A voltage balancing sequencing method for submodules of modular multilevel converter

Through dynamic capacitance voltage limit determination and nearest level modulation method, the submodule with the smallest or largest operating voltage is selected for switching, solving the calculation complexity and high switching frequency of modular multi-level converters in high voltage scenarios. The problem is to achieve the effect of reducing losses and extending service life.

CN115514248BActive Publication Date: 2024-11-22NANJING INST OF TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211162392.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-09-23
Publication Date
2024-11-22
Estimated Expiration
2042-09-23

AI Technical Summary

Technical Problem

In the high voltage and large capacity scenarios, the submodule capacitance voltage sorting calculation complexity is high, and the high switching frequency leads to an increase in losses, affecting the smooth operation and service life of the equipment.

Method used

Using dynamic upper and lower limit value determination methods, combined with the nearest level modulation method, calculate the number of submodules required to be input by the bridge arm, and filter the submodules with the smallest or largest operating voltage for switching, reducing the number of switching and computing quantity.

Benefits of technology

It reduces the switching losses of modular multi-level converters, extends the service life of the equipment, and improves the smooth operation capability. It is suitable for modular multi-level converters of different specifications.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115514248B_ABST
    Figure CN115514248B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for voltage balancing and sorting submodules of a modular multilevel converter, comprising the following steps: obtaining voltage data; calculating the dynamic upper limit value and the dynamic lower limit value of the capacitor voltage of the submodule according to the voltage data; processing the switching state of the over-limit submodule according to the dynamic upper limit value and the dynamic lower limit value, thereby calculating the final number of the over-limit submodules; using the nearest level modulation method, calculating the difference between the number of submodules required to be put into operation at the current moment and the previous moment of the bridge arm, thereby obtaining the number of submodules N finally put into operation at the current moment of the bridge arm (t) ; Filter out the top N with the smallest or largest operating voltage (t) The present invention adopts a new sorting idea to reduce the calculation amount of submodule capacitor voltage sorting, reduces the loss as a whole, prolongs the service life of the modular multilevel converter, and improves the stable operation capability of the modular multilevel converter.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to a voltage balancing and sequencing method for submodules of a modular multi-level converter, and belongs to the technical field of modular multi-level converters. Background Art

[0002] In recent years, modular multilevel converters (MMCs) have been widely used and developed in flexible direct current transmission (HVDC) due to their advantages of facilitating the selection of different numbers of sub-modules to adapt to different power and voltage requirements, high waveform quality, strong fault handling capabilities, low step voltage, and avoidance of dynamic voltage balancing. Furthermore, the application scenarios of MMCs have evolved from initial low-voltage demonstration projects to high-voltage multi-terminal flexible transmission systems, demonstrating their promising development prospects.

[0003] In the operation of modular multilevel converters, voltage balancing control is a key technology for controlling converter operation. As MMC projects rapidly develop towards higher voltage levels and larger capacities, research on MMC voltage balancing strategies and algorithms that reduce the switching frequency of power electronic switching devices (IGBTs) and the computational complexity of submodule capacitor voltage sorting is crucial for improving MMC operational stability and reducing switching losses. Existing voltage balancing strategies include: One approach proposes switching frequency reduction strategies based on capacitor voltage limits, but these approaches fail to optimize the voltage sorting method and reduce the computational complexity of the sorting process. Another approach proposes group-based sorting strategies that reduce the computational complexity of sorting but do not address switching frequency reduction.

[0004] The information disclosed in this background section is only intended to enhance understanding of the overall background of the invention and should not be considered as an admission or any form of suggestion that the information constitutes the prior art already known to a person of ordinary skill in the art. Summary of the Invention

[0005] The present invention aims to overcome the shortcomings of the prior art and provide a method for voltage-sharing submodules in a modular multilevel converter. This method adopts a new sorting concept to reduce the computational complexity of sorting submodule capacitor voltages, thereby reducing losses overall, extending the service life of the modular multilevel converter, and improving the stable operation capability of the modular multilevel converter. Furthermore, the method reduces the switching frequency as much as possible without exceeding the dynamic limit of the submodule capacitor voltage, thereby reducing losses in power electronic switching devices.

[0006] To achieve the above object, the present invention is implemented by adopting the following technical solutions:

[0007] The present invention discloses a method for voltage balancing and sorting submodules of a modular multi-level converter, comprising the following steps:

[0008] Get voltage data;

[0009] Calculating a dynamic upper limit value and a dynamic lower limit value of the capacitor voltage of the submodule according to the voltage data;

[0010] According to the dynamic upper limit value and the dynamic lower limit value, the switching state of the over-limit submodule is processed, thereby calculating the final number of the over-limit submodules;

[0011] The latest level modulation method is used to calculate the difference in the number of submodules required for the bridge arm at the current moment and the previous moment;

[0012] According to the difference and the final number of over-limit submodules, calculate the final number of submodules N put into use by the bridge arm at the current moment (t) ;

[0013] Filter out the top N with the smallest or largest operating voltage (t) sub-modules and switch them on and off.

[0014] Furthermore, the voltage data includes a reference AC voltage of the control system, a capacitor voltage rating of the submodule, an operating voltage measurement value of the submodule, and an average operating voltage value of the submodule.

[0015] Furthermore, the expressions for the dynamic upper limit and dynamic lower limit of the capacitor voltage of the submodule are as follows:

[0016]

[0017] Among them, U c.limitmax Indicates the dynamic upper limit of the capacitor voltage of the submodule, U c.limitmin Indicates the dynamic lower limit of the capacitor voltage of the submodule, U CN Indicates the capacitor voltage rating of the submodule, Uc.avg indicates the average operating voltage of the submodule, and M indicates the control fine parameter, 0≤M.

[0018] Furthermore, according to the dynamic upper limit value and the dynamic lower limit value, the switching state of the over-limit submodule is processed to calculate the final number of the over-limit submodules. The specific steps are as follows:

[0019] For submodules that exceed the voltage upper limit, if they are in the enabled state and the bridge arm current is less than 0 at this step, no processing is performed and the initial number of submodules that exceed the limit remains unchanged;

[0020] For submodules that exceed the voltage upper limit, if they are in the on state and the bridge arm current is greater than 0 during this step, they will be removed and the initial number of submodules exceeding the limit will be increased by 1.

[0021] For submodules that exceed the voltage upper limit, if they are in the cut-off state and the bridge arm current is greater than 0 at this step, no processing is performed and the initial number of submodules that exceed the limit remains unchanged;

[0022] For the submodule that exceeds the voltage upper limit, if it is in the cut-off state and the bridge arm current is less than 0 at this step, it will be put into operation and the initial number of the submodule that exceeds the limit will be -1;

[0023] For submodules that exceed the voltage lower limit, if they are in the on state and the bridge arm current is less than 0 during this step, they will be removed and the initial number of submodules exceeding the limit will be increased by 1.

[0024] For submodules that exceed the voltage lower limit, if they are in the enabled state and the current of the bridge arm is greater than 0 at this step, no processing is performed and the initial number of submodules that exceed the limit remains unchanged;

[0025] For the submodule that exceeds the voltage lower limit, if it is in the cut-off state and the bridge arm current is greater than 0 at this step length, it will be put into operation and the initial number of the submodule that exceeds the limit will be -1;

[0026] For submodules that exceed the voltage lower limit, if they are in the cut-off state and the bridge arm current is less than 0 at this step, no processing is performed and the initial number of submodules that exceed the limit remains unchanged;

[0027] After processing, the final number n of the bridge arm's over-limit submodules is obtained beyond .

[0028] Furthermore, the number of submodules N finally put into use by the bridge arm at the current moment is (t) The number of submodules N finally put into use in the upper bridge arm at the current moment u(t) , or the number of submodules N finally put into use in the lower bridge arm at the current moment l(t) , the specific expression is as follows:

[0029]

[0030]

[0031] Among them, N u(t) Indicates the number of submodules finally put into use in the upper bridge arm at the current time t, Δn u(t) Indicates the difference between the number of submodules that need to be put into use at the current moment and the number of submodules finally put into use at the previous moment. Indicates the final number of over-limit submodules in the upper bridge arm at the current time t;

[0032] N l(t) Indicates the number of submodules finally put into use in the lower bridge arm at the current time t, Δn l(t) Indicates the difference between the number of submodules that need to be put into use at the current moment and the number of submodules finally put into use at the previous moment. Indicates the final number of out-of-limit submodules in the lower bridge arm at the current time t.

[0033] Furthermore, for the number of submodules N finally put into use in the bridge arm at the current moment (t) If the value is positive, it means the submodule is put into operation; if the value is negative, it means the submodule is removed; if the value is 0, it means the state remains unchanged after processing the over-limit submodule.

[0034] Further, filter out the top N with the smallest or largest operating voltage (t) The sub-module switching includes the following steps:

[0035] First, the submodules are classified into six categories, as follows:

[0036] ① The investment at the previous moment is maintained if it does not exceed the limit at the current moment;

[0037] ② The device was charged at the previous moment, and the current moment exceeds the lower limit, but the device is still charged.

[0038] ③ The device was removed at the previous moment, and remains removed if it does not exceed the limit at the current moment;

[0039] ④ It was cut off at the last moment, and it will still be cut off and not charged if it exceeds the upper limit at the current moment;

[0040] ⑤ It was put into use at the last moment, but it is cut off and stops charging at the current moment when it exceeds the upper limit;

[0041] ⑥ The device was cut off at the previous moment, and is now charging after exceeding the lower limit;

[0042] Secondly, if the absolute value of the number of submodules finally put into use in the bridge arm at the current moment is less than or equal to the total number of modules of type ① or ③, the submodules of type ① are sorted and removed, or the submodules of type ③ are sorted and put into use;

[0043] If the absolute value of the number of sub-modules finally put into use in the bridge arm at the current moment is greater than the total number of modules of type ① or ③, and less than or equal to the total number of modules of types ①② or ③④, then the excess part of type ① is supplemented by type ②, and type ③ is supplemented by type ④, completing the sorting and selection switching;

[0044] If the absolute value of the number of sub-modules finally put into use in the bridge arm at the current moment is greater than the total number of modules of types ①② or ③④, the excess part of types ①② will be supplemented by type ⑤, and types ③④ will be supplemented by type ⑥, completing the sorting and selection switching.

[0045] Further, filter out the top N with the smallest or largest operating voltage (t) The switching of sub-modules also includes the following steps:

[0046] Determine the current direction of the bridge arm. If the current direction of the bridge arm is positive, the first N with the smallest operating voltage will be put into operation. (t) The submodules in the cut-off state or the first N submodules with the largest operating voltage (t) Input status submodule;

[0047] If the current direction of the bridge arm is negative, the first N with the largest operating voltage will be put into operation. (t) The submodules in the cut-off state or the first N submodules with the lowest operating voltage (t) A submodule with input status.

[0048] Compared with the prior art, the present invention has the following beneficial effects:

[0049] On the one hand, the present invention adopts a dynamic limit judgment method for the capacitor voltage of the submodule, which greatly reduces the number of switching submodules and reduces the switching loss of the converter; on the other hand, after reducing the number of switching actions, a new sorting idea can be adopted, which only requires excluding or screening the top N modules with the smallest or largest operating voltage. (t) The sub-modules are replaced by the general bubble full sorting method, which reduces the calculation amount of sub-module capacitance and voltage sorting, reduces the overall loss, extends the service life and improves the stable operation capability of the modular multi-level converter.

[0050] The present invention adjusts the control fine parameter M in the dynamic limit of the capacitor voltage of the submodule, and is applicable to modular multi-level converters of different specifications, thus having a wide range of applications. BRIEF DESCRIPTION OF THE DRAWINGS

[0051] Figure 1 It is an overall flow chart of a voltage balancing and sequencing method for submodules of a modular multilevel converter;

[0052] Figure 2 It is a structural diagram of a modular multilevel converter;

[0053] Figure 3 This is the processing flow chart of the limit-crossing submodule;

[0054] Figure 4 This is a schematic diagram of an embodiment of a type of submodule state change;

[0055] Figure 5 Schematic diagram of an embodiment of two types of submodule state changes. DETAILED DESCRIPTION

[0056] The present invention will be further described below in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solutions of the present invention and are not intended to limit the scope of protection of the present invention.

[0057] Example

[0058] This embodiment provides a method for voltage balancing and sorting submodules of a modular multi-level converter, such as Figure 1 As shown, the following steps are included:

[0059] Step 1: Obtain relevant data, including the reference AC voltage of the control system, the capacitor voltage rating of the submodule, and the operating voltage measurement value of the submodule.

[0060] Calculate the average operating voltage Uc.avg of the submodule based on the measured operating voltage value of the submodule.

[0061] It should be noted that the bridge arm in this embodiment refers to the upper bridge arm or the lower bridge arm. Figure 2 As shown, both the upper bridge arm and the lower bridge arm include N submodules SM. By default, the submodules have the same specifications, that is, the capacitor voltage rating of the submodule is U CN same.

[0062] In order to facilitate the subsequent process to generate the switch signal of the corresponding submodule, the submodules on the bridge arm can be numbered in sequence, such as SM1, SM2, ..., SM N .

[0063] Step 2: Calculate the dynamic upper limit and dynamic lower limit of the capacitor voltage of the submodule;

[0064] The specific expression is as follows:

[0065]

[0066] Among them, U c.limitmax Indicates the dynamic upper limit of the capacitor voltage of the submodule, U c.limitmin Indicates the dynamic lower limit of the capacitor voltage of the submodule, U CN Indicates the capacitor voltage rating of the submodule, Uc.avg indicates the average operating voltage of the submodule, and M indicates the control fine parameter, 0≤M.

[0067] Step 3: Process the switching status of the out-of-limit submodule according to the dynamic upper limit and the dynamic lower limit, thereby calculating the final number of out-of-limit submodules;

[0068] like Figure 3 The specific steps are as follows:

[0069] For submodules that exceed the voltage upper limit, if they are in the enabled state and the bridge arm current is less than 0 at this step, no processing is performed and the initial number of submodules that exceed the limit remains unchanged;

[0070] For submodules that exceed the voltage upper limit, if they are in the on state and the bridge arm current is greater than 0 during this step, they will be removed and the initial number of submodules exceeding the limit will be increased by 1.

[0071] For submodules that exceed the voltage upper limit, if they are in the cut-off state and the bridge arm current is greater than 0 at this step, no processing is performed and the initial number of submodules that exceed the limit remains unchanged;

[0072] For the submodule that exceeds the voltage upper limit, if it is in the cut-off state and the bridge arm current is less than 0 at this step, it will be put into operation and the initial number of the submodule that exceeds the limit will be -1;

[0073] For submodules that exceed the voltage lower limit, if they are in the on state and the bridge arm current is less than 0 during this step, they will be removed and the initial number of submodules exceeding the limit will be increased by 1.

[0074] For submodules that exceed the voltage lower limit, if they are in the enabled state and the current of the bridge arm is greater than 0 at this step, no processing is performed and the initial number of submodules that exceed the limit remains unchanged;

[0075] For the submodule that exceeds the voltage lower limit, if it is in the cut-off state and the bridge arm current is greater than 0 at this step length, it will be put into operation and the initial number of the submodule that exceeds the limit will be -1;

[0076] For submodules that exceed the voltage lower limit, if they are in the cut-off state and the bridge arm current is less than 0 at this step, no processing is performed and the initial number of submodules that exceed the limit remains unchanged;

[0077] After processing, the final number n of the bridge arm's over-limit submodules is obtained beyond .

[0078] Step 4: Calculate the difference in the number of submodules required for the bridge arm under the latest level modulation between the current moment and the previous moment.

[0079] First, calculate the number of submodules that need to be put into operation in the bridge arm according to the following formula:

[0080]

[0081]

[0082] Among them, n u(t) Indicates the number of submodules required for the upper bridge arm under the latest level modulation, n l(t) Indicates the number of submodules required for the lower bridge arm under the latest level modulation, N PM Indicates the total number of submodules contained in a single bridge arm, U S(t) Represents the reference AC voltage of the control system, which is a function that changes with time, such as a sinusoidal AC wave, U CN Indicates the capacitor voltage rating of the submodule, and round indicates a function that rounds to the nearest integer.

[0083] Δn u(t) =n u(t) -nu(t-1)

[0084] Δn l(t) =n l(t) -n l(t-1)

[0085] Where Δn u(t) Indicates the difference in the number of submodules required to be put into operation in the upper bridge arm at the current moment and the previous moment under the latest level modulation, n u(t) Indicates the number of submodules that need to be put into the upper bridge arm at the current moment under the latest level modulation, n u(t-1) Indicates the number of submodules required to be put into operation at the last moment of the upper bridge arm under the latest level modulation; Δn l(t) Indicates the difference in the number of submodules required to be put into the lower bridge arm at the current moment and the previous moment under the latest level modulation, n l(t) Indicates the number of submodules that need to be put into the lower bridge arm at the current moment under the latest level modulation, n l(t-1) Indicates the number of sub-modules required to be put into operation at the last moment in the lower bridge arm under the most recent level modulation.

[0086] Step 5: Calculate the number of sub-modules finally put into operation in the bridge arm at the current moment.

[0087] The specific expression is as follows:

[0088]

[0089]

[0090] Among them, N u(t) Indicates the number of submodules finally put into use in the upper bridge arm at the current time t, Δn u(t) Indicates the difference in the number of submodules required for the upper bridge arm at the current moment and the previous moment under the latest level modulation. Indicates the final number of over-limit submodules in the upper bridge arm at the current time t;

[0091] N l(t) Indicates the number of submodules finally put into use in the lower bridge arm at the current time t, Δn l(t) Indicates the difference in the number of submodules required for the lower bridge arm at the current moment and the previous moment under the latest level modulation. Indicates the final number of out-of-limit submodules in the lower bridge arm at the current time t.

[0092] Among them, the number of submodules N finally put into use in the bridge arm at the current moment is u(t) or N l(t) If the value is positive, it means the submodule is put into operation; if the value is negative, it means the submodule is removed; if the value is 0, it means the state remains unchanged after processing the over-limit submodule.

[0093] Step 6: Filter out the top N with the smallest or largest operating voltage (t) sub-modules and switch them on and off.

[0094] The specific steps are as follows:

[0095] First, the submodules are classified into six categories, as follows:

[0096] ① The investment at the previous moment is maintained if it does not exceed the limit at the current moment;

[0097] ② The device was charged at the previous moment, and the current moment exceeds the lower limit, but the device is still charged.

[0098] ③ The device was removed at the previous moment, and remains removed if it does not exceed the limit at the current moment;

[0099] ④ It was cut off at the last moment, and it will still be cut off and not charged if it exceeds the upper limit at the current moment;

[0100] ⑤ It was put into use at the last moment, but it is cut off and stops charging at the current moment when it exceeds the upper limit;

[0101] ⑥ The device was cut off at the previous moment, and is now charging after exceeding the lower limit;

[0102] Secondly, if the absolute value of the number of submodules finally put into operation in the bridge arm at the current moment is less than or equal to the total number of modules of type ① or ③, the submodules of type ① are sorted and selected for removal, or the submodules of type ③ are sorted and selected for operation. If the absolute value of the number of submodules finally put into operation in the bridge arm at the current moment is greater than the total number of modules of types ① and ③, and less than or equal to the total number of modules of types ①, ② or ③, ④, the excess part is supplemented by type ② in type ① and by type ④ in type ③, completing the sorting and selection of switching.

[0103] If the absolute value of the number of sub-modules finally put into use in the bridge arm at the current moment is greater than the total number of modules of types ①② or ③④, the excess part of types ①② will be supplemented by type ⑤, and types ③④ will be supplemented by type ⑥, completing the sorting and selection switching.

[0104] Specifically, if the number of sub-modules finally put into operation in the bridge arm at the current moment is a positive value, indicating that sub-modules need to be put into operation eventually, the absolute value of the number of sub-modules finally put into operation is compared with the number of type ③ modules.

[0105] In response to the absolute value of the number of sub-modules finally put into operation being less than or equal to the number of type ③ modules, the sub-modules of type ③ are sorted and selected for input.

[0106] In response to the absolute value of the number of sub-modules finally put into operation being greater than the number of type ③ modules and less than or equal to the total number of modules of types ③ and ④, the excess part of type ③ is supplemented by type ④ to complete the sorting and selection of input.

[0107] In response to the absolute value of the number of sub-modules finally input being greater than the total number of modules of types ③ and ④, the excess parts of types ③ and ④ are supplemented by type ⑥ to complete the sorting and selection of inputs.

[0108] If the number of submodules finally put into operation in the bridge arm at the current moment is a negative value, indicating that the submodule needs to be removed eventually, the absolute value of the number of submodules finally put into operation is compared with the number of type ① modules.

[0109] In response to the absolute value of the number of sub-modules finally put into operation being less than or equal to the number of modules of type ①, the sub-modules of type ① are sorted and selected for removal.

[0110] In response to the absolute value of the number of sub-modules finally put into operation being greater than the number of modules of type ① and less than or equal to the total number of modules of types ① and ②, the excess part of type ① is supplemented by type ② to complete the sorting and selection removal.

[0111] In response to the absolute value of the number of sub-modules finally put into operation being greater than the total number of modules of type ①②, the excess part of type ①② is supplemented by type ⑤ to complete the sorting selection and removal.

[0112] Finally, determine the direction of the current in the bridge arm. If the current direction of the bridge arm is positive, the first N switches with the smallest operating voltage are put into operation. (t) The submodules in the cut-off state or the first N submodules with the largest operating voltage (t) If the current direction of the bridge arm is negative, the first N modules with the largest operating voltage are put into operation. (t) The submodules in the cut-off state or the first N submodules with the lowest operating voltage (t) A submodule with input status.

[0113] A specific example of a submodule state change of only one type is Figure 4 As shown, the difference Δn between the number of submodules required at the current moment and the previous moment is: 14-12=2. The types of submodules that are processed are ⑤ and ⑥, and the final number of submodules that are out of limit in the bridge arm is n. beyond = 2 - 1 = 1. Therefore, the final number of submodules deployed is 2 + 1 = 3. Therefore, three submodules need to be deployed again. For the three types still in the cutoff state, prioritize type ③, which has not exceeded the limit. Select the three with the lowest voltage (bridge arm current greater than zero) or the highest voltage (bridge arm current less than zero) for deployment.

[0114] Specific examples of two types of submodule status changes are as follows Figure 5 As shown, the difference Δn between the number of submodules required at the current moment and the previous moment is: 8-16=-8. The types of submodules that are processed are ⑤ and ⑥, and the final number of submodules that are out of limit in the bridge arm is n. beyond= 4 - 1 = 3. Therefore, the final number of submodules in operation is -8 + 3 = -5. Therefore, five submodules need to be removed. Of the three types still in operation, type ①, which has not exceeded the limit, is prioritized. Type ① has four submodules, and all are removed. The remaining submodule is replaced by a submodule from type ②. From type ②, the one with the lowest voltage (bridge arm current greater than zero) or the highest voltage (bridge arm current less than zero) is removed.

[0115] In summary, the technical concept of the present invention is as follows: on the one hand, a dynamic limit judgment method for the capacitor voltage of the submodule is adopted, which greatly reduces the number of submodules switched on and off and reduces the switching loss of the converter; on the other hand, a new sorting idea is adopted to screen out the top N submodules with the smallest or largest operating voltage. (t) The sub-modules are arranged in a way that replaces the general bubble sorting method, which reduces the computational complexity of sub-module capacitance and voltage sorting, reduces overall loss, prolongs service life, and improves the stable operation capability of the modular multi-level converter.

[0116] The present invention adjusts the control fine parameter M in the dynamic limit of the capacitor voltage of the submodule, and is applicable to modular multi-level converters of different specifications, thus having a wide range of applications.

[0117] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A voltage balancing and sorting method for submodules of a modular multilevel converter, Its characteristics are: The steps include: Get voltage data; Calculating a dynamic upper limit value and a dynamic lower limit value of a capacitor voltage of a submodule according to the voltage data; According to the dynamic upper limit value and the dynamic lower limit value, the switching state of the over-limit submodule is processed, so as to calculate the final number of the over-limit submodule; The nearest level modulation method is used to calculate the difference between the number of submodules required to be put into use at the current moment and the previous moment of the bridge arm; According to the difference and the final number of over-limit submodules, calculate the number of submodules N that are finally put into use by the bridge arm at the current moment (t) ; Filter out the top N with the smallest or largest operating voltage (t) sub-modules, and switch the sub-modules; The voltage data includes a reference AC voltage of the control system, a capacitor voltage rating of the submodule, an operating voltage measurement value of the submodule, and an average operating voltage value of the submodule; The expressions for the dynamic upper limit value and the dynamic lower limit value of the capacitor voltage of the submodule are as follows: Among them, U c.limitmax Indicates the dynamic upper limit of the capacitor voltage of the submodule, U c.limitmin Indicates the dynamic lower limit of the capacitor voltage of the submodule, U CN Indicates the rated value of the capacitor voltage of the submodule, Uc.avg indicates the average operating voltage of the submodule, M indicates the control fine parameter, 0≤M; According to the dynamic upper limit value and the dynamic lower limit value, the switching state of the over-limit submodule is processed, so as to calculate the final number of the over-limit submodules. The specific steps are as follows: For the submodules that exceed the voltage upper limit, if they are in the on-state and the bridge arm current is less than 0 at this step length, no processing is performed and the initial number of the submodules that exceed the limit remains unchanged; For the submodule that exceeds the voltage upper limit, if it is in the on state and the bridge arm current is greater than 0 during this step, it will be removed and the initial number of the submodule that exceeds the limit will be increased by 1; For the submodule that exceeds the voltage upper limit, if it is in the cut-off state and the bridge arm current is greater than 0 at this step length, no processing is performed and the initial number of the submodule that exceeds the limit remains unchanged; For the submodule that exceeds the voltage upper limit, if it is in the cut-off state and the bridge arm current is less than 0 at this step length, it will be put into operation and the initial number of the submodule that exceeds the limit will be -1; For the submodule that exceeds the voltage lower limit, if it is in the on state and the bridge arm current is less than 0 during this step, it will be removed and the initial number of the submodule that exceeds the limit will be increased by 1; For the submodule that exceeds the voltage lower limit, if it is in the on state and the current of the bridge arm is greater than 0 at this step length, no processing is performed and the initial number of the submodule that exceeds the limit remains unchanged; For the submodule that exceeds the voltage lower limit, if it is in the cut-off state and the bridge arm current is greater than 0 at this step length, it will be put into operation and the initial number of the submodule that exceeds the limit will be -1; For the submodule that exceeds the voltage lower limit, if it is in the cut-off state and the bridge arm current is less than 0 at this step length, no processing is performed and the initial number of the submodule that exceeds the limit remains unchanged; After processing, the final number n of the bridge arm's over-limit submodules is obtained. beyond .

2. The voltage balancing and sorting method of modular multilevel converter submodules according to claim 1, Its characteristics are: The number of sub-modules N finally put into use by the bridge arm at the current moment (t) The number of submodules N finally put into use in the upper bridge arm at the current moment u(t) , or the number of submodules N finally put into use in the lower bridge arm at the current moment l(t) , the specific expression is as follows: Among them, N u(t) Indicates the number of submodules finally put into use in the upper bridge arm at the current time t, Δn u(t) Indicates the difference between the number of submodules that need to be put into use at the current moment and the number of submodules finally put into use at the previous moment, n beyond.u(t) Indicates the final number of over-limit submodules in the upper bridge arm at the current time t; N l(t) Indicates the number of submodules finally put into use in the lower bridge arm at the current time t, Δn l(t) Indicates the difference between the number of submodules that need to be put into use at the current moment and the number of submodules finally put into use at the previous moment, n beyond.l(t) Indicates the final number of over-limit submodules of the lower bridge arm at the current time t.

3. The voltage balancing and sorting method for submodules of a modular multilevel converter according to claim 2, Its characteristics are: For the number of sub-modules N finally put into use by the bridge arm at the current moment (t) If the value is positive, it means the submodule is put into operation; if the value is negative, it means the submodule is removed; if the value is 0, it means the state remains unchanged after processing the over-limit submodule.

4. The voltage balancing and sorting method for submodules of a modular multilevel converter according to claim 2, Its characteristics are: Filter out the top N with the smallest or largest operating voltage (t) The sub-modules are switched, including the following steps: First, the submodules are classified into six categories, as follows: ① The previous moment was invested, and the current moment does not exceed the limit and remains invested; ② The device was charged at the last moment, and the current moment is still charged even if it exceeds the lower limit. ③ The device was removed at the previous moment, and remains removed if it does not exceed the limit at the current moment; ④ It was cut off at the last moment, and it is still cut off and does not charge if it exceeds the upper limit at the current moment; ⑤ It was put into use at the last moment, but at the current moment it exceeds the upper limit and stops charging; ⑥ The device was cut off at the last moment, and the device is charged at the current moment if it exceeds the lower limit; Secondly, if the absolute value of the number of sub-modules finally put into use in the bridge arm at the current moment is less than or equal to the total number of modules of type ① or ③, sort and select the sub-modules of type ① for removal or sort and select the sub-modules of type ③ for investment; If the absolute value of the number of sub-modules finally put into use by the bridge arm at the current moment is greater than the total number of modules of types ①③, and less than or equal to the total number of modules of types ①② or ③④, then the excess part, type ① is supplemented by type ②, and type ③ is supplemented by type ④, and the sorting and switching are completed; If the absolute value of the number of sub-modules finally put into use by the bridge arm at the current moment is greater than the total number of modules of types ①② or ③④, the excess part of types ①② is supplemented by type ⑤, and types ③④ are supplemented by type ⑥, completing the sorting and selection switching.

5. The voltage balancing and sorting method for submodules of a modular multilevel converter according to claim 4, Its characteristics are: Filter out the top N with the smallest or largest operating voltage (t) The sub-modules are switched, and the following steps are also included: Determine the current direction of the bridge arm. If the current direction of the bridge arm is positive, the first N with the smallest operating voltage will be put into operation. (t) The submodules in the cut-off state or the first N submodules with the largest operating voltage (t) Input status submodule; If the current direction of the bridge arm is negative, the first N with the largest operating voltage will be put into operation. (t) The submodules in the cut-off state or the first N submodules with the lowest operating voltage (t) A submodule with input status.