Methods for large equipment to exit the cabin
Through the method of lifting and rail matching, pulley tooling and manual tensioning equipment are used to realize the discharge of large equipment, which solves the problems of large labor consumption and high risks in the existing technology, and achieves rapid, safe and low-cost equipment release Cabin process.
Patent Information
- Application Number
- CN202211164528.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-09-23
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2042-09-23
AI Technical Summary
The existing large-scale equipment discharge method requires a lot of manpower, has a long construction cycle, and has problems such as high lifting risks, high labor intensity and many welding lifting codes.
The lifting and lifting lugs are used to cooperate with the rails, and the large-scale equipment is discharged through pulley tooling and manual tension equipment, reducing the use of lifting and lifting lugs, and reducing labor intensity and lifting risks.
It realizes the rapid and safe discharge of large-scale equipment, shortens the construction cycle, reduces labor costs and risks, and reduces the number of welding hanging codes.
Smart Images

Figure CN115417337B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of hoisting and transportation, and in particular to a method for unloading large equipment. Background Art
[0002] Generally, most of the large equipment in a ship's cabin is large in size and heavy in weight. When a large equipment needs to be removed from the cabin for emergency repair due to damage, the biggest difficulty is how to consider the safest, fastest and most cost-effective way to transport the large equipment out of the cabin with a complex environment, provided that the cabin's structure, outfitting and other facilities are intact.
[0003] Most equipment exit methods use a combination of lifting hooks and manual hoists to lift the equipment, that is, a large number of lifting hooks are installed on the back of the deck above the equipment exit path, and multiple manual hoists are used to connect the lifting hooks and hang the equipment, and then slowly pull it forward. When it reaches a certain distance, another set of manual hoists is used to pull forward to slowly lift the equipment out of the cabin.
[0004] This method will result in the welding of a large number of hoists, which will cause the insulation cotton, cables, electrical fixtures, pipe fittings and other outfitting parts on the back of the deck to be temporarily removed. In addition, a large amount of manpower is required during the lifting process, the construction period is long, the workload of the workers is large, and during long-term operation, it is easy for a single manual hoist to be unevenly stressed, which may cause the chain to break and the equipment to fall, posing a greater risk.
[0005] Therefore, a method for large equipment to exit the cabin is needed to solve the above problems. Summary of the invention
[0006] The purpose of the present invention is to provide a method for unloading large equipment from a cabin, which can reduce the number of welding hangers, reduce labor intensity, and reduce the risk of lifting.
[0007] To achieve this object, the present invention adopts the following technical solutions:
[0008] The method for large equipment to exit the cabin includes the following steps:
[0009] S1. Weld a first lifting eye on the upper deck, and weld a transfer eye on the upper deck, wherein the transfer eye is closer to the equipment outlet of the hull than the first lifting eye; weld two rails in parallel and at intervals on the lower deck adjacent to the upper deck, and slide a pulley tool on the rails; a horizontal lifting eye is arranged on the hull at the equipment outlet, and a second lifting eye is welded on the upper deck at the equipment outlet;
[0010] S2, installing a first manual lifting device at the first lifting lug, and installing a second manual lifting device at the transfer lifting lug;
[0011] S3, connecting the first manual lifting device to the large equipment, and manually controlling the first manual lifting device to perform a lifting operation so that the large equipment is located above the lower deck;
[0012] S4, connecting the second manual lifting device to the large equipment, and manually controlling the first manual lifting device and the second manual lifting device so that the large equipment moves toward the equipment exit;
[0013] S5, manually controlling the first manual lifting device and the second manual lifting device so that the large equipment falls onto the pulley fixture, and releasing the first manual lifting device and the second manual lifting device;
[0014] S6, a manual pulling device is arranged at the horizontal lifting lug, the manual pulling device is connected to the large equipment, and the manual pulling device is manually controlled to pull the large equipment to a set position;
[0015] S7, releasing the manual pulling device, installing a third manual lifting device at the second lifting eye, connecting the third manual lifting device to the large equipment, and manually controlling the third manual lifting device to perform a lifting operation, so that the large equipment is located above the lower deck;
[0016] S8. The lifting device outside the hull extends from the equipment exit and is connected to the large equipment. The lifting device cooperates with the third manual lifting device to transport the large equipment out of the equipment exit.
[0017] Furthermore, a matching lifting lug is fixedly arranged on the large equipment.
[0018] Furthermore, a reinforcing flat iron is welded between the first lifting eye and the upper deck, and the reinforcing flat iron is respectively connected to the first lifting eye and the upper deck.
[0019] Furthermore, two reinforcing flat irons are welded to each of the first lifting ears, and the two reinforcing flat irons are located on opposite sides of the first lifting ears.
[0020] Furthermore, in the step S1, the rail is connected to the lower deck by spot welding.
[0021] Furthermore, spot welding is performed at set intervals along the extending direction of the rail.
[0022] Furthermore, the rail is composed of two angle steels arranged relatively parallel to each other, a slide groove is formed between the two angle steels, and the pulley tooling is slidably arranged in the slide groove.
[0023] Furthermore, the pulley tooling includes a pulley and a mounting frame, the pulley is rotatably arranged on the mounting frame, the large equipment can be placed on the mounting frame, and the pulley slides in the rail.
[0024] Furthermore, in the step S5, after the large equipment falls onto the pulley fixture, a limiting plate is welded on the pulley fixture to limit the relative position of the large equipment on the pulley fixture.
[0025] Furthermore, the first manual lifting device, the second manual lifting device and the third manual lifting device are all manual hoists.
[0026] Beneficial effects of the present invention:
[0027] The present invention provides a method for large equipment to egress the cabin, which realizes the egress of the large equipment by adopting a method of cooperating lifting ears with rails. Due to the use of rails, the number of lifting ears used can be reduced, thereby reducing the construction workload of the lifting ears, and by utilizing a pulley fixture arranged on the rails, the large equipment located on the pulley fixture can be directly pulled into place by a manual pulling device, which can reduce the workload, reduce labor intensity, and reduce the risk of lifting. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a schematic diagram of the arrangement of the hanging hook in a method for large-scale equipment to exit the cabin according to the present invention;
[0029] Figure 2 It is a schematic diagram of a large equipment being located on the pulley tooling in a large equipment egress method of the present invention.
[0030] In the figure:
[0031] 1. Large equipment; 11. Matching lifting lugs; 2. Upper deck; 21. Reinforced flat iron; 3. Lower deck; 31. Rails; 32. Pulley tooling; 4. First lifting lug; 41. First manual lifting device; 5. Transfer lifting lug; 51. Second manual lifting device; 6. Horizontal lifting lug; 61. Manual pulling device; 7. Third lifting lug; 8. Equipment exit. DETAILED DESCRIPTION
[0032] The technical solution of the present invention is further described below in conjunction with the accompanying drawings and implementation methods. It is to be understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for ease of description, only the parts related to the present invention are shown in the accompanying drawings, rather than all of them.
[0033] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection or a detachable connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, and it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0034] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.
[0035] In the process of large equipment unloading, in order to reduce the number of welding hangers, reduce labor intensity, and reduce the risk of lifting, such as Figure 1-Figure 2 As shown, the present invention provides a method for large equipment to exit the cabin.
[0036] The method for exiting a large-scale equipment from a cabin comprises the following steps:
[0037] S1. Weld the first lifting lug 4 on the upper deck 2, weld the transfer lug 5 on the upper deck 2, the transfer lug 5 is closer to the equipment outlet 8 of the hull than the first lifting lug 4; weld two rails 31 in parallel and at intervals on the lower deck 3 adjacent to the upper deck 2, and slide a pulley tool 32 on the rail 31; set a horizontal lifting lug 6 on the hull at the equipment outlet 8, and weld the second lifting lug on the upper deck 2 at the equipment outlet 8;
[0038] S2, installing a first manual lifting device 41 at the first lifting lug 4, and installing a second manual lifting device 51 at the transfer lug 5;
[0039] S3, connecting the first manual lifting device 41 to the large equipment 1, and manually controlling the first manual lifting device 41 to perform a lifting operation, so that the large equipment 1 is located above the lower deck 3;
[0040] S4, connecting the second manual lifting device 51 to the large equipment 1, and manually controlling the first manual lifting device 41 and the second manual lifting device 51 to move the large equipment 1 toward the equipment exit 8;
[0041] S5, manually controlling the first manual lifting device 41 and the second manual lifting device 51, so that the large equipment 1 falls onto the pulley fixture 32, and releasing the first manual lifting device 41 and the second manual lifting device 51;
[0042] S6. A manual pulling device 61 is arranged at the horizontal lifting lug 6. The manual pulling device 61 is connected to the large equipment 1. The manual pulling device 61 is manually controlled to pull the large equipment 1 to a set position. In the present embodiment, the manual pulling device 61 is a manual hoist.
[0043] S7, releasing the manual pulling device 61, installing a third manual lifting device at the second lifting eye, connecting the third manual lifting device to the large equipment 1, and manually controlling the third manual lifting device to perform a lifting operation, so that the large equipment 1 is located above the lower deck 3;
[0044] S8. The lifting device outside the hull extends from the equipment outlet 8 and is connected to the large equipment 1. The lifting device cooperates with the third manual lifting device to transport the large equipment 1 out of the equipment outlet 8.
[0045] By adopting the method of cooperating the lifting lugs with the rails 31, the large equipment 1 can be unloaded from the cabin. Due to the use of the rails 31, the number of lifting lugs used can be reduced, thereby reducing the construction workload of the lifting lugs. In addition, by utilizing the pulley fixture 32 arranged on the rails 31, the large equipment 1 located on the pulley fixture 32 can be directly pulled into place through the manual pulling device 61, which can reduce the workload, reduce labor intensity, and reduce the risk of lifting.
[0046] Furthermore, a matching lifting lug 11 is fixedly provided on the large equipment 1. In this embodiment, specifically, two matching lifting lugs 11 are welded on opposite sides of the large equipment 1, and two first manual lifting devices 41 are also provided, which are provided in a one-to-one correspondence with the two matching lifting lugs 11, so that the large equipment 1 can be lifted stably. In other embodiments, the number of matching lifting lugs 11 and first manual lifting devices 41 can be configured as needed, and no excessive restrictions are made here.
[0047] Furthermore, a reinforcing flat iron 21 is welded between the first lifting eye 4 and the upper deck 2, and the reinforcing flat iron 21 is respectively connected to the first lifting eye 4 and the upper deck 2. By providing the reinforcing flat iron 21, the fixing strength of the first lifting eye 4 can be improved, thereby ensuring that the first lifting eye 4 will not fall off during the lifting process. In this embodiment, the second lifting eye and the transfer eye 5 are also welded with a reinforcing flat iron 21.
[0048] Furthermore, two reinforcing flat irons 21 are welded to each first lifting lug 4, and the two reinforcing flat irons 21 are located on two opposite sides of the first lifting lug 4. By the above method, the fixing strength of the first lifting lug 4 can be further improved.
[0049] Furthermore, in step S1, the rail 31 is spot-welded to the lower deck 3. By spot-welding the rail 31 to the lower deck 3, the rail 31 can be fixedly installed, and welding and disassembly are facilitated, thereby reducing the workload of construction workers.
[0050] Furthermore, spot welding is performed at set distances along the extension direction of the rail 31. Specifically, in this embodiment, the set distance is 1 meter. By performing welding according to the set distance, the strength of the rail 31 welding can be ensured while avoiding stress concentration. In other embodiments, it can also be set according to actual needs, and no excessive restrictions are made here.
[0051] Furthermore, the rail 31 is formed by two angle steels arranged in parallel with each other, a slide groove is formed between the two angle steels, and the pulley tool 32 is slidably arranged in the slide groove. By adopting angle steel to make the rail 31, it is easy to manufacture and easy to obtain materials.
[0052] Furthermore, the pulley tool 32 includes a pulley and a mounting frame, the pulley is rotatably arranged on the mounting frame, the large equipment 1 can be placed on the mounting frame, and the pulley slides in the rail 31. By setting the pulley, the large equipment 1 is transported in a sliding manner, which can reduce friction and labor intensity. By setting the mounting frame, the placement of the large equipment 1 is facilitated.
[0053] Furthermore, in step S5, after the large equipment 1 falls on the pulley fixture 32, a limiting plate is welded on the pulley fixture 32 to limit the relative position of the large equipment 1 on the pulley fixture 32. By welding the limiting plate, it can be ensured that the large equipment 1 does not fall from the pulley fixture 32 during transportation, thereby ensuring the safety of transportation.
[0054] Furthermore, the first manual lifting device 41, the second manual lifting device 51 and the third manual lifting device are all manual hoists.
[0055] When the equipment is heavy and large in size, the large equipment unloading method effectively utilizes the pulley tooling 32 and common auxiliary materials to quickly, safely and conveniently unload the large equipment 1 from the cabin, shortens the construction period, and saves a lot of labor and other costs.
[0056] Obviously, the above embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the embodiments here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the claims of the present invention.
Claims
1. A method for large equipment to exit the cabin, characterized in that: The steps include: S1. Weld a first lifting eye (4) on the upper deck (2), weld a transfer eye (5) on the upper deck (2), and the transfer eye (5) is closer to the equipment outlet (8) of the hull than the first lifting eye (4); weld two rails (31) in parallel and at intervals on the lower deck (3) adjacent to the upper deck (2), and slide a pulley tool (32) on the rails (31); provide a horizontal lifting eye (6) on the hull at the equipment outlet (8), and weld a second lifting eye on the upper deck (2) at the equipment outlet (8); S2, installing a first manual lifting device (41) at the first lifting eye (4), and installing a second manual lifting device (51) at the transfer eye (5); S3, connecting the first manual lifting device (41) to the large equipment (1), and manually controlling the first manual lifting device (41) to perform a lifting operation, so that the large equipment (1) is located above the lower deck (3); S4, connecting the second manual lifting device (51) to the large equipment (1), and manually controlling the first manual lifting device (41) and the second manual lifting device (51) so that the large equipment (1) moves toward the equipment exit (8); S5, manually controlling the first manual lifting device (41) and the second manual lifting device (51) so that the large equipment (1) falls onto the pulley fixture (32), and releasing the first manual lifting device (41) and the second manual lifting device (51); S6, a manual pulling device (61) is arranged at the horizontal lifting lug (6), the manual pulling device (61) is connected to the large equipment (1), and the manual pulling device (61) is manually controlled to pull the large equipment (1) to a set position; S7, releasing the manual pulling device (61), installing a third manual lifting device at the second lifting eye, connecting the third manual lifting device to the large equipment (1), and manually controlling the third manual lifting device to perform a lifting operation, so that the large equipment (1) is located above the lower deck (3); S8. A lifting device outside the hull extends from the equipment outlet (8) and is connected to the large equipment (1). The lifting device cooperates with the third manual lifting device to transport the large equipment (1) out of the equipment outlet (8).
2. The large equipment exit method according to claim 1, characterized in that: A matching lifting lug (11) is fixedly arranged on the large equipment (1).
3. The large equipment exit method according to claim 1, characterized in that: A reinforcing flat iron (21) is welded between the first lifting lug (4) and the upper deck (2), and the reinforcing flat iron (21) is respectively connected to the first lifting lug (4) and the upper deck (2).
4. The large equipment exit method according to claim 3, characterized in that: Two of the reinforcing flat irons (21) are welded to each of the first lifting lugs (4), and the two reinforcing flat irons (21) are located on two opposite sides of the first lifting lug (4).
5. The large equipment exit method according to claim 1, characterized in that: In the step S1, the rail (31) is connected to the lower deck (3) by spot welding.
6. The large equipment exit method according to claim 5, characterized in that: Spot welding is performed at set intervals along the extending direction of the rail (31).
7. The large equipment exit method according to claim 1, characterized in that: The rail (31) is composed of two angle steels arranged in parallel with each other, a slide groove is formed between the two angle steels, and the pulley tooling (32) is slidably arranged in the slide groove.
8. The large equipment exit method according to claim 1, characterized in that: The pulley tooling (32) comprises a pulley and a mounting frame, the pulley is rotatably mounted on the mounting frame, the large equipment (1) can be placed on the mounting frame, and the pulley slides in the rail (31).
9. The large equipment exit method according to claim 1, characterized in that: In the step S5, after the large equipment (1) falls onto the pulley fixture (32), a limiting plate is welded on the pulley fixture (32) to limit the relative position of the large equipment (1) on the pulley fixture (32).
10. The large equipment exit method according to claim 1, characterized in that: The first manual lifting device (41), the second manual lifting device (51) and the third manual lifting device are all manual hoists.