A method for modifying the cross section of a secondary lining trolley in a tunnel

By modifying the section of the secondary lining trolley in the tunnel and using new support rods and circumferential steel connections, the problem of low construction efficiency and high cost in the tunnel widening section was solved, and efficient tunnel construction and cost reduction were achieved.

CN115306433BActive Publication Date: 2024-10-29陕西路桥集团有限公司
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202210227530.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-03-08
Publication Date
2024-10-29
Estimated Expiration
2042-03-08

AI Technical Summary

Technical Problem

In tunnel construction, the construction efficiency of the tunnel widening section is low and the cost is high. Various types of secondary lining trolleys need to be customized, resulting in low transportation and construction efficiency.

Method used

By modifying the cross-section of the secondary lining trolley in the tunnel, using multiple new support rods and circumferential steel connections, setting up reinforcement rods and new formwork panels, the adaptive construction of the widened section is achieved, and multiple customizations are avoided. The demand for two-lined trolleys.

Benefits of technology

It improves construction efficiency, reduces transportation and construction costs, achieves efficient construction during the construction of the tunnel widening section, and reduces the need for the transportation and dismantling of the second lining trolley in the normal section.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115306433B_ABST
    Figure CN115306433B_ABST
Patent Text Reader

Abstract

The present application discloses a method for modifying the cross section of a secondary lining trolley in a tunnel, which belongs to the field of tunnel construction engineering and solves the problem of low construction efficiency and high cost in the construction of tunnels with widened sections. The method comprises the following steps: determining the fixed positions of multiple new support rods on the original template surface according to the positions of multiple original support rods, and calculating the length of each new support rod at the corresponding position. In the direction from the bottom to the top of the tunnel, multiple new support rods of the same height are fixed at corresponding fixed positions along the axial direction of the tunnel. The ends of multiple new support rods on the same cross section perpendicular to the axis of the tunnel away from the original template surface are connected with a ring-shaped steel. Multiple new template surfaces are fixed on the side of multiple reinforcement rods away from the original template surface so that the multiple new template surfaces can completely cover each reinforcement rod and each ring-shaped steel. The side walls of two adjacent new template surfaces are fixedly connected. The present application has high construction efficiency and low cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of tunnel construction engineering, and in particular to a method for modifying the cross-section of a secondary lining trolley in a tunnel. Background Art

[0002] The tunnel lining trolley is a special equipment that must be used in the secondary lining of the tunnel construction process. It is used for the concrete lining construction of the inner wall of the tunnel and is also called the secondary lining trolley.

[0003] With the rapid development of my country's transportation industry, the mileage of highways that have been built is increasing, and the use of secondary lining trolleys is becoming more frequent. At present, during tunnel construction, secondary lining trolleys are generally customized in advance according to the length of the tunnel in the early stage of construction. However, since there are widening sections in tunnels over 500m, it is necessary to customize not only the secondary lining trolleys used in the normal section, but also the secondary lining trolleys used in the widening section, resulting in a large number of secondary lining trolleys, which leads to higher overall construction costs. In addition, when constructing the widening section of the tunnel, it is necessary to transport the secondary lining trolleys used in the normal section out of the tunnel, and then transport the secondary lining trolleys used in the widening section into the tunnel, which not only leads to low construction efficiency, but also high transportation costs. Summary of the invention

[0004] The embodiment of the present application solves the problems of low construction efficiency and high cost during the construction of tunnels with widened sections by providing a method for modifying the cross-section of a secondary lining trolley in a tunnel.

[0005] An embodiment of the present invention provides a method for modifying a section of a secondary lining trolley in a tunnel, comprising the following steps:

[0006] Determine the fixed positions of multiple new support rods on the original template surface according to the positions of the multiple original support rods, and calculate the length of each new support rod at the corresponding position;

[0007] In a direction from the bottom to the top of the tunnel, a plurality of new support rods of the same height are fixed at corresponding fixed positions along the axial direction of the tunnel;

[0008] Connecting the ends of the multiple new support rods on the same cross section perpendicular to the axis of the tunnel away from the original template surface with a ring-shaped steel;

[0009] A plurality of reinforcing rods parallel to the tunnel axis are arranged between two adjacent annular steel sections;

[0010] Fixing a plurality of new template panels on one side of the plurality of reinforcement rods away from the original template panel surface, so that the plurality of new template panels can completely cover each of the reinforcement rods and each of the annular steel sections;

[0011] The side walls of two adjacent new template panels are fixedly connected.

[0012] In a possible implementation, the steps of connecting the ends of the multiple new support rods on the same cross section perpendicular to the axis of the tunnel away from the original template surface with a ring-shaped steel include:

[0013] The ends of the multiple new support rods on the same cross section perpendicular to the axis of the tunnel away from the original template surface are connected in sequence with multiple annular steel sections from the bottom to the top of the tunnel, and then two adjacent annular steel sections are fixed.

[0014] In a possible implementation, before connecting the ends of the multiple new support rods on the same cross section perpendicular to the axis of the tunnel away from the original template surface with multiple annular steel sections from the bottom to the top of the tunnel in sequence, the following steps are also included:

[0015] Calculate the curvature of the annular steel section according to the size of the tunnel widening section;

[0016] Processing and manufacturing a plurality of the annular steel sections outside the hole according to the calculated arc, and numbering the annular steel sections;

[0017] A plurality of the annular steel sections are transported into the tunnel.

[0018] In a possible implementation, after the ends of the multiple new support rods on the same cross section perpendicular to the axis of the tunnel are connected with a ring-shaped steel, which are away from the original template surface, the following steps are also included:

[0019] A wedge-shaped steel plate is provided at a position where the annular steel section and the new support rod are not tightly connected.

[0020] In a possible implementation, the method of determining the fixed positions of multiple new support rods on the original template surface according to the positions of multiple original support rods, and calculating the length of each new support rod at the corresponding position, specifically includes the following steps:

[0021] The fixed positions of the multiple new support rods are determined on the original template surface according to the positions of the multiple original support rods, and the length of the new support rod at each corresponding position is calculated according to the size of the tunnel widening section.

[0022] In a possible implementation, the step of fixing and connecting the side walls of two adjacent new template panels specifically includes the following steps:

[0023] The side walls of two adjacent new template panels are fixedly connected by welding.

[0024] In a possible implementation, after the side walls of two adjacent new template panels are fixedly connected by welding, the following steps are also included:

[0025] Grind and polish the welds.

[0026] In a possible implementation, after a plurality of reinforcing rods parallel to the tunnel axis are arranged between two adjacent annular steel sections, the following steps are further included:

[0027] Local reinforcement is performed on a plurality of the new support rods.

[0028] One or more technical solutions provided in the embodiments of the present invention have at least the following technical effects or advantages:

[0029] An embodiment of the present invention provides a method for modifying the cross-section of a secondary lining trolley in a tunnel, the method comprising the steps of: determining the fixed positions of multiple new support rods on the original template surface according to the positions of multiple original support rods, and calculating the length of each new support rod at the corresponding position. In the direction from the bottom to the top of the tunnel, multiple new support rods of the same height are fixed at corresponding fixed positions along the axial direction of the tunnel. The ends of multiple new support rods on the same cross-section perpendicular to the axis of the tunnel that are away from the original template surface are connected with an annular steel section. Multiple reinforcement rods parallel to the axis of the tunnel are arranged between two adjacent annular steel sections. Multiple new template surfaces are fixed on the side of the multiple reinforcement rods away from the original template surface, so that the multiple new template surfaces can completely cover each reinforcement rod and each annular steel section. The side walls of two adjacent new template surfaces are fixedly connected. During the construction process, there is no need to customize the second lining trolley for the widening section. Only the second lining trolley for the normal section needs to be customized. When constructing the widening section of the tunnel, the cross-section of the second lining trolley used in the normal section can be modified to meet the construction requirements of the widening section. When constructing the normal section of the tunnel, the modified part can be removed, which reduces the construction cost. In addition, there is no need to transport the second lining trolley used in the normal section out of the tunnel when constructing the widening section of the tunnel, which improves construction efficiency and reduces transportation costs. The application has high construction efficiency and low cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments of the present invention will be briefly introduced below. Obviously, the accompanying drawings in the following description are some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.

[0031] Figure 1 A flowchart of a method for modifying a section of a secondary lining trolley in a tunnel provided in an embodiment of the present application;

[0032] Figure 2 Schematic diagram of the structure of the second lining trolley section modification in the tunnel provided in the embodiment of the present application Figure 1 ;

[0033] Figure 3 Schematic diagram of the structure of the second lining trolley section modification in the tunnel provided in the embodiment of the present application Figure 2 ;

[0034] Figure 4 Schematic diagram of the structure of the second lining trolley section modification in the tunnel provided in the embodiment of the present application Figure 3 ;

[0035] Figure 5 Schematic diagram of the structure of the second lining trolley section modification in the tunnel provided in the embodiment of the present application Figure 4 .

[0036] Icons: 1-original support rod; 2-original formwork surface; 3-new support rod; 4-circumferential steel; 5-reinforcement rod; 6-new formwork surface. DETAILED DESCRIPTION

[0037] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0038] In the description of the embodiments of the present invention, it should be noted that the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the embodiments of the present invention and simplifying the description, rather than indicating or implying that the devices or elements referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limitations on the present invention. The terms "first", "second", and "third" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance. In addition, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a connection between the two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the embodiments of the present invention can be understood according to the specific circumstances.

[0039] like Figures 1 to 5 As shown, an embodiment of the present invention provides a method for modifying the cross section of a secondary lining trolley in a tunnel, comprising the following steps:

[0040] Step 101: Determine the fixed positions of multiple new support rods 3 on the original template surface 2 according to the positions of multiple original support rods 1, and calculate the length of each new support rod 3 at the corresponding position. Figure 2 As shown, the fixed positions of the multiple new support rods 3 on the original template surface 2 match the fixed positions of the multiple original support rods 1 on the original template surface 2, and the new support rods 3 at each corresponding position extend coaxially with the original support rods 1. The coaxial extension of the new support rods 3 at each corresponding position with the original support rods 1 ensures the support strength of the new support rods 3, thereby ensuring the strength of the modified secondary lining trolley. Specifically, after the new support rods 3 are manufactured, the new support rods 3 are numbered in the order of installation to avoid too many new support rods 3 being placed together during transportation, resulting in confusion of the new support rods 3, so that the new support rods 3 need to be rearranged when fixed, which affects the construction efficiency.

[0041] Step 102: Fix a plurality of new support rods 3 of the same height at corresponding fixed positions along the axial direction of the tunnel from the bottom to the top of the tunnel. Figure 5 As shown, in the axial direction of the tunnel, a plurality of new support rod groups are arranged on the original template surface 2, and the plurality of new support rod groups are arranged in an array with equal spacing on the original template surface 2. Each new support rod group includes a plurality of new support rods 3, and the plurality of new support rods 3 are arranged in an array in the circumferential direction of the tunnel, and the lengths of the plurality of new support rods 3 are inconsistent. In the actual construction process, from the bottom to the top of the tunnel, a plurality of new support rods 3 of the same height are fixed at corresponding fixed positions along the axial direction of the tunnel. The construction is carried out sequentially from the bottom to the top of the tunnel, which is convenient for the construction personnel to fix the new support rods 3 on the original template surface 2, so that the construction efficiency of the construction personnel is high and the construction quality is guaranteed. Specifically, the new support rods 3 are fixed on the original template surface 2 by welding.

[0042] Step 103: Connect the ends of the multiple new support rods 3 on the same cross section perpendicular to the axis of the tunnel away from the original template surface 2 with a ring-shaped steel 4. Figure 5 As shown, the ends of multiple new support rods 3 on the same cross section perpendicular to the axis of the tunnel away from the original template plate surface 2 are connected with an annular steel section 4, so that the multiple new support rods 3 on the same cross section perpendicular to the axis of the tunnel become a whole, thereby realizing the force transmission between the annular steel section 4 and the new support rods 3, and then ensuring the strength of the modified secondary lining trolley.

[0043] Step 104: a plurality of reinforcing rods 5 parallel to the tunnel axis are arranged between two adjacent annular steel sections 4. Figure 3As shown, a plurality of reinforcing rods 5 parallel to the tunnel axis are arranged between two adjacent annular steel sections 4. The arrangement of the reinforcing rods 5 connects the adjacent annular steel sections 4 into a whole, thereby connecting all new support rods 3 and all annular steel sections 4 into a whole, thereby improving the strength of the annular steel sections 4 and ensuring the strength of the modified secondary lining trolley. In practical applications, the reinforcing rods 5 include 50mm*50mm angle steel or channel steel, and the spacing between adjacent reinforcing rods 5 is 25cm to 30cm, which can meet the bearing capacity of the secondary lining with a thickness of 40cm to 80cm thick concrete.

[0044] Step 105: Fix multiple new template panels 6 on the side of the multiple reinforcement rods 5 away from the original template panel 2, so that the multiple new template panels 6 can completely cover each reinforcement rod 5 and each annular steel 4. Figure 2 As shown, multiple new template panels 6 are fixed on the side of multiple reinforcement rods 5 away from the original template panel 2. Specifically, the number of new template panels 6 is determined according to the length of the second lining trolley. In the actual construction process, the flexibility of the new template panel 6 is fully utilized to lay it in a circumferential direction to ensure that the new template panel 6 is in close contact with the reinforcement rods 5, thereby achieving uniform force at the connection between the new template panel 6 and the reinforcement rods 5, and ensuring the overall strength of the modified second lining trolley. For example, the thickness of the new template panel 6 is 8mm, the back reinforcement is L75×6, and the spacing of the second lining trolley is 250mm. For a concrete tunnel with a second lining thickness of 800mm, its strength and rigidity are sufficient to meet the use requirements during the construction process.

[0045] Step 106: Fixedly connect the side walls of two adjacent new template panels 6. In practical applications, the side walls of two adjacent new template panels 6 are fixedly connected so that the multiple new template panels 6 become a whole, so that the force of the new template panels 6 can be evenly transmitted, ensuring the strength of the new template panels 6 and further strengthening the strength of the modified secondary lining trolley.

[0046] The embodiment of the present invention provides a method for modifying the cross section of a secondary lining trolley in a tunnel, the method comprising the steps of: determining the fixed positions of multiple new support rods 3 on the original template surface 2 according to the positions of multiple original support rods 1, and calculating the length of each new support rod 3 at the corresponding position. In the direction from the bottom to the top of the tunnel, multiple new support rods 3 of the same height are fixed at corresponding fixed positions along the axial direction of the tunnel. The ends of multiple new support rods 3 on the same cross section perpendicular to the axis of the tunnel away from the original template surface 2 are connected with an annular steel section 4. Multiple reinforcement rods 5 parallel to the axis of the tunnel are arranged between two adjacent annular steel sections 4. Multiple new template surfaces 6 are fixed on the side of the multiple reinforcement rods 5 away from the original template surface 2, so that the multiple new template surfaces 6 can completely cover each reinforcement rod 5 and each annular steel section 4. The side walls of two adjacent new template surfaces 6 are fixedly connected. During the construction process, there is no need to customize the second lining trolley for the widening section. Only the second lining trolley for the normal section needs to be customized. When constructing the widening section of the tunnel, the cross-section of the second lining trolley used in the normal section can be modified to meet the construction requirements of the widening section. When constructing the normal section of the tunnel, the modified part can be removed, which reduces the construction cost. In addition, there is no need to transport the second lining trolley used in the normal section out of the tunnel when constructing the widening section of the tunnel, which improves construction efficiency and reduces transportation costs. The application has high construction efficiency and low cost.

[0047] In practical application, the ends of multiple new support rods 3 on the same cross section perpendicular to the axis of the tunnel, which are away from the original template surface 2, are connected with a ring-shaped steel 4, which specifically includes the following steps:

[0048] The ends of the multiple new support rods 3 on the same cross section perpendicular to the axis of the tunnel, which are away from the original template plate surface 2, are connected in sequence with multiple annular steel sections from the bottom to the top of the tunnel, and then two adjacent annular steel sections are fixed. Specifically, after the multiple annular steel sections are connected with the multiple new support rods 3, the supporting force of the new support rods 3 can be evenly transmitted to the annular steel 4 during the use of the secondary lining trolley, thereby ensuring the overall strength of the modified secondary lining trolley, and then the annular steel sections are corrected in the annular section direction, the two adjacent annular steel sections are welded, and the annular steel 4 is reinforced and welded, thereby ensuring the smoothness of the overall section curve and improving the aesthetics of the modified secondary lining trolley.

[0049] Specifically, before connecting the ends of the multiple new support rods 3 on the same cross section perpendicular to the axis of the tunnel away from the original template surface 2 with multiple annular steel sections from the bottom to the top of the tunnel in sequence, the following steps are also included:

[0050] The curvature of the annular steel segment is calculated according to the size of the tunnel widening section. Multiple annular steel segments are processed and manufactured outside the tunnel according to the calculated curvature, and the annular steel segments are numbered. Multiple annular steel segments are transported into the tunnel. In actual application, the size of the tunnel widening section is first measured, and then the curvature of the annular steel segment is calculated according to the measured size, and then the annular steel segment is processed according to the calculated curvature, and finally the processed annular steel segment is numbered. Numbering the annular steel segments makes it possible to quickly find the annular steel segment at the corresponding position when connecting the annular steel segment to the new support rod 3, thereby improving the construction efficiency when connecting the annular steel segment and reducing the workload of the construction personnel. Specifically, the annular steel segment is processed and manufactured outside the tunnel by cold bending and shaping, and then transported into the tunnel after processing for ring-by-ring spot welding and reinforcement welding. In practical applications, the space inside the tunnel is limited. Since the annular steel section 4 is large in size, it is difficult to transport. Therefore, the annular steel section 4 is processed into multiple annular steel section segments during processing, which is not only convenient for construction workers to transport, but also can reduce the transportation cost.

[0051] In practical application, after the ends of a plurality of new support rods 3 on the same cross section perpendicular to the axis of the tunnel are connected with a ring-shaped steel 4 away from the original template surface 2, the following steps are also included:

[0052] A wedge-shaped steel plate is set at the place where the annular steel 4 and the new support rod 3 are not tightly connected. Since the new support rod 3 and the annular steel 4 are processed and manufactured in advance, and then the new support rod 3 and the annular steel 4 are transported into the tunnel for connection, the error generated in the manufacturing process may cause a gap between the annular steel 4 and the new support rod 3 when they are connected, so that the annular steel 4 and the new support rod 3 are not tightly connected. Therefore, a wedge-shaped steel plate is set at the place where the annular steel 4 and the new support rod 3 are not tightly connected for reinforcement, so that the annular steel 4 and the new support rod 3 can be tightly connected, thereby ensuring that the force of the new support rod 3 can be evenly transmitted to the annular steel 4, so as to meet the support and stiffness requirements of the new template plate surface 6.

[0053] Specifically, the fixed positions of the multiple new support rods 3 are determined on the original template surface 2 according to the positions of the multiple original support rods 1, and the length of each new support rod 3 at the corresponding position is calculated, which specifically includes the following steps:

[0054] The fixed positions of the multiple new support rods 3 are determined on the original template surface 2 according to the positions of the multiple original support rods 1, and the length of the new support rod 3 at each corresponding position is calculated according to the size of the tunnel widening section. In actual applications, the fixed positions of the multiple new support rods 3 on the original template surface 2 correspond to the fixed positions of the multiple original support rods 1 on the original template surface 2, and the extension direction of the new support rods 3 is consistent with the extension direction of the original support rods 1, so as to ensure the support strength of the new support rods 3, thereby ensuring the strength of the modified secondary lining trolley. In actual applications, the material of the new support rods 3 is steel, and the model of the steel is the same as that of the original support rods 1.

[0055] In practical applications, the side walls of two adjacent new template panels 6 are fixedly connected, specifically including the following steps:

[0056] The side walls of two adjacent new template panels 6 are fixedly connected by welding. When installing the new template panel 6, firstly, the material is loaded by spot welding so that the new template panel 6 can be connected to the reinforcing rod 5, and then the toughness of the new template panel 6 is used to form an arc-shaped panel, and finally, the side walls of two adjacent new template panels 6 are fixedly connected by welding, so that the two adjacent new template panels 6 can be more firmly connected, so that the force between all the new template panels 6 can be transmitted more stably, so that the support strength of the new template panel 6 is higher, and the overall stability of the second lining trolley is further improved.

[0057] Specifically, after the side walls of two adjacent new template panels 6 are fixedly connected by welding, the following steps are also included:

[0058] Grind and polish the weld. When welding the side walls of two adjacent new template panels 6, the weld may be uneven due to the operation of the construction workers. The uneven weld will easily cause stress concentration on the new template panel 6 after it is subjected to force, thereby causing local cracking of the new template panel 6 and reducing the strength of the new template panel 6. Therefore, after the side walls of the two adjacent new template panels 6 are fixedly connected by welding, the weld is ground and polished to ensure that the new template panel 6 is subjected to uniform force, thereby increasing the support strength of the new template panel 6 and ensuring the overall strength of the second lining trolley.

[0059] Furthermore, after the welds are ground and polished, the jacks need to be hydraulically supported by extension and retraction and forward and backward movement to complete the debugging, and then the easily missed and unsafe parts between the processes are systematically checked, especially the parts with greater stress need to be carefully checked to ensure the reliability of the secondary lining trolley and improve the safety of the construction process.

[0060] In practical applications, after a plurality of reinforcing rods 5 parallel to the tunnel axis are arranged between two adjacent annular steel sections 4, the following steps are also included:

[0061] Partial reinforcement is performed on multiple new support rods 3. Specifically, threaded steel bars are used to reinforce the new support rods 3 at locations where the force is greater, so as to ensure the support strength of the new support rods 3. In addition, during the construction process, construction workers can also place the parts to be used in the construction process at the reinforced locations, further improving the construction efficiency.

[0062] The various embodiments in this specification are described in a progressive manner, and the same or similar parts between the various embodiments can be referenced to each other. Each embodiment focuses on the differences from other embodiments.

[0063] The above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit the present application. Although the present application has been described in detail with reference to the aforementioned embodiments, a person of ordinary skill in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some or all of the technical features thereof may be replaced by equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the present application.

Claims

1. A method for modifying the cross section of a secondary lining trolley in a tunnel, characterized in that: The following steps are involved: Determining the fixed positions of a plurality of new support rods (3) on the original template surface (2) according to the positions of the plurality of original support rods (1), and calculating the length of the new support rod (3) at each corresponding position; In the direction from the bottom to the top of the tunnel, a plurality of new support rods (3) of the same height are fixed at corresponding fixed positions along the axial direction of the tunnel; Connecting the ends of the plurality of new support rods (3) on the same cross section perpendicular to the axis of the tunnel, which are away from the original template surface (2), with a ring-shaped steel (4); A plurality of reinforcing rods (5) parallel to the tunnel axis are arranged between two adjacent annular steel sections (4); A plurality of new template panels (6) are fixed on the side of the plurality of reinforcement rods (5) away from the original template panel surface (2), so that the plurality of new template panels (6) can completely cover each of the reinforcement rods (5) and each of the annular steel sections (4); The side walls of two adjacent new template panels (6) are fixedly connected.

2. The method for modifying the cross section of the secondary lining trolley in a tunnel according to claim 1 is characterized in that: The method of connecting the ends of the plurality of new support rods (3) on the same cross section perpendicular to the axis of the tunnel, which are away from the original template surface (2), with a ring-shaped steel (4), specifically comprises the following steps: The ends of the multiple new support rods (3) on the same cross section perpendicular to the axis of the tunnel, which are away from the original template surface (2), are sequentially connected with multiple annular steel sections from the bottom to the top of the tunnel, and then two adjacent annular steel sections are fixed.

3. The method for modifying the cross section of the secondary lining trolley in a tunnel according to claim 2, characterized in that: Before connecting the ends of the multiple new support rods (3) on the same cross section perpendicular to the axis of the tunnel away from the original template surface (2) with multiple annular steel sections from the bottom to the top of the tunnel in sequence, the following steps are also included: Calculate the curvature of the annular steel section according to the size of the tunnel widening section; Processing and manufacturing a plurality of the annular steel sections outside the hole according to the calculated arc, and numbering the annular steel sections; A plurality of the annular steel sections are transported into the tunnel.

4. The method for modifying the cross section of the secondary lining trolley in a tunnel according to claim 1, characterized in that: After the ends of the plurality of new support rods (3) on the same cross section perpendicular to the axis of the tunnel, which are away from the original template surface (2), are connected with a ring-shaped steel (4), the following steps are also included: A wedge-shaped steel plate is provided at the location where the annular steel section (4) and the new support rod (3) are not tightly connected.

5. The method for modifying the cross section of the secondary lining trolley in a tunnel according to claim 1, characterized in that: The method of determining the fixed positions of a plurality of new support rods (3) on the original template surface (2) according to the positions of the plurality of original support rods (1) and calculating the length of each of the new support rods (3) at the corresponding position specifically comprises the following steps: The fixed positions of the plurality of new support rods (3) are determined on the original template surface (2) according to the positions of the plurality of original support rods (1), and the length of the new support rod (3) at each corresponding position is calculated according to the size of the tunnel widening section.

6. The method for modifying the cross section of the secondary lining trolley in a tunnel according to claim 1, characterized in that: The step of fixing and connecting the side walls of two adjacent new template panels (6) specifically comprises the following steps: The side walls of two adjacent new template panels (6) are fixedly connected by welding.

7. The method for modifying the cross section of the secondary lining trolley in a tunnel according to claim 6, characterized in that: After the side walls of two adjacent new template panels (6) are fixedly connected by welding, the following steps are also included: Grind and polish the welds.

8. The method for modifying the cross section of the secondary lining trolley in a tunnel according to claim 1, characterized in that: After arranging a plurality of reinforcing rods (5) parallel to the tunnel axis between two adjacent annular steel sections (4), the method further comprises the following steps: The plurality of new support rods (3) are locally reinforced.

Citation Information

Patent Citations

  • Combined type tunnel lining mold plate trolley

    CN107130978A

  • Two lining platform trucks of tunnel section of widening

    CN207944955U

  • Tunnel super-large section secondary lining trolley capable of widening for multiple times

    CN212867563U

  • Telescopic formwork trolley for tunnel widening section

    CN214887105U

  • Cross section widening method for existing tunnel and cross section widening device

    JP2003227288A