A method and system for controlling engineering costs

Through the combination of thermal imaging monitoring video and surveillance video, the lighting equipment on the construction site is automatically controlled, which solves the cost waste caused by manual control, realizes efficient management of lighting equipment, and reduces construction costs.

CN115099783BActive Publication Date: 2024-12-03ANHUI HIGHWAY BRIDGE ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210763732.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-06-29
Publication Date
2024-12-03
Estimated Expiration
2042-06-29

AI Technical Summary

Technical Problem

At the construction site, the opening and closing of lighting equipment mainly relies on manual control, resulting in waste of engineering costs. In the indirect costs, lighting equipment-related expenses account for a large proportion, making it difficult to effectively manage.

Method used

Using a combination of thermal imaging monitoring video and surveillance video, the lighting equipment is automatically turned on or off by analyzing the movement trajectory and body movement of the personnel, counting the equipment opening time, calculating the theoretical lighting cost, and making abnormal judgments to realize intelligent control of the lighting equipment. .

Benefits of technology

Minimize the opening time of lighting equipment, reduce construction costs, improve the efficiency of lighting equipment, and reduce cost waste.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115099783B_ABST
    Figure CN115099783B_ABST
Patent Text Reader

Abstract

The present invention is applicable to the field of computer technology, and in particular to a method and system for controlling project costs, the method comprising: obtaining a thermal imaging monitoring video, and turning on a first lighting device in a corresponding area based on the thermal imaging monitoring video; obtaining a monitoring video corresponding to the lighting area of ​​the first lighting device, and judging the movement trajectory of personnel based on the monitoring video; analyzing the movement trajectory of personnel, the second lighting device, and identifying the body movements of personnel to determine whether to keep the second lighting device always on; counting the opening time of the first lighting device and the second lighting device, calculating the theoretical lighting cost, and making an abnormality judgment. The present invention determines the position of construction personnel and predicts their moving direction based on monitoring video data, and then actively turns on the lighting equipment on their moving path, thereby minimizing the opening time of the lighting equipment and the fill light equipment, and greatly reducing the construction cost of the lighting equipment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of computer technology, and in particular relates to an engineering cost control method and system. Background Art

[0002] The project cost is composed of direct costs and indirect costs. Direct costs refer to the costs directly consumed during the installation and construction of the construction project, such as material costs, labor costs, and machinery costs; indirect costs refer to all expenses incurred during the construction preparation, construction organization, and construction production management, such as the wages of construction management personnel, office expenses, etc.

[0003] There are many types of indirect costs, including costs related to lighting equipment. Generally, a large number of lighting equipment need to be installed at the construction site. The lighting equipment is used to illuminate the construction site so that the construction project can be carried out at night to speed up the construction progress.

[0004] However, in the current construction scenario, the lighting equipment is turned on or off manually, so the corresponding project costs are all controlled manually, which easily leads to cost waste. Summary of the invention

[0005] The purpose of the embodiment of the present invention is to provide a method for controlling engineering costs, aiming to solve the problem raised in the third part of the background technology.

[0006] The embodiment of the present invention is implemented as follows: a method for controlling engineering costs, the method comprising:

[0007] Acquire a thermal imaging surveillance video, and turn on a first lighting device in a corresponding area based on the thermal imaging surveillance video;

[0008] Obtaining a surveillance video corresponding to the lighting area of ​​the first lighting device, and determining a movement trajectory of a person based on the surveillance video;

[0009] Analyze the movement trajectory of the person, turn on the second lighting device located on the movement trajectory of the person, and identify the body movements of the person to determine whether to keep the second lighting device always on;

[0010] The opening time of the first lighting device and the second lighting device is counted, the theoretical lighting cost is calculated, and an abnormality determination is performed.

[0011] Preferably, the step of obtaining the surveillance video corresponding to the lighting area of ​​the first lighting device and determining the movement trajectory of the person based on the surveillance video specifically includes:

[0012] Obtaining a surveillance video corresponding to the lighting area of ​​the first lighting device;

[0013] Determine the available road locations in the area based on the movement trajectories of people in historical monitoring data;

[0014] By comparing adjacent picture frames, the direction of movement of the person is determined, thereby determining and generating the movement trajectory of the person.

[0015] Preferably, the step of identifying the body movements of the person and determining whether to keep the second lighting device always on specifically includes:

[0016] Perform facial recognition on people in the monitoring area and determine their identities through facial recognition;

[0017] For persons whose identities can be confirmed, determine whether the equipment control conditions are met based on the person's body movements;

[0018] The time for turning on the second lighting device is set according to the determination result.

[0019] Preferably, the step of counting the start-up time of the first lighting device and the second lighting device, calculating the theoretical lighting cost, and performing abnormality determination specifically includes:

[0020] Identify the models of the first lighting device and the second lighting device, and determine their theoretical power consumption;

[0021] Counting the start time of the first lighting device and the second lighting device and calculating the respective theoretical lighting costs accordingly;

[0022] Obtain power statistics information and determine whether there is abnormal power consumption of the device based on historical data.

[0023] Preferably, the thermal imaging video and the surveillance video corresponding to the same area are not acquired at the same time.

[0024] Preferably, if the thermal imaging surveillance video does not contain any active heat sources, all lighting equipment and surveillance equipment are turned off.

[0025] Another object of an embodiment of the present invention is to provide a project cost control system, the system comprising:

[0026] A thermal imaging analysis module, used to obtain a thermal imaging monitoring video, and turn on a first lighting device in a corresponding area based on the thermal imaging monitoring video;

[0027] A personnel trajectory determination module, used to obtain a monitoring video corresponding to the lighting area of ​​the first lighting device, and determine the movement trajectory of the personnel based on the monitoring video;

[0028] The lighting device control module is used to analyze the movement trajectory of the person, turn on the second lighting device located on the movement trajectory of the person, and identify the body movements of the person to determine whether to keep the second lighting device always on;

[0029] The cost anomaly analysis module is used to count the opening time of the first lighting device and the second lighting device, calculate the theoretical lighting cost, and make anomaly determinations.

[0030] Preferably, the personnel trajectory determination module includes:

[0031] A monitoring acquisition unit, used to acquire a monitoring video corresponding to the lighting area of ​​the first lighting device;

[0032] A road identification unit is used to determine the location of available roads in the area based on the movement trajectory of people in the historical monitoring data;

[0033] The trajectory prediction unit is used to determine the direction of movement of a person by comparing adjacent picture frames, thereby determining and generating the movement trajectory of the person.

[0034] Preferably, the lighting device control module includes:

[0035] A facial recognition unit is used to perform facial recognition on people in the monitoring area and determine their identities through facial recognition;

[0036] A body movement recognition unit, used to determine whether the device control conditions are met according to the body movements of persons whose identities can be determined;

[0037] The device control unit is used to set the time for turning on the second lighting device according to the determination result.

[0038] Preferably, the cost anomaly analysis module includes:

[0039] A device identification unit, used to identify the models of the first lighting device and the second lighting device, and determine their theoretical power consumption;

[0040] A theoretical cost calculation unit, used to count the opening time of the first lighting device and the second lighting device and calculate the respective theoretical lighting costs accordingly;

[0041] The power consumption analysis unit is used to obtain power statistics information and determine whether there is abnormal power consumption of the device based on historical data.

[0042] An engineering cost control method provided by an embodiment of the present invention monitors the on-site environment through a thermal imaging camera to determine whether to turn on the lighting equipment, and then determines the position of the construction personnel and predicts their movement direction based on the monitoring video data, and then actively turns on the lighting equipment on their movement path, thereby minimizing the turn-on time of the lighting equipment and the fill light equipment, and greatly reducing the construction cost for the lighting equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] Figure 1 An application environment diagram of an engineering cost control method provided by an embodiment of the present invention;

[0044] Figure 2 A flowchart of the steps of obtaining a monitoring video corresponding to the lighting area of ​​a first lighting device and determining a movement trajectory of a person based on the monitoring video provided in an embodiment of the present invention;

[0045] Figure 3 A flowchart of the steps of analyzing a movement trajectory of a person, turning on a second lighting device located on the movement trajectory of the person, identifying the body movements of the person, and determining whether to keep the second lighting device always on, provided by an embodiment of the present invention;

[0046] Figure 4 A flowchart of the steps of counting the start-up time of the first lighting device and the second lighting device, calculating the theoretical lighting cost, and performing abnormality determination provided by an embodiment of the present invention;

[0047] Figure 5 An architectural diagram of an engineering cost control system provided by an embodiment of the present invention;

[0048] Figure 6 An architecture diagram of a personnel trajectory determination module provided in an embodiment of the present invention;

[0049] Figure 7 An architectural diagram of a lighting device control module provided by an embodiment of the present invention;

[0050] Figure 8 An architectural diagram of a cost anomaly analysis module provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0051] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0052] It is understood that the terms "first", "second", etc. used in this application may be used herein to describe various elements, but unless otherwise specified, these elements are not limited by these terms. These terms are only used to distinguish a first element from another element. For example, without departing from the scope of this application, a first xx script may be referred to as a second xx script, and similarly, a second xx script may be referred to as a first xx script.

[0053] There are many types of indirect costs, including those related to lighting equipment. Generally, a large number of lighting equipment are required at the construction site to illuminate the construction site so that the construction can be carried out at night to speed up the construction progress. However, in the current construction scenario, the lighting equipment is turned on or off manually, so the corresponding project costs are all controlled manually, which easily leads to cost waste.

[0054] In the present invention, the on-site environment is monitored by a thermal imaging camera to determine whether to turn on the lighting equipment, and then the position of the construction personnel is determined and their movement direction is predicted based on the monitoring video data, and then the lighting equipment on their moving path is actively turned on, thereby minimizing the turn-on time of the lighting equipment and the fill light equipment, and greatly reducing the construction cost for the lighting equipment.

[0055] like Figure 1 FIG. 1 is an application environment diagram of an engineering cost control method provided by an embodiment of the present invention, wherein the method comprises:

[0056] S100, obtaining a thermal imaging surveillance video, and turning on a first lighting device in a corresponding area based on the thermal imaging surveillance video.

[0057] In this step, a thermal imaging surveillance video is obtained, and thermal imaging equipment and monitoring equipment are set up at the construction site, wherein the imaging areas of the thermal imaging equipment and the monitoring equipment can each cover the entire construction site, and the construction site will be equipped with multiple lighting equipment at different locations. The first lighting equipment in the corresponding area is turned on based on the thermal imaging surveillance video, and the thermal imaging surveillance video is obtained in real time. According to the thermal imaging image, it is judged whether there are personnel or construction machinery being started in each area of ​​the construction site. When it is detected that the construction machinery has been started or there are personnel, the lighting equipment in the area, namely the first lighting equipment, is turned on; if the thermal imaging surveillance video does not contain any active heat source, all lighting equipment and monitoring equipment are turned off.

[0058] S200, obtaining a monitoring video corresponding to the lighting area of ​​the first lighting device, and determining a movement trajectory of a person based on the monitoring video.

[0059] In this step, the monitoring video corresponding to the lighting area of ​​the first lighting device is obtained. Before the first lighting device is turned on, the lighting devices in various areas of the construction site are in a closed state. Only after the first lighting device is turned on, the monitoring device used to monitor the area will be turned on accordingly. That is, when it is detected that there are personnel at the construction site or construction machinery is in operation, the first lighting device and the monitoring device used to monitor the area are turned on at the same time to obtain the monitoring video. The movement path of the personnel is analyzed based on the monitoring video. During the analysis, the movement trajectory of the personnel in the historical monitoring video is counted, and the movement direction of the personnel in the current monitoring video is predicted to generate the movement trajectory of the personnel. Based on the same distance, the movement trajectory of the construction machinery can be predicted. The thermal imaging video and the monitoring video corresponding to the same area are not obtained at the same time.

[0060] S300, analyzing the movement trajectory of the person, turning on the second lighting device located on the movement trajectory of the person, and identifying the body movements of the person to determine whether to keep the second lighting device always on.

[0061] In this step, the movement trajectory of the personnel is analyzed, and the next working area of ​​the personnel or machine is predicted based on the movement trajectory, and the second lighting device corresponding to the working area is turned on in advance. Similarly, the monitoring device corresponding to the working area is also turned on at the same time, and then analysis is performed based on the monitoring video of the area. If the personnel or machine does not move according to the predicted movement trajectory, the adjacent lighting device in the direction of its movement is turned on synchronously. In this process, the personnel can make corresponding control gestures or body movements to the monitoring device, and the monitoring device can recognize them, thereby achieving control over the lighting device.

[0062] S400, counting the start-up time of the first lighting device and the second lighting device, calculating the theoretical lighting cost, and performing an abnormality determination.

[0063] In this step, the turn-on time of the first lighting device and the second lighting device is counted. The power of each lighting device is known, so its theoretical power consumption can be calculated according to its turn-on time, and then the theoretical lighting cost is calculated according to the electricity rate. Combined with historical data, it is determined whether there is any abnormality in the power consumption of the lighting device, thereby achieving the purpose of self-inspection.

[0064] like Figure 2 As shown, as a preferred embodiment of the present invention, the step of obtaining the monitoring video corresponding to the lighting area of ​​the first lighting device and determining the movement trajectory of the person based on the monitoring video specifically includes:

[0065] S201, obtaining a monitoring video corresponding to a lighting area of ​​a first lighting device.

[0066] In this step, the monitoring video corresponding to the lighting area of ​​the first lighting device is obtained. Since the construction site is wide, multiple monitoring devices will be set up, and there will inevitably be overlaps in the monitoring areas between the monitoring devices. For this reason, the construction site can be divided into multiple monitoring areas. Each monitoring device corresponds to a monitoring area, and a virtual frame is generated in the monitoring video according to the monitoring area. The position of the personnel or machinery can be determined based on the relative position between the personnel or machinery and the virtual frame.

[0067] S202: Determine the available road locations in the area according to the movement trajectories of people in the historical monitoring data.

[0068] In this step, the locations of available roads in the area are determined based on the movement trajectories of people in the historical monitoring data. The historical data is retrieved and the navigable paths in each area are counted based on the historical data. Specifically, there will be a corresponding path for each person passing through the area. When only one path is used by three or more people, the path is considered an available road.

[0069] S203, by comparing adjacent picture frames, determine the direction of movement of the person, thereby determining and generating a movement trajectory of the person.

[0070] In this step, the movement of the person is determined by comparing adjacent frames, and the available road the person walks into is determined based on the movement of the person. The available road corresponding to the direction of the person is the movement trajectory of the person.

[0071] like Figure 3 As shown, as a preferred embodiment of the present invention, the step of identifying the body movements of the person and determining whether to keep the second lighting device always on specifically includes:

[0072] S301, performing facial recognition on people in the monitoring area, and determining the identity of the people through facial recognition.

[0073] In this step, facial recognition is performed on people in the monitoring area. For construction workers, a real-name system is implemented, and only those who have passed the real-name system are allowed to enter the construction site. Therefore, the facial information of people in the area can be extracted based on the monitoring video, and then compared with the background data to identify their identity.

[0074] S302: For a person whose identity can be confirmed, determine whether the device control conditions are met based on the person's body movements.

[0075] In this step, for people whose identities can be determined, their gestures or body movements are recognized in real time. For example, if a person raises his hands above his head and crosses them, it indicates that the light should be turned off. If a person raises his hands above his head and tilts them to the left at the same time, it indicates that the light should be kept on, etc., thereby realizing real-time interaction between people and lights. In this process, the person's body movements need to be judged in real time, and they can only be triggered when the equipment control conditions are met.

[0076] S303: Setting a start time of the second lighting device according to the determination result.

[0077] In this step, the time for turning on the second lighting device is set according to the determination result, such as turning off or keeping it on all the time. Control actions such as extending the lighting for one hour can also be set. The control actions should be simple and non-repetitive.

[0078] like Figure 4 As shown, as a preferred embodiment of the present invention, the steps of counting the start-up time of the first lighting device and the second lighting device, calculating the theoretical lighting cost, and performing abnormality determination specifically include:

[0079] S401, identifying models of a first lighting device and a second lighting device, and determining their theoretical power consumption.

[0080] S402: Count the start-up time of the first lighting device and the second lighting device and calculate the respective theoretical lighting costs accordingly.

[0081] In this step, the models of the first lighting device and the second lighting device are identified, the lighting power corresponding to each lighting device model is queried from the database according to the model of the lighting device, and the cost during the start-up time is calculated according to the statistical start-up time.

[0082] S403, obtaining power statistics information, and determining whether there is abnormal power consumption of the device based on historical data.

[0083] In this step, power statistics information is obtained, and the power statistics information records the on and off time of all lighting devices in the historical use process and the actual power consumption. When making a judgment, all historical data are analyzed. When analyzing, they are divided into groups. For example, the lighting devices corresponding to three adjacent working areas are grouped as one group, namely lighting device A, lighting device B and lighting device C. Their respective power is calculated according to historical data. For example, in the three uses, when the lighting device A is turned on for one hour, the lighting device B is turned on for one hour, and the lighting device C is not turned on during the first use; when the lighting device A is turned on for one hour, the lighting device B is not turned on, and the lighting device C is turned on for one hour during the third use; when the lighting device A is not turned on, the lighting device B is turned on for one hour, and the lighting device C is turned on for one hour during the third use; During the use process, the corresponding total power consumption is Q1, Q2 and Q3 respectively. Assuming that the power of lighting equipment A, lighting equipment B and lighting equipment C are P1, P2 and P3 respectively, the values ​​of P1, P2 and P3 can be calculated based on the three start-up processes. Of course, the more times it is used, the more groups of values ​​of P1, P2 and P3 are obtained. As long as the value change of P1, P2 and P3 does not exceed the preset value, it is considered normal. If the deviation is within 5%, then according to the data this time, combined with the historical data, calculation is performed to determine the values ​​of P1, P2 and P3. If an abnormality occurs, the abnormal device can be determined. Specifically, according to the start-up time of the three lighting devices this time, two groups of historical data are selected to form a set of three-variable linear equations, which are solved to obtain the values ​​of P1, P2 and P3 and then judged.

[0084] like Figure 5 As shown, an engineering cost control system provided by an embodiment of the present invention includes:

[0085] The thermal imaging analysis module 100 is used to obtain the thermal imaging monitoring video and turn on the first lighting device in the corresponding area based on the thermal imaging monitoring video.

[0086] In this system, the thermal imaging analysis module 100 obtains thermal imaging monitoring video, and thermal imaging equipment and monitoring equipment are set up at the construction site, wherein the imaging areas of the thermal imaging equipment and the monitoring equipment can cover the entire construction site, and the construction site will be equipped with multiple lighting equipment at different positions. The first lighting equipment in the corresponding area is turned on based on the thermal imaging monitoring video, and the thermal imaging monitoring video is obtained in real time. According to the thermal imaging image, it is judged whether there are personnel or construction machinery being started in each area of ​​the construction site. When the started construction machinery or the presence of personnel is detected, the lighting equipment in the area is turned on, that is, the first lighting equipment; if the thermal imaging monitoring video does not contain any active heat source, all lighting equipment and monitoring equipment are turned off.

[0087] The personnel trajectory determination module 200 is used to obtain the monitoring video corresponding to the lighting area of ​​the first lighting device, and determine the movement trajectory of the personnel based on the monitoring video.

[0088] In this system, the personnel trajectory determination module 200 obtains the monitoring video corresponding to the lighting area of ​​the first lighting device. Before the first lighting device is turned on, the lighting devices in various areas of the construction site are in a closed state. Only after the first lighting device is turned on, the monitoring device used to monitor the area will be turned on accordingly. That is, when it is detected that there are personnel at the construction site or construction machinery is in operation, the first lighting device and the monitoring device used to monitor the area are turned on at the same time to obtain a monitoring video. The movement path of the personnel is analyzed based on the monitoring video. During the analysis, the movement trajectory of the personnel in the historical monitoring video is counted, and the movement direction of the personnel in the current monitoring video is predicted to generate the movement trajectory of the personnel. Based on the same distance, the movement trajectory of the construction machinery can be predicted; the thermal imaging video and the monitoring video corresponding to the same area are not obtained at the same time.

[0089] The lighting device control module 300 is used to analyze the movement trajectory of the person, turn on the second lighting device located on the movement trajectory of the person, and identify the body movements of the person to determine whether to keep the second lighting device always on.

[0090] In this system, the lighting device control module 300 analyzes the movement trajectory of the personnel, and predicts the next work area of ​​the personnel or machine based on the movement trajectory, and then turns on the second lighting device corresponding to the work area in advance. Similarly, the monitoring device corresponding to the work area is also turned on at the same time, and then analysis is performed based on the monitoring video of the area. If the personnel or machine does not move according to the predicted movement trajectory, the adjacent lighting devices in the direction of its movement are turned on synchronously. In this process, the personnel can make corresponding control gestures or body movements to the monitoring device, which can be recognized by the monitoring device, thereby achieving control of the lighting device.

[0091] The cost anomaly analysis module 400 is used to count the start-up time of the first lighting device and the second lighting device, calculate the theoretical lighting cost, and perform anomaly determination.

[0092] In this system, the cost anomaly analysis module 400 counts the turn-on time of the first lighting device and the second lighting device. The power of each lighting device is known, so its theoretical power consumption can be calculated according to its turn-on time, and then the theoretical lighting cost is calculated according to the electricity rate. Combined with historical data, it is determined whether there is any abnormality in the power consumption of the lighting device, thereby achieving the purpose of self-inspection.

[0093] like Figure 6 As shown, as a preferred embodiment of the present invention, the personnel trajectory determination module 200 includes:

[0094] The monitoring acquisition unit 201 is used to acquire the monitoring video corresponding to the lighting area of ​​the first lighting device.

[0095] In this module, the monitoring acquisition unit 201 acquires the monitoring video corresponding to the lighting area of ​​the first lighting device. Since the construction site is wide, multiple monitoring devices will be set up, and there will inevitably be overlaps in the monitoring areas between the monitoring devices. For this reason, the construction site can be divided into multiple monitoring areas. Each monitoring device corresponds to a monitoring area, and a virtual frame is generated in the monitoring video according to the monitoring area. The position of the personnel or machinery can be determined based on the relative position between the personnel or machinery and the virtual frame.

[0096] The road identification unit 202 is used to determine the available road locations in the area according to the movement trajectory of people in the historical monitoring data.

[0097] In this module, the road identification unit 202 determines the location of available roads in the area according to the movement trajectories of people in the historical monitoring data, retrieves the historical data, and counts the passable paths in each area according to the historical data. Specifically, there will be a corresponding path for each person passing through the area. When only one path is used by three or more people, the path is regarded as an available road.

[0098] The trajectory prediction unit 203 is used to determine the movement direction of the person by comparing adjacent picture frames, thereby determining and generating the movement trajectory of the person.

[0099] In this module, the trajectory prediction unit 203 determines the movement of the person by comparing adjacent picture frames, and determines which available road the person walks into based on the person's movement. The available road corresponding to the person's movement direction is the person's movement trajectory.

[0100] like Figure 7 As shown, as a preferred embodiment of the present invention, the lighting device control module 300 includes:

[0101] The facial recognition unit 301 is used to perform facial recognition on people in the monitoring area and determine the identity of the people through facial recognition.

[0102] In this module, the facial recognition unit 301 performs facial recognition on people in the monitoring area. For construction workers, a real-name system is implemented, and only people who have passed the real-name system are allowed to enter the construction site. Therefore, the facial information of people in the area can be extracted based on the monitoring video, and then compared with the background data to identify their identity.

[0103] The body movement recognition unit 302 is used to determine whether the device control conditions are met according to the body movements of a person whose identity can be determined.

[0104] In this module, the body movement recognition unit 302 starts to recognize the gestures or body movements of the person whose identity can be determined in real time. For example, if the person raises his hands above his head and crosses them, it indicates to turn off the light. If the person raises his hands above his head and tilts them to the left, it indicates that the light is always on, etc., thereby realizing real-time interaction between the person and the light. In this process, the person's body movements need to be judged in real time, and they can only be triggered when the device control conditions are met.

[0105] The device control unit 303 is used to set the time for turning on the second lighting device according to the determination result.

[0106] In this module, the device control unit 303 sets the time for the second lighting device to be turned on according to the determination result, such as turning off or keeping it on all the time. Control actions such as extending the lighting for one hour can also be set. The control actions should be simple and non-repetitive.

[0107] like Figure 8 As shown, as a preferred embodiment of the present invention, the cost anomaly analysis module 400 includes:

[0108] The device identification unit 401 is used to identify the models of the first lighting device and the second lighting device, and determine their theoretical power consumption.

[0109] The theoretical cost calculation unit 402 is used to count the start-up time of the first lighting device and the second lighting device and calculate the respective theoretical lighting costs accordingly.

[0110] In this step, the device identification unit 401 identifies the models of the first lighting device and the second lighting device, queries the lighting power corresponding to each lighting device from the database according to the model of the lighting device, and calculates the cost during the start-up time according to the statistical start-up time.

[0111] The power consumption analysis unit 403 is used to obtain power consumption statistical information and determine whether there is abnormal power consumption of the device based on historical data.

[0112] In this step, the power consumption analysis unit 403 obtains power statistics information, which records the on and off time and actual power consumption of all lighting devices in the historical use process. When making a judgment, all historical data are analyzed. When analyzing, they are divided into groups. For example, the lighting devices corresponding to three adjacent working areas are grouped as one group, namely lighting device A, lighting device B and lighting device C. Their respective power is calculated according to historical data. For example, in the three uses, when the lighting device A is turned on for one hour, the lighting device B is turned on for one hour, and the lighting device C is not turned on during the first use. When the lighting device A is turned on for one hour, the lighting device B is not turned on, and the lighting device C is turned on for one hour during the third use, and when the lighting device A is not turned on, the lighting device B is turned on for one hour, and the lighting device C is turned on for one hour during the third use. During the three uses, the corresponding total power consumption is Q1, Q2 and Q3 respectively. Assuming that the power of lighting device A, lighting device B and lighting device C are P1, P2 and P3 respectively, the values ​​of P1, P2 and P3 can be calculated based on the three start-up processes. Of course, the more times it is used, the more groups of values ​​of P1, P2 and P3 are obtained. As long as the value change of P1, P2 and P3 does not exceed the preset value, it is considered normal. If the deviation is within 5%, then according to the data of this time, combined with the historical data, calculation is performed to determine the values ​​of P1, P2 and P3. If an abnormality occurs, the abnormal device can be determined. Specifically, according to the start-up time of the three lighting devices this time, two groups of historical data are selected to form a set of three-variable linear equations, which are solved to obtain the values ​​of P1, P2 and P3 and then judged.

[0113] It should be understood that, although each step in the flow chart of each embodiment of the present invention is shown in sequence according to the indication of the arrow, these steps are not necessarily performed in sequence according to the order indicated by the arrow. Unless there is a clear explanation in this article, the execution of these steps does not have a strict order restriction, and these steps can be performed in other orders. Moreover, at least a portion of the steps in each embodiment may include a plurality of sub-steps or a plurality of stages, and these sub-steps or stages are not necessarily performed at the same time, but can be performed at different times, and the execution order of these sub-steps or stages is not necessarily performed in sequence, but can be performed in turn or alternately with at least a portion of other steps or sub-steps or stages of other steps.

[0114] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the program can be stored in a non-volatile computer-readable storage medium. When the program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application may include non-volatile and / or volatile memory. Non-volatile memory may include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory may include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).

[0115] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0116] The above-mentioned embodiments only express several implementation methods of the present invention, and the description thereof is relatively specific and detailed, but it cannot be understood as limiting the scope of the patent of the present invention. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be subject to the attached claims.

[0117] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for controlling engineering costs, characterized in that: The method comprises: Acquire a thermal imaging surveillance video, and turn on a first lighting device in a corresponding area based on the thermal imaging surveillance video; Obtaining a surveillance video corresponding to the lighting area of ​​the first lighting device, and determining a movement trajectory of a person based on the surveillance video; Analyze the movement trajectory of the person, turn on the second lighting device located on the movement trajectory of the person, and identify the body movements of the person to determine whether to keep the second lighting device always on; Counting the opening time of the first lighting device and the second lighting device, calculating the theoretical lighting cost, and making an abnormality determination; The step of identifying the body movements of the person and determining whether to keep the second lighting device always on specifically includes: Perform facial recognition on people in the monitoring area and determine their identities through facial recognition; For persons whose identities can be confirmed, determine whether the equipment control conditions are met based on the person's body movements; The time for turning on the second lighting device is set according to the determination result.

2. The engineering cost control method according to claim 1, characterized in that: The step of obtaining the monitoring video corresponding to the lighting area of ​​the first lighting device and determining the movement trajectory of the person based on the monitoring video specifically includes: Obtaining a surveillance video corresponding to the lighting area of ​​the first lighting device; Determine the available road locations in the area based on the movement trajectories of people in historical monitoring data; By comparing adjacent picture frames, the direction of movement of the person is determined, thereby determining and generating the movement trajectory of the person.

3. The engineering cost control method according to claim 1, characterized in that: The step of counting the start-up time of the first lighting device and the second lighting device, calculating the theoretical lighting cost, and performing abnormality determination specifically includes: Identify the models of the first lighting device and the second lighting device, and determine their theoretical power consumption; Counting the start time of the first lighting device and the second lighting device and calculating the respective theoretical lighting costs accordingly; Obtain power statistics information and determine whether there is abnormal power consumption of the device based on historical data.

4. The engineering cost control method according to claim 1, characterized in that: The thermal imaging video and surveillance video corresponding to the same area are not acquired at the same time.

5. The engineering cost control method according to claim 1, characterized in that: If the thermal imaging surveillance video does not contain any active heat sources, turn off all lighting and surveillance equipment.

6. A project cost control system, characterized in that: The system comprises: A thermal imaging analysis module, used to obtain a thermal imaging monitoring video, and turn on a first lighting device in a corresponding area based on the thermal imaging monitoring video; A personnel trajectory determination module, used to obtain a monitoring video corresponding to the lighting area of ​​the first lighting device, and determine the movement trajectory of the personnel based on the monitoring video; The lighting device control module is used to analyze the movement trajectory of the person, turn on the second lighting device located on the movement trajectory of the person, and identify the body movements of the person to determine whether to keep the second lighting device always on; A cost anomaly analysis module, used to count the opening time of the first lighting device and the second lighting device, calculate the theoretical lighting cost, and make anomaly determination; The lighting equipment control module comprises: A facial recognition unit is used to perform facial recognition on people in the monitoring area and determine their identities through facial recognition; A body movement recognition unit, used to determine whether the device control conditions are met according to the body movements of persons whose identities can be determined; The device control unit is used to set the time for turning on the second lighting device according to the determination result.

7. The engineering cost control system according to claim 6, characterized in that: The personnel trajectory determination module comprises: A monitoring acquisition unit, used to acquire a monitoring video corresponding to the lighting area of ​​the first lighting device; A road identification unit is used to determine the location of available roads in the area based on the movement trajectory of people in the historical monitoring data; The trajectory prediction unit is used to determine the direction of movement of a person by comparing adjacent picture frames, thereby determining and generating the movement trajectory of the person.

8. The engineering cost control system according to claim 6, characterized in that: The cost anomaly analysis module includes: A device identification unit, used to identify the models of the first lighting device and the second lighting device, and determine their theoretical power consumption; A theoretical cost calculation unit, used to count the opening time of the first lighting device and the second lighting device and calculate the respective theoretical lighting costs accordingly; The power consumption analysis unit is used to obtain power statistics information and determine whether there is abnormal power consumption of the device based on historical data.