A method for repairing deformation of lead sheath of oil-filled cable

By removing the lead sheath and repairing the deformation of the lead sheath of the oil-filled cable using components such as lead sheath, copper box, and cooling pipe, the problem of the reliability and insulation of the lead sheath due to local deformation was solved, and the reliability and compressive strength of the lead sheath were improved.

CN115296223BActive Publication Date: 2024-11-26CSG POWER GENERATION CO LTD MAINT & TEST CO
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202211026265.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-08-25
Publication Date
2024-11-26
Estimated Expiration
2042-08-25

AI Technical Summary

Technical Problem

If the lead sheath of an oil-filled cable deforms due to excessive local stress during use and is not repaired in time, it will affect its reliability, the effectiveness of the power transmission process, and its insulation.

Method used

The strength and reliability of the lead sheath are enhanced by removing the lead sheath at the deformed location, covering it with lead sheeting and welding it, installing temperature sensors and cooling pipes, splicing copper boxes and welding them together, wrapping the wire bundles and coating them with lead-tin mixture and epoxy tape.

Benefits of technology

It effectively repairs the deformed locations of the lead sheath of oil-filled cables, enhances its compressive strength, and ensures the reliability and insulation of the lead sheath after repair.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115296223B_ABST
    Figure CN115296223B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of cable repair, and discloses a method for repairing the deformation of the lead sheath of an oil-filled cable, which mainly includes the following steps: cutting off the lead sheath of the oil-filled cable at the deformation position; using a lead sheet to cover the notch after the cutting, and welding the lead sheet to the lead sheath; arranging a temperature sensor on the lead sheet, and winding a cooling pipe on the lead sheet, and connecting the cooling pipe to a cooling water circulation device; splicing two copper boxes to form a copper box, and sleeve the copper box on the lead sheath and cover the lead sheet, and then welding the joints, and during welding, the cooling water circulation device passes cooling water into the cooling pipe, and the temperature sensor detects the cable temperature in the oil-filled cable; then winding a second bundle of wires on the copper box, coating the molten lead-tin mixture on the second bundle of wires, and winding an epoxy tape. The method for repairing the deformation of the lead sheath of an oil-filled cable provided by the present invention can reliably repair the deformed part of the lead sheath of the oil-filled cable, and ensure the compressive strength after the deformation position is repaired.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of cable repair, and in particular to a method for repairing deformation of a lead sheath of an oil-filled cable. Background Art

[0002] Oil-filled cable is a pressure-type cable that uses insulating oil as a pressurized fluid and allows the oil to flow freely in the cable. It has good insulation properties, can withstand high working electric field strength, has low dielectric loss, strong heat dissipation, and high reliability. It is commonly used in public corridors, passenger tunnels, bridges and other scenes. In the daily use of oil-filled cables, due to excessive local force, the lead sheath of the oil-filled cable at the stress position will bulge and deform. If the deformed position is not repaired in time, the deformation amount at the deformed position will become larger and larger under the action of concentrated stress, which will affect the reliability of the lead sheath of the oil-filled cable, the effectiveness of the power transmission process, and the insulation of the oil-filled cable. Summary of the invention

[0003] The purpose of the present invention is to provide a method for repairing deformation of the lead sheath of an oil-filled cable, which can effectively repair the deformed position of the lead sheath of the oil-filled cable and has high reliability.

[0004] To achieve this object, the present invention adopts the following technical solutions:

[0005] A method for repairing deformation of lead sheath of oil-filled cable mainly comprises the following steps:

[0006] S100, cutting off the lead sheath of the oil-filled cable at the deformation position, so that a gap is formed in the lead sheath after the cutting;

[0007] S200, using a lead sheet cover to cover the notch, and welding the lead sheet to the lead sheath;

[0008] S300, arranging a plurality of temperature sensors on the lead sheet, and winding a cooling pipe on the lead sheet, wherein both ends of the cooling pipe are connected to a cooling water circulation device;

[0009] S400, splicing two semicircular copper box parts to form a copper box, the spliced ​​copper box is sleeved on the lead sheath and covered on the lead sheet, and then the joints on the copper box are welded, during the welding process, the cooling water circulation device circulates cooling water into the cooling pipe, and the temperature sensor detects the cable temperature inside the oil-filled cable in real time;

[0010] S500. After welding is completed, a second bundle of wires is wound around the upper and lower ends of the copper box, and a cable tie is wound around the second bundle of wires. After winding is completed, molten lead-tin mixture is applied to the second bundle of wires and the cable tie, and then an epoxy tape is wound around the copper box.

[0011] Optionally, in step S100, cutting off the lead sheath of the oil-filled cable at the deformation position mainly comprises the following steps:

[0012] S110, removing the lead sealing layer outside the lead sheath at the deformation position of the oil-filled cable;

[0013] S120, removing the steel wire wrapped around the lead sheath at the deformation position;

[0014] S130, using a cutting tool to cut off the lead sheath at the deformed position.

[0015] Optionally, in step S110, after the steel wires wrapped around the lead sheath at the deformation position are removed, the steel wires wrapped around the upper and lower ends of the lead sheath at the deformation position are wound and fixed using a first wire bundle.

[0016] Optionally, in step S500, the second bundle of wires wound around the upper and lower ends of the copper box are partially overlapped and pressed onto the first bundle of wires at the corresponding ends, and the overlapping distance of the second bundle of wires at each end pressed onto the first bundle of wires at the corresponding end is ≥5 cm.

[0017] Optionally, in step S500, the winding directions of the cable tie and the second cable bundle are perpendicular to each other, and the cable tie is alternately wound on the inner and outer sides of the second cable bundle along the axial direction of the oil-filled cable.

[0018] Optionally, step S200 mainly includes the following steps:

[0019] S210, splicing two semicircular lead sheet divisions to form the lead sheet, and the spliced ​​lead sheet is sleeved on the lead sheath and covers the notch;

[0020] S220, welding the seams on the lead sheet;

[0021] S230, welding the upper and lower ends of the lead sheet to the lead sheath at the corresponding ends;

[0022] S240, winding a third bundle of wires on the lead sheet, and coating the molten lead-tin mixture on the third bundle of wires after the winding is completed.

[0023] Optionally, in step S500, after welding is completed, the oxide layer on the copper box is removed, and then a hoop is installed at the lower end of the copper box, and the hoop can clamp the copper box tightly onto the lead sheath.

[0024] Optionally, in step S500, after the installation of the hoop is completed, the surface of the copper box is derusted and polished to make the surface of the copper box rough. After polishing, the molten lead-tin mixture is applied to the surface of the copper box, and the solid lead-tin mixture is filled in the gap between the upper and lower ends of the copper box and the lead sheath at the corresponding end.

[0025] Optionally, in step S500, during the winding process of the epoxy tape, the epoxy tape on the upper layer is partially overlapped and pressed on the epoxy tape on the lower layer, and after the epoxy tape is wound, a plastic protective tape is wound on the outside of the epoxy tape.

[0026] Optionally, in step S500, the cooling water circulation device is removed after welding is completed, and the cooling water remaining in the cooling pipe is cleared after the removal is completed.

[0027] Beneficial effects:

[0028] The method for repairing the deformation of the lead sheath of an oil-filled cable provided by the present invention comprises the following steps: firstly, the lead sheath of the oil-filled cable is cut off at the deformed position, and a gap is formed in the lead sheath after the cutting; next, a lead sheet is used to cover the gap after the cutting, and the lead sheet is welded to the lead sheath, so as to perform a preliminary sealing and repair on the lead sheath after the cutting; then, a plurality of temperature sensors are arranged on the lead sheet, and a cooling pipe is wound around the lead sheet, and both ends of the cooling pipe are connected to a cooling water circulation device; then, two semicircular copper box sections are spliced ​​to form a copper box, and the spliced ​​copper box is sleeved on the lead sheath and covered on the lead sheet. The arrangement of the copper box can effectively enhance the strength of the deformed position of the lead sheath after the repair, and after the splicing of the copper box is completed, the seams on the copper box are welded. During the welding process, the temperature sensor can detect the cable temperature inside the oil-filled cable in real time, and the cooling water circulation device circulates cooling water into the cooling pipe. Water can reliably cool the copper box and the cables inside the oil-filled cable. The combination of the temperature sensor and the cooling tube can reliably control the cable temperature inside the oil-filled cable during the copper box welding process. When the welding is completed, the second wire bundle is wound around the upper and lower ends of the copper box, so that the copper box is reliably tied to the lead sheath, and by winding a cable tie around the second wire bundle, the second wire bundle can be further tightened to enhance the reliability and tightness of the copper box binding. After the winding is completed, the molten lead-tin mixture is coated on the second wire bundle and the cable tie, so that the second wire bundle and the cable tie can be effectively integrated with the surface of the copper box. Subsequently, an epoxy tape is wrapped around the copper box coated with the lead-tin mixture to reinforce the copper box and the lead sheath part connected to the copper box, thereby completing the deformation repair of the lead sheath of the oil-filled cable, and also ensuring the compressive strength of the oil-filled cable lead sheath after the deformation position is repaired. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1It is a schematic flow chart of a method for repairing deformation of lead sheath of an oil-filled cable according to the present invention;

[0030] Figure 2 This is a schematic structural diagram of the oil-filled cable of the present invention when the lead seal layer is not removed;

[0031] Figure 3 It is a schematic diagram of the structure after the lead sheath at the deformation position is cut off in the present invention;

[0032] Figure 4 It is a structural schematic diagram of the present invention when the temperature sensor and the cooling pipe are installed on the lead sheet and the copper box is about to be installed;

[0033] Figure 5 It is a schematic diagram of the structure after the copper box is welded and the hoop sleeve is installed in the present invention;

[0034] Figure 6 It is a schematic diagram of the structure after the outer surface of the copper box is coated with a lead-tin mixture and the upper and lower ends of the copper box are trimmed;

[0035] Figure 7 It is a schematic diagram of the structure of the present invention after the second wire bundle is wound on the copper box and the cable tie is wound on the second wire bundle;

[0036] Figure 8 It is a schematic diagram of the structure of the copper box after being wrapped with epoxy tape in the present invention;.

[0037] In the figure:

[0038] 100, oil-filled cable; 101, notch; 110, lead sheath; 120, lead sealing layer; 130, steel wire;

[0039] 200, lead sheet; 210, lead sheet division;

[0040] 310, temperature sensor; 320, cooling pipe;

[0041] 400, copper box; 410, copper box division; 420, protruding structure;

[0042] 510, second harness; 520, harness tie; 530, first harness; 540, third harness; 550, hoop;

[0043] 610. Epoxy tape. DETAILED DESCRIPTION

[0044] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for ease of description, only parts related to the present invention, rather than all structures, are shown in the accompanying drawings.

[0045] In the description of the present invention, unless otherwise clearly specified and limited, the terms "connected", "connected", and "fixed" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0046] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.

[0047] In the description of this embodiment, the terms "upper", "lower", "right", etc., directions or positional relationships are based on the directions or positional relationships shown in the drawings, and are only for the convenience of description and simplification of operation, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are only used to distinguish in the description and have no special meaning.

[0048] This embodiment provides a method for repairing deformation of the lead sheath of an oil-filled cable. Figures 1 to 8 As shown in the figure, the method for repairing the deformation of the lead sheath of the oil-filled cable mainly includes the following steps:

[0049] S100, cutting off the lead sheath 110 of the oil-filled cable 100 at the deformation position, so that a notch 101 is formed in the lead sheath 110 after the cutting;

[0050] S200, using lead sheet 200 to cover the notch 101, and welding the lead sheet 200 to the lead sheath 110;

[0051] S300, multiple temperature sensors 310 are arranged on the lead sheet 200, and a cooling pipe 320 is wound around the lead sheet 200, and both ends of the cooling pipe 320 are connected to a cooling water circulation device (cooling water is not shown in the figure);

[0052] S400, splicing two semicircular copper box sections 410 to form a copper box 400, the spliced ​​copper box 400 is sleeved on the lead sheath 110 and covered on the lead sheet 200, and then the joints on the copper box 400 are welded. During the welding process, the cooling water circulation device circulates cooling water into the cooling pipe 320, and the temperature sensor 310 detects the temperature of the cable inside the oil-filled cable 100 in real time;

[0053] S500, when welding is completed, the second wire bundle 510 is wound around the upper and lower ends of the copper box 400, and the cable tie 520 is wound around the second wire bundle 510, and after the winding is completed, the molten lead-tin mixture is applied to the second wire bundle 510 and the cable tie 520, and then the epoxy tape 610 is wound around the copper box 400.

[0054] In this embodiment, by using the lead sheet 200 to cover the gap 101, and welding the lead sheet 200 and the lead sheath 110, the lead sheath 110 after the deformation position is cut off can be initially plugged and repaired. Then, by splicing two semicircular copper box sections 410 to form a copper box 400, the spliced ​​copper box 400 is sleeved on the lead sheath 110 and covered on the lead sheet 200. The setting of the copper box 400 can further enhance the strength of the repaired deformed part of the lead sheath 110. After the splicing of the copper box 400 is completed, the joint seam on the copper box 400 is welded. In addition, before installing the copper box 400, by setting a plurality of temperature sensors 310 on the lead sheet 200 and winding a cooling pipe 320 on the lead sheet 200, when welding the copper box 400, the cooling water circulation device circulates cooling water into the cooling pipe 320 to reliably cool the copper box 400 and the cables inside the oil-filled cable 100, and the temperature sensor 310 can detect the cable temperature inside the oil-filled cable 100 in real time, and the cooperation of the temperature sensor 310 and the cooling pipe 320 can reliably control the cable temperature inside the oil-filled cable 100 during the welding process of the copper box 400. When the welding is completed, the second wire harness 510 is wound around the upper and lower ends of the copper box 400, so that the copper box 400 is reliably tied to the lead sheath 110, and by winding a cable tie 520 on the second wire harness 510, the second wire harness 510 can be further tightened to enhance the reliability and tightness of the binding and fixing of the copper box 400. After the winding is completed, the molten lead-tin mixture is coated on the second wire bundle 510 and the cable tie 520, so that the second wire bundle 510 and the cable tie 520 can be effectively integrated with the surface of the copper box 400. Then, the epoxy tape 610 is wrapped around the copper box 400 coated with the lead-tin mixture to reinforce the copper box 400 and the lead sheath 110 connected to the copper box 400.

[0055] This embodiment can effectively repair the deformed position on the lead sheath 110 of the oil-filled cable 100, and by adding the copper box 400, the copper box 400 can withstand a pressure of more than 30 bar, thereby ensuring the compressive strength of the lead sheath 110 after the deformed position is repaired.

[0056] It is worth mentioning that before starting step S100, all the insulating oil in the oil-filled cable 100 needs to be drained in advance to prevent the insulating oil from leaking out during the subsequent repair process to affect the entire repair process.

[0057] In this embodiment, in step S100, the lead sheath 110 of the oil-filled cable 100 at the deformed position is cut off, which mainly includes the following steps:

[0058] S110, removing the lead sealing layer 120 outside the lead sheath 110 of the oil-filled cable 100 at the deformation position;

[0059] S120, removing the steel wire 130 wrapped around the lead sheath 110 at the deformation position;

[0060] S130, using a cutting tool to cut away the lead sheath 110 at the deformed position.

[0061] In this embodiment, refer to Figure 2 As shown, the lead sheath 110 of the oil-filled cable 100 is coated with a lead seal layer 120 for protecting the lead sheath 110. Before cutting the lead sheath 110, the lead seal layer 120 at the deformed position must first be removed to expose the lead sheath 110, so that the lead sheath 110 at the deformed position can be subsequently cut. In step S110, the lead seal layer 120 is removed by heating with a welding gun. Specifically, the welding gun is aimed at the lead seal layer 120 at the position to be melted and the lead seal layer 120 is heated. After the lead seal layer 120 is heated and reaches the melting point, it melts and falls off the lead sheath 110 by itself, thereby achieving the removal of the lead seal layer 120. The temperature of the welding gun heating is preferably set to 120℃-130℃.

[0062] Furthermore, before cutting, the entire lead sheath 110 is completely wrapped with the steel wire 130 from top to bottom. When the oil-filled cable 100 is produced, the lead seal layer 120 covers the steel wire 130 on the lead sheath 110. When the lead seal layer 120 is removed, the steel wire 130 wound on the lead sheath 110 will also be exposed. In step S120, after the lead seal layer 120 at the deformation position is removed, the steel wire 130 wrapped outside the deformation position of the lead sheath 110 must also be removed, thereby ensuring that step S130 can be performed reliably.

[0063] Further, refer to Figure 3As shown, in step S110, after the steel wire 130 wound around the lead sheath 110 at the deformation position is removed, the first wire bundle 530 is used to wind and fix the steel wire 130 wound around the lead sheath 110 at the upper and lower ends of the deformation position. In this embodiment, since the steel wire 130 is a whole piece wound around the lead sheath 110, after the steel wire 130 at the deformation position of the lead sheath 110 is removed, it is equivalent to dividing the steel wire 130 into two independent sections. Therefore, by using the first wire bundle 530, the first wire bundle 530 can wind and fix the steel wire 130 wound around the lead sheath 110 at the upper and lower ends of the deformation position, avoiding the loose turns of the steel wire 130 at the upper and lower ends, and further ensuring the reliability and tightness of the steel wire 130 at the two ends of the deformation position wound around the lead sheath 110.

[0064] In this embodiment, the first wire bundle 530 is preferably configured as copper wires.

[0065] In this embodiment, step S200 mainly includes the following steps:

[0066] S210, splicing two semicircular lead sheet divisions 210 to form a lead sheet 200, and the spliced ​​lead sheet 200 is sleeved on the lead sheath 110 and covers the gap 101;

[0067] S220, welding the joints on the lead sheet 200;

[0068] S230, welding the upper and lower ends of the lead sheet 200 to the lead sheath 110 at the corresponding ends;

[0069] S240 , winding a third bundle of wires 540 on the lead sheet 200 , and coating the third bundle of wires 540 with molten lead-tin mixture after the winding is completed.

[0070] Specifically, refer to Figure 4As shown, in step S210, the shape of the two lead sheet divisions 210 is set to be semicircular, that is, the spliced ​​lead sheet 200 is in a round tube shape, so that it can adapt to the shape of the lead sheath 110, can be reliably covered on the lead sheath 110 and reliably cover the incision 101. In step S220, the welding method for welding the joints on the lead sheet 200 is preferably set to argon arc welding. In step S230, the upper and lower ends of the lead sheet 200 are welded to the lead sheath 110 at the corresponding ends, so that the lead sheet 200 is reliably fixed on the lead sheath 110, and the welding method between the lead sheet 200 and the lead sheath 110 is preferably set to soldering. In step S240, by winding the third bundle of wires 540 on the lead sheet 200, the third bundle of wires 540 can further fix the lead sheet 200, thereby increasing the reliability of the fixation between the lead sheet 200 and the lead sheath 110, and then by coating the molten lead-tin mixture onto the third bundle of wires 540, the third bundle of wires 540 can be effectively covered on the lead sheet 200, thereby further enhancing the fastening and protection of the lead sheath 110.

[0071] In this embodiment, the molten lead-tin mixture can be obtained by heating the solid lead-tin mixture using a welding gun to melt the solid lead-tin mixture.

[0072] In this embodiment, the third wire bundle 540 is preferably configured as copper wire.

[0073] In this embodiment, in S300, the temperature sensor 310 is preferably electrically connected to an external communication display device (the external communication display device is not marked in the figure), and the temperature sensor 310 can send the collected temperature signal to the external communication display device when working, and the relevant operator can observe the temperature of the cable inside the oil-filled cable 100 in real time by observing the temperature indication on the external display communication device. In addition, the cooling tube 320 is preferably a copper tube with a specification of M8.

[0074] In this embodiment, in step S400, the shape of the two copper box sections 410 is set to be semicircular, that is, the spliced ​​copper box 400 is in a round tube shape, so that it can be adapted to the shape of the lead sheet 200, so that the copper box 400 can be reliably covered with the lead sheet 200. In addition, the length of the copper box 400 along the axial direction of the oil-filled cable 100 is greater than the length of the lead sheet 200 along the axial direction of the oil-filled cable 100, so that the lead sheet 200 can be completely covered. Further, the welding method for welding the seam of the copper box 400 is preferably set to argon arc welding. During welding, the cooling water circulation device circulates cooling water into the cooling pipe 320, and the temperature sensor 310 detects the cable temperature inside the oil-filled cable 100 in real time. The cooperation between the temperature sensor 310 and the cooling pipe 320 can reliably control the temperature of the cable inside the oil-filled cable 100 during the welding of the copper box 400. When the temperature sensor 310 detects that the temperature of the internal cable is too high, the cooling water circulation device can reduce the temperature of the cooling water entering the cooling pipe 320, thereby ensuring real-time temperature control of the cable inside the oil-filled cable 100. In this embodiment, when welding the copper box 400, the local heating temperature of the welding point is preferably not more than 650°C, and the temperature of the cable inside the oil-filled cable 100 is preferably not more than 100°C.

[0075] The specific principle and process of the temperature sensor 310 detecting the temperature of the cable inside the oil-filled cable 100 and the principle and specific process of the cooling water circulation device circulating cooling water into the cooling pipe 320 are both existing technologies and will not be elaborated on here.

[0076] Further, in step S500, after the welding is completed, the cooling water circulation device connected to both ends of the cooling pipe 320 is removed, and after the removal is completed, the cooling water remaining in the cooling pipe 320 is removed using compressed air to prevent the remaining cooling water flow in the cooling pipe 320 from getting damp on the copper box 400 and the lead sheet 200. In addition, the residual impurities in the copper box 400 after welding are also removed.

[0077] Further, refer to Figure 5 As shown, in step S500, after the welding is completed, the oxide layer on the copper box 400 is removed, and then the hoop 550 is installed at the lower end of the copper box 400, and the hoop 550 can clamp the copper box 400 tightly on the lead sheath 110. Specifically, the oxide layer on the copper box 400 is effectively removed by using a polishing machine, and the hoop 550 is provided to further ensure the reliability of the fixation between the copper box 400 and the lead sheath 110.

[0078] In this embodiment, in step S500, after the installation of the hoop 550 is completed, the surface of the copper box 400 is rust-removed, and the surface of the copper box 400 is polished to make the surface of the copper box 400 rough. After the polishing is completed, the molten lead-tin mixture is applied to the surface of the copper box 400, and the solid lead-tin mixture is filled in the gap between the upper and lower ends of the copper box 400 and the lead sheath 100 at the corresponding end. Specifically, alcohol is used to clean the surface of the copper box 400, and sandpaper is used to remove rust from the surface of the copper box 400, and then a coarse-grained file is used to polish the surface of the copper box 400 to roughen the surface of the copper box 400, so that the molten lead-tin mixture can be reliably coated on the surface of the copper box 400, thereby better protecting the surface of the copper box 400. In addition, filling the gaps between the upper and lower ends of the copper box 400 and the lead sheath 110 at the corresponding ends with a solid lead-tin mixture can effectively fill the gaps between the upper and lower ends of the copper box 400 and the lead sheath 110. The molten lead-tin mixture and the solid lead-tin mixture are equivalent to repairing the deformed position of the lead sheath 110 and then re-sealing it, further ensuring the sealing between the copper box 400 and the lead sheath 110, and making the copper box 400 and the lead sheath 110 form a whole.

[0079] Further, refer to Figure 6 As shown, it is preferred to use a plurality of lead strips, heat them to a semi-molten state, and arrange them at the upper and lower ends of the copper box 400, so that the upper and lower ends of the copper box 400 can respectively form protruding structures 420, that is, the shape of the new lead seal on the outside of the copper box 400 is corrected, thereby further ensuring the overall compressive strength of the copper box 400 and being able to better protect the copper box 400.

[0080] Further, refer to Figure 7 As shown, in step S500, the second wire bundle 510 wound at the upper and lower ends of the copper box 400 is partially overlapped and pressed on the first wire bundle 530 at the corresponding end, and the overlapping distance of the second wire bundle 510 at each end pressed on the first wire bundle 530 at the corresponding end is ≥5cm. In this embodiment, by partially overlapping and pressing the second wire bundle 510 wound at the upper and lower ends of the copper box 400 on the first wire bundle 530 at the corresponding end, the second wire bundle 510 can further compress the first wire bundle 530, thereby enabling the first wire bundle 530 to more reliably fix the steel wire 130. Optionally, the overlapping distance of the second wire bundle 510 at each end pressed on the first wire bundle 530 at the corresponding end is set to 5cm, 6cm, 7cm, 8cm, 9cm, 10cm.

[0081] Further, continue to refer to Figure 7As shown, in step S500, the winding directions of the cable tie 520 and the second cable tie 510 are perpendicular to each other, and the cable tie 520 is staggered and wound with the inner and outer sides of the second cable tie 510 along the axial direction of the oil-filled cable 100. In this embodiment, the cable tie 520 is staggered and wound with the inner and outer sides of the second cable tie 510 along the axial direction of the oil-filled cable 100, which can further enhance the tightening effect of the cable tie 520 on the second cable tie 510, so that the second cable tie 10 is more tightly and reliably wound on the copper box 400, and can ensure that the cable tie 520 is uniformly stressed on the second cable tie 510, avoiding stress concentration of the second cable tie 510 under the winding and tightening of the cable tie 520.

[0082] As a preferred embodiment, the second wire harness 510 is set as a complete wire harness and is wound around the copper box 400 in turns. The winding directions of the cable tie 520 and the second wire harness 510 are perpendicular to each other, which is equivalent to the second wire harness 510 and the extension direction of the cable tie 520 being arranged in a cross. The second wire harness 510 is arranged as a plurality of cable harness groups in the axial direction of the oil-filled cable 100, each cable harness group includes a plurality of adjacent single turns of the second wire harness 510, and for one of the cable harness groups, the cable tie 520 is located on the inner side of the plurality of adjacent single turns of the second wire harness 510, that is, the cable tie 520 is located on the side close to the copper box 400, and for another cable harness group adjacent to the above or below the cable harness group, the cable tie 520 is located on the outer side of the plurality of adjacent single turns of the second wire harness 510, that is, the cable tie 520 is located on the side away from the copper box 400, and this cycle is repeated.

[0083] Furthermore, when both ends of the cable tie 520 still have a certain length of extension ends after passing through the second cable tie 510, the extension ends can be controlled to bend in the opposite direction toward the second cable tie 510 to prevent the extension ends of the cable tie 520 from extending outward.

[0084] In this embodiment, the second wire harness 510 is preferably configured as a copper wire, and the wire tie 520 is preferably configured as a steel belt.

[0085] In this embodiment, refer to Figure 8As shown, in step S500, during the winding process of the epoxy tape 610, the epoxy tape 610 located in the upper layer is partially overlapped and pressed on the epoxy tape 610 of the lower layer, and after the epoxy tape 610 is wound, a plastic protective tape (plastic protective tape is not marked in the figure) is wound on the outer side of the epoxy tape 610. Specifically, by setting the epoxy tape 610 of the upper layer to be partially overlapped and pressed on the epoxy tape 610 of the lower layer, the tightness of the winding of the epoxy tape 610 can be further ensured, and it can be ensured that no gaps are generated in the epoxy tape 610 during the coating process. The overlapping area of ​​the epoxy tape 610 located in the upper layer and the epoxy tape 610 of the lower layer is preferably set to 50%. The protective effect of the copper box 400 and the new lead seal coated on the outside of the copper box 400 is further ensured. In addition, by providing a plastic protective tape, the plastic protective tape can further reinforce the epoxy tape 610 , prevent the epoxy tape 610 from loosening, and ensure the overall tightness and reliability of the epoxy tape 610 .

[0086] It is worth mentioning that after completing the above work, insulating oil is re-injected into the oil-filled cable 100, and then the oil-filled cable 100 is left to stand. After ensuring that there is no leakage of insulating oil, the entire repair process of the lead sheath 110 of the oil-filled cable 100 is completed.

[0087] Obviously, the above embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. For those skilled in the art, various obvious changes, readjustments and substitutions can be made without departing from the protection scope of the present invention. It is not necessary and impossible to list all the embodiments here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the claims of the present invention.

Claims

1. A method for repairing deformation of lead sheath of oil-filled cable, It is characterized in that The main steps include: S100, cutting off the lead sheath (110) of the oil-filled cable (100) at the deformation position, so that a notch (101) is formed in the lead sheath (110) after the cutting; S200, using a lead sheet (200) to cover the notch (101), and welding the lead sheet (200) to the lead sheath (110); S300, arranging a plurality of temperature sensors (310) on the lead sheet (200), and winding a cooling pipe (320) on the lead sheet (200), wherein both ends of the cooling pipe (320) are connected to a cooling water circulation device; S400, splicing two semicircular copper box sections (410) to form a copper box (400), sleeved on the lead sheath (110) and covered on the lead sheet (200), then welding the joints on the copper box (400), during which the cooling water circulation device circulates cooling water into the cooling pipe (320), and the temperature sensor (310) detects the cable temperature inside the oil-filled cable (100) in real time; S500, after welding is completed, a second wire bundle (510) is wound around the upper and lower ends of the copper box (400), and a cable tie (520) is wound around the second wire bundle (510), and after winding is completed, a molten lead-tin mixture is applied to the second wire bundle (510) and the cable tie (520), and then an epoxy tape (610) is wound around the copper box (400).

2. The method for repairing deformation of lead sheath of oil-filled cable according to claim 1, It is characterized in that In step S100, the lead sheath (110) of the oil-filled cable (100) is cut off at the deformation position, which mainly includes the following steps: S110, removing the lead sealing layer (120) outside the lead sheath (110) at the deformation position of the oil-filled cable (100); S120, removing the steel wire (130) wrapped around the lead sheath (110) at the deformed position; S130, using a cutting tool to cut away the lead sheath (110) at the deformed position.

3. The method for repairing deformation of lead sheath of oil-filled cable according to claim 2, It is characterized in that In step S120, after the steel wire (130) wrapped around the lead sheath (110) at the deformation position is removed, the first wire bundle (530) is used to wrap and fix the steel wire (130) wrapped around the lead sheath (110) at the upper and lower ends of the deformation position.

4. The method for repairing deformation of lead sheath of oil-filled cable according to claim 3, It is characterized in that In step S500, the second wire bundle (510) wound around the upper and lower ends of the copper box (400) is partially overlapped and pressed onto the first wire bundle (530) at the corresponding end, and the overlapping distance of the second wire bundle (510) at each end pressed onto the first wire bundle (530) at the corresponding end is ≥5 cm.

5. The method for repairing deformation of lead sheath of oil-filled cable according to claim 1, It is characterized in that In step S500, the winding directions of the cable tie (520) and the second cable tie (510) are perpendicular to each other, and the cable tie (520) is wound alternately on the inner and outer sides of the second cable tie (510) along the axial direction of the oil-filled cable (100).

6. The method for repairing deformation of lead sheath of oil-filled cable according to claim 1, It is characterized in that Step S200 mainly includes the following steps: S210, splicing two semicircular lead sheet sections (210) to form the lead sheet (200), and the spliced ​​lead sheet (200) is sleeved on the lead sheath (110) and covers the notch (101); S220, welding the seams on the lead sheet (200); S230, welding the upper and lower ends of the lead sheet (200) to the lead sheath (110) at the corresponding ends; S240, winding a third bundle of wires (540) on the lead sheet (200), and coating the molten lead-tin mixture on the third bundle of wires (540) after the winding is completed.

7. The method for repairing deformation of lead sheath of oil-filled cable according to claim 1, It is characterized in that In step S500, after welding is completed, the oxide layer on the copper box (400) is removed, and then a hoop (550) is installed at the lower end of the copper box (400), wherein the hoop (550) can clamp the copper box (400) tightly onto the lead sheath (110).

8. The method for repairing deformation of lead sheath of oil-filled cable according to claim 7, It is characterized in that In step S500, after the installation of the hoop (550) is completed, the surface of the copper box (400) is derusted and the surface of the copper box (400) is polished to make the surface of the copper box (400) rough. After the polishing is completed, the molten lead-tin mixture is applied to the surface of the copper box (400), and the solid lead-tin mixture is filled in the gap between the upper and lower ends of the copper box (400) and the lead sheath (110) at the corresponding ends.

9. The method for repairing deformation of lead sheath of oil-filled cable according to claim 1, It is characterized in that In step S500, during the winding process of the epoxy tape (610), the epoxy tape (610) located in the upper layer is partially overlapped and pressed on the epoxy tape (610) of the lower layer, and after the epoxy tape (610) is wound, a plastic protective tape is wound on the outer side of the epoxy tape (610).

10. The method for repairing deformation of lead sheath of oil-filled cable according to claim 1, It is characterized in that In step S500, the cooling water circulation device is removed after welding is completed, and the cooling water remaining in the cooling pipe (320) is cleared after the removal is completed.

Citation Information

Patent Citations

  • Continuous production method for extruding lead sheath and non-metallic sheath of high-voltage power cable

    CN108091452A

  • Soft joint lead sheath welded cooling device of submarine cable

    CN205070131U

  • Improvements in or connected with Lead Covered Cables.

    GB113378A

  • Improvements in the insulation of electric wires and cables

    GB330552A