Kerbstone and its laying method

Through the L-shaped curb stone structure and the use of technologies such as connecting grooves, connecting columns and bolts, a stable connection between the road shoulder and the fixed seat is achieved, which solves the problems of existing curb stone materials and cumbersome maintenance, reduces costs and improves efficiency. stability.

CN115341431BActive Publication Date: 2024-10-29NANTONG TIANCHENG OPTOELECTRONICS TECH CO LTD +2
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202210621261.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-06-02
Publication Date
2024-10-29
Estimated Expiration
2042-06-02

AI Technical Summary

Technical Problem

Existing curb stones have problems such as increased material usage, heavy weight, inconvenient handling, and cumbersome maintenance during construction and maintenance. Especially when a single curb stone is damaged, it requires destructive removal and reconstruction.

Method used

An L-shaped curb stone structure is adopted, in which the shoulder and the fixed seat are connected through connecting grooves, connecting columns, bolts and other structures. The fixed seat is integrated with the roadbed material, and the shoulder is firmly seated on the fixed seat as the foundation, simplifying the installation and maintenance process.

Benefits of technology

It saves road shoulder materials, reduces the overall cost of curb stones on both sides of the road, simplifies the construction and maintenance process, and improves the stability and connection strength of curb stones.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115341431B_ABST
    Figure CN115341431B_ABST
Patent Text Reader

Abstract

The present invention relates to a curbstone and a laying method thereof in the technical field of road construction, including a shoulder and a fixing seat; the shoulder and the fixing seat are both block structures, the shoulder is a vertical installation block, the fixing seat is a horizontal installation block, and the fixing seat is a road elevation block, the side of the shoulder opposite to the road surface is the front side surface, the fixing seat is in contact with the front side surface and connected to the shoulder to form an L-shaped curbstone, the side of the fixing seat in contact with the front side surface is the docking surface, and the other side of the fixing seat opposite to the docking surface is the connecting surface; the fixing seat is provided with a fixed connection structure, the L-shaped curbstone is placed on the road surface of the roadbed, the fixing seat is connected to the road surface material laid on the roadbed through the fixed connection structure, and the shoulder is located on the roadbed with the fixing seat as the foundation and its lower end face is in contact with the roadbed surface. The present invention is connected to the road surface as a whole through the fixing seat, so that the shoulder can be firmly located on the roadbed with the fixing seat as the foundation, and has a significant energy-saving and consumption-reducing effect.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of road construction, and in particular to a kerbstone and a paving method thereof. Background Art

[0002] Kerbstones, also known as curbstones, are mainly formed by cutting marble materials or pouring concrete. They are used to distinguish the boundaries of carriageways, sidewalks, green spaces, isolation belts and other parts of the road on the road surface, and play a role in ensuring the safety of pedestrians and vehicles and ensuring the neatness of the road surface edges.

[0003] In the prior art, in order to ensure the stability of the curbstone, a part of the curbstone is implanted into the roadbed and poured with concrete to keep the curbstone stable. The depth of the curbstone implanted into the roadbed is about 15-20 cm. With this structure and laying method, on the one hand, the material of the curbstone is increased, and the weight of the curbstone is heavy, which is inconvenient to carry. On the other hand, when a single curbstone is damaged, it needs to be removed by destructive means and then installed by pouring, which is more cumbersome to maintain.

[0004] Through prior art search, it was found that the Chinese utility model patent with patent publication number CN207891681U discloses an L-shaped curbstone, which adopts concrete pouring steel structure to form an integrated structure. It is mainly conceived to solve the problem of cumbersome on-site installation of split structures and to form an integrated structure by pouring two split components to solve the problem of construction efficiency. Summary of the invention

[0005] In view of the defects in the prior art, an object of the present invention is to provide a kerbstone and a paving method thereof.

[0006] A kerbstone provided by the present invention comprises a shoulder and a fixing seat; the shoulder and the fixing seat are both block structures, the shoulder is a vertical mounting block, the fixing seat is a horizontal mounting block, the side of the shoulder opposite to the road surface is a front side surface, the fixing seat is in contact with the front side surface and connected to the shoulder to form an L-shaped kerbstone, the side of the fixing seat in contact with the front side surface is a butt joint surface, and the other side of the fixing seat opposite to the butt joint surface is a connecting surface;

[0007] The fixing seat is provided with a fixed connection structure. When the L-shaped curbstone is laid, the shoulder and the lower end surface of the fixing seat are placed on the roadbed surface. The fixing seat is connected to the road construction materials laid on the roadbed surface through the fixed connection structure. The shoulder is located on the roadbed surface with the fixing seat as the foundation.

[0008] In some embodiments, the fixed connection structure includes a connection groove with an accommodating space, the feed port of the connection groove is located on the connection surface, the fluid road construction material laid on the roadbed surface flows into the feed port of the connection groove, and the fixed seat is connected to the solidified road construction material as a whole.

[0009] In some embodiments, the connecting groove is a rectangular groove, a T-shaped groove, a card-shaped groove, an arc groove or an S-shaped groove.

[0010] In some embodiments, the fixed connection structure includes a connection column, which is a column protruding from the connection surface by a preset length, and the connection column is used to be embedded in the road construction material.

[0011] In some embodiments, there are multiple connecting columns, and the lengths of the multiple connecting columns are the same or different.

[0012] In some implementations, the road shoulder and the fixing seat are detachably connected via bolts.

[0013] In some embodiments, one end of the bolt extends to a preset distance outside the connection surface to form the connection column. 8. The curbstone according to claim 7, characterized in that the bolt comprises a first thread segment, a second thread segment, a sliding surface segment and a stop block, the two ends of the sliding surface segment are respectively connected to the first thread segment and the second thread segment, the stop block is connected to the second thread segment, the end of the first thread segment passes through the fixing seat and the shoulder in sequence and is connected to the fastening nut, and the stop block abuts against the connection surface.

[0014] In some embodiments, along the laying direction of the L-shaped curbstone, the left and right side surfaces of the shoulder are provided with adaptively connected buckle strips and buckle grooves, and the adjacent shoulders laid on the roadbed surface are connected as a whole through the cooperation of the buckle strips and the buckle grooves.

[0015] The present invention also provides a method for laying a kerbstone, using the kerbstone, comprising the following steps:

[0016] S1, after cleaning the roadbed surface, determine the reference position of the first L-shaped curbstone, and place the first L-shaped curbstone on the roadbed surface in a manner that the shoulder and the lower end surface of the fixing seat are in contact with the roadbed surface;

[0017] S2, connecting the remaining L-shaped curbstones into one piece by plugging the buckle strips into the buckle grooves in sequence;

[0018] S3, after temporarily positioning the L-shaped curbstone placed on the roadbed surface, lay fluid road construction materials on the roadbed surface, mix the fluid road construction materials evenly through vibration, the fixing seat is connected to the solidified road construction material through the connecting groove and / or the connecting column, and the shoulder is located on the roadbed with the fixing seat as the foundation.

[0019] Compared with the prior art, the present invention has the following beneficial effects:

[0020] 1. The present invention is connected to the road surface as a whole through a fixed seat, so that the shoulder can be firmly seated on the roadbed with the fixed seat as the foundation. Compared with the prior art that adopts the method of inserting part of the shoulder below the roadbed surface, it can save the shoulder material and effectively reduce the overall cost of the curbstones laid on both sides of the road. In addition, since the shoulder is made of marble or concrete, its price is higher than the cost price of the roadbed material, it has a significant energy-saving and consumption-reducing effect.

[0021] 2. The present invention designs the fixed connection structure of the fixing seat as an outwardly protruding column, thereby simplifying the fixed connection structure and enhancing the fixed connection effect.

[0022] 3. The present invention provides matching buckling structures on both sides of the shoulder, so that adjacent curbstones form a connection structure to restrain each other, thereby improving the stability of the curbstones located on the roadbed. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Other features, objects and advantages of the present invention will become more apparent from the detailed description of non-limiting embodiments made with reference to the following drawings:

[0024] Figure 1 This is a schematic diagram of an explosion structure of an embodiment of the present invention;

[0025] Figure 2 This is a schematic diagram of the overall structure of the present invention provided with a connecting groove;

[0026] Figure 3 This is a schematic diagram of the structure of the present invention in which the extended portion of the bolt serves as a connecting column;

[0027] Figure 4 It is a schematic diagram of the structure of the bolt of the present invention. DETAILED DESCRIPTION

[0028] The present invention is described in detail below in conjunction with specific embodiments. The following embodiments will help those skilled in the art to further understand the present invention, but are not intended to limit the present invention in any form. It should be noted that, for those of ordinary skill in the art, several changes and improvements can also be made without departing from the concept of the present invention. These all belong to the protection scope of the present invention.

[0029] Example 1

[0030] The present invention provides a kerbstone, and more particularly relates to a kerbstone used on both sides of an asphalt road. Figure 1-4 As shown, it includes a shoulder 11 and a fixing seat 12 connected to the shoulder 11 to form an L-shaped curbstone 1. The shoulder 11 is an upright installation block, which is higher than the road surface by a certain distance, and the fixing seat 12 is used as an elevation block for the road surface height, so that the road surface height does not exceed the upper surface height of the fixing seat 12. The shoulder 11 and the fixing seat 12 are made of the same material, and the materials of both can be marble or concrete. The shoulder 11 and the fixing seat 12 are both block structures, wherein the fixing seat 12 is a rectangular block, and the shoulder 11 can be a rectangular block, or a long strip member formed by adding an arched body on the top of the rectangular block. The connection between the shoulder 11 and the fixing seat 12 can be connected as a whole by an integrated molding method. For example, when both are made of marble, the shoulder 11 and the fixing seat 12 can be formed into an L-shaped curbstone 1 by machining, and when both are made of concrete, the L-shaped curbstone 1 can be formed by compression molding. The shoulder 11 and the fixing seat 12 can also be detachably connected by the bolt 2. For example, the shoulder 11 is provided with an internal thread hole penetrating the front and rear sides, and the fixing seat 12 is provided with a countersunk hole with an internal thread. The end of the bolt 2 is screwed from the internal thread hole of the shoulder 11 to the countersunk hole of the fixing seat 12. After tightening, the surface of the bolt head of the bolt 2 abuts against the rear side of the shoulder 11. The operation is simple, and the shoulder 11 and the fixing seat 12 can be disassembled for easy maintenance. Of course, the internal thread hole of the shoulder 11 can also be a plain hole, which can also achieve connection and fixation.

[0031] The fixing seat 12 is provided with a fixing connection structure 120 for connecting with the road building material as a whole. One embodiment of the fixing connection structure 120 is a connection groove 1201 opened on the fixing seat 12 and capable of accommodating the road building material. The side of the shoulder 11 opposite to the road surface is recorded as the front side surface 111, and the side of the fixing seat 12 in contact with the front side surface 111 is recorded as the docking surface 121, and the other side of the fixing seat 12 opposite to the docking surface 121 is recorded as the connection surface 122, and the connection surface 122 is used as the side contacting with the road building material. The connection surface 122 is provided with an opening of the connection groove 1201, and the opening is the feed port of the connection groove 1201. The connection groove 1201 is an open cavity that extends a certain distance from the connection surface 122 toward the docking surface 121 and is formed by digging out materials to accommodate the road surface material. The structural shape of the connection groove 1201 can be a rectangular groove, a T-shaped groove, a card-shaped groove, an arc groove or an S-shaped groove. When the connection groove 1201 is a rectangular groove, preferably, the connection grooves 1201 of the rectangular structure are multiple and arranged in parallel. The multiple parallel connection grooves 1201 make the base 2 as a whole similar to a comb structure, so that the base 2 and the road construction material form a mutually embedded structure to improve the structural strength. For example, it can be 2-5 groups arranged in parallel and spaced a certain distance from top to bottom or left to right. When the connection groove 1201 is a T-slot, after extending a certain distance along the connection surface 122 toward the direction of the docking surface 121 to form a transverse rectangular groove, it is then extended a certain distance along the bottom end of the fixed seat 12 toward the top end thereof to form a vertical rectangular groove and connected with the transverse rectangular groove to form a T-slot. When the connection groove 1201 is a card-shaped groove, on the basis of the T-slot forming method, it is only necessary to extend the depth of the transverse rectangular groove and pass through the vertical rectangular groove to form a card-shaped groove. When the connection groove 1201 is an arc groove, it is preferably a groove of a semicircular structure. Through machining or integral molding, the groove of the semicircular structure can obtain better gripping force. When the connection groove 1201 is an S-shaped groove, it is integrally formed by machining or molding.

[0032] The working principle of the present invention is: first, the L-shaped curbstones 1 are laid side by side on the two side edges of the roadbed, and then the fluid asphalt or concrete and other road-building materials are poured on the roadbed surface. At this time, the fluid road-building materials flow into the connecting groove 1201 from the feed port located on the connecting surface 122. After the fluid road-building materials are solidified, the road-building materials in the connecting groove 1201 are connected to the fixing seat 12 as a whole, and the fixing seat 12 is connected to the road-building materials on the roadbed surface as a whole. Since the shoulder 11 and the fixing seat 12 are an integrated structure or a structure fastened by bolts, the shoulder 11 can be firmly seated on the roadbed surface with the fixing seat 12 as the foundation. Compared with the prior art that uses the method of inserting part of the shoulder 11 below the roadbed surface, the shoulder material can be saved, which will effectively reduce the overall cost of the curbstones laid on both sides of the road. In addition, since the price of the shoulder is higher than the cost price of the roadbed material, whether it is marble or concrete, it has a significant energy-saving and consumption-reducing effect.

[0033] Example 2

[0034] This embodiment 2 is formed on the basis of embodiment 1, by further optimizing the fixed connection structure, the specific fixed connection structure can be designed as a protruding column separately, simplifying the fixed connection structure, or the protruding column structure and the connection groove structure can be matched and set at the same time to form a mutually embedded mechanism, which greatly improves the fixed connection effect. Specifically:

[0035] like Figure 1-4 As shown, the fixed connection structure 120 of the fixed seat 12 is a protruding connection column 1202. One molding method of the connection column 1202 is to extend a certain distance outward from the connection surface 122 in the direction away from the docking surface 121 to form a column. Preferably, there are multiple connection columns 1202 arranged on the connection surface 122. The multiple connection columns 1202 can be arranged in one or more rows side by side, or in a regular wavy shape. The so-called wavy shape here means that the line connecting the root connection points of the connection columns 1202 located on the connection surface 122 is wavy. Furthermore, the lengths of the connection columns 1202 located outside the connection surface 122 can be the same or different. By connecting with the road construction material through the protruding connection column 1202, that is, by embedding the connection column 1202 in the solidified road construction material, the molding process of the fixed connection structure is simplified and the operation is convenient.

[0036] Furthermore, when the shoulder 11 and the fixing seat 12 are detachably connected by the bolt 2, the end of the bolt 2 extends a certain distance toward the outside of the connecting surface 122 to form a connecting column 1202.

[0037] Furthermore, when the shoulder 11 and the fixing seat 12 are detachably connected by the bolt 2, the structure of the bolt 2 includes a first threaded section 21, a sliding surface section 23, a second threaded section 22 and a limit block 24. The sliding surface section 23 is clamped between the first threaded section 21 and the second threaded section 22, and the limit block 24 is threadedly connected to the second threaded section 22. At this time, the through hole set in the shoulder 11 and the fixing seat 12 is a light hole. The end of the first threaded section 21 passes through the through hole of the fixing seat 12 and the through hole of the shoulder 11 in turn and is placed outside the rear side surface of the shoulder 11. The shoulder 11 and the fixing seat 12 are fastened together by the threaded connection of the fastening nut 3 with the first threaded section 21. At this time, the surface of the limit block 24 abuts against the connecting surface 122 of the fixing seat 12, and the second threaded section 22 can also be used as a connecting column 1202. The disassembly and assembly operation is simple and convenient, which also simplifies the fixed connection structure of the fixing seat 12 and reduces the manufacturing cost. Preferably, the outer diameters of the second thread segment 22, the sliding surface segment 23 and the first thread segment 21 decrease successively. When the shoulder 11 is damaged, the filling material on the back thereof, usually the green belt filling soil, is dug out, the fastening nut 3 is removed, and then the shoulder 11 can be directly translated along the sliding surface segment 23 and taken out for replacement, which greatly facilitates the disassembly and maintenance operations and will not cause secondary damage to the road surface after construction.

[0038] Furthermore, the fixed connection structure 120 includes a connection groove 1201 and a connection column 1202 , that is, the connection groove 1201 is formed on the fixing seat 12 and a connection column 1202 structure is provided at the same time, so as to strengthen the connection strength between the fixing seat and the road construction material.

[0039] Example 3

[0040] This embodiment 3 is formed on the basis of embodiment 1 or embodiment 2, and by providing matching buckling structures on both sides of the shoulder, adjacent curbstones form a connection structure to restrain each other, thereby improving the stability of the curbstones located on the roadbed. Specifically:

[0041] like Figure 1-4As shown, buckle strips 112 and buckle grooves 113 are respectively provided on the left and right sides of the shoulder 11, and the so-called left and right sides of the shoulder 11 refer to the sides located on both sides of the front side 111 thereof. When the L-shaped curbstone 1 is laid on the roadbed, buckle strips 112 and buckle grooves 113 are respectively provided on the sides of the two adjacent shoulders 11, and the buckle strips 112 are inserted into the buckle grooves 113, so that the adjacent shoulders 11 are connected, and then the rows of several groups of L-shaped curbstones 1 are connected to each other as a whole. In addition, the L-shaped curbstone 1 is connected to the road construction material as a whole through the fixing seat 12, which ensures the stability of the curbstone laid on the roadbed. At this time, when the shoulder 11 and the fixing seat 12 are connected by bolts 2, the internal threaded hole provided on the fixing seat 12 is a blind hole, so that the bolts 2 can be removed first, and then the buckle strip 112 can be pulled out from the buckle groove 113, and the shoulder can also be disassembled.

[0042] Preferably, the cross-section of the buckle strip 112 and the buckle groove 113 is in a dovetail shape. The dovetail-shaped buckle strip 112 and the buckle groove 113 can be formed by machining or integrally formed by molding.

[0043] Example 4

[0044] This embodiment 4 is a method for laying curbstones formed on the basis of embodiment 3, using the curbstones described in embodiment 3, and specifically comprising the following steps:

[0045] S1, after cleaning the roadbed surface, determine the reference position of the first L-shaped curbstone 1, and place the first L-shaped curbstone 1 on the roadbed surface in a manner that the lower end surface of the shoulder 11 and the fixing seat 12 are in contact with the roadbed surface;

[0046] S2, connecting the remaining L-shaped curbstones 1 into one piece by plugging the buckle strips 112 and the buckle grooves 113 in sequence;

[0047] S3, temporarily position the L-shaped curbstone 1 placed on the roadbed surface. The positioning method can be achieved by applying mortar on the rear side of the shoulder 11 or installing a bracket. If it is mortar, it will be retained. If it is a bracket, it will be removed after paving is completed. After positioning, fluid road construction materials are laid on the roadbed surface, and the fluid road construction materials are mixed evenly by vibration. The fixing seat 12 is connected to the solidified road construction material through the connecting groove 1201 and / or the connecting column 1202. The shoulder 11 is located on the roadbed with the fixing seat 12 as the foundation.

[0048] When the fixed connection structure 120 is a connection groove 1201, the fluid pavement material enters the connection groove 1201 through the feed port located on the connection surface 122. After the fluid pavement material solidifies, the fixed seat 12 and the pavement material are connected as a whole, thereby ensuring the structural stability of the shoulder 11 connected to the fixed seat 12 after it is located on the roadbed.

[0049] When the fixed connection structure 120 is a connection column 1202, the connection column 1202 extends beyond the connection surface 122. After the fluid pavement material flows to contact the connection surface, the connection column 1202 is buried in the pavement material. After the pavement material solidifies, the fixing seat 12 is fastened to the pavement material through the connection column 1202. When the protruding part of the bolt 2 is used as the connection column 1202, the rod body of the bolt 2 is fastened to the fixing seat 12 through a thread, thereby effectively reducing the process complexity of the fixing seat 12 forming the connection column 1202, reducing the manufacturing cost, and improving the connection strength.

[0050] When the fixed connection structure 120 includes a connection groove 1201 and a connection column 1202, the connection firmness between the fixing base and the road construction material can be further improved.

[0051] In the description of the present application, it should be understood that the terms "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0052] The above describes the specific embodiments of the present invention. It should be understood that the present invention is not limited to the above specific embodiments, and those skilled in the art can make various changes or modifications within the scope of the claims, which does not affect the essence of the present invention. In the absence of conflict, the embodiments of the present application and the features in the embodiments can be combined with each other arbitrarily.

Claims

1. A kerbstone, characterized in that: It includes a road shoulder (11) and a fixed seat (12); The shoulder (11) and the fixing seat (12) are both block structures, the shoulder (11) is a vertical mounting block, the fixing seat (12) is a horizontal mounting block, the side of the shoulder (11) opposite to the road surface is the front side surface (111), the fixing seat (12) is in close contact with the front side surface (111) and is connected to the shoulder (11) to form an L-shaped curbstone (1), the side of the fixing seat (12) in close contact with the front side surface (111) is the butt joint surface (121), and the other side of the fixing seat (12) opposite to the butt joint surface (121) is the connection surface (122); The fixing seat (12) is provided with a fixing connection structure (120). When the L-shaped curbstone (1) is laid, the shoulder (11) and the lower end surface of the fixing seat (12) are placed on the roadbed surface. The fixing seat (12) is connected to the road construction material laid on the roadbed surface as a whole through the fixing connection structure (120). The shoulder (11) is located on the roadbed surface with the fixing seat (12) as a foundation. The fixed connection structure (120) comprises a connection groove (1201) having an accommodating space and a connection column (1202); a feed port of the connection groove (1201) is located on the connection surface (122); a fluid road-building material laid on the roadbed surface flows in from the feed port of the connection groove (1201); and the fixed seat (12) is connected to the cured road-building material as a whole; The connecting column (1202) is a column protruding from the connecting surface (122) by a preset length, and the connecting column (1202) is used to be embedded in road construction materials; Along the laying direction of the L-shaped curbstone (1), the left and right side surfaces of the shoulder (11) are provided with adaptively connected buckle strips (112) and buckle grooves (113), and the adjacent shoulders (11) laid on the roadbed surface are connected as a whole through the cooperation of the buckle strips (112) and the buckle grooves (113); The road shoulder (11) and the fixing seat (12) are detachably connected via bolts (2); One end of the bolt (2) extends to a preset distance outside the connection surface (122) to form the connection column (1202); The bolt (2) comprises a first threaded section (21), a second threaded section (22), a sliding surface section (23) and a stop block (24); two ends of the sliding surface section (23) are respectively connected to the first threaded section (21) and the second threaded section (22); the stop block (24) is connected to the second threaded section (22); an end of the first threaded section (21) passes through the fixing seat (12) and the shoulder (11) in sequence and is connected to the fastening nut (3); the stop block (24) abuts against the connecting surface (122); The outer diameters of the second thread segment, the sliding surface segment and the first thread segment decrease in sequence.

2. The kerbstone according to claim 1, characterized in that: The connecting groove (1201) is a rectangular groove, a T-shaped groove, a card-shaped groove, an arc groove or an S-shaped groove.

3. The kerbstone according to claim 1, characterized in that: There are multiple connecting pillars (1202), and the lengths of the multiple connecting pillars (1202) are the same or different.

4. A method for laying kerbstones, characterized in that: The method of using the kerbstone according to claim 1 comprises the following steps: S1, after cleaning the roadbed surface, determining the reference position of the first L-shaped curbstone (1), and placing the first L-shaped curbstone (1) on the roadbed surface in a manner such that the lower end surfaces of the shoulder (11) and the fixing seat (12) are in close contact with the roadbed surface; S2, connecting the remaining L-shaped curbstones (1) in sequence into one piece by plugging the buckle strips (112) and the buckle grooves (113); S3, after temporarily positioning the L-shaped curbstone (1) placed on the roadbed surface, laying a fluid road-building material on the roadbed surface, and mixing the fluid road-building material evenly by vibration, the fixing seat (12) is connected to the solidified road-building material through the connecting groove (1201) and / or the connecting column (1202), and the shoulder (11) is located on the roadbed with the fixing seat (12) as the foundation.

Citation Information

Patent Citations

  • L type curbstone component

    CN207891681U

  • Bituminous paving's flat stone of road

    CN207295369U

  • Embedded extrusion type construction waste curb

    CN211897677U