An S-shaped tunnel construction method passing through an existing operating shield tunnel

During the construction of the S-shaped tunnel that passes through the existing operating shield tunnel, the shield tunnel was reinforced by using the method of shoring and dismantling the support and sand bag counter-pressure, which solved the problem of difficulty in forming stable support and The problem of large uplift deformation has improved the safe operation of trains and construction safety in the tunnel.

CN114961741BActive Publication Date: 2024-10-29INNER MONGOLIA UNIV OF SCI & TECH
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202210584916.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-05-27
Publication Date
2024-10-29
Estimated Expiration
2042-05-27

AI Technical Summary

Technical Problem

In the construction of urban rail transit, it is difficult to quickly form a stable stress-bearing support system for shallow-buried underground tunnels that pass through shield tunnels at short distances due to geographical environment restrictions, and the water-rich gravel strata cause the underlying shield tunnel to bulge and deform. It is large and affects the safe operation of trains in the tunnel.

Method used

The construction methods of vaulting and shoring and sandbag back-pressure were used to reinforce the soil near the existing operating shield tunnels and S-shaped tunnels, through sleeve valve tube grouting, advance small conduit deep hole grouting, and sub-guide tunnel excavation. and sandbag back pressure to control the uplift and deformation of the shield tunnel to ensure safe operation of trains in the tunnel.

Benefits of technology

It effectively reduces the uplift deformation of the shield tunnel, improves construction safety and efficiency, and ensures the safe operation of trains in the tunnel. It is suitable for deformation control of shield tunnels under water-rich gravel strata and has wide applicability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114961741B_ABST
    Figure CN114961741B_ABST
Patent Text Reader

Abstract

The invention discloses an S-type tunnel construction method for passing through an existing operating shield tunnel. The construction method includes: the S-type tunnel is set up on the existing operating shield tunnel, and before excavating the S-type tunnel, the soil above the arch waist of the existing operating shield tunnel is grouting reinforced through a sleeve valve pipe, and the S-type tunnel is half-section deep hole grouting is performed through an advance small guide tube; first, the left pilot tunnel is excavated, and initial support and a temporary middle partition are set. After the left pilot tunnel is excavated to be through, the left pilot tunnel is back-pressed with sandbags, and then the right pilot tunnel is excavated, and initial support is set. After the right pilot tunnel is excavated to be through, the right pilot tunnel is back-pressed with sandbags; the temporary middle partition is removed; and a second lining structure is constructed. The advantages of the invention are: it is suitable for the deformation control of a newly built S-type tunnel passing through a shield tunnel under water-rich gravel formation conditions, has high construction efficiency, high construction safety, can effectively control the uplift deformation of the shield tunnel, and ensure the safe operation of trains in the tunnel.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tunnel construction, and in particular to an S-shaped tunnel construction method that passes through an existing operating shield tunnel. Background Art

[0002] With the large-scale construction of urban rail transit, the development and construction of underground space projects will inevitably lead to the problem of crossing with existing structures, resulting in many complex and changeable crossing conditions. Among them, the close-range shield tunnel has strict construction requirements and high safety risks, which brings severe challenges to the construction. This project is restricted by the surrounding geographical environment. The shallow buried dark-cut tunnel passing through is S-shaped, which brings great difficulties to the initial support of the tunnel and cannot quickly form a stable force support system. In addition, the area is located in a water-rich gravel stratum. The buoyancy of the groundwater on the existing shield tunnel below is more likely to cause the uplift deformation of the segment structure to be too large, affecting the safe operation of trains in the tunnel. In response to this problem, it is necessary to adopt a reasonable construction plan for the new tunnel to ensure the deformation control requirements of the shield tunnel. The traditional shallow buried dark-cut tunnel is constructed by the CD method. Before the second lining is applied, the temporary middle partition needs to be removed. During the removal process, it is easy to cause the uplift deformation of the underlying tunnel to increase instantly. Therefore, a S-shaped tunnel construction method that can solve the above problems is needed to pass through the existing operating shield tunnel. Summary of the invention

[0003] The purpose of the present invention is to provide an S-type tunnel construction method that passes through an existing operating shield tunnel based on the above-mentioned deficiencies in the prior art, to reinforce the soil near the existing operating shield tunnel and the S-type tunnel, and to adopt a construction method of skipping chamber dismantling support and sandbag back pressure to effectively reduce the uplift deformation of the underlying shield tunnel and ensure the safe operation of trains in the tunnel.

[0004] The purpose of the present invention is achieved by the following technical solutions:

[0005] A method for constructing an S-shaped tunnel passing through an existing operating shield tunnel, characterized in that the construction method comprises the following steps:

[0006] The S-shaped tunnel is set up above the existing operating shield tunnel. Before excavating the S-shaped tunnel, the soil above the arch waist of the existing operating shield tunnel is grouting reinforced through the sleeve valve pipe, and the S-shaped tunnel is semi-section deep hole grouting is performed through the advance small guide tube; the S-shaped tunnel is excavated in separate pilot tunnels, the left pilot tunnel is excavated first, and initial support and temporary middle partition walls are set up, after the left pilot tunnel is excavated and penetrated, the left pilot tunnel is back-pressed by sandbags, and then the right pilot tunnel is excavated, and the initial support is set up, after the right pilot tunnel is excavated and penetrated, the right pilot tunnel is back-pressed by sandbags; the temporary middle partition wall is removed; and the secondary lining structure is constructed.

[0007] When dismantling the temporary middle partition wall, the sprayed concrete of the temporary middle partition wall is chiseled off with a jackhammer to expose the I-beam frame inside the temporary middle partition wall, and the I-beam frames are dismantled in the manner of dismantling two I-beam frames for every other I-beam frame.

[0008] For the I-beam frame to be removed, a gas welding machine is used to cut off the I-beam frame to be removed at the top elevation and the bottom elevation of the temporary middle partition wall respectively.

[0009] For the I-beam skeleton that has not been removed, a water-stop flange is embedded in the I-beam skeleton at a certain distance above the bottom elevation of the top plate of the second lining structure and at a certain distance below the top elevation of the bottom plate of the second lining structure, and the water-stop flange is welded to the steel plate; the bottom plate mold is supported, the bottom plate steel bars are laid, and it is ensured that the bottom plate steel bars are fully distributed around the I-beam skeleton, bottom plate concrete is poured into the bottom plate mold, and the water-stop flange and steel plate at the bottom of the I-beam skeleton that has not been removed are wrapped in the bottom plate concrete; after the bottom plate concrete reaches the design strength, the side walls and top plate of the second lining structure are sequentially constructed; the I-beam skeleton that has not been removed is neatly cut along the bottom elevation of the top plate and the top elevation of the bottom plate of the second lining structure by a gas welding machine.

[0010] The back pressure ranges of the left pilot tunnel and the right pilot tunnel are both the areas directly above the existing operating shield tunnel.

[0011] When the left pilot tunnel and the right pilot tunnel are excavated to directly above the existing operating shield tunnel, the monitoring and measurement frequency of the existing operating shield tunnel is strengthened to ensure that the left pilot tunnel and the right pilot tunnel are steadily excavated until they are through.

[0012] The advantages of the present invention are:

[0013] 1. It is suitable for the deformation control of newly built S-shaped tunnels passing through shield tunnels under water-rich gravel strata. It has high construction efficiency and high construction safety. It can effectively control the uplift deformation of shield tunnels and ensure the safe operation of trains in tunnels.

[0014] 2. Using sandbags to weigh down the newly built tunnel can reduce the uplift deformation caused by the shield tunnel, providing sufficient safety margin for the tunnel uplift caused by later construction;

[0015] 3. The construction efficiency is high, the control ability of the shield tunnel uplift deformation is strong, the operability is wider, and the applicability is strong under the condition that the existing shield tunnel cannot be reinforced. Without this limitation, it can be supplemented by the reinforcement inside the shield tunnel, which can greatly play the effect of controlling the uplift deformation of the shield tunnel. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of grouting reinforcement of the present invention;

[0017] Figure 2 It is a position relationship diagram of the S-shaped tunnel of the present invention and the existing operating shield tunnel;

[0018] Figure 3 This is a schematic diagram of the left pilot tunnel excavation of the present invention (I);

[0019] Figure 4 This is a schematic diagram of the left pilot tunnel excavation of the present invention (II);

[0020] Figure 5 This is a schematic diagram of the left pilot tunnel excavation of the present invention (III);

[0021] Figure 6 This is a schematic diagram of the right pilot tunnel excavation of the present invention (I);

[0022] Figure 7 This is a schematic diagram of the right pilot tunnel excavation of the present invention (II);

[0023] Figure 8 This is a schematic diagram of the right pilot tunnel excavation of the present invention (III);

[0024] Fig. 9 This is a schematic diagram of the back pressure of the sandbag of the present invention;

[0025] Fig.10 This is a schematic diagram of the removal of the temporary intermediate partition wall of the present invention (I);

[0026] Fig.11 This is a schematic diagram of the removal of the temporary intermediate partition wall of the present invention (II);

[0027] Fig.12 This is a schematic diagram of the removal of the temporary intermediate partition wall of the present invention (III);

[0028] Fig.13 This is a schematic diagram of the removal of the temporary middle partition wall of the present invention (IV). DETAILED DESCRIPTION

[0029] The features of the present invention and other related features are further described in detail below through embodiments in conjunction with the accompanying drawings to facilitate understanding by those skilled in the art:

[0030] like Figure 1-13As shown, marks 1-22 in the figure respectively represent: sleeve valve pipe 1, surface grouting reinforcement area 2, advance grouting reinforcement area 3, S-shaped tunnel 4, existing operating shield tunnel 5, left pilot tunnel excavated area 6, left pilot tunnel counterpressure area 7, right pilot tunnel excavated area 8, right pilot tunnel counterpressure area 9, left pilot tunnel 10, right pilot tunnel 11, temporary middle partition wall 12, initial support 13, sandbags 14, I-beam skeleton 15, water stop flange 16, steel plate 17, advance small guide tube 18, underground crossing passage 19, underground station 20, top plate 21, bottom plate 22.

[0031] Example: Figure 1-13 As shown, this embodiment relates to an S-shaped tunnel construction method that passes through an existing operating shield tunnel, and the construction method includes the following steps:

[0032] 1. The S-shaped tunnel 4 is set up above the existing operating shield tunnel 5, and the two ends of the S-shaped tunnel 4 are connected to the underground pedestrian passage 19 and the underground station 20 respectively. Before excavating the S-shaped tunnel 4, the soil near the existing operating shield tunnel 5 and the S-shaped tunnel 4 is reinforced. Figure 1 and Figure 2 As shown, firstly, a Φ48 sleeve valve pipe 1 is used to grout downward on the surface to reinforce the soil from the surface to the waist of the existing operating shield tunnel 5, forming a surface grouting reinforcement zone 2. The longitudinal length of the surface grouting reinforcement zone 2 is the length of the S-shaped tunnel 4 passing through the existing operating shield tunnel 5, which is 25m in this embodiment. The starting and ending positions of the surface grouting reinforcement zone 2 in the transverse direction are both located 2m outside the primary support contour of the existing operating shield tunnel 5, that is, the transverse length of the surface grouting reinforcement zone 2 is the diameter of the existing operating shield tunnel 5 plus 4m. Then, a Φ32 advance small guide tube 18 is used to perform half-section deep hole grouting on the S-shaped tunnel 4 to form an advance grouting reinforcement zone 3. The single advance small guide tube 18 is 2m long, and one row is set up for each grid.

[0033] 2. After the grouting reinforcement is completed, the S-shaped tunnel 4 is excavated by digging the left pilot tunnel 10 first and then the right pilot tunnel 11. Figures 3 to 5 As shown, when the left pilot tunnel 10 is excavated, initial support 13 and temporary intermediate partition wall 12 are constructed therein, wherein the excavation progress of one frame is 0.5m, and one frame is supported after excavation. The initial support 13 is an I-beam frame plus shotcrete. When the excavation reaches the top of the existing operating shield tunnel 5, the monitoring and measurement frequency of the existing operating shield tunnel 5 should be strengthened. The left pilot tunnel 10 is steadily excavated until it is through, and the left pilot tunnel 10 is immediately back-pressed with sandbags 14. The left pilot tunnel back-pressure area 7 is the area just above the existing operating shield tunnel 5. Figures 6 to 8As shown, after the back pressure of the left pilot tunnel 10 is completed, the right pilot tunnel 11 can be excavated. The excavation principle of the right pilot tunnel 11 is the same as that of the left pilot tunnel 10. The excavation advance is 0.5m, and support is provided as the excavation progresses. When the excavation reaches the top of the existing operating shield tunnel 5, the monitoring frequency is strengthened, and the sandbags 14 are used to back pressure the inside of the right pilot tunnel 11 after the excavation is gradually completed. Fig. 9 As shown, in this embodiment, the height of the sandbag 14 is 2-2.5m.

[0034] 3. If Figures 10 to 13 As shown, the temporary middle partition wall 12 is demolished, and the shotcrete of the temporary middle partition wall 12 is completely chiseled out with a pneumatic pick, so that the I-beam frame 15 inside the temporary middle partition wall 12 is exposed, and the I-beam frame 15 is demolished according to the principle of "jumping warehouse dismantling support", that is, two I-beam frames 15 are demolished every other I-beam frame 15. Among them, for the I-beam frame 15 to be demolished, the I-beam frame 15 to be demolished is cut off along the top elevation and bottom elevation of the temporary middle partition wall 12 with a gas welding machine; for the I-beam frame 15 that has not been demolished, a water stop flange 16 is embedded at 30mm above the bottom elevation of the top plate 21 of the second lining structure and 30mm below the top elevation of the bottom plate 22 of the second lining structure of the I-beam frame 15 that has not been demolished, and the water stop flange 16 is welded on the steel plate 17, and the steel plate 17 is also installed on the I-beam frame 15 that has not been demolished, and the size of the steel plate 17 is larger than the size of the water stop flange 16. The support sets up the bottom plate mold, lays the bottom plate steel bars, and ensures that the I-beam frame 15 that has not been removed is fully covered with bottom plate steel bars. The bottom plate concrete is poured into the bottom plate mold, and the water stop flange 16 and the steel plate 17 at the bottom of the I-beam frame 15 that has not been removed are wrapped in the bottom plate concrete. When the bottom plate concrete reaches the design strength, the construction of the bottom plate 22 of the secondary lining structure is completed, and the side walls and top plate 21 of the secondary lining structure are constructed in turn. Finally, the I-beam frame 15 that has not been removed is neatly cut along the bottom elevation of the top plate 21 of the secondary lining structure and the top elevation of the bottom plate 22 with a gas welding machine to complete the construction of the secondary lining structure.

[0035] In summary, this embodiment mainly overcomes the following difficulties:

[0036] 1. Due to the limitations of the surrounding geographical environment, the newly built tunnel is ultimately an S-shaped shallow buried dark-excavated tunnel, which makes it difficult to close the initial support into a ring and poses a high risk of construction. In addition, the minimum clear distance between the newly built tunnel and the existing shield tunnel is only 0.96m, which is a close-range crossing. If no corresponding construction methods or reinforcement measures are taken, there will be a major safety hazard to the safe operation of trains in the shield tunnel.

[0037] 2. The newly built tunnel is an S-shaped tunnel. During the crossing process, it will go through various crossing forms such as oblique crossing and straight crossing. The stress form of the shield tunnel is complex, which puts higher requirements on the construction.

[0038] 3. Trains are already in operation in the existing shield tunnel, so reinforcement conditions cannot be implemented in the shield tunnel. In addition, since this is the first time that the region has conducted exploratory research on the overpass project, on-site construction is quite difficult.

[0039] Although the above embodiments have described in detail the concepts and embodiments of the present invention with reference to the accompanying drawings, ordinary technicians in this field can recognize that various improvements and changes can still be made to the present invention without departing from the scope of the claims, so they are not described one by one here.

Claims

1. A method for constructing an S-shaped tunnel passing through an existing operating shield tunnel, characterized in that: The construction method comprises the following steps: The S-shaped tunnel is set up above the existing operating shield tunnel. Before excavating the S-shaped tunnel, the soil above the arch waist of the existing operating shield tunnel is grouting reinforced through the sleeve valve pipe, and the S-shaped tunnel is half-section deep hole grouting is performed through the advance small guide tube; the S-shaped tunnel is excavated in separate pilot tunnels, the left pilot tunnel is excavated first, and initial support and temporary middle partition walls are set. After the left pilot tunnel is excavated and penetrated, the left pilot tunnel is back-pressed with sandbags, and then the right pilot tunnel is excavated, and the initial support is set. After the right pilot tunnel is excavated and penetrated, the right pilot tunnel is back-pressed with sandbags; the temporary middle partition wall is removed; and the secondary lining structure is constructed; When dismantling the temporary middle partition wall, the shotcrete of the temporary middle partition wall is chiseled out with a jackhammer to expose the I-beam frame inside the temporary middle partition wall, and the I-beam frames are dismantled in a manner of dismantling two I-beam frames for every other I-beam frame; For the I-beam frame to be removed, the I-beam frame to be removed is cut off at the top elevation and the bottom elevation of the temporary middle partition respectively by using a gas welding machine; For the I-beam frame that has not been removed, a water stop flange is respectively embedded at a certain distance above the bottom elevation of the top plate of the second lining structure and at a certain distance below the top elevation of the bottom plate of the second lining structure on the I-beam frame that has not been removed, and the water stop flange is welded to the steel plate; the bottom plate mold is supported, the bottom plate steel bars are laid, and it is ensured that the bottom plate steel bars are fully distributed around the I-beam frame, and the bottom plate concrete is poured into the bottom plate mold, and the water stop flange and steel plate at the bottom of the I-beam frame that has not been removed are wrapped in the bottom plate concrete; after the bottom plate concrete reaches the design strength, the side wall and top plate of the second lining structure are sequentially constructed; the I-beam frame that has not been removed is neatly cut along the bottom elevation of the top plate and the top elevation of the bottom plate of the second lining structure by a gas welding machine; The back pressure ranges of the left pilot tunnel and the right pilot tunnel are both the area directly above the existing operating shield tunnel; When the left pilot tunnel and the right pilot tunnel are excavated to directly above the existing operating shield tunnel, the monitoring and measurement frequency of the existing operating shield tunnel is strengthened to ensure that the left pilot tunnel and the right pilot tunnel are steadily excavated until they are through.

Citation Information

Patent Citations

  • Construction method for enabling subway shield section to penetrate through existing station

    CN110173267A

  • Construction method of secondary lining mid-partition tunnel with supporting mold

    CN111828051A