An assembled frame tunnel

By designing a prefabricated frame tunnel with rectangular upper and reverse arch lower structures, combining high-performance concrete frames and multi-functional channels, the problem of insufficient bearing capacity and stability of the prefabricated frame tunnel is solved, and efficient space utilization and complex environment adaptation are achieved. sex.

CN115434721BActive Publication Date: 2024-11-22GUANGXI UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210941220.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-08-08
Publication Date
2024-11-22
Estimated Expiration
2042-08-08

AI Technical Summary

Technical Problem

Prefabricated frame tunnels are weak in bearing capacity and overall stability, less functional, and difficult to meet complex municipal requirements and large-tonnage vehicle access requirements.

Method used

A prefabricated frame tunnel consisting of the upper rectangular body and the lower reverse arch body of the tunnel is designed. It is connected through wet joints to increase the high-performance concrete frame and multi-functional channel structure, improve the bearing capacity and stability, and set up emergency escape channels and Alternate drainage channels to suit complex environments.

Benefits of technology

It improves the space utilization and bearing capacity of the tunnel, enhances overall stability, is suitable for large-tonnage vehicles and complex municipal facilities, meets the needs of multi-lane traffic and uneven settlement, and at the same time enriches functionality and construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115434721B_ABST
    Figure CN115434721B_ABST
Patent Text Reader

Abstract

An assembled frame tunnel includes a tunnel body, a vehicle passage, a pedestrian passage, a pipeline passage, an emergency escape passage, air defense facilities, lighting facilities, ventilation facilities, drainage facilities, a high-performance concrete frame, a wet joint, and an emergency sidewalk; the tunnel body includes an upper rectangular tunnel body and a lower inverted arch tunnel body, which are connected by a wet joint; the pipeline passage is arranged in the tunnel lining structure; the emergency escape passage and the drainage facilities are arranged at intervals; the high-performance concrete frame is embedded in the air defense facilities as an interlayer in the form of cast-in-place. The present invention makes the most of the tunnel space and saves building materials. The bottom structure is conducive to improving the tunnel's bearing capacity for soil and upper dynamic and static loads; the combination of cast-in-place and assembled types can reduce the construction period while ensuring the construction quality.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tunnel engineering section structures, in particular to an assembled frame tunnel. Background Art

[0002] With the acceleration of urbanization, the society's demand for underground space is increasing. With the development of urban underground space, more and more tunnels and underground engineering facilities are being built. The existing tunnel cross-section structures are mainly shield tunnels and prefabricated rectangular frame tunnels. Among them, prefabricated rectangular frame tunnels have the advantages of high space utilization, simple construction process, fast speed and easy quality control. Shield tunnels have the advantages of good stress performance and mature construction experience.

[0003] However, compared with shield tunnels, prefabricated rectangular frame tunnels are less capable of bearing soil pressure and upper loads. In addition, due to the high space utilization of prefabricated rectangular frame tunnels, the functions of prefabricated rectangular frame tunnels are relatively simple, making it difficult to adapt to the increasingly complex urban transportation environment and to take into account the increasingly developed municipal requirements. As for shield circular tunnels, although they have excellent force characteristics and can meet complex tunnel requirements, the design and construction process of tunnels of the same scale requires more manpower and material resources than prefabricated frame tunnels.

[0004] In view of this, according to the existing problems, research and improvement are carried out, and a prefabricated frame tunnel is developed to increase the function of the tunnel structure while ensuring space utilization and bearing capacity, so as to ensure that the tunnel can meet the existing complex municipal requirements, and by setting up an anti-arch structure, the tunnel function is increased while the bearing capacity of the tunnel is improved, so as to meet complex working conditions. This technology combines some advantages of prefabricated frame tunnels and shield tunnels. Summary of the invention

[0005] The object of the present invention is to provide an assembled frame tunnel to solve the problems of low bearing capacity of the assembled frame tunnel, weak overall stability of the assembled frame tunnel and less functionality of the assembled frame tunnel.

[0006] In order to solve the above technical problems, the present invention adopts the following technical solutions.

[0007] The assembled frame tunnel described in the present invention includes a tunnel body, a vehicle passage, a pipeline passage, an emergency escape passage, drainage facilities, emergency sidewalk ventilation facilities and lighting facilities, and also includes a pedestrian passage, civil air defense facilities, a high-performance concrete frame and a wet joint. The tunnel body includes an upper rectangular body of the tunnel and a lower inverted arch body of the tunnel, and the upper rectangular body of the tunnel and the lower inverted arch body of the tunnel are connected by a wet joint; the vehicle passage is arranged in the frame of the upper part of the tunnel body; the pipeline passage is arranged in the tunnel lining structure; one end of the emergency escape passage is connected to the emergency sidewalk, and the other end is connected to the emergency sidewalk. One end is connected to the pedestrian passage, and the entrance of the emergency escape passage is located on the emergency sidewalk; the entrance of the emergency escape passage and the drainage outlet of the drainage facility are arranged on the left and right sides of the lower inverted arch body of the tunnel, and the entrance of the emergency escape passage and the drainage outlet are arranged at intervals; ventilation facilities and lighting facilities are arranged in the vehicle passage, pipeline passage, emergency escape passage, pedestrian passage, and civil air defense facilities; the pedestrian passage is located below the vehicle passage and placed in the lower inverted arch structure; the civil air defense facilities are arranged in the lower inverted arch structure; the high-performance concrete frame is embedded in the frame columns and the side walls and top of the civil air defense facilities.

[0008] The upper rectangular body of the tunnel comprises side column prefabricated components, middle column prefabricated components and top prefabricated components. The side column prefabricated components are respectively arranged on both sides of the upper rectangular body of the tunnel, the middle column prefabricated components are arranged in the middle of the upper rectangular body of the tunnel, and the top prefabricated components are arranged between the side column prefabricated components and the middle column prefabricated components. Wet joints are connected between the top prefabricated components and the side column prefabricated components and between the top prefabricated components and the middle column prefabricated components.

[0009] The wet joint is cast in place during assembly.

[0010] The pipeline channel is also provided with an inspection port.

[0011] The vehicle passage is a single-layer two-way passage.

[0012] The pedestrian passage is provided with a fire curtain.

[0013] The emergency escape passage is a circular cross-section slideway, and a passage cover is arranged on the entrance of the emergency escape passage.

[0014] The drainage facilities include a drainage pipe, a drainage channel and a backup drainage channel. The inlet of the drainage pipe is arranged on the side of the vehicle channel. The drainage pipe is connected and penetrated with the drainage channel. The backup drainage channel is arranged in the civil air defense facility.

[0015] The construction method of the assembled frame tunnel comprises the following steps:

[0016] (1) Casting of the inverted arch structure, civil air defense facilities, and horizontal floor slabs. A high-performance concrete frame is added to the civil air defense facilities, and emergency escape passages and drainage pipes are reserved;

[0017] (2) Prefabricate top prefabricated components, side column prefabricated components, and center column prefabricated components;

[0018] (3) Assembling the top prefabricated components, the side column prefabricated components, and the middle column prefabricated components through wet joints to form the upper rectangular body of the tunnel;

[0019] (4) Concrete the emergency pedestrian passage in the tunnel, connect the tunnel drainage pipe and the drainage channel, and install various lighting facilities.

[0020] The beneficial effects obtained by the present invention are:

[0021] 1. The tunnel body of the present invention includes an upper rectangular body and a lower inverted arch body. Compared with a circular structure, the upper rectangular structure has a high space utilization rate; compared with a rectangular structure, the load transmitted from the upper part of the tunnel will be transmitted to the bottom inverted arch structure through the side, which can convert the shear force caused by the upper load into an axial force, which is beneficial to improving the shear resistance of the tunnel floor, and at the same time greatly sharing the shear force of the horizontal floor, which is beneficial to the passage of large-tonnage vehicles in the tunnel. The load borne by the middle column is formed by embedding three frame columns in the middle of the inverted arch to form a fork. The three frame columns work together to share the load transmitted to the middle column from the upper part, which can effectively improve the bearing capacity of the middle column. The tunnel adopting this structure will greatly improve the bearing capacity while ensuring a large space utilization rate, and can be suitable for the construction of tunnels with large-tonnage vehicles and multi-lane traffic, large burial depth or large loads on the upper part.

[0022] 2. The lower inverted arch structure of the tunnel body of the present invention is more adaptable to the uneven settlement of the tunnel in the future compared to the horizontal bottom plate. Since the weight of the lower arch structure is much greater than that of the upper structure, the weight of the center part of the lower arch is greater than that of the two sides. When local uneven settlement occurs, the overall center of gravity is located in the middle of the lower inverted arch, which enhances the overall stability of the structure. This structure will be suitable for the construction of tunnels in soft soil layers.

[0023] 3. The present invention arranges circular or elliptical pipes in the top prefabricated components, which has little impact on the mechanical properties of the tunnel and is conducive to saving tunnel building materials. At the same time, it eliminates the disadvantage of the single function of the frame rectangular tunnel, enriches the functionality of the tunnel, and is more adaptable to the increasingly complex municipal requirements.

[0024] 4. In order to meet the needs of civil air defense facilities in resisting disasters and wars, the present invention adds a high-performance concrete frame in the concrete structural wall of the civil air defense facilities. The high-performance concrete frame further improves the bearing capacity of the tunnel while ensuring the safety of the civil air defense facilities.

[0025] 5. The drainage channel of the present invention is arranged in the lower anti-arch body, and there is a spare drainage channel, which is more conducive to the drainage of the upper driving channel and can ensure the smooth passage of vehicles in the tunnel in rainy weather.

[0026] 6. When used in the construction of long tunnels, the elliptical pipeline channel of the upper rectangular frame of the prefabricated frame tunnel can be converted into a ventilation duct and equipped with ventilation facilities to ensure smooth ventilation in the tunnel.

[0027] 7. The emergency escape passage has a slide design and the pedestrian passage is set on the lower anti-arch body. When thick smoke or fire occurs in the tunnel, people can quickly slide from the emergency sidewalk to the pedestrian passage, which can greatly reduce the harm caused by inhaling thick smoke in the tunnel.

[0028] 8. The present invention combines cast-in-place construction with assembly construction, which can reduce construction period while ensuring construction quality. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 It is a schematic diagram of the overall structure of the tunnel section of the emergency escape passage section of the assembled frame tunnel of the present invention.

[0030] Figure 2 It is a schematic diagram of the overall structure of the drainage channel section of the assembled frame tunnel of the present invention.

[0031] Figure 3 It is a schematic diagram of the AA section of the assembled frame tunnel of the present invention.

[0032] Figure 4 It is a schematic diagram of the prefabricated components at the top of the non-inspection section of the assembled frame tunnel of the present invention.

[0033] Figure 5 It is a schematic diagram of the prefabricated components at the top of the inspection opening section of the assembled frame tunnel of the present invention.

[0034] Figure 6 It is a schematic diagram of the prefabricated components of the side columns of the non-inspection section of the assembled frame tunnel of the present invention.

[0035] Figure 7 It is a schematic diagram of the prefabricated components of the side columns of the inspection opening section of the assembled frame tunnel of the present invention.

[0036] Figure 8 It is a schematic diagram of the prefabricated components of the center column of the assembled frame tunnel of the present invention.

[0037] Fig. 9 It is a schematic diagram of the wet joint at the bottom of the center column of the assembled frame tunnel of the present invention.

[0038] Fig.10 It is a schematic diagram of the wet joint at the top of the side column of the assembled frame tunnel of the present invention.

[0039] Fig.11 It is a schematic diagram of the wet joint at the bottom of the side column of the assembled frame tunnel of the present invention.

[0040] Fig.12 It is a schematic diagram of the wet joint at the top of the center column of the assembled frame tunnel of the present invention.

[0041] Marked in the figure are: the upper rectangular body of the tunnel 1, the lower arch body of the tunnel 2, the vehicle passage 3, the pedestrian passage 4, the civil air defense facilities 5, the upper pipeline passage 6, the upper pipeline passage inspection port 601, the side column pipeline passage 7, the side column pipeline passage inspection port 701, the high-performance concrete frame 8, the emergency escape passage 9, the drainage pipe 10, the drainage passage 11, the spare pipeline passage 12, the spare drainage passage 13, the main lighting facilities of the vehicle passage 14, the secondary lighting facilities of the vehicle passage 15, the lighting facilities of the civil air defense facilities 16, the lighting facilities of the pedestrian passage 17, the emergency sidewalk 18, the steel bars 19, the top prefabricated components 20, the middle column prefabricated components 21, and the side column prefabricated components 22. DETAILED DESCRIPTION

[0042] The technical solution of the present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0043] Example 1

[0044] The assembled frame tunnel described in the present invention includes an upper rectangular body 1 of the tunnel, a lower anti-arch body 2 of the tunnel, a vehicle passage 3, a pedestrian passage 4, civil air defense facilities 5, an upper pipeline passage 6, an upper pipeline passage inspection port 601, a side column pipeline passage 7, a side column pipeline passage inspection port 701, a high-performance concrete frame 8, an emergency escape passage 9, a drainage pipe 10, a drainage passage 11, a spare pipeline passage 12, a spare drainage passage 13, a main lighting facility for the vehicle passage 14, a secondary lighting facility for the vehicle passage 15, lighting facilities for civil air defense facilities 16, lighting facilities for pedestrian passages 17, an emergency sidewalk 18, steel bars 19, a top prefabricated component 20, a middle column prefabricated component 21, and a side column prefabricated component 22.

[0045] The main body of the tunnel includes an upper rectangular main body 1 of the tunnel and a lower inverted arch main body 2 of the tunnel, and the upper rectangular main body 1 of the tunnel and the lower inverted arch main body 2 of the tunnel are connected by a wet joint. The upper rectangular main body 1 of the tunnel includes a side column prefabricated component 22, a top prefabricated component 20 and a middle column prefabricated component 21, and the side column prefabricated component 22 and the top prefabricated component 20, and the middle column prefabricated component 21 and the top prefabricated component 20 are connected by a wet joint, and the wet joint is cast in situ during assembly. The vehicle passage 3 is arranged in the frame of the upper rectangular main body 1 of the tunnel, and the vehicle passage 3 is a single-layer two-way passage, and the middle of the two-way passage is the middle column prefabricated component 21.

[0046] The pipeline channel includes a side column pipeline channel 7, an upper pipeline channel 6 and a spare pipeline channel 12. The side column pipeline channel 7 is arranged on the side wall of the upper rectangular body 1 of the tunnel, the upper pipeline channel 6 is arranged in the top prefabricated component 20, and the spare pipeline channel 12 is arranged in the civil air defense facility. The side column pipeline channel 7 is provided with a side column pipeline channel inspection port 701 at a certain distance, and the upper pipeline channel 6 is provided with an upper pipeline channel inspection port 601 at a certain distance.

[0047] The pedestrian passage 4 is located below the vehicle passage 3 and is placed in the lower anti-arch structure. A fire curtain is arranged at one end of the pedestrian passage 4. The fire curtain can block the spread of fire in the pedestrian passage.

[0048] The emergency escape passage 9 is arranged together with the drainage facilities on the left and right sides of the anti-arch body 2 at the lower part of the tunnel, and the emergency escape passage 9 and the drainage pipe 10 are arranged at intervals. The emergency escape passage 9 is arranged on the emergency sidewalk 18, one end of the emergency escape passage 9 is connected to the emergency sidewalk 18, and the other end is connected to the pedestrian passage 4. The entrance of the emergency escape passage 9 is located on the emergency sidewalk 18. The emergency escape passage 9 is designed as a slide with a circular cross-section, and a channel cover is provided on the entrance of the emergency escape passage 9. The drainage facilities include a drainage pipe 10, a drainage channel 11 and a backup drainage channel 13. The entrance of the drainage pipe 10 is arranged on the side of the vehicle passage, the drainage pipe 10 is connected and connected with the drainage channel 11, and the backup drainage channel 13 is arranged in the civil air defense facilities.

[0049] Ventilation facilities are installed in vehicle passages, pipeline passages, emergency escape passages, pedestrian passages, and civil defense facilities.

[0050] The lighting facilities include the main lighting facilities 14 for the vehicle passage, the secondary lighting facilities 15 for the vehicle passage, the lighting facilities 16 for the civil air defense facilities, and the lighting facilities 17 for the pedestrian passage. The main lighting facilities 14 for the vehicle passage and the secondary lighting facilities 15 for the vehicle passage are arranged at the top of the vehicle passage. The lighting facilities 16 for the civil air defense facilities are arranged at the top of the civil air defense facilities 5.

[0051] The civil air defense facility 5 is arranged in the anti-arch main body 2 at the lower part of the tunnel, and a movable door is provided between the civil air defense facility 5 and the pedestrian passage 4; the high-performance concrete frame 8 is embedded in the frame column and the side wall and the top of the civil air defense facility, and the frame column of the civil air defense facility is directly below the middle column prefabricated component.

[0052] Example 2

[0053] This embodiment is an embodiment of the construction method of the assembled frame tunnel of the present invention, and the specific construction steps are as follows:

[0054] (1) Cast the inverted arch structure, civil air defense facilities, and horizontal floor. A high-performance concrete frame is added to the civil air defense facilities to reserve emergency escape passages and drainage pipes. Cast the inverted arch body 2 at the bottom of the tunnel. Figure 1 , 2 As shown, the main body of the tunnel consists of two parts: the upper rectangular main body 1 and the lower inverted arch main body 2. The construction first requires pouring the lower inverted arch main body 2 of the tunnel. For the pouring of the lower inverted arch main body 2 of the tunnel, the arc bottom plate must be poured first. In the process of pouring the arc bottom plate, it is necessary to build civil air defense facilities 5, and pour high-performance concrete 8 as an interlayer so that the high-performance concrete 8 is embedded in the arc bottom plate, and drainage pipes 10 need to be pre-buried at certain intervals. Then, the top plate of the lower inverted arch main body 2 is poured, and the formwork is cast through the civil air defense facilities 5 and the arch end, as shown in FIG. Figure 3 , while pouring, holes for emergency escape passage 9 and drainage pipe 10 are reserved at a certain distance, and steel bars 19 are reserved at the connection between the side column and the middle column. While pouring the top plate, concrete can be laid on the bottom surface of pedestrian passage 4 and civil air defense facility 5, and during the laying process, drainage passage 11, spare pipeline passage 12, spare drainage passage 13 are reserved, and drainage pipe 10 is connected to reserved drainage passage 11. Finally, drainage pipe 10 is connected to the reserved hole, and emergency escape passage 9 is built along the anti-arch sliding surface in the reserved hole of emergency escape passage 9.

[0055] (2) Prefabricate the top prefabricated component 20, the side column prefabricated component 22, and the middle column prefabricated component 21: Figure 4 , Figure 5 , Figure 6 , Figure 7 , Figure 8 During the prefabrication process, the upper pipeline channel 6 and the side column pipeline channel 7 should be reserved, and some of the top prefabricated components 20 and the side column prefabricated components 22 should be reserved for inspection.

[0056] (3) Assemble the top prefabricated components 20, the side column prefabricated components 22, and the middle column prefabricated components 21 through wet joints to form the upper rectangular body of the tunnel: After the prefabricated top prefabricated components 20, the side column prefabricated components 22, and the middle column prefabricated components 21 reach a certain strength, assemble and cast the upper rectangular body 1 of the tunnel. Fig. 9 , 11 As shown, firstly, the bottom steel bars 19 of the middle column prefabricated component 21 and the side column prefabricated component 22 are tied with the steel bars 19 reserved in the top plate of the lower anti-arch body 2, and then poured. Fig.10 , 12 As shown, the top steel bars of the middle column prefabricated component 21 and the side column prefabricated component 22 are tied to the steel bars of the top prefabricated component 20 and poured.

[0057] (4) Cast the emergency pedestrian passage in the tunnel, connect the tunnel drainage pipe and the drainage passage, and install various lighting facilities: After completing the main structure of the tunnel, start casting the emergency pedestrian passage 18 of the tunnel vehicle passage 3, install the vehicle passage main lighting facilities 14 and vehicle passage secondary lighting facilities 15 for the vehicle passage 3, install the lighting facilities 16 for the civil air defense facilities, and install the lighting facilities 17 for the pedestrian passage.

Claims

1. An assembled frame tunnel, comprising a tunnel body, a vehicle passage, a pipeline passage, an emergency escape passage, drainage facilities, emergency pedestrian ventilation facilities and lighting facilities, characterized in that: It also includes a pedestrian passage, civil air defense facilities, a high-performance concrete frame and a wet joint, wherein the tunnel body includes an upper rectangular tunnel body and a lower inverted arch tunnel body, and the upper rectangular tunnel body and the lower inverted arch tunnel body are connected by a wet joint; The vehicle passage is arranged in the frame at the upper part of the tunnel body; The pipeline channel is arranged in the tunnel lining structure; One end of the emergency escape passage is connected to the emergency sidewalk, and the other end is connected to the pedestrian passage. The entrance of the emergency escape passage is located on the emergency sidewalk; The entrance of the emergency escape passage and the drainage outlet of the drainage facility are arranged on the left and right sides of the anti-arch body at the lower part of the tunnel, and the entrance of the emergency escape passage and the drainage outlet are arranged at intervals; ventilation facilities and lighting facilities are arranged in vehicle passages, pipeline passages, emergency escape passages, pedestrian passages, and civil air defense facilities; The pedestrian passage is located below the vehicle passage and is placed in the lower inverted arch structure; the civil air defense facilities are arranged in the lower inverted arch structure; the high performance concrete frame is embedded in the frame columns and the side walls and top of the civil air defense facilities.

2. The assembled frame tunnel according to claim 1, characterized in that: The upper rectangular body of the tunnel comprises side column prefabricated components, middle column prefabricated components and top prefabricated components. The side column prefabricated components are respectively arranged on both sides of the upper rectangular body of the tunnel, the middle column prefabricated components are arranged in the middle of the upper rectangular body of the tunnel, and the top prefabricated components are arranged between the side column prefabricated components and the middle column prefabricated components. Wet joints are connected between the top prefabricated components and the side column prefabricated components and between the top prefabricated components and the middle column prefabricated components.

3. The assembled frame tunnel according to claim 1 or 2, characterized in that: The wet joint is cast in place during assembly.

4. The assembled frame tunnel according to claim 1, characterized in that: The pipeline channel is also provided with an inspection port.

5. The assembled frame tunnel according to claim 1, characterized in that: The vehicle passage is a single-layer two-way passage.

6. The assembled frame tunnel according to claim 1, characterized in that: The pedestrian passage is provided with a fire curtain.

7. The assembled frame tunnel according to claim 1, characterized in that: The emergency escape passage is a circular cross-section slideway, and a passage cover is arranged on the entrance of the emergency escape passage.

8. The assembled frame tunnel according to claim 1, characterized in that: The drainage facilities include a drainage pipe, a drainage channel and a backup drainage channel. The inlet of the drainage pipe is arranged on the side of the vehicle channel. The drainage pipe is connected and penetrated with the drainage channel. The backup drainage channel is arranged in the civil air defense facility.

9. The construction method of the assembled frame tunnel according to claim 1, characterized in that: The following steps are involved: (1) Casting of the inverted arch structure, civil air defense facilities, and horizontal floor slabs. A high-performance concrete frame is added to the civil air defense facilities, and emergency escape passages and drainage pipes are reserved; (2) Prefabricate top prefabricated components, side column prefabricated components, and center column prefabricated components; (3) Assembling the top prefabricated components, the side column prefabricated components, and the middle column prefabricated components through wet joints to form the upper rectangular body of the tunnel; (4) Concrete the emergency pedestrian passage in the tunnel, connect the tunnel drainage pipe and the drainage channel, and install various lighting facilities.