A method for installing a planetary gear set
By using centering tooling and fixed tooling, the problem of unfixed position during the installation of planet wheel axles is solved, ensuring the coaxial positioning of planet wheel axles and planet carriers is avoided, assembly efficiency and stability are improved, and the planet wheel set is enhanced reliability.
Patent Information
- Application Number
- CN202210724578.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-06-24
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2042-06-24
AI Technical Summary
The prior art cannot completely fix the position of the planet wheel during the installation of the planet wheel shaft, resulting in the Papistle alloy coating being easily bumped and affecting the assembly effect and reliability.
The sun shaft is first installed, and then positioned twice by centering and fixed tooling to ensure the coaxial position of the planet wheel shaft and the planet carrier. Finally, the planet wheel shaft is fixed on the planet carrier to avoid friction and bumps.
Through the use of centering tooling and fixed tooling, ensure the one-time insertion position of the planetary wheel shaft, avoid bumps, improve assembly efficiency and stability, ensure the intact Pappointment alloy coating, and enhance the stability and reliability of the planetary wheel set.
Smart Images

Figure CN115306869B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of nuclear power reducers, and in particular to a method for installing a planetary gear set. Background Art
[0002] The planetary shaft and the planetary wheel slide and rub against each other through the Babbitt alloy coating. Because the Babbitt alloy coating on the planetary shaft is ZChSnSb11-6, with a hardness of 30HB and a melting point of 241℃, the material is relatively soft, and the coating often bumps during the assembly process, especially when the planetary shaft is placed into the inner hole of the planetary wheel. The bump will affect the use effect, and in serious cases, the planetary shaft will be directly scrapped;
[0003] The original assembly method was to observe with the naked eye from below to determine whether they were roughly coaxial. During the process of lowering the planetary gear shaft, the inner hole of the planetary gear was often not coaxial, and the Babbitt alloy and the edge of the inner hole of the planetary gear collided during the lowering process, or the diameter could not put the planetary gear shaft into the inner hole. The position of the planetary gear had to be readjusted, and this had to be repeated several times before it could be successfully put into the inner hole. Before installing the planetary gear shaft, repeated assembly was often caused by the shaking or outward sliding of the planetary gear, which could cause quality problems in severe cases. The direct problem was the collision of the Babbitt alloy. Therefore, the planetary gear needed to be fixed after it was aligned with the hole so that the inner hole would not shift.
[0004] Patent document with publication number CN110802380B discloses a method for assembling planetary components of a wind turbine gearbox, wherein the planetary wheels and bearings of the wind turbine gearbox are assembled using an assembly tooling table, and in the process of the parts returning to room temperature, a pressing method is used to make the bearings reach the axial assembly clearance required by the design; a lifting method is used to measure the axial assembly clearance of the bearings of the planetary wheel components; before assembling the planetary shafts of the wind turbine gearbox, an axial alignment tool is used to ensure the precise alignment of the planetary carrier and the planetary wheel components of the wind turbine gearbox, and during the assembly process, the planetary carrier and the planetary wheel components and the frozen planetary shafts are heated simultaneously to increase the gap between the hot / cold assembly joint surfaces; after assembly, the planetary shafts are axially pre-tightened to ensure effective fitting of the joint surfaces; finally, the assembled planetary components that have not yet returned to room temperature are reheated to eliminate condensed water on the surface of the planetary shafts after freezing to prevent rusting of the parts.
[0005] Although the prior art uses an alignment tool to align the mounting hole of the planet carrier and the inner hole of the planet wheel, it is impossible to ensure that the planet wheel is always in the centered position during the process of removing the alignment tool and hoisting the planet wheel shaft; moreover, after assembly, the planet wheel shaft is only axially pre-tightened, which reduces the reliability between the planet wheel shaft and the planet carrier. Summary of the invention
[0006] In order to solve the problem in the prior art that the position of the planetary gear cannot be completely fixed during the installation of the planetary gear shaft, the purpose of the present invention is to provide a method for installing a planetary gear set, first installing the sun shaft and then installing the planetary gear, the planetary gear is positioned twice, the first positioning is to coaxially position the planetary gear and the mounting hole of the planetary carrier through a centering tool, the second positioning is to prevent the planetary gear from moving through the sun gear and the fixing tool to ensure that it is in a coaxial position with the mounting hole, and finally installed on the planetary gear shaft, and the planetary gear shaft is fixed to the planetary carrier.
[0007] In order to achieve the above-mentioned purpose, the present invention adopts the following technical solution: the planetary gear set includes a sun gear, a planet carrier, a plurality of planetary gears and a plurality of planetary gear shafts, a cavity is provided inside the planet carrier and a plurality of openings are provided on the side of the planet carrier to communicate with the inside of the planet carrier, a first mounting hole is provided in the middle of the planet carrier, a plurality of second mounting holes are provided on the planet carrier around the first mounting hole, the first mounting hole and the plurality of second mounting holes all pass through the cavity, and the aperture of the second mounting hole located on the upper side is larger than the aperture of the second mounting hole located on the lower side; the planetary gear set is assembled by the following steps:
[0008] Step 1) Place the planet carrier on a horizontal workbench, lift the sun gear vertically, and allow the sun gear to pass through the first mounting hole from top to bottom and enter the planet carrier;
[0009] Step 2) Push the planetary gear into the planetary carrier through the opening on the side of the planetary carrier, and adjust the relative position of the shaft hole of the planetary gear and the second mounting hole of the planetary carrier by visual inspection to complete the preliminary centering and positioning of the shaft hole of the planetary gear and the second mounting hole of the planetary carrier; vertically lift the centering tool, insert the centering tool from top to bottom and pass through the second mounting hole on the upper side, then insert the first centering part of the centering tool into the shaft hole of the planetary gear, and insert the second centering part of the centering tool into the second mounting hole on the lower side, wherein the first centering part and the second centering part of the centering tool are connected. The shaft hole is tightly matched, and the middle part of the second pair is tightly matched with the second mounting hole located on the lower side, so as to complete the centering positioning of the shaft hole of the planetary gear and the second mounting hole of the planetary carrier; a fixing fixture is installed on the side of the planetary carrier, and the planetary gear is clamped by the fixing fixture and the sun gear to prevent the radial movement of the planetary gear, wherein the outer teeth of the planetary gear and the outer teeth of the sun gear are herringbone teeth, and the planetary gear and the sun gear are meshed to prevent, and the meshing teeth of the planetary gear and the sun gear prevent the axial movement of the planetary gear, so as to complete the fixing of the centering position of the shaft hole of the planetary gear and the second mounting hole of the planetary carrier;
[0010] Step 3) After vertically lifting and removing the centering tooling, the planetary gear shaft is vertically lifted and inserted into the second mounting hole and the shaft hole from top to bottom, and then the planetary gear shaft is fixed on the planetary carrier; after the planetary gear shaft is fixed, the fixing tooling is removed;
[0011] Step 4), repeat steps 2) and 3) to install the remaining planetary gears and planetary gear shafts on the planetary carrier.
[0012] Preferably, the centering tool is made of nylon.
[0013] Preferably, the planetary gear shaft is coated with a babbitt alloy coating, and sliding friction occurs between the planetary gear shaft and the planetary gear through the babbitt alloy coating.
[0014] Preferably, since the second mounting hole passes through the cavity of the planet carrier, the second mounting hole is divided into two parts, an upper part and an lower part; in step 3), one end of the planetary gear shaft is axially fixed to the planet carrier, and the other end of the planetary gear shaft is radially fixed to the planet carrier.
[0015] Preferably, the planetary gear axle is fixed in the following manner: after the planetary gear axle is inserted into the second mounting hole, both ends of the planetary gear axle are tightly fitted with the planetary carrier, and the top section of the planetary gear axle is inserted into the second mounting hole located on the upper side, and the junction of the top section of the planetary gear axle and the second mounting hole located on the upper side is hinged with a first positioning hole, and then a first positioning pin is driven into the first positioning hole to radially fix the planetary gear axle; an annular positioning groove is provided on the other end of the planetary gear axle, and a second positioning hole connected to the second mounting hole located on the lower side is provided on the side of the planetary carrier, and a second positioning pin is driven into the second positioning hole, so that one end of the second positioning pin is inserted into the positioning groove to complete the axial fixation of the planetary gear axle.
[0016] Preferably, the planetary axle is frozen before being installed.
[0017] Preferably, the centering tool comprises an annular positioning portion; in the step 3), during the process of centering the axial hole and the second mounting hole, the inner wall of the second mounting hole and the inner wall of the axial hole of the planetary gear both abut against the positioning portion.
[0018] Preferably, in step 3), the fixing fixture comprises a connecting portion that can be fixed to the planet carrier, and a top protrusion of the connecting portion is provided with a stop portion for abutting against the planetary gear.
[0019] Preferably, before assembling the planetary gear set, a static balancing test is performed on the planet carrier, requiring that the unbalance amount on the outer circumferential surface of the planet carrier is ≯50g.
[0020] The beneficial effects of the technical solution of the present invention are as follows: 1) by means of the centering tool and the fixing tool, it is ensured that during the installation of the planetary wheel, the second mounting hole is coaxially positioned with the axial hole of the planetary wheel, so that the planetary wheel shaft can be inserted into the second mounting hole and the axial hole at one time, avoiding friction or collision between the planetary wheel shaft and the planetary wheel during installation, ensuring the integrity of the babbitt alloy coating, improving the product and assembly efficiency and the stability of the operation of the planetary gear set; 2) the two ends of the planetary wheel shaft fix the planetary wheel shaft to the planetary carrier in different ways, so that the connection between the planetary wheel shaft and the planetary carrier is more stable, while avoiding the use of a complex fixing structure on the planetary carrier. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a schematic diagram of the structure of the planetary gear set;
[0022] Figure 2 A schematic diagram of the structure for positioning the planetary gear using the centering fixture and the fixing fixture;
[0023] Figure 3 This is a schematic diagram of the centering tooling structure;
[0024] Figure 4 It is a schematic diagram of the fixed tooling structure;
[0025] Figure 5 Schematic diagram of the planetary gear shaft structure.
[0026] Figure numerals: 19, center oil pipe; 20, sun gear; 201, middle through hole; 21, planetary gear shaft; 211, positioning groove; 212, notch; 22, planetary gear; 221, shaft hole; 23, fuel injection pipe; 27, centering tool; 271, first pair of center parts; 272, second pair of center parts; 273, lifting hole 28, fixing tool; 281, connecting part; 282, shifting part; 8, planetary carrier; 81, cavity; 811, first mounting hole; 812, second mounting hole; 813, third mounting hole; 814, second positioning hole; 815, first positioning hole; 82, opening. DETAILED DESCRIPTION
[0027] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.
[0028] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "clockwise", "counterclockwise" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0029] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "plurality" means two or more, unless otherwise clearly specified.
[0030] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the terms in the present invention can be understood according to specific circumstances.
[0031] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.
[0032] The orientation in this embodiment is Figure 1 The center of the planet carrier is considered as “inside” and the surrounding area of the planet carrier is considered as “outside”.
[0033] Example
[0034] A method for installing a planetary gear set, such as Figure 1-5As shown, the planetary gear set includes a sun gear 20, a planet carrier 8, a plurality of planetary gears 22 and a plurality of planetary gear shafts 21, a cavity 81 is provided inside the planet carrier and a plurality of openings 82 communicating with the inside of the planet carrier 8 are provided on the side of the planet carrier 8, a first mounting hole 811 is provided in the middle of the planet carrier 8, a plurality of second mounting holes 812 are provided on the planet carrier 8 around the first mounting hole 811, the first mounting hole 811 and the plurality of second mounting holes 812 all pass through the cavity 81, and the aperture of the second mounting hole 812 located on the upper side is larger than the aperture of the second mounting hole 812 located on the lower side; the planetary gear set is assembled using the following steps:
[0035] Step 1) Place the planet carrier 8 on a horizontal workbench, lift the sun gear 20 vertically, and allow the sun gear 20 to pass through the first mounting hole 811 from top to bottom and enter the planet carrier 8;
[0036] Step 2) Push the planetary gear 22 into the cavity 81 inside the planetary gear 8 through the opening 82 on the side of the planetary gear 8, and visually adjust the relative positions of the shaft hole 221 of the planetary gear 22 and the second mounting hole 812 of the planetary gear 8 to complete the preliminary centering and positioning of the shaft hole 221 of the planetary gear 22 and the second mounting hole 812 of the planetary gear 8; vertically lift the centering tool 27, so that the centering tool 27 is inserted from top to bottom and passes through the second mounting hole 812 located on the upper side, and then the annular first centering portion 271 on the centering tool 27 is inserted into the shaft hole 221 of the planetary gear 22, and the annular second centering portion 272 on the centering tool 27 is inserted into the second mounting hole 812 located on the lower side, wherein the first centering portion 2 71 is tightly matched with the shaft hole 221, the second pair of middle parts 272 is tightly matched with the second mounting hole 812 located at the lower side, the first pair of middle parts 271 and the second pair of middle parts 272 are concentric, and the shaft hole 221 of the planetary gear 22 and the second mounting hole 812 of the planetary carrier 8 are aligned and positioned; a fixing fixture 28 is installed on the side of the planetary carrier, and the planetary gear 22 is clamped by the fixing fixture 28 and the sun gear 20 to prevent the radial movement of the planetary gear, wherein the outer teeth of the planetary gear 22 and the outer teeth of the sun gear 20 are both herringbone teeth, and the axial movement of the planetary gear is prevented by the meshing teeth of the planetary gear 22 and the sun gear 20, and the alignment position of the shaft hole 221 of the planetary gear 22 and the second mounting hole 812 of the planetary carrier 8 is fixed;
[0037] Step 3) After vertically lifting and removing the centering tool 27, the planetary shaft 21 is vertically lifted and inserted into the second mounting hole 812 and the shaft hole 221 from top to bottom, and then the planetary shaft 21 is fixed to the planetary carrier 8; after the planetary shaft 21 is fixed, the fixing tool is removed;
[0038] Step 4) Repeat steps 2 and 3 to install the remaining planetary gears 22 and planetary gear shafts 21 on the planetary carrier 8.
[0039] With such arrangement, the centering tool 27 and the fixing tool ensure that during the installation of the planetary gear, the second mounting hole 812 is coaxially positioned with the axial hole 221 of the planetary gear 2, so that the planetary gear shaft 21 can be inserted into the second mounting hole 812 and the axial hole 221 at one time, thereby avoiding friction or collision between the planetary gear shaft 21 and the planetary gear 22 during installation, ensuring the integrity of the Babbitt alloy coating, and improving the product and assembly efficiency and the stability of the planetary gear set operation.
[0040] In this embodiment, the planet carrier 8 needs to be subjected to a static balance test before assembly, requiring that the unbalance amount on the outer circumferential surface of the planet carrier 8 should be ≯50g. This arrangement ensures the stability and reliability of the planetary gear set during operation.
[0041] In this embodiment, the planetary gear assembly further includes a plurality of oil injection pipes 23, and the planetary frame 8 is further provided with a plurality of third mounting holes 812, the plurality of third mounting holes 813 are arranged around the first mounting hole 811, and the plurality of third mounting holes 813 are located inside the plurality of second mounting holes 812; in the step 1), before the sun gear 20 is installed, the plurality of oil injection pipes 23 are inserted into the third mounting holes 813 one by one, and the oil injection pipes 813 are fixed to the planetary frame 8; after the oil injection pipes 23 are installed, the two ends of the oil injection pipes 23 do not exceed the planetary frame 8. In this way, the oil injection pipes 23 are prevented from interfering with the remaining components. Further preferably, the oil injection pipes 23 are provided with oil injection holes, and the oil injection holes face the meshing position of the sun gear 20 and the planetary gear 22. With such a setting, the internal transmission structure of the planetary gear set is lubricated and cooled more directly. Further preferably, the fixing method of the oil injection pipes 23 is to open the two ends of the oil injection pipes 23, and fix the oil pipes to the planetary frame 8 by bolts and glue. In this way, the two ends of the fuel injection pipe 23 are spread apart, which can effectively prevent the fuel injection pipe 23 from axial movement and improve the connection strength and stability of the components in the planetary gear set. Furthermore, after the fuel injection pipe is coated with glue, the planetary carrier 8 is heated to 150° C. In this way, the glue solidifies faster and the assembly efficiency is improved.
[0042] In this embodiment, the planetary gear assembly also includes an intermediate oil pipe 19. After multiple planetary gears 22 are installed on the planetary carrier 8, the intermediate oil pipe 19 is installed; the first mounting hole 811 located on the lower side is a countersunk hole, and a mounting seat is fixed on the bottom end of the intermediate oil pipe 19; the mounting seat is inserted into the countersunk hole and fixedly connected to the bottom of the planetary carrier 22.
[0043] In this embodiment, one end of the planetary shaft 21 is axially fixed to the planetary carrier 8, and the other end of the planetary shaft 21 is radially fixed to the planetary carrier 8. This arrangement avoids the complicated fixing structure from affecting the position accuracy between the planetary carrier and the planetary shaft. Furthermore, since the plurality of mounting holes penetrate the cavity in the up-down direction, the plurality of mounting holes are evenly divided into two sections, upper and lower. In the step 3), the fixing method of the planetary gear shaft 21 is as follows: the top of the planetary gear shaft 21 is tightly fitted with the second mounting hole 812 located on the upper side, a first positioning hole 815 is hinged at the joint between the planetary gear shaft 21 and the second mounting hole 812 located on the upper side, and a first positioning pin is driven into the first positioning hole 815 to prevent the planetary gear shaft 21 from axial rotation; the bottom of the planetary gear shaft 21 is located in the second mounting hole 812 on the lower side, the bottom of the planetary gear shaft 21 is tightly fitted with the second mounting hole 812 located on the lower side, an annular positioning groove 211 is provided at the bottom of the planetary gear shaft 21, and a second positioning hole 814 connected to the second mounting hole 812 located on the lower side is provided on the planetary frame 8, the second positioning pin is driven into the second positioning hole 814, and one end of the second positioning pin passes through the second positioning hole 814 and is inserted into the positioning groove 211. With such a configuration, the planetary axle is fixed axially and radially in two ways, and the two positioning methods will not affect each other, so that the positioning of the planetary axle and the planetary carrier is more accurate. Furthermore, the planetary axle 21 is covered with a babbitt alloy coating, and sliding friction between the planetary axle 21 and the planetary wheel 22 is achieved through the babbitt alloy coating; in the step 3), before the planetary axle 21 is hoisted, the planetary axle 21 is pre-cooled to -50°C, and white oil is applied to the outside of the planetary axle 21. With such a configuration, collisions between the planetary axle and the shaft hole are avoided, the installation of the planetary axle is facilitated, and the installation efficiency and success rate are improved. Furthermore, if Figure 5 As shown, a notch 212 is provided on the planetary shaft 21 ; when the planetary shaft 21 is installed, the notch of the planetary shaft 21 should be parallel to the tangent direction of the rotation path of the planet carrier 8 .
[0044] In this embodiment, the aperture of the second mounting hole 812 located on the upper side is larger than the aperture of the second mounting hole 812 located on the lower side, the planetary gear shaft 21 is a stepped shaft, the bottom outer diameter of the planetary gear shaft 21 is smaller, and the outer diameter of the first positioning portion 271 in the centering tool is larger than the outer diameter of the second positioning portion 272. This arrangement facilitates the positioning of the planetary gear and the installation of the planetary gear shaft.
[0045] In this embodiment, the material of the centering tool 27 is nylon. This arrangement enables the use of a softer material to prevent the centering tool 27 from damaging the surface of the shaft hole 221. Further, at least two lifting holes 273 for installing lifting rings are provided on the top of the first pair of centering parts, and the axes of the lifting holes 273 are parallel to the central axis of the first pair of centering parts. Further, a plurality of lifting holes 273 for installing lifting ears are provided on the top of the first pair of centering parts 271. In the step 2), before moving the centering tool 27, the lifting ears are installed at the lifting holes 273, and the centering tool 27 is lifted horizontally by the lifting ears. This arrangement facilitates the lifting of the centering tool through the lifting holes, and the annular centering tool effectively reduces its own weight, facilitates the movement of the centering tool, and can reduce the conflict between the centering tool and the inner hole of the planetary gear during the centering process, thereby reducing the damage to the inner hole of the planetary gear.
[0046] In this embodiment, Figure 4 As shown, the fixing tool 28 includes a connecting portion 281 that can be fixed to the planet carrier 8, and the top of the connecting portion 281 is protruded with a stop portion 282 for abutting against the planetary gear 22, and the connecting portion 281 can be fixed to the planet carrier 8 by bolts. Such a configuration simplifies the structure of the tooling and reduces the difficulty and cost of manufacturing the tooling while meeting the assembly requirements.
[0047] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.
[0048] Although the embodiments of the present invention have been shown and described above, it is to be understood that the embodiments are exemplary and are not to be construed as limitations on the present invention. A person skilled in the art may change, modify, substitute and vary the embodiments within the scope of the present invention without departing from the principles and intent of the present invention.
Claims
1. A method for installing a planetary gear set, the planetary gear set comprising a sun gear (20), a planet carrier (8), a plurality of planetary gears (22) and a plurality of planetary gear shafts (21), characterized in that: A cavity (81) is provided inside the planet carrier, and a side surface of the planet carrier (8) has a plurality of openings (82) communicating with the inside of the planet carrier (8), a first mounting hole (811) is provided in the middle of the planet carrier (8), and a plurality of second mounting holes (812) are provided on the planet carrier (8) around the first mounting hole (811), the first mounting hole (811) and the plurality of second mounting holes (812) all pass through the cavity (81), and the aperture of the second mounting hole (812) located on the upper side is larger than the aperture of the second mounting hole (812) located on the lower side; The planetary shaft (21) is fixed in the following manner: after the planetary shaft (21) is inserted into the second mounting hole (812), both ends of the planetary shaft (21) are tightly matched with the planetary frame (8), the top section of the planetary shaft (21) is inserted into the second mounting hole (812) located on the upper side, a first positioning hole (815) is hinged at the junction of the top section of the planetary shaft (21) and the second mounting hole (812) located on the upper side, and then a first positioning pin is driven into the first positioning hole (815) to radially fix the planetary shaft (21); an annular positioning groove (211) is provided on the other end of the planetary shaft (21), a second positioning hole (814) connected to the second mounting hole (812) located on the lower side is provided on the side of the planetary frame (8), a second positioning pin is driven into the second positioning hole (814), one end of the second positioning pin is inserted into the positioning groove (211), and the axial fixation of the planetary shaft (21) is completed; The planetary gear set is assembled using the following steps: Step 1), placing the planet carrier (8) on a horizontal workbench, lifting the sun gear (20) vertically, and allowing the sun gear (20) to pass through the first mounting hole (811) from top to bottom and enter the planet carrier (8); Step 2: Push the planetary gear (22) into the cavity (81) inside the planetary gear (8) through the opening (82) on the side of the planetary gear (8); visually adjust the relative position of the shaft hole (221) of the planetary gear (22) and the second mounting hole (812) of the planetary gear (8); complete the preliminary centering and positioning of the shaft hole (221) of the planetary gear (22) and the second mounting hole (812) of the planetary gear (8); vertically lift the centering tool (27); insert the centering tool (27) from top to bottom and pass through the second mounting hole (812) located on the upper side; then insert the first annular center portion (271) on the centering tool (27) into the shaft hole (221) of the planetary gear (22); and insert the second annular center portion (272) on the centering tool (27) into the second mounting hole (812) located on the lower side; wherein the first annular center portion (271) on the centering tool (27) is inserted into the shaft hole (221) of the planetary gear (22); and the second annular center portion (272) on the centering tool (27) is inserted into the second mounting hole (812) located on the lower side; The middle portion (271) is tightly matched with the shaft hole (221), and the second middle portion (272) is tightly matched with the second mounting hole (812) located at the lower side, so that the shaft hole (221) of the planetary gear (22) and the second mounting hole (812) of the planetary carrier (8) are aligned and positioned; a fixing tool (28) is installed on the side of the planetary carrier, and the planetary gear (22) is clamped by the fixing tool (28) and the sun gear (20) to prevent the planetary gear from moving radially, wherein the outer teeth of the planetary gear (22) and the outer teeth of the sun gear (20) are both herringbone teeth, the planetary gear (22) and the sun gear (20) are meshed to prevent, and the meshing teeth of the planetary gear (22) and the sun gear (20) prevent the planetary gear from moving axially, so that the alignment position of the shaft hole (221) of the planetary gear (22) and the second mounting hole (812) of the planetary carrier (8) is fixed; In step 3), after vertically lifting and removing the centering tool (27), the planetary shaft (21) is vertically lifted and the planetary shaft (21) is inserted from top to bottom into the second mounting hole (812) and the shaft hole (221), and then the planetary shaft (21) is fixed to the planetary carrier (8); after the planetary shaft (21) is fixed, the fixing tool is removed; in step 3), one end of the planetary shaft (21) is axially fixed to the planetary carrier (8), and the other end of the planetary shaft (21) is radially fixed to the planetary carrier (8); Step 4), repeat steps 2) and 3) to install the remaining planetary gears (22) and planetary gear shafts (21) on the planetary carrier (8).
2. The method for installing a planetary gear set according to claim 1, characterized in that: The centering tool (27) is made of nylon.
3. The method for installing a planetary gear set according to claim 1, characterized in that: The planetary wheel shaft (21) is coated with a babbitt alloy coating, and sliding friction occurs between the planetary wheel shaft (21) and the planetary wheel (22) through the babbitt alloy coating.
4. The method for installing a planetary gear set according to claim 1, characterized in that: In the step 4), the planetary wheel shaft (21) is pre-frozen before the planetary wheel shaft (21) is installed.
5. The method for installing a planetary gear set according to claim 1, characterized in that: In step 4), before installing the planetary gear shaft (21), white oil is first applied to the outside of the planetary gear shaft (21).
6. The method for installing a planetary gear set according to claim 1, characterized in that: At least two lifting holes (273) for installing lifting rings are arranged on the first pair of middle parts (271), and the axes of the lifting holes (273) are parallel to the central axis of the first pair of middle parts (271).
7. The method for installing a planetary gear set according to claim 1, characterized in that: In the step 3), the fixing tool (28) comprises a connecting portion (281) that can be fixed to the planetary carrier (8), and a stop portion (282) protrudes from the top of the connecting portion (281) for abutting against the planetary gear (22).
8. The method for installing a planetary gear set according to claim 1, characterized in that: Before assembling the planetary gear set, a static balance test is performed on the planet carrier (8), and it is required that the unbalance amount on the outer circumferential surface of the planet carrier (8) is ≯50g.
Citation Information
Patent Citations
A method for assembling planetary components of a wind turbine gearbox
CN110802380B
Planetary gear brushless gear motor
CN214755931U
Planetary gear assembly device
JP1990039840U