flow on line l, F max,l is the power flow limit value of line l, Step 4, then obtain the fault and load recovery status according to the power system fault recovery model, update the system status according to the fault status, and obtain T3, which is the time when the system performance starts to recover. It is set that the load removed due to emergency control measures can be restored at the next simulation time, and the load lost due to component outage can be restored at the next simulation time after the outage component is restored; It is assumed that the outage line will be repaired when the typhoon no longer affects the outage line, and it is assumed that there are sufficient restoration resources to carry out restoration work on multiple outage components at the same time; it is assumed that the generator has a fast start and stop function, and the time for it to be reconnected to the grid after outage is set to 4 hours; The recovery time after a non-instantaneous outage of a transmission line follows a log-normal distribution. The log-normal distribution is selected as the recovery model for the outage line, and its probability density function is: Where: μ and σ are the mean and variance of the lognormal distribution respectively; Step 5, enter the next simulation time, repeat steps 2 to 4 until the power system performance returns to normal after the typhoon leaves, and the typhoon disaster leaves at time T4, and the system performance returns to normal at time T5; S I (t) is the ideal system performance curve without failure, S(t) is the actual system performance curve under typhoon disaster, the shaded area is the system performance loss, the load supply is used to describe the system performance, and the elasticity index r under the kth round of typhoon disaster is k for: Where: r k ∈[0,1],r k The larger the value is, the stronger the system's ability to cope with the kth round of typhoon disasters is; Step 6: Perform the next round of typhoon simulation, and repeat steps 2 to 5 until the preset typhoon simulation round is reached; Step 7: Calculate the power system resilience index value: Evaluate the power system resilience by simulating the typhoon process multiple times, and calculate the power system resilience index r under the kth round of typhoon disaster. k , the power system resilience index considering the disaster duration is: Where: N MCS To simulate the total number of typhoon rounds; R∈[0,1], the larger the R, the stronger the system's ability to cope with typhoon disasters.