A method and system for automatically processing power board test data

The automated power board test data processing method and system improve efficiency by using a host computer for data acquisition, linear fitting, and reliability evaluation, addressing the inefficiencies of manual data processing in non-manufacturer organizations.

CN115080342BInactive Publication Date: 2024-12-06NO 719 RES INST CHINA SHIPBUILDING IND
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202210640415.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-06-08
Publication Date
2024-12-06
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The manual processing of power board test data in non-manufacturer organizations results in heavy workload and low efficiency, lacking automated testing equipment for reliability evaluation.

Method used

A method and system for automatically processing power board test data using a host computer, which includes data acquisition, linear fitting, and reliability evaluation to calculate MTBF and pseudo-life, facilitating efficient data analysis and reliability assessment.

Benefits of technology

Enhances data processing efficiency by automating test data analysis, accurately calculating failure times, pseudo-life, and MTBF parameters, thereby verifying power board reliability and supporting design improvements.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115080342B_ABST
    Figure CN115080342B_ABST
Patent Text Reader

Abstract

The present invention discloses a method and system for automatically processing test data of a power supply board. The method is applied to a host computer, and the method comprises the following steps: obtaining pre-coded test status information of each tested power supply board according to a test execution instruction; performing data analysis on the test status information of each tested power supply board according to the test execution instruction, and the data analysis includes the test duration of failed tested power supply boards, the number of failed tested power supply boards, the pseudo life t of non-failed power supply boards, and the mean time between failures (MTBF) point estimate and the lower confidence limit (MTBF) of the MTBF of all tested power supply boards. L ; Based on the MTBF point estimate, the MTBF lower confidence limit MTBF L The reliability evaluation results of all tested power boards are analyzed by using the pseudo life t. The present invention directly uses the host computer to automatically analyze and process the test data, which can effectively improve the data processing efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of power board test, and more specifically, relates to a method and system for automatically processing power board test data. Background Art

[0002] Power boards are widely used in various industrial and control equipment fields. Since power boards generally have the characteristics of withstanding large electrical stress and generating large amounts of heat, they are prone to failure and often require environmental reliability tests to evaluate and verify their reliability in order to make design improvements and application optimizations.

[0003] However, since the power supply board itself is usually a pure hardware circuit board, the manufacturer usually develops corresponding automated testing equipment for the routine electrical performance test of the mass-produced power supply board in the laboratory environment, but most non-manufacturer organizations do not have the corresponding conditions. In most cases, the test test, test inspection, data recording, data analysis and report output of the power supply board in the reliability test are completed manually, which results in heavy test workload and low test efficiency.

[0004] Therefore, how to improve the test data processing efficiency in power board reliability assessment is a technical problem that needs to be solved urgently. Summary of the invention

[0005] In view of the defects of the prior art, the purpose of the present invention is to provide a method and system for automatically processing power board test data, which can automatically realize reliability evaluation of the power board and effectively improve the efficiency of power board test data processing.

[0006] To achieve the above object, in a first aspect, the present invention provides a method for automatically processing power board test data, which is applied to a host computer, and the method comprises the following steps:

[0007] (1) receiving a test execution instruction, and obtaining pre-coded test status information of each power board under test according to the test execution instruction; wherein the test execution instruction includes a parameter configuration instruction, a data acquisition instruction, and a data analysis instruction, the parameter configuration instruction includes the number of power boards under test, a test time period, and an output voltage failure threshold, and the test status information is the output voltage information of the power board under test during the test time period;

[0008] (2) according to the test execution instruction, it is judged in turn whether the output voltage of each power board under test exceeds the failure threshold value within the test time period; if it exceeds the failure threshold value, it is counted as failure, and the test of the power board under test is terminated, and the number of failed power boards under test is increased by one, and the test duration of the power board under test when the power board under test fails is calculated accordingly; if it does not exceed the failure threshold value, a linear fit is performed on the test state information of all power boards under test that meet the condition, and a fitting straight line equation and a judgment coefficient R are obtained. 2 , when the judgment coefficient R 2 If it is greater than or equal to the set value, the test of the tested power board is terminated, and the failure threshold is substituted into the fitting linear equation to calculate the pseudo life t of each tested power board that meets the condition. 2 If the value is less than the set value, the output voltage information of each tested power board that meets the condition in the next test time period is obtained and the operation of step S20 is performed until the test of the tested power board is completed;

[0009] (3) According to the test duration and number of failed power boards, calculate the mean time between failures (MTBF) point estimate and the lower confidence limit (MTBF) of all tested power boards. L ;

[0010] (4) Based on the MTBF point estimate and the MTBF lower confidence limit L The reliability assessment results of all tested power boards are analyzed using the pseudo-lifetime t.

[0011] The automatic processing method for power board test data provided by the present invention directly uses a host computer to automatically analyze and process the test data, which can effectively improve the data processing efficiency; at the same time, the test data analysis includes calculating the failure time, pseudo life and MTBF parameters of the failed power board, and performing reliability evaluation of the tested power board based on the parameters, which can accurately verify the reliability of the tested power board and facilitate subsequent design improvement and application optimization.

[0012] In one embodiment, in step (2), the test state information of all tested power boards that meet the condition is linearly fitted to obtain a fitting straight line equation and a judgment coefficient R 2 The steps are as follows:

[0013] Acquire test status information of all tested power boards whose output voltage does not exceed the failure threshold within the test time period;

[0014] Call the linear fitting function of Office Excel software, and use the test status information of all tested power boards that do not exceed the failure threshold to draw a scatter plot of output voltage and test time;

[0015] The Excel regression analysis function is used to calculate the fitting straight line equation for the scatter plot according to the least squares method, and the judgment coefficient R is calculated based on the fitting straight line equation and the test status information of all tested power boards that do not exceed the failure threshold. 2 .

[0016] In one embodiment, in step (2), when there is an interruption during the test, the test duration is:

[0017] T = t2-t1-(t4-t3)

[0018] Wherein, t1 indicates the test start time; t2 indicates the test time when the output voltage of the power board under test exceeds the failure threshold; t3 and t4 indicate the start and end time of the interruption respectively.

[0019] In one embodiment, step (2) further comprises:

[0020] If it is determined that the output voltage of a tested power board exceeds the failure threshold, the alarm information is displayed and the tested power board is triggered to send out a fault alarm, and then the alarm information is uploaded to the remote terminal through the network link, and at the same time, a fault path data tag is added to the test status information of the tested power board and saved and recorded, and then the output voltage acquisition, judgment, alarm, marking and record saving operations of the next tested power board are repeated; if it is determined that the output voltage of a tested power board does not exceed the failure threshold, the test status information of the tested power board is saved and recorded until the test end condition is met, otherwise the output voltage acquisition, judgment and record saving operations of the next tested power board are repeated;

[0021] Among them, the specific implementation method of saving and recording the test status information is: on the one hand, the test status information of each tested power board is generated into a log file, and then the data information in the log file is cached and updated in real time and permanently saved in the form of a data table; on the other hand, the test status information of each tested power board is drawn into a curve, and the interface is displayed together with its corresponding test status information.

[0022] In one embodiment, the method further comprises:

[0023] Obtain the test report export instruction input by the test personnel;

[0024] Determine whether the test of all the tested power boards is completed, if not, wait for the test to be completed; if it is completed, generate a corresponding test report by calling the test report template according to the configuration information in the test report export instruction;

[0025] Receive the test report modification instruction input by the test personnel, and modify and export the test report according to the test report modification instruction; wherein the configuration information in the report export task includes the coding information of the power board under test, the test time point and the output voltage information.

[0026] In one embodiment, the method further comprises:

[0027] Obtain the data analysis report export instructions input by the experimenter;

[0028] Determine whether steps (2) and (3) have been executed, and if not, wait for execution; if executed, generate a corresponding data analysis report by calling a data analysis report template according to the configuration information in the data analysis report export instruction;

[0029] Receive the data analysis report modification instruction input by the test personnel, and modify and export the data analysis report according to the data analysis report modification instruction; wherein the configuration information in the data analysis report export instruction includes the coding information of the power board under test, the test duration and pseudo life t, and the confidence lower limit MTBF L , analysis pictures and reliability assessment results, the analysis pictures including display interfaces and curves in picture form.

[0030] In one embodiment, in step (3), the lower confidence limit MTBF L The confidence lower limit of MTBF when the confidence level is 95% is calculated as follows:

[0031]

[0032] The calculation formula for the MTBF point estimate is: MTBF = T / r

[0033] In the formula, χ 2 represents chi-square distribution; r represents the number of failed power boards under test in the test; T represents the sum of the test durations of all failed power boards under test.

[0034] In one embodiment, step (4) is specifically:

[0035] Take the MTBF point estimate and the MTBF lower confidence limit MTBF L and the minimum value t0 of the pseudo life t, and then combine the pure working time t5 of all the tested power boards and the average daily operation ratio n to calculate the reliability evaluation result t6 of all the tested power boards in this batch, t6 = t5 / n;

[0036] Among them, the pure working time t5 = t0*K, where K represents the test acceleration factor, which is calculated according to the Arrhenius formula.

[0037] In one of the embodiments, in step (1), the pre-coded test status information of each tested power board during the test is obtained through a voltage acquisition board;

[0038] The voltage acquisition board is connected to the voltage output terminals of each power supply board under test installed in the environmental test box through a communication link, and is used to acquire and output the output voltage signals of each power supply board under test after analog-to-digital conversion.

[0039] In a second aspect, the present invention provides a power board test data automatic processing system, which is applied to a host computer and includes:

[0040] A data acquisition module, used to receive a test execution instruction, and acquire pre-coded test status information of each tested power board according to the test execution instruction; wherein the test execution instruction includes a parameter configuration instruction, a data acquisition instruction, a data analysis instruction, and a report output instruction, wherein the parameter configuration instruction includes the number of tested power boards to be tested, the test time period, and the output voltage failure threshold, and the test status information is the output voltage information of the tested power board within the test time period;

[0041] The data analysis module is used to determine in turn whether the output voltage of each tested power board exceeds the failure threshold within the test time period according to the test execution instruction. If it exceeds the failure threshold, it is counted as a failure, and the test of the tested power board is terminated. At the same time, the number of failed tested power boards is increased by one, and the test duration when the tested power board fails is calculated accordingly; if it does not exceed the failure threshold, the test state information of all tested power boards that meet the condition is linearly fitted to obtain the fitting straight line equation and the judgment coefficient R 2 , when the judgment coefficient R 2 If it is greater than or equal to the set value, the test of the tested power board is terminated, and the failure threshold is substituted into the fitting linear equation to calculate the pseudo life t of each tested power board that meets the condition. 2 When the value is less than the set value, the output voltage information of each tested power board that meets the condition in the next test time period is obtained and the operation of step S20 is performed until the test of the tested power board is completed; at the same time, it is also used to calculate the mean time between failures MTBF point estimate and the lower confidence limit MTBF of MTBF of all tested power boards according to the test duration and the number of failed tested power boards. L ;

[0042] A reliability evaluation module is used to calculate the MTBF based on the MTBF point estimate and the MTBF lower confidence limit. L The reliability assessment results of all tested power boards are analyzed using the pseudo-lifetime t.

[0043] The power board test data automatic processing system provided by the present invention directly uses a host computer to automatically analyze and process the test data, which can effectively improve the data processing efficiency; at the same time, the test data analysis includes calculating the failure time, pseudo life and MTBF parameters of the failed power board, and performing reliability evaluation of the tested power board based on the parameters, which can accurately verify the reliability of the tested power board and facilitate subsequent design improvement and application optimization. BRIEF DESCRIPTION OF THE DRAWINGS

[0044] Figure 1 This is a hardware architecture diagram on which the power board test data automatic processing method provided by the present invention relies;

[0045] Figure 2 It is a flow chart of the method for automatically processing power board test data provided by the present invention;

[0046] Figure 3 It is a software function block diagram of the power board test data automatic processing method provided by the present invention;

[0047] Figure 4 It is a flow chart of executing the data analysis function of the method for automatically processing power board test data provided by one embodiment of the present invention;

[0048] Figure 5 It is a flow chart of the execution of the power board fault alarm function of the power board test data automatic processing method provided by one embodiment of the present invention;

[0049] Figure 6 It is a flow chart of the execution of a test equipment fault alarm of a method for automatically processing power board test data provided by an embodiment of the present invention;

[0050] Figure 7 The present invention is a flowchart of the report export function of the method for automatically processing power board test data provided by one embodiment of the present invention. DETAILED DESCRIPTION

[0051] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0052] The present invention is a software system that automatically processes data on a power board by relying on a commonly used power board test hardware architecture in the art, such as Figure 1As shown. Among them, the software system can be executed by the host computer software system. The hardware architecture it relies on includes a voltage acquisition board and an environmental test chamber commonly used in the field for power board tests. Each power board under test is installed in the environmental test chamber. The interior of the environmental test chamber is subjected to various temperatures and test stresses, and is used to perform environmental reliability tests on the power board. The voltage acquisition board is used to collect the output voltage signal of the power board under test during the test, and output the output voltage signal after analog-to-digital conversion, and then upload it to the host computer through a communication link (such as serial port communication) for corresponding data automatic processing, and also send it to a remote terminal through a network link (such as the Internet) for remote monitoring and recording.

[0053] The automatic processing functions of the host computer software system provided by the present invention mainly include data acquisition, data analysis and reliability evaluation functions. Figure 2 is a flow chart of the method for automatically processing power board test data provided by the present invention, such as Figure 2 As shown, the method includes steps S10 to S40, which are described in detail as follows:

[0054] The data acquisition function provided in this embodiment is a function manually selected after the test operation is started, and its specific implementation method is as follows:

[0055] S10, receiving a test execution instruction, and obtaining pre-coded test status information of each power board under test according to the test execution instruction. The test execution instruction includes parameter configuration instructions, data acquisition instructions, and data analysis instructions. The parameter configuration instructions include the number of power boards under test, the test time period, and the output voltage failure threshold. The test status information is the output voltage information of the power board under test during the test time period.

[0056] In step S10, Figure 3 As shown in the figure, after the system is powered on and initialized, it is necessary to configure the number of test samples (the number of power boards under test), the test time period, the input and output voltage failure threshold and other parameters, confirm that the test starts running, and then the voltage acquisition board starts to collect the input and output voltages of the power board under test, and after the collected power board output voltage signal is converted through analog to digital, it is uploaded to the host computer through the communication link.

[0057] Furthermore, in order to facilitate the subsequent data analysis of the test status information of each power supply board under test, each power supply board under test can be installed in an array arrangement in the environmental test chamber, and each array unit is encoded by the host computer, so as to achieve the encoding of each power supply board under test installed at the corresponding position of each array unit, so as to facilitate the subsequent data analysis of the test data of each power supply board under test.

[0058] The data analysis function provided in this embodiment includes degradation parameter fitting, pseudo life calculation and MTBF parameter calculation. The data analysis function is a function manually selected and executed during the test process. The specific implementation method is as follows:

[0059] S20, after receiving the output voltage information of each tested power board card within the test time period, the host computer sequentially determines whether the output voltage of each tested power board card within the test time period exceeds the failure threshold according to the data analysis instructions in the test execution instruction. If it exceeds the failure threshold, it is counted as failure, and the test of the tested power board card is terminated. At the same time, the number of failed tested power boards is increased by one, and the test duration when the tested power board card fails is calculated accordingly; if it does not exceed the failure threshold, a linear fit is performed on the test state information of all tested power boards that meet the condition to obtain the fitting straight line equation and the judgment coefficient R 2 , when the judgment coefficient R 2 If it is greater than or equal to the set value, the test of the tested power board is terminated, and the failure threshold is substituted into the fitting linear equation to calculate the pseudo life t of each tested power board that meets the condition. 2 If it is less than the set value, the output voltage information of each tested power board meeting the condition after the next test time period is obtained and the operation of step S20 is performed until the test of the tested power board is completed.

[0060] Specifically, Figure 4 As shown, after the system is initialized, the data analysis function is manually selected, the test status information of the power supply board under test is called, and data analysis is performed under manual selection. (1) For power supply boards whose output voltage value exceeds the failure threshold, they are counted as failed, and the test duration when they fail is calculated: failure duration T = test time point t2 when the voltage value exceeds the failure threshold - test start time point t1. If there is an interruption during the test, the system automatically identifies the interruption time and eliminates the interruption time by manual selection, that is, T = t2-t1-(t4-t3), where t3 and t4 correspond to the time points indicating the start and end of the interruption. (2) For power supply boards whose output voltage value does not exceed the failure threshold, a linear fitting analysis is performed on the trend of degradation of their output voltage value over time (the trend is divided into an increasing or decreasing trend, and the threshold is usually a positive or negative percentage range of the nominal voltage). The data is saved in the form of a table. The linear fitting analysis calls the linear fitting function of Office Excel software, and uses the test data to draw a scatter plot of "output voltage-test time". The Excel regression analysis function calculates the slope a and intercept b in the fitting straight line equation "y=a*x+b(voltage value=slope*test time+intercept)" according to the principle of least squares method, and calculates the judgment coefficient R based on the slope a, intercept b and the test status information of all tested power boards that do not exceed the failure threshold. 2 , that is, variance.2 When it is greater than or equal to the set value, the fitting result is accepted and the pseudo life t of the power board is calculated. The method is: substitute the failure threshold y0 into the fitting linear equation, let x = t, y = y0, then t = (y0-b) / a. Output the calculated result of the sample pseudo life t; when R 2 If the value is less than the set value, the fitting result is rejected, and the output voltage information of the tested power board in the next test period is continuously obtained and the operation of step S20 is performed until the test of the tested power board is finished. Specifically, the set value can be selected according to the actual situation, such as 60%.

[0061] S30, based on the test duration of all failed tested power boards and the number of failed tested power boards, calculate the mean time between failures (MTBF) point estimate and the lower confidence limit (MTBF) of all tested power boards L .

[0062] Specifically, the MTBF of the power board under test is estimated, and the confidence lower limit of MTBF is calculated when the confidence level is 95%. L The calculation formula is:

[0063]

[0064] In the formula, χ 2 represents chi-square distribution; r represents the number of failed power boards in the test; T represents the sum of the test durations of all failed power boards (MTBF calculation is for the overall sample of all tested power boards, not for a single power board, so this calculation is only performed once in the process.). Calculate the MTBF point estimate: MTBF = T / r. Output the lower confidence limit of MTBF and the calculation results of the MTBF point estimate when the confidence level is 95%.

[0065] The reliability evaluation function provided in this embodiment is specifically implemented as follows:

[0066] S40, based on the MTBF point estimate, MTBF lower confidence limit MTBF L The reliability assessment results of all the tested power boards in this batch are analyzed by using the pseudo life span t, i.e. the estimated service life t6 of the test samples.

[0067] In step S40, the MTBF point estimate and the MTBF confidence limit MTBF can be obtained. L The reliability of the test sample is estimated based on the minimum value t0 of the pseudo life t.

[0068] Specifically, in order to more accurately evaluate the reliability of the test samples, the reliability estimate of this batch of test samples can be comprehensively calculated by combining the pure working time t5 of the test samples and the average daily operation ratio n of the test samples.

[0069] Among them, the pure working time of the test product is t5 = t0*K, where K represents the test acceleration ratio, which can be calculated according to the Arrhenius formula. The average daily operation ratio of the tested sample n is the ratio of the working and stopping of the test sample, n = t 工作 / t 停止 The estimated reliability value of this batch of test samples is t6 = t5 / n.

[0070] The automatic processing method for power board test data provided in this embodiment directly uses the host computer to automatically analyze and process the test data, which can effectively improve the data processing efficiency; at the same time, the test data analysis includes calculating the failure time, pseudo life and MTBF parameters of the failed power board, and performing the reliability evaluation of the tested power board based on the parameters, which can accurately verify the reliability of the tested power board and facilitate subsequent design improvement and application optimization.

[0071] In one embodiment, the functions of the upper computer software system provided by the present invention also include a power board fault alarm function, which is a function automatically executed by the system after the test operation starts, and its specific implementation method is:

[0072] like Figure 5 As shown, after the upper computer receives the test status information of all the power supply boards under test, it determines in turn according to the test execution instruction whether the output voltage of each power supply board under test exceeds the failure threshold range. If the output voltage of the power supply board under test exceeds the failure threshold, the alarm information is displayed and the power supply board under test is triggered to perform a fault alarm. The alarm information is then uploaded to the remote terminal through the network link for remote monitoring and recording. At the same time, a fault path data tag is added to the test status information of the power supply board under test and the record is saved. Then, the output voltage acquisition, judgment, alarm, marking processing, and record saving operations of the next power supply board under test are repeated until manual intervention; if the failure threshold is not exceeded, the test status information of the power supply board under test is saved and recorded until the test end condition is met, otherwise the output voltage acquisition, judgment, and record saving operations of the next power supply board under test are repeated.

[0073] Furthermore, the functions of the upper computer software system provided by the present invention may also include a test equipment failure alarm, which is a function automatically executed by the system after the test operation is started, and its specific implementation method is:

[0074] like Figure 6As shown, after the system is powered on and initialized and parameter configuration is completed, the test is confirmed to start running, and the system automatically performs equipment inspection, including whether the configuration parameters are normal, whether the acquisition, communication, and network links are normal, etc., to identify equipment hardware and software failures. If the inspection result is abnormal, the equipment failure alarm is performed on the host computer and the alarm information is pushed to the remote terminal through the network for remote monitoring and recording; if the inspection result is normal, it is determined whether the fault alarm of the power supply board under test is triggered in the data analysis function. If the fault alarm of the power supply board under test is triggered, the alarm information is displayed on the host computer and the alarm information is pushed to the remote terminal through the network for remote monitoring and recording. Otherwise, the equipment inspection is repeated regularly.

[0075] The power board fault alarm function and test equipment fault alarm provided in this embodiment can monitor and record the changes in the output voltage value during the power board test in real time, automatically determine the test sample status and the test equipment status, and issue a fault alarm, which can effectively reduce manual inspection time.

[0076] In one embodiment, the functions of the upper computer software system provided by the present invention also include a data recording function, which includes data storage and display, and data export. The data recording function is a function automatically executed by the system after the test operation starts, and its specific implementation method is:

[0077] After the system is initialized, the parameters are configured and the test is confirmed to start running. After the host computer receives the test status information of all the power boards under test, it generates the test status information and generates a log file according to the preset requirements. On the one hand, the system caches and updates the data information in the log file in real time and permanently saves it in the form of a data table. The test personnel can export the required data files from the log file as needed; on the other hand, the test status information is drawn into a curve and displayed in real time on the host computer display interface together with the test status information. The display interface and the curve can be exported in the form of a picture.

[0078] In one embodiment, the function of the upper computer software system provided by the present invention also includes a report output function, which includes a test report output and a data analysis report output. The report output function is a function selected and executed by the means when the test of all the tested power supply boards is completed or the test is interrupted, and its specific implementation method is:

[0079] like Figure 7As shown, after the system is initialized, manually select the test report output function, the system determines whether the test is over. If the test is not over, you need to wait for the test to end before generating the test report. If the test is over, the system calls the test report template, manually selects the information that the report needs to include, such as: sample information, test duration, test conditions, equipment information, test data, test results, etc. (where the test data only reflects the data file path in the report), and then confirms whether each content is correct. In the report editing state, you can manually modify the relevant content. After confirming that it is correct, select Generate Test Report and select the required format file to export.

[0080] To output a data analysis report, manually select the data analysis report output function. The system determines whether the data analysis has been executed. If the data analysis has not been executed, you need to wait for the data analysis to be executed before generating the data analysis report. If the data analysis has been executed, the system calls the data analysis report template and manually selects the information that the report needs to include, such as: sample information, test conditions, equipment information, test results, analysis process, analysis results (test duration and pseudo life t, lower confidence limit MTBF) L and MTBF point estimates), analysis pictures, etc., and then confirm whether each item is correct. In the report editing state, you can manually modify the relevant content. After confirmation, choose to generate a data analysis report and select the required format file to export.

[0081] This embodiment directly outputs the test report and the data analysis report through the host computer, which can effectively improve the report output efficiency.

[0082] Based on the same inventive concept, the present invention provides a power board test data automatic processing system, which is applied to a host computer and includes:

[0083] A data acquisition module, used to receive a test execution instruction, and acquire pre-coded test status information of each tested power board according to the test execution instruction; wherein the test execution instruction includes a parameter configuration instruction, a data acquisition instruction, a data analysis instruction, and a report output instruction, wherein the parameter configuration instruction includes the number of tested power boards to be tested, the test time period, and the output voltage failure threshold, and the test status information is the output voltage information of the tested power board within the test time period;

[0084] The data analysis module is used to determine in turn whether the output voltage of each tested power board exceeds the failure threshold within the test time period according to the test execution instruction. If it exceeds the failure threshold, it is counted as a failure, and the test of the tested power board is terminated. At the same time, the number of failed tested power boards is increased by one, and the test duration when the tested power board fails is calculated accordingly; if it does not exceed the failure threshold, the test state information of all tested power boards that meet the condition is linearly fitted to obtain the fitting straight line equation and the judgment coefficient R 2, when the judgment coefficient R 2 If it is greater than or equal to the set value, the test of the tested power board is terminated, and the failure threshold is substituted into the fitting linear equation to calculate the pseudo life t of each tested power board that meets the condition. 2 When the value is less than the set value, the output voltage information of each tested power board that meets the condition in the next test time period is obtained and the operation of step S20 is performed until the test of the tested power board is completed; at the same time, it is also used to calculate the mean time between failures MTBF point estimate and the lower confidence limit MTBF of MTBF of all tested power boards according to the test duration and the number of failed tested power boards. L ;

[0085] A reliability evaluation module is used to calculate the MTBF based on the MTBF point estimate and the MTBF lower confidence limit. L The reliability assessment results of all tested power boards are analyzed using the pseudo-lifetime t.

[0086] Specifically, the various modules in the power board test data automatic processing system provided in this embodiment can be referred to the detailed description in the aforementioned method embodiment, and will not be described in detail in this embodiment.

[0087] The power board test data automatic processing system provided in this embodiment directly uses the host computer to automatically analyze and process the test data, which can effectively improve the data processing efficiency; at the same time, the test data analysis includes calculating the failure time, pseudo life and MTBF parameters of the failed power board, and performing the reliability evaluation of the tested power board based on the parameters, which can accurately verify the reliability of the tested power board and facilitate subsequent design improvement and application optimization.

[0088] It will be easily understood by those skilled in the art that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for automatically processing power board test data, characterized in that: Applied to a host computer, the method comprises the following steps: (1) receiving a test execution instruction, and obtaining pre-coded test status information of each power board under test according to the test execution instruction; wherein the test execution instruction includes a parameter configuration instruction, a data acquisition instruction, and a data analysis instruction, the parameter configuration instruction includes the number of power boards under test, the test time period, and the output voltage failure threshold, and the test status information is the output voltage information of the power board under test during the test time period; (2) According to the test execution instruction, it is judged in turn whether the output voltage of each power board under test exceeds the failure threshold value during the test time period. If it exceeds the failure threshold value, it is counted as a failure, and the test of the power board under test is terminated. At the same time, the number of failed power boards under test is increased by one, and the test duration of the power board under test when the power board under test fails is calculated accordingly; if it does not exceed the failure threshold value, a linear fit is performed on the test state information of all power boards under test that meet the condition to obtain the fitting straight line equation and the judgment coefficient R 2 , when the judgment coefficient R 2 If it is greater than or equal to the set value, the test of the tested power board is terminated, and the failure threshold is substituted into the fitting linear equation to calculate the pseudo life t of each tested power board that meets the condition. 2 If the value is less than the set value, the output voltage information of each tested power board that meets the condition in the next test time period is obtained and the operation of step S20 is performed until the test of the tested power board is completed; (3) Based on the test duration and number of failed power boards, calculate the mean time between failures (MTBF) point estimate and the lower confidence limit (MTBF) of all tested power boards. L ; (4) Based on the MTBF point estimate and the MTBF lower confidence limit L The reliability evaluation results of all the tested power boards in this batch were analyzed by using the pseudo life span t; In step (2), the test state information of all the tested power boards that meet the condition is linearly fitted to obtain the fitting straight line equation and the judgment coefficient R 2 The steps are as follows: Acquire test status information of all tested power boards whose output voltage does not exceed the failure threshold within the test time period; Call the linear fitting function of Office Excel software, and use the test status information of all tested power boards that do not exceed the failure threshold to draw a scatter plot of output voltage and test time; The Excel regression analysis function is used to calculate the fitting straight line equation for the scatter plot according to the least squares method, and the judgment coefficient R is calculated based on the fitting straight line equation and the test status information of all tested power boards that do not exceed the failure threshold. 2 ; In step (3), the lower confidence limit MTBF L The lower confidence limit of MTBF when the confidence level is 95% is calculated as follows: The calculation formula for the MTBF point estimate is: MTBF = T / r In the formula, represents chi-square distribution; r Indicates the number of failed tested power boards in the test; T Represents the sum of the test durations of all failed power boards under test.

2. The method for automatically processing power board test data according to claim 1, characterized in that: In step (2), if there is an interruption during the test, the test duration is: T = t2-t1-(t4-t3) Wherein, t1 indicates the test start time; t2 indicates the test time when the output voltage of the power board under test exceeds the failure threshold; t3 and t4 indicate the start and end time of the interruption respectively.

3. The method for automatically processing power board test data according to claim 1, characterized in that: Step (2) also includes: If it is determined that the output voltage of a tested power board exceeds the failure threshold, the alarm information is displayed and the tested power board is triggered to send out a fault alarm, and then the alarm information is uploaded to the remote terminal through the network link, and at the same time, a fault path data tag is added to the test status information of the tested power board and saved and recorded, and then the output voltage acquisition, judgment, alarm, marking and record saving operations of the next tested power board are repeated; if it is determined that the output voltage of a tested power board does not exceed the failure threshold, the test status information of the tested power board is saved and recorded until the test end condition is met, otherwise the output voltage acquisition, judgment and record saving operations of the next tested power board are repeated; Among them, the specific implementation method of saving and recording the test status information is: on the one hand, the test status information of each tested power board is generated into a log file, and then the data information in the log file is cached and updated in real time and permanently saved in the form of a data table; on the other hand, the test status information of each tested power board is drawn into a curve, and the interface is displayed together with its corresponding test status information.

4. The method for automatically processing power board test data according to claim 3, characterized in that: The method further comprises: Obtain the test report export instruction input by the test personnel; Determine whether the test of all the tested power boards is completed, if not, wait for the test to be completed; if it is completed, generate a corresponding test report by calling the test report template according to the configuration information in the test report export instruction; Receive the test report modification instruction input by the test personnel, and modify and export the test report according to the test report modification instruction; wherein the configuration information in the report export task includes the coding information of the power board under test, the test time point and the output voltage information.

5. The method for automatically processing power board test data according to claim 3, characterized in that: The method further comprises: Obtain the data analysis report export instructions input by the experimenter; Determine whether steps (2) and (3) have been executed, and if not, wait for execution; if executed, generate a corresponding data analysis report by calling a data analysis report template according to the configuration information in the data analysis report export instruction; Receive the data analysis report modification instruction input by the test personnel, and modify and export the data analysis report according to the data analysis report modification instruction; wherein the configuration information in the data analysis report export instruction includes the coding information of the tested power board, the test duration and pseudo life t, and the lower confidence limit MTBF L , MTBF point estimation value, analysis picture and reliability evaluation result, wherein the analysis picture includes a display interface and curve in picture form.

6. The method for automatically processing power board test data according to claim 1, characterized in that: Step (4) is as follows: Take the MTBF point estimate and the MTBF lower confidence limit MTBF L and the minimum value t0 of the pseudo life t, and then combine the pure working time t5 of all the tested power boards and the average daily operation ratio n to calculate the reliability evaluation result t6 of all the tested power boards in this batch, t6=t5 / n; Among them, the pure working time t5=t0*K, where K represents the test acceleration factor, which is calculated according to the Arrhenius formula.

7. The method for automatically processing power board test data according to claim 1, characterized in that: In step (1), the pre-coded test status information of each power supply board under test during the test is obtained through the voltage acquisition board; The voltage acquisition board is connected to the voltage output terminals of each power supply board under test installed in the environmental test box through a communication link, and is used to acquire and output the output voltage signals of each power supply board under test after analog-to-digital conversion.

8. A power board test data automatic processing system, characterized in that: Applied to the host computer, including: A data acquisition module, used to receive a test execution instruction, and acquire pre-coded test status information of each tested power board according to the test execution instruction; wherein the test execution instruction includes a parameter configuration instruction, a data acquisition instruction, a data analysis instruction, and a report output instruction, wherein the parameter configuration instruction includes the number of tested power boards to be tested, the test time period, and the output voltage failure threshold, and the test status information is the output voltage information of the tested power board within the test time period; The data analysis module is used to determine in turn whether the output voltage of each tested power board exceeds the failure threshold within the test time period according to the test execution instruction. If it exceeds the failure threshold, it is counted as a failure, and the test of the tested power board is terminated. At the same time, the number of failed tested power boards is increased by one, and the test duration when the tested power board fails is calculated accordingly; if it does not exceed the failure threshold, the test state information of all tested power boards that meet the condition is linearly fitted to obtain the fitting straight line equation and the judgment coefficient R 2 , when the judgment coefficient R 2 If it is greater than or equal to the set value, the test of the tested power board is terminated, and the failure threshold is substituted into the fitting linear equation to calculate the pseudo life t of each tested power board that meets the condition. 2 When the value is less than the set value, the output voltage information of each tested power board that meets the condition in the next test time period is obtained and the operation of step S20 is performed until the test of the tested power board is completed; at the same time, it is also used to calculate the mean time between failures MTBF point estimate and the lower confidence limit MTBF of MTBF of all tested power boards according to the test duration and the number of failed tested power boards. L ; A reliability evaluation module is used to calculate the MTBF based on the MTBF point estimate and the MTBF lower confidence limit. L and pseudo-lifetime t to analyze the reliability assessment results of all tested power boards; The data analysis module is specifically used for: Acquire test status information of all tested power boards whose output voltage does not exceed the failure threshold within the test time period; Call the linear fitting function of Office Excel software, and use the test status information of all tested power boards that do not exceed the failure threshold to draw a scatter plot of output voltage and test time; The Excel regression analysis function is used to calculate the fitting straight line equation for the scatter plot according to the least squares method, and the judgment coefficient R is calculated based on the fitting straight line equation and the test status information of all tested power boards that do not exceed the failure threshold. 2 ; The lower confidence limit of MTBF L The lower confidence limit of MTBF when the confidence level is 95% is calculated as follows: The calculation formula for the MTBF point estimate is: MTBF = T / r In the formula, represents chi-square distribution; r Indicates the number of failed tested power boards in the test; T Represents the sum of the test durations of all failed power boards under test.