Safety risk assessment method for settlement of large-diameter water supply pipelines caused by shield tunneling
By fitting the soil loss rate and performing numerical simulation on the surface settlement data of shield construction, the problem of insufficient timeliness of safety risk assessment of large-diameter water supply pipelines in shield construction is solved, and accurate prediction and risk of underground pipeline settlement value is achieved. Control ensures safety during construction.
Patent Information
- Application Number
- CN202211136531.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-09-19
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2042-09-19
AI Technical Summary
The safety risk assessment of underground large-diameter water supply pipelines in existing shield construction lacks timelinearity, mainly relies on pipeline settlement measurements, and fails to effectively predict and control potential deformation risks.
By fitting the surface settlement data of the shield construction, the soil loss rate is obtained, the construction parameters are designed, and numerical simulation is carried out to determine the pipeline settlement value, and then the safety risk level is divided and corresponding protection measures are taken to ensure the timeliness of the assessment.
The safety risk level is determined through the simulation of the pipeline settlement value, which ensures the timeliness of safety risk assessment of large-diameter water supply pipelines in shield construction, controls pipeline deformation, and ensures safety during construction.
Smart Images

Figure CN115450633B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of shield construction, and in particular to a method for assessing the safety risk of settlement of a large-diameter water supply pipeline caused by shield tunneling. Background Art
[0002] Due to functional requirements, cities often have various pipelines underground, such as water pipes, sewage pipes, underground cables, etc. Many pipelines have aged due to their long construction years and have reached or even exceeded their service life. Therefore, the stratum deformation caused by shield tunnel excavation can easily lead to deformation and damage of the pipelines, especially for large-diameter underground water pipelines in cities. Due to their use requirements, they are highly sensitive to deformation, and any carelessness can lead to serious consequences. It is very important to accurately evaluate the safety risk level of large-diameter underground water pipelines during shield construction and take relevant control measures.
[0003] At present, the judgment of the safety risk of underground large-diameter water supply pipelines is mainly based on the pipeline settlement control value. Wu Xianguo (Journal of Railway Engineering Society, 2013(09):127-132) and Liu Chengzhu (Journal of Railway Science and Engineering, 2020, 17(11):2882-2891) divided the pipeline safety risk level into four levels with pipeline settlement values of -10mm, -20mm, -30mm and -40mm as critical points, and proposed corresponding construction treatment measures for pipelines of different risk levels; Wei Gang et al. (Rock and Soil Mechanics, 2018, 39(01):181-190) proposed to use surface settlement values to judge pipeline safety through theoretical calculation and considering pipeline aging and damage; some local standards stipulate that the cumulative settlement value of rigid pressurized water supply mains shall not exceed -10mm, and 80% and 65% of the settlement control value combined with the pipeline settlement rate are used as warning values. The above methods all evaluate pipeline safety risks by measuring pipeline settlement during shield construction, which lacks timeliness. Summary of the invention
[0004] In view of the defects in the prior art, the present invention provides a method for assessing the safety risk of settlement of large-diameter water supply pipelines caused by shield tunneling, so as to solve the problem that the safety assessment of existing shield construction is based on the measured values of pipeline settlement during the shield construction process and lacks timeliness.
[0005] The present invention provides a method for assessing the safety risk of large-diameter water supply pipeline settlement caused by shield tunneling, comprising:
[0006] Classify the safety risk levels of underground large-diameter water pipeline settlement;
[0007] Conduct geological surveys on underground large-diameter water supply pipelines and obtain the soil loss rate of shield construction based on survey parameters;
[0008] Design the tunneling parameters for the shield machine to pass through the underground large-diameter water supply pipeline;
[0009] Conduct construction simulation for shield tunneling through underground large-diameter water supply pipelines to determine the predicted settlement value of the pipeline;
[0010] According to the predicted settlement value of the pipeline, the safety risk level at different positions of the pipeline is determined, and corresponding protective measures are taken according to the corresponding safety risk level.
[0011] It can be seen from the above technical scheme that the present invention provides a method for assessing the safety risk of settlement of large-diameter water supply pipelines caused by shield tunneling. The soil loss rate value and the shield construction parameters are obtained by fitting the surface settlement data of shield construction, and then the pipeline position parameters are changed through numerical simulation to obtain the settlement values of pipelines at different positions. The safety risk level is determined based on the simulated pipeline settlement values, thereby ensuring the timeliness of the safety risk assessment.
[0012] Optionally, the classification of the safety risk levels of underground large-diameter water supply pipeline settlement includes:
[0013] Determine several risk warning values for underground large-diameter water pipeline settlement according to industry standards;
[0014] The risk numerical range is divided according to the risk warning value to determine the settlement safety risk level; the safety risk level of the settlement value of underground large-diameter water supply pipelines is determined by the risk numerical range of the settlement value.
[0015] Optionally, the survey parameters include soil layer distribution in the shield tunneling section, pipeline burial depth, pipeline structural parameters and pipeline materials.
[0016] Optionally, the soil loss rate is obtained by back-calculating and fitting according to the Peck formula, including:
[0017]
[0018]
[0019]
[0020] Among them, x i is the distance between the ith surface settlement measuring point and the tunnel centerline, S(x i ) is the surface settlement caused by shield construction at the measuring point, R is the tunnel radius, η is the soil loss rate, S xx =∑ln S(x i ) is the calculated value of the regression variable for the Peck formula linear regression calculation, S xy For The calculated value of the linear regression calculation of Peck formula for the regression variable.
[0021] Optionally, the excavation parameters include excavation face support pressure, shield jack thrust and grouting pressure.
[0022] Optionally, the excavation face support pressure and the grouting pressure are both greater than the formation soil water pressure, and the formation soil water pressure P is determined by the following formula:
[0023]
[0024] Where K0 is the static earth pressure coefficient, X i is the density of the i-th layer of soil, Y i is the thickness of the i-th layer, γ 水 is the density of water, h 水 is the water head height.
[0025] Optionally, the construction simulation of the shield tunneling through the underground large-diameter water supply pipeline to determine the predicted settlement value of the pipeline includes:
[0026] Defining soil layer conditions according to the survey parameters, generating a geometric model of shield construction for underground large-diameter water supply pipelines, and determining initial stresses;
[0027] Define construction steps;
[0028] Change the buried depth of the pipeline and determine the predicted settlement value of the pipeline at different locations.
[0029] By adopting the above technical solution, the present application has the following beneficial effects:
[0030] The present invention obtains the soil loss rate value and designs the shield construction parameters by fitting the surface settlement data of shield construction, and then obtains the settlement values of pipelines at different positions by changing the pipeline position parameters through numerical simulation. The safety risk level is determined based on the simulated pipeline settlement value, thereby ensuring the timeliness of the safety risk assessment. Accordingly, corresponding treatment measures are taken for the underground large-diameter water supply pipeline in subsequent construction to control the deformation of the pipeline. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] In order to more clearly illustrate the specific embodiments of the present invention or the technical solutions in the prior art, the following is a brief introduction to the drawings required for the specific embodiments or the description of the prior art. In all the drawings, similar elements or parts are generally identified by similar reference numerals. In the drawings, the elements or parts are not necessarily drawn according to the actual scale.
[0032] Figure 1 A flow chart showing a method for assessing the safety risk of large-diameter water supply pipeline settlement caused by shield tunneling provided in an embodiment of the present invention;
[0033] Figure 2A flow chart showing a method for assessing the safety risk of large-diameter water supply pipeline settlement caused by shield tunneling provided in an embodiment of the present invention;
[0034] Figure 3 A flow chart showing a method for assessing the safety risk of large-diameter water supply pipeline settlement caused by shield tunneling provided in an embodiment of the present invention;
[0035] Figure 4 A three-dimensional schematic diagram of the classification of safety risk levels of underground large-diameter water supply pipelines provided by an embodiment of the present invention is shown;
[0036] Figure 5 A two-dimensional schematic diagram of the classification of safety risk levels of underground large-diameter water supply pipelines provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0037] The following embodiments of the technical solution of the present invention are described in detail in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present invention, and are therefore only used as examples, and cannot be used to limit the protection scope of the present invention.
[0038] It should be noted that, unless otherwise specified, the technical terms or scientific terms used in this application should have the common meanings understood by those skilled in the art to which the present invention belongs.
[0039] This embodiment takes a section of Nantong Metro where a shield machine crosses an underground large-diameter water supply pipeline as an example. The total length of the construction is about 1.879 km, and the entire line is laid underground. The left line is 1392.85 m long and the right line is 1394.98 m long. The thickness of the top soil covering the section tunnel is about 9.34 to 17.88 m. The left line tunnel is excavated first, and the right line is constructed after the left line excavation is completed. The distance between the center axes of the left and right lines of the tunnel is 13 to 17 m, and the earth pressure balance shield method is used for construction.
[0040] like Figure 1 As shown, a method for assessing the safety risk of large-diameter water supply pipeline settlement caused by shield tunneling is provided in an embodiment of the present invention, comprising:
[0041] S1. Classify the safety risk levels of settlement of underground large-diameter water supply pipelines.
[0042] Among them, Figure 2 As shown, step S1 specifically includes:
[0043] S101. Determine several risk warning values for settlement of underground large-diameter water pipelines based on industry standards.
[0044] S102. Divide the risk value range according to the risk warning value and determine the settlement safety risk level; the safety risk level of the settlement value of the underground large-diameter water supply pipeline is determined by the risk value range of the settlement value.
[0045] In this embodiment, three risk warning values are determined, namely -6.5 mm, -8 mm and -10 mm. Based on these three risk warning values, four safety risk levels are determined, including:
[0046] S ≥ -10mm is a very high risk zone (Zone I).
[0047] -10mm>S≥-8mm is a high risk area (Zone II).
[0048] -8mm>S≥-6.5mm General risk zone (Zone III),
[0049] -6.5mm>S is a lower risk area (Zone IV).
[0050] The corresponding treatment measures are:
[0051] When S is in zone I, the settlement of the pipeline exceeds the control value, which is very risky and may damage the pipeline structure, causing cracking and leakage. At this time, construction protection measures need to be taken, such as timely maintenance of the damaged points, or replacement of the diverted pipeline before construction, and full-process monitoring of the pipeline during construction;
[0052] When S is in zone II, the risk is relatively high. At this time, the pipeline has been greatly deformed and is on the verge of destruction. There is a risk of cracking and leakage at any time. Certain construction protection measures should be taken for the pipeline, such as: appropriate grouting reinforcement of the pipeline at the corresponding position, adjustment of shield construction parameters, reduction of stratum deformation, and intensified monitoring of the pipeline at the same time;
[0053] When S is in Zone III, the risk is general and the pipeline deformation is small, which does not affect its normal use. At this time, the pipeline should be monitored throughout the construction process to understand the pipeline status in a timely manner and take corresponding protective measures when necessary;
[0054] When S is in zone IV, the pipeline is risk-free or basically safe, and only needs to be monitored during shield construction.
[0055] S2. Conduct geological surveys on underground large-diameter water supply pipelines and obtain the soil loss rate of shield construction based on the survey parameters.
[0056] Among them, the survey parameters include the soil layer distribution in the shield section, the buried depth of the pipeline, the pipeline structural parameters and the pipeline material. Taking the aforementioned shield section crossing the underground large-diameter water supply pipeline as an example, the double-line shield tunnel section vertically and orthogonally crosses the DN1800 large-diameter water supply pipeline. The pipeline material is ductile iron pipe, socket joint, medium pressure, and the buried depth from the surface to the top of the pipeline is about 1.9m. The pipeline diameter is 1.8m, the wall thickness is 28mm, and the minimum distance between the pipeline and the top of the tunnel is 6.53m; from the surface to the bottom, the main soil layers are clay silt, sandy silt, silt sand and sandy silt, silt sand, and fine sand. Among them, the shield tunnel mainly passes through silt sand and sandy silt and silt sand layers, and the stratum where the DN1800 large-diameter water supply pipeline is located is a clay silt layer.
[0057] Based on the survey parameters, the soil loss rate is calculated and fitted according to the Peck formula, including:
[0058]
[0059]
[0060]
[0061] Among them, x i is the distance between the ith surface settlement measuring point and the tunnel centerline, S(x i ) is the surface settlement caused by shield construction at the measuring point, R is the tunnel radius, η is the soil loss rate, S xx =∑ln S(x i ) is the calculated value of the regression variable for the Peck formula linear regression calculation, S xy For The calculated value of the linear regression calculation of Peck formula for the regression variable.
[0062] In the shield construction environment of this embodiment, the range of the soil loss rate η obtained based on the above equation is 0.05%-0.5%, the average value is 0.25%, and the average values of the soil loss rates of the left line and the right line are 0.35% and 0.15% respectively.
[0063] S3. Design the tunneling parameters for the shield machine to pass through the underground large-diameter water supply pipeline.
[0064] Specifically, based on the geological survey information and data of the shield tunneling under the underground large-diameter water supply pipeline, the excavation parameters of the shield tunneling under the underground large-diameter water supply pipeline are designed, including the excavation face support pressure, shield jack thrust, and grouting pressure.
[0065] For an earth pressure balance shield, reasonable excavation face support pressure is the key to ensuring smooth shield excavation. The excavation face support pressure generally needs to be slightly greater than the corresponding stratum soil and water pressure. At the same time, the grouting pressure also needs to be strictly controlled. Excessive or insufficient grouting pressure will have an adverse effect on the water supply pipeline. The grouting pressure should also be slightly greater than the corresponding stratum soil and water pressure.
[0066] Among them, the soil water pressure P is determined by the following formula:
[0067]
[0068] Where K0 is the static earth pressure coefficient, X i is the density of the i-th layer of soil, Y i is the thickness of the i-th layer, γ 水 is the density of water, h 水 is the water head height.
[0069] S4. Conduct construction simulation on the shield tunneling through the underground large-diameter water supply pipeline to determine the predicted settlement value of the pipeline.
[0070] This embodiment uses PLAXIS3D numerical simulation software to simulate the construction environment. Figure 3 As shown, the steps include:
[0071] S401, defining soil layer conditions according to survey parameters, generating a geometric model of shield construction for underground large-diameter water supply pipelines, and determining initial stress;
[0072] S402, define construction steps;
[0073] S403, changing the buried depth of the pipeline to determine the predicted settlement values of the pipeline at different locations.
[0074] When defining soil conditions, in order to accurately obtain the deformation of the stratum and pipeline caused by shield construction, the influence of small strain of the soil is considered. In this embodiment, the small strain hardening constitutive model is adopted. Based on this, the buried depth of the pipeline is changed from 1 meter to near the top of the tunnel, and the settlement values of the pipeline at different positions are obtained. The simulation results are as follows: Figure 4 and Figure 5 shown.
[0075] S5. Determine the safety risk level at different locations of the pipeline based on the predicted settlement value of the pipeline, and take corresponding protective measures based on the corresponding safety risk level.
[0076] According to the numerical simulation results, combined with the classification of safety risk levels of underground large-diameter water supply pipelines, the risk levels of pipelines at different locations are divided, and corresponding protection and control measures are taken in advance to protect the safe and normal use of pipelines. The safety risk levels of underground large-diameter water supply pipelines at different locations obtained according to the numerical simulation results are as follows: Figure 4and Figure 5 As shown in the figure, the red area is the area with great pipeline risk (Area I), the yellow area is the area with relatively high risk (Area II), the green area is the area with average risk (Area III), and the blue area is the area with relatively low risk (Area IV). Figure 4 and Figure 5 It is found that the area where the shield machine crosses the DN1800 large-diameter water supply pipeline near the axis of the double-track tunnel is mainly a high-risk area (Zone II). Therefore, it is necessary to take appropriate grouting reinforcement measures in advance, adjust the shield machine construction parameters, and conduct intensified monitoring of the pipeline.
[0077] In actual projects, after the shield construction is completed, due to a series of measures taken, the pipeline settlement caused by the shield construction is relatively small, with the maximum being about -6.2mm, which effectively achieves the purpose of controlling pipeline deformation and ensuring the normal use of the pipeline.
[0078] The above-mentioned embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent of the present application shall be subject to the attached claims.
Claims
1. A safety risk assessment method for underground large-diameter water pipeline settlement caused by shield tunneling. It is characterized in that include: Classify the safety risk levels of underground large-diameter water pipeline settlement; Conduct geological surveys on underground large-diameter water supply pipelines, and obtain the soil loss rate of shield construction based on survey parameters; the survey parameters include soil layer distribution in the shield section, pipeline burial depth, pipeline structural parameters and pipeline materials; The soil loss rate is obtained by back-calculation and fitting according to the Peck formula, including: in, is the distance between the ith surface settlement measuring point and the tunnel centerline, is the surface settlement caused by shield construction at the measuring point, R is the tunnel radius, is the soil loss rate, For is the calculated value of the linear regression calculation of the Peck formula for the regression variable, For The calculated value of the linear regression calculation of Peck formula for the regression variable; Design the excavation parameters of the shield machine passing through the underground large-diameter water supply pipeline; the excavation parameters include the excavation face support pressure, the shield jack thrust and the grouting pressure; the excavation face support pressure and the grouting pressure are both greater than the formation soil water pressure, and the formation soil water pressure P is determined by the following formula: in, is the static earth pressure coefficient, is the density of the i-th layer of soil, is the thickness of the i-th layer, is the weight of water, is the water head height; Conduct construction simulation for shield tunneling through underground large-diameter water supply pipelines to determine the predicted settlement value of the pipeline; including: Defining soil layer conditions according to the survey parameters, generating a geometric model of shield construction for underground large-diameter water supply pipelines, and determining initial stresses; Define construction steps; Change the buried depth of pipelines to determine the predicted settlement values of pipelines at different locations; According to the predicted settlement value of the pipeline, the safety risk level at different positions of the pipeline is determined, and corresponding protective measures are taken according to the corresponding safety risk level.
2. The method according to claim 1, It is characterized in that The classification of the safety risk levels of underground large-diameter water supply pipeline settlement includes: Determine several risk warning values for underground large-diameter water pipeline settlement according to industry standards; The risk numerical range is divided according to the risk warning value to determine the settlement safety risk level; the safety risk level of the settlement value of underground large-diameter water supply pipelines is determined by the risk numerical range of the settlement value.