Construction method for waterproofing the slope surface of the underground garage of a building
By arranging a water-blocking circulation structure and waterproof layer under the car ramp, the problem of water seepage on the underground garage car ramp slope is solved, an effective waterproofing effect is achieved, the maintenance requirements and the risk of leakage of the basement roof are reduced, and the The architectural quality and look and feel.
Patent Information
- Application Number
- CN202210905505.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-07-29
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2042-07-29
AI Technical Summary
Water seeps out from the backfill soil and the surrounding green belt on the car ramp slope of the underground garage, causing water to flow into the garage, causing problems such as poor appearance, frequent maintenance and leakage of the basement roof.
A water-blocking circulation structure and waterproof layer are installed under the car ramp to form a four-sided closed waterproofing, which separates the backfill soil from the basement roof and blocks the lateral connection of groundwater.
It effectively prevents water seepage, reduces the need for maintenance of car ramps and the hidden danger of leakage in the basement roof, and improves the quality and appearance of the building.
Smart Images

Figure CN115030221B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of construction, in particular to a construction method for waterproofing the slope surface of an automobile ramp in an underground garage of a building. Background Art
[0002] Water often seeps out along the slope separation joints or cracks of the slope on the slope of the underground garage of the building. When there is a green belt around the car ramp, this phenomenon occurs after rain or after watering by greening workers, resulting in a poor appearance of the car ramp. In severe cases, the seepage flows along the ramp to the underground garage, causing the inner wall of the garage to absorb water and moisture, and the paint to fall off, requiring repeated repairs, increasing maintenance costs, and seriously affecting the appearance quality and construction quality of the car ramp. The reason for this problem is that there is no reasonable sealing measure for the backfill soil under the open entrance and exit of the car ramp, resulting in the connection between the backfill soil under the car ramp and the surrounding green backfill soil. Rainwater and water used for perennial flower and plant maintenance accumulate in the backfill soil under the car ramp over time, reaching saturation, and seeping out along the gaps in the ramp surface layer. At the same time, it also causes a certain amount of pressure on the anti-leakage of the basement roof under the car ramp of the underground garage. Summary of the invention
[0003] The present invention aims to solve the above-mentioned problem, thereby providing a construction method for waterproofing the slope surface of an automobile ramp in an underground garage.
[0004] The present invention solves the above-mentioned problem by adopting the following technical solution:
[0005] A construction method for waterproofing the slope surface of an underground garage car ramp is carried out in the following steps:
[0006] Step 1: Use conventional construction methods to construct the main structure roof of the underground garage and the main structure of the car ramp. The main structure of the car ramp includes the garage roof below the car ramp and the left and right retaining walls of the car ramp;
[0007] Step 2: At the designed underground garage entrance, construct the underground garage car ramp water-blocking flow structure;
[0008] Step 3: Waterproof the top of the main structure of the underground garage, the outside of the retaining wall, and the outside of the water-blocking circulation structure. The waterproofing on the outside of the water-blocking circulation structure is rolled up to completely cover the top surface of the water-blocking circulation structure;
[0009] Step 4: Add a waterproof protective layer to the waterproof surface above the top plate of the main structure of the underground garage, the outside of the retaining wall, and the outside of the water-blocking flow structure;
[0010] Step 5: Backfill soil on both sides of the retaining wall and water-blocking flow structure, and compact it layer by layer;
[0011] Step 6: Construct a water retaining ditch, which covers and compresses the waterproof layer on the upper surface of the water-blocking flow structure, and tightly covers the end of the waterproof layer;
[0012] Step 7: Construct the remaining steps of the car ramp according to conventional processes.
[0013] Compared with the prior art, the present invention adopting the above technical solution has the following outstanding features:
[0014] Compared with the traditional method, the method described in the present invention increases the water-blocking circulation structure and the waterproof layer, and changes the three-sided blocking of the garage roof and the left and right retaining walls of the car ramp below the car ramp into four-sided blocking. Complete closed waterproofing is laid on the outer sides of the four retaining walls, and the backfill soil under the car ramp building layer is separated from the backfill soil of other parts of the basement roof, blocking the lateral connection of groundwater, avoiding the maintenance of the car ramp building layer and the side walls due to groundwater seepage, and reducing the hidden danger of leakage of the basement roof under the underground garage car ramp.
[0015] Preferably, a further technical solution of the present invention is:
[0016] The moisture content of the backfill soil located inside the water-blocking flow structure is the optimal moisture content, that is, under standard compaction conditions, the backfill soil can reach the maximum dry density. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is a schematic diagram of the planar structure of the automobile ramp according to an embodiment of the present invention;
[0018] Figure 2 This is a schematic diagram of the AA cross-sectional structure of the automobile ramp according to an embodiment of the present invention;
[0019] Figure 3 It is a partial enlarged structural schematic diagram of the AA section of the automobile ramp according to an embodiment of the present invention;
[0020] Marked in the figure are: top plate of the main structure of the underground garage 1; retaining wall 2; main structure of the underground garage car ramp 3; water-blocking circulation structure 4; waterproofing 5; backfill soil inside the water-blocking circulation structure 6; backfill soil outside the water-blocking circulation structure 7; retaining ditch 8. DETAILED DESCRIPTION
[0021] The present invention will be further described below in conjunction with embodiments, the purpose of which is only to provide a better understanding of the content of the present invention. Therefore, the examples given do not limit the protection scope of the present invention.
[0022] See also Figure 1-Figure 3 A construction method for waterproofing the slope surface of an underground garage car ramp is carried out in the following steps:
[0023] Step 1: Use conventional construction methods to construct the main structure top plate 1 of the underground garage and the main structure 3 of the car ramp. The main structure of the car ramp includes the garage top plate below the car ramp and the left and right retaining walls 2 of the car ramp;
[0024] Step 2: at the designed entrance of the underground garage, construct the underground garage car ramp water-blocking circulation structure 4; the water-blocking circulation structure 4 can be any rigid material structure that can provide a paving base for waterproof construction, such as a reinforced concrete structure, a plain concrete structure, a brick wall structure, a block masonry structure, a stone masonry structure, a lightweight partition board structure, etc., and its thickness can meet the requirement of not being damaged by the pressure of backfill soil on both sides of the inside and outside. If it is composed of block materials, it is necessary to add a mortar leveling layer to provide a flat base for waterproofing, such as a 200mm thick C20 plain concrete structure, and another example is a 200mm thick aerated concrete block structure with a 1:2.5 cement mortar applied on the outside;
[0025] Step 3: Make waterproofing 5 on the top of the main structure top plate 1 of the underground garage, the outside of the retaining wall 2, and the outside of the water blocking circulation structure 4. The waterproofing 5 on the outside of the water blocking circulation structure 4 is rolled up to completely cover the top surface of the water blocking circulation structure 4;
[0026] Step 4: Add a waterproof protective layer to the waterproof surface 5 above the top plate 1 of the main structure of the underground garage, the outside of the retaining wall 2, and the outside of the water-blocking flow structure 4;
[0027] Step 5: Backfill soil on both sides of the retaining wall 2 and the water-blocking flow structure 4, and compact them layer by layer;
[0028] Step 6: construct the water retaining ditch 8, the water retaining ditch 8 covers and presses the waterproof 5 on the upper surface of the water blocking flow structure 4, and tightly covers the end of the waterproof 5;
[0029] Step 7: Construct the remaining steps of the car ramp according to conventional techniques.
[0030] The moisture content of the backfill soil located inside the water-blocking flow structure is the optimal moisture content, that is, under standard compaction conditions, the backfill soil can reach the maximum dry density.
[0031] The ratio of the vertical height h and the horizontal width L of the slope is called the slope ratio, which is represented by the letter i and is usually expressed as a percentage: i=h / L*100%. The slope ratios of the entire car ramp from bottom to top are i=7.5%, i=15%, i=7.5%, and i=5%; at the entrance of the car ramp, i=7.5% and i=5% have opposite slopes.
[0032] Compared with the traditional method, the method described in the present invention increases the water-blocking circulation structure and the waterproof layer, and changes the three-sided blocking of the garage roof and the left and right retaining walls of the car ramp below the car ramp into four-sided blocking. Complete closed waterproofing is laid on the outer sides of the four retaining walls, and the backfill soil under the car ramp building layer is separated from the backfill soil of other parts of the basement roof, blocking the lateral connection of groundwater, avoiding the maintenance of the car ramp building layer and the side walls due to groundwater seepage, and reducing the hidden danger of leakage of the basement roof under the underground garage car ramp.
[0033] The above description is only a preferred feasible embodiment of the present invention, and does not limit the scope of rights of the present invention. All equivalent changes made using the contents of the present specification and its drawings are included in the scope of rights of the present invention.
Claims
1. A construction method for waterproofing the slope surface of an underground garage car ramp. It is characterized in that Proceed as follows: Step 1: Use conventional construction methods to construct the main structure roof of the underground garage and the main structure of the car ramp. The main structure of the car ramp includes the garage roof below the car ramp and the left and right retaining walls of the car ramp; Step 2: At the designed underground garage entrance, construct the underground garage car ramp water-blocking flow structure; Step 3: Waterproof the top of the main structure of the underground garage, the outside of the retaining wall, and the outside of the water-blocking circulation structure. The waterproofing on the outside of the water-blocking circulation structure is rolled up to completely cover the top surface of the water-blocking circulation structure; Step 4: Add a waterproof protective layer to the waterproof surface above the top plate of the main structure of the underground garage, the outside of the retaining wall, and the outside of the water-blocking flow structure; Step 5: Backfill soil on both sides of the retaining wall and water-blocking flow structure, and compact it layer by layer; Step 6: Construct a water retaining ditch, which covers and compresses the waterproof layer on the upper surface of the water-blocking flow structure, and tightly covers the end of the waterproof layer; Step 7: Construct the remaining steps of the car ramp according to conventional techniques; by adding a water-blocking flow structure and a waterproof layer, the three-sided blocking of the garage roof and the left and right retaining walls of the car ramp below the car ramp is changed to a four-sided blocking. A complete closed waterproofing is laid on the outside of the four retaining walls to separate the backfill soil under the car ramp building layer from the backfill soil in other parts of the basement roof, blocking the lateral connection of groundwater, avoiding the maintenance of the car ramp building layer and side walls due to groundwater seepage, and reducing the risk of leakage of the basement roof under the underground garage car ramp.
2. A construction method for waterproofing the slope of an underground garage according to claim 1, Features: The moisture content of the backfill soil located inside the water-blocking flow structure is the optimal moisture content, that is, under standard compaction conditions, the backfill soil can reach the maximum dry density.