An installation and construction method for seismic isolation reinforcement using a self-locking underpinning structure device
Through the factory prefabricated assembly technology of self-locking underpinning structural devices, the problems of high construction cost and long cycle in building reinforcement are solved, and fast, stable and low-noise seismic isolation reinforcement is achieved, which is suitable for a variety of construction and industrial scenarios.
Patent Information
- Application Number
- CN202211718546.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-12-30
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2042-12-30
AI Technical Summary
Among the existing building reinforcement technologies, the construction cost is high, the cycle is long and complex, and subsequent maintenance and replacement are inconvenient. Especially in earthquake disaster prevention, the installation and removal of isolation layers are difficult.
It adopts a self-locking underpinning structure device and is quickly assembled through factory prefabricated components. The ratchet and the surface of the frame column are engaged and locked to form a "corbel" structure. Combined with the jack support and connectors, the isolation support can be quickly installed and removed. Reduce construction complexity and cost.
It achieves low construction cost, short cycle, high stability, and easy later replacement and maintenance. It is suitable for rapid underpinning needs in housing construction and industrial fields, reduces construction noise and waste, and improves the safety and service life of the structure.
Smart Images

Figure CN115853271B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of vibration reduction and reinforcement of existing buildings, and particularly relates to an installation and construction method for vibration isolation and reinforcement using a self-locking underpinning structure device. Background Art
[0002] With the continuous development of national construction, the number of existing buildings is increasing. The structural system and usage functions of some buildings do not meet the original design requirements and people's usage requirements. Reinforcement and renovation technology is a more reasonable response measure. Among them, concrete replacement is a commonly used reinforcement method. Some construction defects in the construction process require replacement of local concrete and jacking of walls and columns.
[0003] In addition, seismic isolation reinforcement and reconstruction technology is also a commonly used reinforcement and reconstruction technology. It is to set up a "seismic isolation layer" by adding seismic isolation bearings and other seismic isolation devices between the foundation and the upper structure of the building by disconnecting the walls and columns. Most of the earthquake energy is consumed through the deformation and damage of the seismic isolation layer, and only a small part of the energy is transmitted to the upper structure, ensuring that the building will not collapse or be seriously damaged when encountering a strong earthquake, effectively reducing the damage caused by the earthquake. The commonly used method at present is to cast the corbel to apply the jacking force and then disconnect the walls and columns, but this method will damage the original structure, and the construction period is long, and the later removal of the corbel is complicated. Summary of the invention
[0004] The technical problem to be solved by the present invention is to provide an installation and construction method for seismic isolation reinforcement using a self-locking underpinning structure device, which has low construction cost, simple on-site construction, short construction period, good durability and stability, and convenient later replacement and maintenance.
[0005] In order to solve the above technical problems, the technical solution adopted by the present invention is:
[0006] An installation and construction method for seismic isolation reinforcement using a self-locking underpinning structure device comprises the following steps:
[0007] S1: Factory prefabricated components, which are processed and manufactured by factory prefabrication. The components are cut and prefabricated in the factory and transported to the site for rapid assembly;
[0008] S2: Install the supporting structure device, transport the prefabricated components from the factory to the construction site, and connect them according to the corresponding structural arrangement. The ratchets are arranged on the left and right sides of the frame column through the ratchet shaft, and the ratchet bearing plates are arranged on the front and rear sides of the frame column. The ratchet shaft is installed on the ratchet bearing plate. The ratchet and the frame column are contacted and locked by force. The ratchet bearing plate is connected to the jack support through the connecting piece to form an overall force system.
[0009] S3: Install the jack support, place the jack at the support position below the jack support, calibrate the elevation and tilt angle of the support structure through the total station, and adjust and correct the error in time through the jack slow push;
[0010] S4: After the jack applies the pre-loading force, the frame column is cut off by using a rope saw;
[0011] S5: Install the seismic isolation bearing, use the jack to support the cut frame column, install the seismic isolation bearing, and fix the seismic isolation bearing stably on the frame column;
[0012] S6: Concrete pouring and maintenance. After the isolation bearing is installed, the isolation pier is poured. The vibration is not allowed to collide with other construction equipment to prevent the axis, elevation and flatness from being offset or damaged, which will affect the installation quality.
[0013] Furthermore, in step S3, when measuring the elevation, the highest points of the underpinning structure in different directions are selected and monitored simultaneously.
[0014] Furthermore, in step S3, when measuring the angle, it is required to monitor different directions simultaneously to improve the installation accuracy of the structure.
[0015] Furthermore, in step S3, the calibration is performed by a slow push method using a jack. After the calibration is completed, bolting construction of the underpinning structure is performed. After the construction is completed, the structure is re-measured and accepted after passing the re-measurement.
[0016] Furthermore, in step S4, according to the structure of the frame column before truncation and the lifting position requirements, the single block area is reasonably set, the cutting area is drawn, the drill is turned, the rope is threaded, the blocks are cut, the blocks are lifted out by crane, and transported out of the site by a transport vehicle.
[0017] Furthermore, the jack support includes a bottom plate and a vertical plate fixedly arranged on the bottom plate, and the vertical plate is provided with more than two rows of first through holes.
[0018] Furthermore, the ratchet support plate includes a support plate upright plate and support plate side plates vertically fixed on both sides of the support plate upright plate. The support plate upright plate is provided with a mounting hole, and the ratchet shaft is installed in the mounting hole. The support plate side plates are provided with a third through hole.
[0019] Furthermore, the ratchet bearing plate is connected and fixed to the jack support through a connecting piece, and the connecting piece includes a connecting vertical plate and connecting side plates vertically fixed on both sides of the connecting vertical plate, a second through hole is set on the connecting side plate, the first through hole and the second through hole are matched, and the third through hole and the second through hole are matched.
[0020] Furthermore, there are more than two mounting holes.
[0021] Furthermore, a reinforcement support vertical plate is vertically fixedly arranged on the bottom plate, and reinforcement support side plates are vertically fixedly arranged on both sides of the reinforcement support vertical plate, and the reinforcement support vertical plate is vertically fixedly arranged with the vertical plate.
[0022] The beneficial effects of adopting the above technical solution are:
[0023] The present invention relates to an installation and construction method for seismic isolation reinforcement using a self-locking underpinning structure device. The self-locking underpinning structure device comprises a ratchet, a ratchet shaft, a ratchet bearing plate, a connecting piece and a jack support, etc. The ratchet is engaged and locked with the surface of a frame column to form a fixed "bull leg" as a force point of the structure. The upward vertical force from the jack is converted into a lifting support force for the frame column through the engagement of the ratchet and the surface of the frame column, thereby forming a rapid underpinning of the structure. The method is mainly suitable for the situation where rapid underpinning is required for component replacement in the field of house construction and for the addition of seismic isolation supports in the field of reinforcement and reconstruction, and is also suitable for rapid underpinning in other industrial fields.
[0024] The components used in the present invention are prefabricated in a factory. After the prefabrication, the components are transported to the construction site. Through on-site assembly, the construction and transportation are convenient, and the installation and removal are quick, which can shorten the construction period and greatly reduce the complexity of on-site construction.
[0025] The present invention forms a firm whole through self-locking of the ratchet and the structural column, realizes quick "bull leg" on the original structure, is safe and firm, and can adapt to components with different cross-sections by adjusting the length of the ratchet shaft and the ratchet bearing plate. The components can be reused many times, reducing the cost of use.
[0026] The invention can be directly assembled during the construction process, which shortens the construction period and greatly reduces the complexity of on-site construction. During the structural construction process, the construction is convenient and the mechanical equipment is simple; the impact on the construction scope is small and the interference to adjacent structures is small; not much construction waste will be generated during the construction process, and the noise level on the construction site will be reduced. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] in, Figure 1 It is a schematic diagram of the structure of the present invention;
[0028] Figure 2 It is a schematic diagram of the top view structure of the present invention;
[0029] Figure 3 It is a schematic diagram of the main structure of the present invention;
[0030] Figure 4 This is a schematic diagram of the structure of the present invention after installation and use;
[0031] Figure 5This is a schematic diagram of the main structure of the present invention after installation and use;
[0032] Figure 6 It is a schematic diagram of the ratchet bearing plate structure of the present invention;
[0033] Figure 7 It is a schematic diagram of the top view structure of the connecting piece of the present invention;
[0034] Figure 8 It is a schematic diagram of the top view of the structure of the jack support of the present invention;
[0035] Fig. 9 It is a right side structural schematic diagram of the jack support of the present invention;
[0036] Fig.10 This is a schematic diagram of the main structure of the ratchet of the present invention;
[0037] Among them, 1. frame column, 2. ratchet, 3. ratchet supporting plate, 301. supporting plate vertical plate, 302. supporting plate side plate, 303. mounting hole, 304. third through hole, 4. jack support, 401. bottom plate, 402. vertical plate, 403. first through hole, 404. reinforcement support vertical plate, 405. reinforcement support side plate, 5. connecting piece, 501. connecting vertical plate, 502. connecting side plate, 503. second through hole, 6. ratchet shaft. DETAILED DESCRIPTION
[0038] The present invention will be further described below in conjunction with the accompanying drawings.
[0039] As attached Figure 1-10 As shown, this embodiment provides an installation and construction method for seismic isolation reinforcement using a self-locking underpinning structure device, which includes the following steps:
[0040] S1: Factory prefabricated components, which are processed and manufactured by factory prefabrication. The components are cut and prefabricated in the factory and transported to the site for rapid assembly;
[0041] S2: Install the replacement structure device, transport the factory prefabricated components to the construction site, and connect them according to the corresponding structural arrangement. The ratchet 2 is arranged on the left and right sides of the frame column 1 through the ratchet shaft 6. The ratchet 2 can be selected in different quantities according to the size of the frame column 1. It is arranged in pairs, more than two. The center of the arc of the ratchet teeth of the ratchet 2 is located directly above the axis of the ratchet shaft 6, that is, the distance between the axis of the ratchet shaft 6 and the arc line formed by the ratchet teeth of the ratchet 2 gradually increases. After the ratchet 2 is engaged and locked with the surface of the frame column 1 to form a fixed "bull leg" as the force point of the structure, it can prevent the frame column 1 from falling due to excessive weight, and ensure the effect of engagement and locking. The ratchet bearing plate 3 is arranged on the front and rear sides of the frame column 1, and the ratchet shaft 6 is arranged on the ratchet bearing plate 3. The ratchet 2 is locked by contact with the frame column 1. The ratchet bearing plate 3 is connected to the jack support 4 through the connecting piece 5 to form an overall force system;
[0042] The ratchet bearing plate 3 includes a bearing plate upright plate 301 and a bearing plate side plate 302 vertically fixedly arranged on both sides of the bearing plate upright plate 301. The bearing plate upright plate 301 is provided with a mounting hole 303, and the ratchet shaft 6 is inserted into the mounting hole 303. There are more than two mounting holes 303. The ratchet shaft 6 is inserted into the mounting holes 303 at different positions to make it suitable for frame columns 1 of different sizes.
[0043] The third through hole 304 is arranged on the carrier side plate 302, the jack support 4 includes a bottom plate 401 and a vertical plate 402 vertically fixedly arranged on the bottom plate 401, and the vertical plate 402 is provided with more than two rows of first through holes 403; the first through holes 403 are more than two rows, and are mainly used for selection and adaptation according to frame columns 1 of different sizes. If the frame column 1 is larger in size, the two rows of first through holes 403 close to the outside can be selected, and if the frame column is smaller in size, the two rows of first through holes 403 close to the inside can be selected. The ratchet carrier plate 3 is connected and fixed to the jack support 4 through a connecting member 5, and the connecting member 5 includes The connecting upright plate 501 and the connecting side plates 502 vertically fixedly arranged on both sides of the connecting upright plate 501, the connecting side plates 502 are provided with second through holes 503, the first through holes 403 and the second through holes 503 are provided in cooperation, the third through holes 304 and the second through holes 503 are provided in cooperation, that is, the connecting member 5 and the jack support can be connected by connecting bolts passing through the first through holes 403 and the second through holes 503, and the connecting member 5 and the carrier plate side plates can be connected by connecting bolts passing through the third through holes 304 and the second through holes 503. The main purpose of the above structural setting is to adjust the distance of the ratchet shaft according to different column cross-sectional sizes, and the adaptability is stronger;
[0044] A reinforcement support vertical plate 404 is vertically fixed on the bottom plate 401, and reinforcement support side plates 405 are vertically fixed on both sides of the reinforcement support vertical plate 404. The reinforcement support vertical plate 404 is vertically fixed to the vertical plate 402. The reinforcement support vertical plate 404 and the reinforcement support side plates 405 are mainly used to reinforce and support the vertical plate 402 to ensure that the vertical plate 402 can be stably supported when subjected to an upward lifting force.
[0045] S3: Install the jack support, place the jack at the support position below the jack support 4, calibrate the elevation and inclination angle of the underpinning structure through the total station, and adjust and correct the error in time through the slow push of the jack. When measuring the elevation, select the highest point in different directions of the underpinning structure and monitor it at the same time. When measuring the angle, monitor different directions of the underpinning structure at the same time to improve the installation accuracy of the structure. When correcting, use the slow push method of the jack to correct. After the correction is completed, carry out the bolting construction of the underpinning structure. After the construction is completed, re-measure the structure, and accept it after the re-measurement is qualified.
[0046] S4: Cutting of frame columns: Using rope saw to cut frame columns 1. According to the structure of frame columns 1 before cutting and the need for hoisting position, reasonably set the single block area, draw the cutting area, drill the eye, thread the rope, cut in blocks, lift the blocks out by crane, and transport them out of the site by transport vehicle;
[0047] S5: Install the seismic isolation bearing, lift up the cut column with a jack, leave a certain gap, and hoist the seismic isolation bearing so that the seismic isolation bearing can be stably fixed on the frame column 1;
[0048] S6: Concrete pouring and maintenance. After the isolation bearing is installed, the isolation pier is poured. The vibration is not allowed to collide with other construction equipment to prevent the axis, elevation and flatness from being offset or damaged, which will affect the installation quality.
[0049] The construction work process principle is as follows:
[0050] The present invention relates to bolts that use high-strength bolts and need to be rust-proofed. The present invention can adopt a symmetrical structure or an asymmetrical structure, and the components are mainly composed of H-steel and ordinary steel plates. The size of the structure can be proportionally enlarged or reduced according to the actual size of the project. The components used are prefabricated in the factory. On the basis of designing the mechanical model and related data of the steel structure, the model is strictly controlled, and the size of each part meets the design requirements of the project, avoiding the influence of deviation and irregular steel components on installation and construction equipment.
[0051] In the construction of structural components, relevant measurement, positioning and layout work are required. In the connection of these components, the data quality will directly affect the construction effect of the project. Only when the accuracy of the measurement data is fully guaranteed can the quality of the installation be guaranteed. Before installing the components, it is necessary to understand the site conditions in detail and carefully prepare for installation. In the present invention, the assembly is designed as an integral component according to the existing stress characteristics, and has the characteristics of light weight, high strength and easy construction, making the construction process simpler and more efficient.
[0052] After the prefabrication, the components are transported to the construction site, assembled on site, and placed in different locations. The construction and transportation are convenient, and they can be installed and unloaded quickly, which can shorten the construction period. At the same time, it also greatly reduces the complexity of on-site construction. After the construction is completed, all parts can be recycled and reused, which is green, environmentally friendly and energy-saving. The construction is convenient and can effectively shorten the construction period.
[0053] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. An installation and construction method for seismic isolation reinforcement using a self-locking underpinning structure device, characterized in that: It includes the following steps: S1: Factory prefabricated components, which are processed and manufactured by factory prefabrication. The components are cut and prefabricated in the factory and transported to the site for rapid assembly; S2: Install the replacement structure device, transport the factory prefabricated components to the construction site, arrange and connect them according to the corresponding structure, arrange the ratchet (2) on the left and right sides of the frame column (1) through the ratchet shaft (6), the ratchet support plate (3) is set on the front and rear sides of the frame column (1), the ratchet shaft (6) is installed on the ratchet support plate (3), the ratchet (2) and the frame column (1) are in contact and locked, and the ratchet support plate (3) is connected to the jack support (4) through the connecting piece (5) to form an overall force system; The jack support (4) comprises a bottom plate (401) and a vertical plate (402) vertically fixedly arranged on the bottom plate (401), and the vertical plate (402) is provided with more than two rows of first through holes (403); The ratchet support plate (3) comprises a support plate upright plate (301) and support plate side plates (302) vertically fixedly arranged on both sides of the support plate upright plate (301); a mounting hole (303) is arranged on the support plate upright plate (301); a ratchet shaft (6) is arranged in the mounting hole (303); and a third through hole (304) is arranged on the support plate side plates (302); The ratchet support plate (3) is connected and fixed to the jack support (4) via a connecting member (5), the connecting member (5) comprising a connecting vertical plate (501) and connecting side plates (502) vertically fixedly arranged on both sides of the connecting vertical plate (501), the connecting side plates (502) being provided with a second through hole (503), the first through hole (403) and the second through hole (503) being arranged in coordination, the third through hole (304) and the second through hole (503) being arranged in coordination, that is, the connecting member (5) and the jack support are connected by connecting bolts passing through the first through hole (403) and the second through hole (503), and the connecting member (5) and the support plate side plates are connected by connecting bolts passing through the third through hole (304) and the second through hole (503); There is more than one mounting hole (303); S3: Install the jack support, place the jack at the support position below the jack support (4), measure the elevation and inclination angle of the support structure by using a total station, and adjust and correct the error in time by using the jack to push slowly; S4: Cutting off the frame column: after the jack applies a pre-loading force, the frame column (1) is cut off by a rope saw; S5: Installing a seismic isolation support, using a jack to support the cut frame column (1), and installing the seismic isolation support so that the seismic isolation support is stably fixed on the frame column (1); S6: Concrete pouring and maintenance. After the isolation bearing is installed, the isolation pier is poured. The vibration is not allowed to collide with other construction equipment to prevent the axis, elevation and flatness from being offset or damaged, which will affect the installation quality.
2. The installation construction method for seismic isolation reinforcement using a self-locking underpinning structure device according to claim 1 is characterized in that: In step S3, when measuring the elevation, the highest points of the underpinning structure in different directions are selected and monitored simultaneously.
3. The installation construction method for seismic isolation reinforcement using a self-locking underpinning structure device according to claim 1 is characterized in that: In step S3, when measuring the angle, it is required to monitor different directions simultaneously to improve the installation accuracy of the structure.
4. The installation construction method for seismic isolation reinforcement using a self-locking underpinning structure device according to claim 1 is characterized in that: In step S3, the calibration is performed by a slow push method using a jack. After the calibration is completed, bolting construction of the underpinning structure is performed. After the construction is completed, the structure is re-measured and accepted after the re-measurement is qualified.
5. The installation construction method for seismic isolation reinforcement using a self-locking underpinning structure device according to claim 1 is characterized in that: In step S4, according to the structure of the frame column before truncation and the hoisting position requirements, the single block area is reasonably set, the cutting area is drawn, the drill is turned, the rope is threaded, the blocks are cut, the blocks are hoisted out by crane, and transported out of the site by a transport vehicle.
6. The installation construction method for seismic isolation reinforcement using a self-locking underpinning structure device according to claim 1 is characterized in that: A reinforcement support upright plate (404) is vertically fixedly arranged on the bottom plate (401), and reinforcement support side plates (405) are vertically fixedly arranged on both sides of the reinforcement support upright plate (404). The reinforcement support upright plate (404) is vertically fixedly arranged on the upright plate (402).
Citation Information
Patent Citations
Building column-truncating, replacing and seismic-isolating support construction method and supporting device
CN103741832A
Self-locking type shock insulation reinforcing underpinning structure device
CN219261847U