A self-locking layered surrounding rock large deformation control anchor rod and its construction method

By arranging barbed rubber sleeves and cement slurry grouting holes on the anchor rods, a self-locking structure is formed, which solves the problem of insufficient anchoring force and easy slipping, and achieves effective control of large deformation of the layered surrounding rock.

CN114909164BActive Publication Date: 2024-10-01CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP CO LTD
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202210662598.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-06-13
Publication Date
2024-10-01
Estimated Expiration
2042-06-13

Smart Images

  • Figure CN114909164B_ABST
    Figure CN114909164B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of underground engineering support, and specifically to a self-locking layered surrounding rock large deformation control anchor and a construction method thereof, comprising an anchor body, wherein the anchor body is provided with a main grouting channel and an auxiliary grouting channel, and the main grouting channel and the auxiliary grouting channel are both arranged along the length direction of the anchor body; the bottom of the anchor body is provided with a cement slurry grouting hole connected to the main grouting channel, and the surface of the anchor body is provided with a plurality of chemical slurry grouting holes connected to the auxiliary grouting channel, and each chemical slurry grouting hole is installed with a hollow rubber sleeve, and the rubber sleeve is arranged on the surface of the anchor body in a barb shape. The anchor of the present invention has a simple external structure and soft rubber. Compared with other self-locking anchors, it is faster and more labor-saving in the process of driving the anchor; through the rubber grouting barbs on the anchor, the pull-out resistance of the anchor is improved, the anchoring effect is strengthened, the anchor is effectively prevented from slipping, and the displacement of the surrounding rock is prevented, so as to meet the control of large deformation of the layered surrounding rock.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of underground engineering support, and in particular to a self-locking layered surrounding rock large deformation control anchor rod and a construction method thereof. Background Art

[0002] The problem of large deformation of tunnels is a difficulty faced by many tunnel builders. Among them, large deformation of layered surrounding rocks accounts for a large proportion. Grouting reinforcement of the surrounding rock as a whole and increasing the strength of the support structure can effectively control the deformation of the surrounding rock. Among them, anchor rods are a common support structure with many types, but the structure is simple and the anchorable part is limited. In the project, the anchoring force may be insufficient and easy to slip, and the control ability of the surrounding rock deformation is weak. Summary of the invention

[0003] In order to overcome the deficiencies of the above-mentioned prior art, the object of the present invention is to provide a self-locking layered surrounding rock large deformation controlled anchor rod with simple structure and enhanced anchoring, and a construction method thereof.

[0004] To achieve the above-mentioned purpose, the technical solution of the present invention is a self-locking layered surrounding rock large deformation control anchor, including an anchor body, wherein a main grouting channel and an auxiliary grouting channel are arranged in the anchor body, and the main grouting channel and the auxiliary grouting channel are arranged along the length direction of the anchor body; a cement slurry grouting hole connected to the main grouting channel is arranged at the bottom of the anchor body, and a plurality of chemical slurry grouting holes connected to the auxiliary grouting channel are arranged on the surface of the anchor body, and each of the chemical slurry grouting holes is installed with a hollow rubber sleeve, and the rubber sleeve is arranged on the surface of the anchor body in a barb shape.

[0005] Furthermore, each of the cement slurry grouting holes is connected to the auxiliary grouting channel through a barbed grouting channel.

[0006] Furthermore, the length of the rubber sleeve is 3 to 4 cm, and the diameter of the rubber sleeve is 1 to 2 cm.

[0007] Furthermore, the chemical slurry grouting holes are distributed in multiple rings on the surface of the anchor body, and each ring has a plurality of chemical slurry grouting holes.

[0008] Furthermore, two adjacent rings of chemical slurry grouting holes are staggered.

[0009] Furthermore, each ring has two chemical grouting holes, and the chemical grouting holes are distributed in a plum blossom shape on the surface of the anchor body.

[0010] Furthermore, the spacing between two adjacent rings of chemical slurry grouting holes is 0.5~1.0m.

[0011] Furthermore, when the surrounding rock conditions are poor, two adjacent rings of chemical slurry grouting holes are arranged with a smaller spacing; when the surrounding rock conditions are good, two adjacent rings of chemical slurry grouting holes are arranged with a larger spacing.

[0012] The present invention also provides a construction method for the above-mentioned self-locking layered surrounding rock large deformation control anchor rod, comprising the following steps:

[0013] S1. Locate the anchor bolt placement position and then drill the hole;

[0014] S2, placing the prepared anchor rod into the drill hole;

[0015] S3, placing an auxiliary grouting pipe in the auxiliary grouting hole; slowly and steadily injecting the prepared chemical slurry into the bottom of the auxiliary grouting hole through the auxiliary grouting pipe, and the chemical slurry enters the rubber sleeve through the barbed grouting channel at the bottom, and the next round of grouting is carried out after the rubber sleeve is fully propped up to form rubber grouting barbs, and the above operation is repeated until the chemical slurry props up all the rubber sleeves to form rubber grouting barbs;

[0016] S4. After the chemical slurry in the rubber sleeve is completely solidified, a main grouting pipe is placed in the main grouting channel to the bottom of the anchor rod; the prepared cement slurry is injected into the bottom of the main grouting channel through the main grouting pipe, and the cement slurry enters the gap around the anchor rod through the cement slurry grouting hole at the bottom, and the grouting is continued until the cement slurry reaches the soil surface;

[0017] S5. After the grouting is completed, maintenance is carried out and then anchoring is carried out.

[0018] Furthermore, the chemical slurry is any one of water glass, acrylamide (acrylic gel), acrylate, polyurethane, epoxy resin, and methacrylate (methacrylate).

[0019] Working principle of the present invention:

[0020] After the hollow anchor rod is driven into the surrounding rock, the present invention slowly injects a proper amount of chemical slurry into the rubber sleeve through the auxiliary grouting pipe and the chemical slurry grouting hole on the anchor rod body, and the chemical slurry injected into the rubber sleeve forms a barb-shaped protrusion after solidification, and the adjacent rubber grouting barbs form a semi-enclosed self-locking structure with the soil between them, so that the anchor rod and the surrounding rock are in contact with each other in advance, the anchoring effect and the anti-slip effect are enhanced, and the grouting amount is small and the slurry coagulation time can be controlled; then, cement slurry is injected into the surrounding surrounding rock by pressure delivery through the main grouting pipe and the cement slurry grouting hole at the bottom of the anchor rod body, and the cement slurry penetrates into the large and small cracks of the hole and the surrounding rock, and solidifies in the cracks, forming a whole with good adhesion with the surrounding rock, thereby strengthening the anchoring force of the anchor rod and improving the strength, stability and impermeability of the rock mass around the anchor rod.

[0021] Compared with the prior art, the present invention has the following beneficial effects:

[0022] (1) The anchor rod of the present invention has a simple external structure and is made of soft rubber. Compared with other self-locking anchor rods, the anchor rod can be driven in more quickly and with less effort.

[0023] (2) The present invention improves the pull-out resistance of the anchor rod and strengthens the anchoring effect by using the rubber grouting barbs on the anchor rod, which can effectively prevent the anchor rod from sliding off and the surrounding rock from shifting, thereby meeting the control of large deformation of layered surrounding rock.

[0024] 3) The present invention firstly generates rubber grouting barbs on the surface of the anchor rod as early as possible by slowly injecting a small amount of chemical slurry, so that the anchor rod is in contact with the surrounding rock, and then performs cement slurry grouting, so that the anchoring effect is better and more outstanding. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0026] Figure 1 A schematic cross-sectional view of a self-locking layered surrounding rock large deformation control anchor provided by an embodiment of the present invention;

[0027] Figure 2 A schematic diagram of the structure of a self-locking layered surrounding rock large deformation control anchor provided by an embodiment of the present invention;

[0028] Figure 3 A schematic structural diagram of the rubber grouting barbs formed on the surface of the anchor rod after grouting the auxiliary grouting channel according to an embodiment of the present invention;

[0029] Figure 4 A schematic cross-sectional view of the rubber grouting barbs formed on the surface of the anchor rod after grouting the auxiliary grouting channel according to an embodiment of the present invention;

[0030] In the figure: 1. Main grouting channel; 2. Auxiliary grouting channel; 3. Barb grouting channel; 4. Rubber sleeve; 5. Cement slurry grouting hole; 6. Rubber grouting barb; 7. Chemical slurry. DETAILED DESCRIPTION

[0031] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0032] In the description of the present invention, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0033] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features; in the description of the present invention, unless otherwise specified, "plurality" means two or more.

[0034] Embodiment 1

[0035] like Figure 1-Figure 2 As shown, this embodiment provides a self-locking layered surrounding rock large deformation control anchor, including an anchor body, wherein a main grouting channel 1 and an auxiliary grouting channel 2 are arranged in the anchor body, and the main grouting channel 1 and the auxiliary grouting channel 2 are arranged along the length direction of the anchor body; a cement slurry grouting hole 5 connected to the main grouting channel 1 is arranged at the bottom of the anchor body, and a plurality of chemical slurry grouting holes connected to the auxiliary grouting channel 2 are arranged on the surface of the anchor body, and each of the chemical slurry grouting holes is installed with a hollow rubber sleeve 4, and the rubber sleeve 4 is arranged on the surface of the anchor body in a barb shape. In this embodiment, hollow rubber sleeves 4 arranged in the shape of barbs are installed on the several chemical grouting holes on the surface of the anchor body. Before the cement grouting, chemical slurry 7 is injected into each rubber sleeve 4 through the auxiliary grouting channel 2 and the chemical slurry grouting hole. After the chemical slurry 7 solidifies, several rubber grouting barbs 6 can be formed on the surface of the anchor body. The semi-enclosed self-locking structure formed by the rubber barbs and the soil can improve the pull-out resistance and anchoring effect of the anchor, effectively prevent the anchor from slipping, and prevent the surrounding rock from displacement. In addition, the external structure of the anchor is simple and the rubber is soft. Compared with other self-locking anchors, the process of driving the anchor is faster and more labor-saving.

[0036] Furthermore, each of the cement slurry injection holes 5 is connected to the auxiliary grouting channel 2 through a barbed grouting channel 3. Figure 1 As shown, the auxiliary grouting channel 2 can be arranged in the middle of the anchor body, so as to facilitate the setting of the barbed grouting channel 3 in the anchor body to connect with each cement slurry grouting hole 5, and the main grouting channel 1 can be arranged on one side of the auxiliary grouting channel 2 and avoid the position of the barbed grouting channel 3.

[0037] Furthermore, the length of the rubber sleeve 4 is 3 to 4 cm, and the diameter of the rubber sleeve 4 is 1 to 2 cm. In this embodiment, the length and diameter of the rubber sleeve 4 can be determined according to the actual conditions of the anchor rod body, the borehole, the surrounding rock, etc.

[0038] Furthermore, the chemical grouting holes are distributed in multiple rings on the surface of the anchor body, and each ring has a plurality of chemical grouting holes. Optimally, the chemical grouting holes in two adjacent rings are staggered. Figure 2 As shown, the surface of the anchor body has multiple rings of chemical grouting holes to ensure that a self-locking structure is formed between the entire anchor body and the soil, and the two adjacent rings of chemical grouting holes are staggered, which has better anchoring and anti-slip effects. As an optimized implementation method, Figure 1 and Figure 2 As shown, each ring has two chemical grouting holes, and the chemical grouting holes are distributed in a plum blossom shape on the surface of the anchor body.

[0039] Furthermore, the spacing between two adjacent rings of chemical grouting holes is 0.5-1.0m, and the specific spacing can be determined according to the surrounding rock conditions; in the case of poor surrounding rock conditions, two adjacent rings of chemical grouting holes can be arranged with a smaller spacing; in the case of good surrounding rock conditions, two adjacent rings of chemical grouting holes can be arranged with a larger spacing. In this embodiment, two or more types of anchor rods with larger and smaller spacings between two adjacent rings of chemical grouting holes can be pre-designed and manufactured, and in specific use, the appropriate anchor rod can be selected according to the specific conditions of the surrounding rock conditions.

[0040] Embodiment 2

[0041] like Figure 1-Figure 4 As shown, this embodiment also provides a construction method for the above-mentioned self-locking layered surrounding rock large deformation control anchor rod, comprising the following steps:

[0042] S1. Positioning and drilling: After positioning the anchor rod, drill the hole;

[0043] S2, placing the anchor rod into the hole: placing the prepared anchor rod into the pre-drilled hole;

[0044] S3, rubber sleeve grouting: place an auxiliary grouting pipe in the auxiliary grouting channel 2, and the placement length of the auxiliary grouting pipe is equal to that of the auxiliary grouting channel; slowly and steadily inject the prepared chemical slurry 7 with early strength and quick drying properties into the bottom of the auxiliary grouting channel 2 through the auxiliary grouting pipe, and the chemical slurry 7 enters the rubber sleeve 4 through the barbed grouting channel 3 at the bottom. The hole at the end of the rubber sleeve 4 can be used for exhaust during grouting. After the rubber sleeve 4 is fully propped up to form the rubber grouting barbs 6, the next round of grouting is carried out, and the above chemical slurry 7 grouting operation is repeated from the bottom to the top until the chemical slurry 7 props up all the rubber sleeves 4 and forms the rubber grouting barbs 6;

[0045] S4, external grouting of the anchor rod: after the chemical slurry 7 in the rubber sleeve 4 is completely solidified, the main grouting pipe is placed in the main grouting channel 1 to the bottom of the anchor rod; the prepared cement slurry is injected into the bottom of the main grouting channel 1 through the main grouting pipe, and the cement slurry enters the gap around the anchor rod through the cement slurry grouting hole 5 at the bottom, and the grouting is continued until the cement slurry reaches the soil surface;

[0046] S5. Anchoring: After the grouting is completed, maintenance is carried out and then anchoring is carried out.

[0047] In this embodiment, after the hollow anchor rod is driven into the surrounding rock, an appropriate amount of chemical slurry 7 is slowly injected into the rubber sleeve 4 through the auxiliary grouting pipe and the chemical slurry 7 grouting hole on the anchor rod body. The chemical slurry 7 injected into the rubber sleeve 4 forms a barb-shaped protrusion after solidification, and the adjacent rubber grouting barbs 6 form a semi-enclosed self-locking structure with the soil between them, so that the anchor rod and the surrounding rock have contact first, thereby enhancing the anchoring effect and anti-slip effect, and the grouting amount is small and the slurry coagulation time is controllable; subsequently, cement slurry is injected into the surrounding surrounding rock by pressure delivery through the main grouting pipe and the cement slurry grouting hole 5 at the bottom of the anchor rod body, and the cement slurry penetrates into the large and small cracks of the pores and the surrounding rock, and solidifies in the cracks, forming a whole with good adhesion with the surrounding rock, thereby strengthening the anchoring force of the anchor rod and improving the strength, stability and impermeability of the rock mass around the anchor rod.

[0048] Furthermore, the chemical grout 7 is any one of water glass, acrylamide (acrylic condensate), acrylate, polyurethane, epoxy resin, and methacrylate (methacrylic condensate). The grouting material of the anchor rod surface rubber sleeve 4 is selected from the above chemical grout 7, which has the advantages of high strength, no dispersion when exposed to water, and artificially controllable polymerization time.

[0049] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A construction method of a self-locking layered rock large deformation control anchor, the self-locking layered rock large deformation control anchor comprising an anchor body, wherein a main grouting channel and an auxiliary grouting channel are arranged in the anchor body, and the main grouting channel and the auxiliary grouting channel are arranged along the length direction of the anchor body; a cement grouting hole connected to the main grouting channel is arranged at the bottom of the anchor body, and a plurality of chemical grouting holes connected to the auxiliary grouting channel are arranged on the surface of the anchor body, each of the chemical grouting holes is connected to the auxiliary grouting channel through a barbed grouting channel, and each of the chemical grouting holes is installed with a hollow rubber sleeve, and the rubber sleeve is arranged on the surface of the anchor body in a barb shape, characterized in that: The construction method of the self-locking layered surrounding rock large deformation control anchor bolt specifically comprises the following steps: S1, drilling after locating the placement position of the anchor bolt; S2, placing the prepared anchor bolt into the drill hole; S3, placing the auxiliary grouting pipe in the auxiliary grouting hole; slowly and steadily injecting the prepared chemical slurry into the bottom of the auxiliary grouting hole through the auxiliary grouting pipe, and the chemical slurry enters the rubber sleeve through the barbed grouting channel at the bottom, and the next round of grouting is carried out after the rubber sleeve is fully propped up to form the rubber grouting barbs, and then the rubber sleeve is re-grouted. Repeat the above operation from bottom to top until the chemical slurry props up all the rubber sleeves to form rubber grouting barbs; S4, after the chemical slurry in the rubber sleeve is completely solidified, place the main grouting pipe in the main grouting channel to the bottom of the anchor rod; inject the prepared cement slurry into the bottom of the main grouting channel through the main grouting pipe, and the cement slurry enters the gap around the anchor rod through the cement slurry grouting hole at the bottom, and continue grouting until the cement slurry reaches the soil surface; S5, after the grouting is completed, perform maintenance and then perform anchoring treatment.

2. The construction method of the self-locking layered surrounding rock large deformation control anchor rod according to claim 1, characterized in that: The length of the rubber sleeve is 3-4 cm, and the diameter of the rubber sleeve is 1-2 cm.

3. The construction method of the self-locking layered surrounding rock large deformation control anchor rod according to claim 1, characterized in that: The chemical slurry grouting holes are distributed in multiple rings on the surface of the anchor body, and each ring has a plurality of chemical slurry grouting holes.

4. The construction method of the self-locking layered surrounding rock large deformation control anchor rod according to claim 3 is characterized by: The chemical grouting holes in two adjacent rings are staggered.

5. The construction method of the self-locking layered surrounding rock large deformation control anchor rod according to claim 4, characterized in that: Each ring has two chemical grouting holes, and the chemical grouting holes are distributed in a plum blossom shape on the surface of the anchor body.

6. The construction method of the self-locking layered surrounding rock large deformation control anchor rod according to claim 3, characterized in that: The distance between two adjacent rings of chemical slurry grouting holes is 0.5~1.0m.

7. The construction method of the self-locking layered surrounding rock large deformation control anchor rod according to claim 1, characterized in that: The chemical slurry is any one of water glass, acrylamide, acrylate, polyurethane, epoxy resin and methacrylate.

Citation Information

Patent Citations

  • Resin Cartridge Insertion Method & Apparatus

    AU2007203613A1

  • Novel anchoring grouting anchor rod and construction method thereof

    CN108979692A

  • Construction method of grouting flower tube anchor rods in support process of soft soil slope

    CN111364475A

  • Anti-pulling grouting anchor rod for deep roadway

    CN114320410A

  • Barb grouting anchor rod

    CN209800001U