A modular construction method for a core shaft of a nuclear power plant
Through the modular construction method, including the core shaft combination module and the space truss support system, combined with BIM software and adjustable sleeve connection process, the problems of long construction period, difficult to control accuracy and high safety risks in traditional construction methods are solved, and the problem of high safety risks is achieved. Efficient and safe construction of core shafts of nuclear power plant.
Patent Information
- Application Number
- CN202211209161.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-09-30
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2042-09-30
AI Technical Summary
The construction period of traditional nuclear power plant core shafts is long, the accuracy is difficult to control, and the safety risks are high. There are problems of cross-operation in construction and critical path occupation, which affects the introduction time of the pressure vessel of the main equipment.
Using a modular construction method, the core shaft combination module includes steel lining module, steel bar module and space truss support system, combined with BIM software and adjustable sleeve connection process, realize the lifting of the combined module and the overall spiral up-and-pouring casting, simplifying the construction process Parallelization.
It significantly shortens the construction period, improves construction efficiency and quality, reduces safety risks, achieves the "factory" effect of on-site construction, and ensures the accuracy and stability of the combined module.
Smart Images

Figure CN115949244B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of core shaft construction, and in particular to a modular construction method for a core shaft of a nuclear power plant. Background Art
[0002] The core shaft is an important module located in the center of the nuclear island floor, with a net weight of hundreds of tons. In the existing technology, the design of the nuclear island plant generally adopts a non-modular design.
[0003] The traditional nuclear power plant core shaft construction method has many on-site installation procedures, a long construction period, and many cross-operations with other construction in the shaft. It takes up a lot of key paths for the reactor cavity construction, which has a direct impact on the introduction time of the main equipment pressure vessel. This traditional construction technology has a great risk of construction period for the construction of new nuclear power reactors, especially the first reactor.
[0004] In addition, the installation process of the nuclear power plant core shaft is complicated, and the overall installation accuracy is difficult to control. The installation period is long, the safety risk is high, and the critical path of the project is occupied for a long time. The embedded parts of the core shaft support are located in the steel ring wall, and its periphery is wrapped by the steel mesh, and the operating space is narrow when the bolts are tightened.
[0005] Therefore, there is an urgent need for a construction method with short construction period, controllable quality, low safety risk and economic feasibility to solve the above problems and shortcomings. Summary of the invention
[0006] The purpose of the present invention is to provide a modular construction method for a nuclear power plant core shaft in view of the problems and shortcomings of the prior art, so as to effectively control the construction accuracy, significantly improve the construction efficiency and quality, simplify the construction process, shorten the installation period, and reduce safety risks.
[0007] To solve the above problems, the present invention adopts the following technical solutions:
[0008] A modular construction method for a core shaft of a nuclear power plant, which adopts a core shaft assembly module for construction, wherein the core shaft assembly module comprises a steel lining module, a steel bar module, a space truss support system and a position limiting fixture, wherein the steel lining module comprises a steel lining, an embedded part and a penetration part, wherein the space truss support system comprises an assembled truss support structure and a hoisting truss support structure, wherein the assembled truss support structure is used to realize the combination of the steel lining module and the steel bar module, and wherein the hoisting truss support structure is used to control the module deformation during hoisting and later pouring;
[0009] The construction method of the core shaft assembly module comprises the following steps:
[0010] S 100 : Processing and assembling steel lining modules for core shafts;
[0011] Make welded steel linings and install penetrations and embedded parts on the welded and assembled steel linings;
[0012] S 200 : Make limit tooling;
[0013] BIM software is used for modeling to generate a steel bar layout diagram, and the same vertical steel bar positioning point is used to make two sets of limiting tooling, which are put in place in advance during the foundation reinforcement construction phase and the steel bar module installation phase to assist in completing the steel bar positioning and limiting.
[0014] S 300 : Make steel bar modules;
[0015] The adjustable sleeve connection process is used to verify the connection performance and the maximum adjustable deviation through simulation tests to connect the steel bars of the steel bar module and the foundation dowel bars;
[0016] S 400 : Install the space truss support system;
[0017] The spatial truss support structure is designed and manufactured using channel steel to be used for assembly, hoisting and later concrete pouring of modular modules;
[0018] S 500 : Hoisting and installation of core shaft assembly modules;
[0019] Insert the main hoisting wire rope into the hoisting holes on the hoisting truss support structure, and hook the other end of the wire rope on the circular transition beam located above the center of the hoisting truss support structure. The angle between the wire rope and the horizontal plane after hooking is equal to the hoisting angle. Operate the crane to lift the core shaft assembly module and lift it to the installation position.
[0020] S 600 : The whole spiral rises to pour concrete;
[0021] After the core shaft assembly module is fixed in the installation position, the overall spiral ascending casting method is adopted to achieve one-time casting of the entire height range of the core shaft assembly module. After the overall insulation is done, the subsequent equipment installation work is carried out simultaneously inside.
[0022] Furthermore, the assembled truss support structure includes a first vertical ring column group, a first horizontal ring beam group and a first radial horizontal support rod group.
[0023] The first vertical ring column group includes a plurality of ring three columns and ring two columns that are evenly spaced and vertically distributed in the circumferential direction, and the diameter of the cylinder surrounded by the ring two columns is smaller than the diameter of the cylinder surrounded by the ring three columns. The first horizontal ring beam group includes a plurality of ring three column ring beams evenly spaced and distributed in the vertical direction of the ring three columns and a plurality of ring two column ring beams evenly spaced and distributed in the vertical direction of the ring two columns. The intersection of the ring three columns and the ring three column ring beams is welded and fixed;
[0024] The first radial horizontal support rod group includes a plurality of first radial horizontal support rods horizontally connected between the ring three columns and the ring two columns, and each of the first radial horizontal support rods is respectively located between every two ring beams of the ring three columns.
[0025] Furthermore, the hoisting truss support structure includes a second vertical ring column group, a second horizontal ring beam group and a second radial support rod group.
[0026] The second vertical ring column group includes a plurality of ring-one columns that are evenly spaced in annular direction and vertically distributed, and the diameter of the cylinder formed by the ring-one columns is smaller than the diameter of the cylinder formed by the ring-two columns, and the ring-one columns are located at the top of the steel lining module;
[0027] The second horizontal ring beam group includes a top ring beam fixedly connected along the top of the ring-column and a ring-column ring beam fixedly connected along the bottom of the ring-column;
[0028] The second radial support rod group includes a spatial diagonal support rod group and a horizontal diagonal support rod group.
[0029] The spatial diagonal brace group includes a first diagonal rod connected between the top ring ring beam and the ring three column ring beam and a second diagonal rod connected between the top ring ring beam and the ring two column ring beam, and one end of the first diagonal rod is connected to the top of the ring one column at a corresponding position, and the other end is connected to the top of the ring three column at a corresponding position, and one end of the second diagonal rod is connected to the top of the ring one column at a corresponding position, and the other end is connected to the top of the ring two column at a corresponding position;
[0030] The horizontal diagonal brace group includes a third diagonal rod connected between the ring beam of the first column and the ring beam of the second column, and a fourth diagonal rod connected between the ring beam of the second column and the ring beam of the third column. One end of the third diagonal rod is connected to the top of the second column at a corresponding position, and the other end is connected to the bottom of the first column at an adjacent position. One end of the fourth diagonal rod is connected to the top of the third column at a corresponding position, and the other end is connected to the bottom of the second column at an adjacent position.
[0031] Furthermore, the first ring column is C20b channel steel, the second ring column is C16b channel steel, the third ring column is C8 channel steel, the top ring ring beam, the first ring column ring beam, the second ring column ring beam and the third ring column ring beam are all made of C16a channel steel, the first diagonal rod, the first diagonal rod, the third diagonal rod and the fourth diagonal rod are all C16a channel steel, and the components in the support system are all made of Q355 grade steel.
[0032] Furthermore, the steel bar module includes vertical steel bars, horizontal annular steel bars, hook bars and adjustable sleeves. The vertical steel bars are vertically arranged in six layers from the inside to the outside along the horizontal radial direction, and the vertical steel bars of each layer are evenly spaced and fixedly connected along the vertical direction through the horizontal annular steel bars of the corresponding layer. The vertical steel bars are connected by the adjustable sleeves, and the intersections of the vertical steel bars and the annular steel bars are connected by the hook bars. The joints of the horizontal annular steel bars are connected by double wire connection and positive and negative wire connection.
[0033] Furthermore, the limiting fixture is a two-layer steel truss, each layer of the steel truss is composed of annular C8 channel steels and radial C10 channel steels, and each layer of adjacent annular C8 channel steels is connected with the radial C10 channel steels.
[0034] Furthermore, in step S 600 In the process, the casting is carried out in sections and spirally according to the height of the supporting embedded parts of the core shaft combination module. The length of the casting hose is greater than or equal to 6 meters and the diameter is 120-160mm. As the casting height is increased and removed, the free fall height of the lower pipe mouth shall not exceed three meters.
[0035] Furthermore, in step S 600 In the process, after pouring concrete, the surrounding trusses are removed first, and then the outer scaffolding is removed.
[0036] Furthermore, in step S 600 In the process, the pre-embedded steel bars in the wall are covered with two layers of quilt insulation, which are then covered with two more layers of quilt insulation after pouring. The overlapping parts of the thermal insulation and waterproof quilt are firmly tied to the frame with steel wire or rope.
[0037] Compared with the prior art, the present invention has significant advantages and beneficial effects, which are specifically embodied in the following aspects:
[0038] 1. The present invention realizes the internal welding connection of the steel lining cylinder by modifying and optimizing the connection nodes between the steel lining module and the bottom plate steel lining, solves the conflict between the construction of the steel lining fixed weld and the construction of the outer reinforcement, and creates basic conditions for the combined construction of the steel lining module and the reinforcement module; designs a steel space truss support system for assembly and hoisting to realize the combination of the steel lining module and the reinforcement module, and controls the module deformation during hoisting and later pouring; adopts an adjustable sleeve connection process, verifies the connection performance and the maximum adjustable deviation through preliminary simulation tests, and solves the connection problem between the module reinforcement and the foundation dowel; adopts an overall spiral rising casting method to realize one-time casting within the full height range of 8.58m of the combined module, and after overall insulation, carries out subsequent equipment installation work internally simultaneously to realize multi-process parallel construction.
[0039] 2. Through the integration of new technologies such as BIM three-dimensional simulation, adjustable sleeve connection of steel bars, and high-precision anti-deformation tooling, the process is more complicated and the construction difficulty is increased compared to conventional operations, but it can achieve parallel construction more effectively and realize "factoryization" of on-site construction, which can save construction time while ensuring quality. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] Figure 1 It is a schematic flow chart of a modular construction method of a nuclear power plant core shaft in an embodiment of the present invention;
[0041] Figure 2 The three-dimensional structural effect diagram of the core shaft steel lining module (with embedded parts and penetration parts) in the embodiment of the present invention;
[0042] Figure 3 This is a schematic diagram of the three-dimensional effect of the core shaft reinforcement module in an embodiment of the present invention;
[0043] Figure 4 It is a schematic diagram of the three-dimensional structure of the hoisting support system of the core shaft in an embodiment of the present invention;
[0044] Figure 5 It is a schematic structural diagram of a steel bar positioning tool and a steel bar limiting tool for a core shaft in an embodiment of the present invention.
[0045] Figure 6 It is a schematic diagram of hoisting the core shaft assembly module in an embodiment of the present invention;
[0046] Figure 7 A schematic diagram of the connection of the steel bar adjustable sleeve of the core shaft assembly module in an embodiment of the present invention;
[0047] Figure 8 It is a schematic BIM model diagram of the vertical pre-embedded steel bar limit of the upper bottom plate of the core shaft in an embodiment of the present invention;
[0048] Fig. 9This is a diagram showing the effect of the reinforcement limit frame being in place in an embodiment of the present invention;
[0049] Fig.10 This is a drawing showing the effect of tying the vertical pre-buried steel bars of the upper floor of the core shaft in an embodiment of the present invention;
[0050] Fig.11 This is a BIM effect diagram after the steel bar positioning frame is removed in an embodiment of the present invention;
[0051] Fig.12 This is a schematic diagram of the connection between the embedded vertical steel bar positioning frame and the adjustable sleeve of the upper base plate in an embodiment of the present invention;
[0052] Fig.13 This is a schematic diagram of an internal support frame for pouring concrete in an embodiment of the present invention.
[0053] Description of reference numerals:
[0054] 1-Steel lining module;
[0055] 2-rebar module; 21-vertical reinforcement; 22-horizontal ring reinforcement; 23-hook reinforcement; 24-adjustable sleeve;
[0056] 3- Space truss support system;
[0057] 31-Assembly truss support structure;
[0058] 311-first vertical ring column group; 3111-ring three columns; 3112-ring two columns;
[0059] 312-first horizontal ring beam group; 3121-ring beam around three columns; 3122-ring beam around two columns;
[0060] 313-first radial horizontal support rod group; 3131-first radial horizontal support rod;
[0061] 32-Lifting truss support structure;
[0062] 321-the second vertical ring column group; 3211-the first ring column;
[0063] 322-second horizontal ring beam group; 3221-top ring beam; 3222-ring beam around the first column;
[0064] 323-second radial support rod group; 3231-spatial diagonal support rod group; 3232-horizontal diagonal support rod group;
[0065] 4-Limiting tooling. DETAILED DESCRIPTION
[0066] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, specific embodiments of the present invention are described in detail below with reference to the accompanying drawings.
[0067] The core shaft is an important module located in the center of the nuclear island floor. The core shaft of the reactor building is located on the foundation plate above the internal structure.
[0068] See also Figure 1-13 As shown, in an embodiment of the present invention, an embodiment of the present invention provides a modular construction method for a core shaft of a nuclear power plant, which is constructed using a core shaft combination module. The core shaft combination module includes a steel lining module 1, a steel bar module 2, a space truss support system 3 and a limiting tool 4, wherein the steel lining module 1 includes a steel lining, embedded parts and through-pieces; the space truss support system 3 includes an assembly truss support structure 31 and a hoisting truss support structure 32, and a steel space truss support system for both assembly and hoisting is designed to realize the combination of the steel lining module 1 and the steel bar module 2, and to control the module deformation during hoisting and later pouring.
[0069] See also Figure 1 As shown, the construction method of the core shaft assembly module includes the following steps:
[0070] S 100 : Processing and assembling the steel lining module 1 of the core shaft;
[0071] See also Figure 2 As shown, in this embodiment, a welded steel lining is manufactured, and penetration parts and embedded parts are installed on the welded and assembled steel lining.
[0072] The steel lining is the main component of the containment of the reactor building of a nuclear power plant. The steel lining is used to maintain sealing. The radius of the steel lining in the embodiment of the present invention is 3.8m, and the material is 8mm thick P265H plate. P265H plate is the material of the boiler container plate. It is an alloy quality steel with high temperature performance, good plasticity, cold bending performance and welding performance. The back rib is L75×6 Q235B angle steel. The bottom elevation of the shaft is -7.250m, the top elevation is 1.330m, and the total height of the shaft wall is 8.58m.
[0073] S 200 : Make limit tooling 4;
[0074] See also Figure 5 As shown, BIM software is used for modeling, a steel bar layout diagram is generated, and the same vertical steel bar positioning point is used to make two sets of limiting tooling, which are put in place in advance during the foundation reinforcement construction stage and the steel bar module installation stage to assist in completing the steel bar positioning and limiting.
[0075] In order to achieve one-to-one connection between vertical steel bars and foundation dowel bars, BIM modeling is used in advance to generate a steel bar layout diagram. The same vertical steel bar positioning point is used to make a limit tooling. The limit tooling 4 is put in place in advance to assist in completing the steel bar positioning and limiting.
[0076] S 200 : Make steel bar module 2;
[0077] See also Figure 3 As shown, an adjustable sleeve connection process is used to verify the connection performance and the maximum adjustable deviation through simulation tests to connect the steel bars of the steel bar module 2 with the foundation dowel bars;
[0078] In the embodiment of the present invention, the vertical steel bars of the steel bar module 2 are mainly made of HRB500E and have diameters of 40 mm and 32 mm, the horizontal steel bars are mainly made of diameters of 36 mm and 32 mm, and the hook bars are 16 mm in diameter.
[0079] The steel bar module 2 is arranged in six layers from the inside to the outside. The steel bars at the vertical heights of 600mm and 1600mm are connected by adjustable sleeves. The last horizontal annular steel bar joint of the horizontal annular steel bars is connected by double wire. The double wire connection is achieved by connecting the first steel bar and the second steel bar through a connecting sleeve and threaded connection. This simplifies the connection method between the steel bars, improves construction efficiency and reduces construction costs. The rest are connected by positive and negative wire joints.
[0080] S 400 : Install space truss support system 3;
[0081] See also Figure 4 As shown, the assembly truss support structure 31 is used to realize the combination of the steel lining module 1 and the steel bar module 2, and the hoisting truss support structure 32 is used to control the module deformation during hoisting and subsequent pouring.
[0082] S 500 : Hoisting and installation of core shaft assembly modules;
[0083] See also Figure 6 As shown, the main lifting wire rope is partially inserted into the lifting holes on the lifting truss support structure 32, and the other end is partially hooked on the circular transition beam located above the center of the lifting truss support structure 32. The angle between each wire rope and the horizontal plane after hooking is equal to the lifting angle. The core shaft combination module is lifted by the crane and lifted to the installation position. The lower embedded parts of the support truss are successfully lifted into place. The lower embedded parts of the support truss are assembled and welded from three fan-shaped parts.
[0084] In the embodiment of the present invention, the lower embedded part module of the supporting truss being hoisted is an important component of the core shaft of the VVER unit, with a maximum size of 11 meters in diameter, 6.1 meters in height, and a total weight of about 62 tons. A self-made lower embedded part hoist is used for hoisting and introduction work.
[0085] The internal structure shaft steel lining cylinder (-7.40~+1.33m) is a barrel-shaped structure (divided into upper and lower parts) with a diameter of 7600mm and a height of 8477mm, which is composed of 8mm thick P265GH steel lining plates. The weight of the cylinder plus the supporting tooling is about 26 tons. The lower part of the reactor cavity shaft cylinder was hoisted this time, which is 4000mm high and weighs about 12 tons.
[0086] In this embodiment, combined with the actual structure of the core shaft assembly module, an LTL-2600B crane is used for lifting. The crane uses a 122m main arm working condition, a lifting radius of 87.1m, a positioning radius of 61.5m, a designed total lifting weight of 363.7 tons (weight below the hook), a lifting load rate of 68.73%, and a positioning load rate of 42.65%.
[0087] S 600 : The whole spiral rises to pour concrete;
[0088] After the core shaft assembly module is fixed in the installation position, the overall spiral ascending casting method is adopted to achieve one-time casting of the entire height range of the core shaft assembly module. After the overall insulation is done, the subsequent equipment installation work is carried out simultaneously inside.
[0089] In an embodiment of the present invention, the inner diameter of the core shaft is 3.8m, the outer diameter is 6.0m (elevation -7.250m to elevation -0.100m), the wall thickness is 2.2m (H=7.15m), the outer diameter is 5.5m (elevation -0.100m to elevation +1.330m), the wall thickness is 1.7m (H=1.43m), and it is a ring-shaped reinforced concrete structure.
[0090] The bottom elevation of the core shaft is -7.250m, the top elevation is 1.330m, and the total height of the shaft wall is 8.58m. The structure is constructed in the form of a combination module of steel bars and steel linings. That is, the steel lining inside the core shaft is used as an integral cylinder module, and the steel bars of the outer wall of the steel lining are used as an integral module. Finally, the two modules are connected through a special support system to form a combined module. After being hoisted and installed in place by a 2,600-ton crawler crane, the overall casting is completed in one go.
[0091] See also Figure 4 As shown, specifically in the embodiment of the present invention, the assembled truss support structure 31 includes a first vertical ring column group 311, a first horizontal ring beam group 312 and a first radial horizontal support rod group 313.
[0092] The first vertical ring column group 311 includes a plurality of three-column rings 3111 and two-column rings 3112 that are evenly spaced in the circumferential direction and vertically distributed, and the diameter of the cylinder surrounded by the two-column rings 3112 is smaller than the diameter of the cylinder surrounded by the three-column rings 3111. The first horizontal ring beam group 312 includes a plurality of three-column ring beams 3121 evenly spaced in the vertical direction of the three-column rings 3111 and a plurality of two-column ring beams 3122 evenly spaced in the vertical direction of the two-column rings 3112. The intersections of the three-column rings 3111 and the three-column ring beams 3121 are welded and fixed.
[0093] The first radial horizontal support rod group 313 includes a plurality of first radial horizontal support rods 3131 horizontally connected between the ring three columns 3111 and the ring two columns 3112 , and each first radial horizontal support rod 3131 is located between every two ring three column ring beams 3121 .
[0094] See also Figure 4 As shown, specifically in the embodiment of the present invention, the hoisting truss support structure 32 includes a second vertical ring column group 321, a second horizontal ring beam group 322 and a second radial support rod group 323,
[0095] The second vertical ring column group 321 includes a plurality of ring-one columns 3211 that are evenly spaced in the annular direction and vertically distributed, and the diameter of the cylinder surrounded by the ring-one columns 3211 is smaller than the diameter of the cylinder surrounded by the ring-two columns 3112, and the ring-one column 3211 is located at the top of the steel lining module 1.
[0096] The second horizontal ring beam group 322 includes a top ring beam 3221 fixedly connected along the top of the ring column 3211 and a ring-column ring beam 3222 fixedly connected along the bottom of the ring column 3211;
[0097] The second radial support rod group 323 includes a spatial diagonal support rod group 3231 and a horizontal diagonal support rod group 3232. The spatial diagonal support rod group 3231 includes a first diagonal rod connected between the top ring ring beam 3221 and the ring three column ring beam 3121, and a second diagonal rod connected between the top ring ring beam 3221 and the ring two column ring beam 3122. One end of the first diagonal rod is connected to the top of the ring one column 3211 at the corresponding position, and the other end is connected to the top of the ring three column 3111 at the corresponding position. One end of the second diagonal rod is connected to the top of the ring one column 3211 at the corresponding position, and the other end is connected to the top of the ring two column 3112 at the corresponding position.
[0098] The horizontal diagonal brace rod group 3232 includes a third diagonal rod connected between the ring beam 3222 of the first column and the ring beam 3122 of the second column, and a fourth diagonal rod connected between the ring beam 3122 of the second column and the ring beam 3121 of the third column. One end of the third diagonal rod is connected to the top of the second column 3112 at a corresponding position, and the other end is connected to the bottom of the first column 3211 at an adjacent position. One end of the fourth diagonal rod is connected to the top of the third column 3111 at a corresponding position, and the other end is connected to the bottom of the second column 3112 at an adjacent position.
[0099] See also Figure 4 As shown, specifically in the embodiments of the present invention, the first column 3211 is C20b channel steel, the second column 3112 is C16b channel steel, the third column 3111 is C8 channel steel, the top ring beam 3221, the first column ring beam 3222, the second column ring beam 3122 and the third column ring beam 3121 are all made of C16a channel steel, the first diagonal rod, the first diagonal rod, the third diagonal rod and the fourth diagonal rod are all C16a channel steel, and the components in the support system are all made of Q355 grade steel.
[0100] The components are made of universal materials, with few specifications and types. They are processed in workshops and installed on site, which facilitates specification unification and standard control. Modular steel bar construction requires higher requirements on installation tolerance control due to positioning accuracy requirements, and strict control is implemented to ensure that the construction quality meets the requirements.
[0101] See also Figure 3 As shown, specifically in the embodiment of the present invention, the steel bar module 2 includes vertical steel bars 21, horizontal annular steel bars 22, hook bars 23 and adjustable sleeves 24. The vertical steel bars 21 are vertically arranged in six layers from the inside to the outside along the horizontal radial direction, and each layer of vertical steel bars 21 is evenly spaced and fixedly connected along the vertical direction by the horizontal annular steel bars 22 of the corresponding layer. The vertical steel bars 21 are connected by adjustable sleeves 24, and the intersection of the vertical steel bars 21 and the horizontal annular steel bars 22 is connected by the hook bars 23. The joints of the horizontal annular steel bars 22 are connected by double wire connection and positive and negative wire connection.
[0102] It should be noted that the vertical steel bars and the dowel bars on the upper bottom plate are connected one-to-one using an adjustable sleeve 24, which can achieve a first-level joint connection, with a maximum allowable adjustable deviation of 40mm for the concentricity of the steel bars and a maximum allowable adjustable deviation of 50mm for the end gap. The adjustable sleeve connection process is used to verify the connection performance and maximum adjustable deviation through preliminary simulation tests to solve the connection problem between the module steel bars and the foundation dowel bars.
[0103] In addition, the connection nodes between the steel lining module 1 and the bottom plate steel lining are modified and optimized to realize the internal welding connection of the steel lining cylinder, resolve the conflict between the steel lining fixed weld construction and the outer steel bar construction, and create basic conditions for the combined construction of the steel lining module 1 and the steel bar module 2.
[0104] See also Figure 5 As shown, specifically in the embodiment of the present invention, the limiting tool is a two-layer steel truss, each layer of the steel truss is composed of annular C8 channel steel and radial C10 channel steel, and each layer of adjacent annular C8 channel steels is connected with radial C10 channel steels.
[0105] In the embodiment of the present invention, the limiting tooling includes a vertical primary positioning device and a vertical secondary positioning device, wherein the vertical primary positioning device is made of H-shaped steel column + steel plate welding, and the bottom plate of the H-shaped steel column is fixed by expansion bolts; the vertical secondary positioning device is made of No. 10 channel steel with a bevel cut, and the No. 10 channel steel is spot welded to the two rows of vertical dowels on the inner side.
[0106] Specifically in the embodiment of the present invention, in step S 600 In the process, the casting is carried out in sections according to the height of the supporting embedded parts of the core shaft combination module. The length of the casting hose is greater than or equal to 6 meters and the diameter is 120-160mm. As the casting height is increased and removed, the free fall height of the lower pipe mouth shall not exceed three meters.
[0107] Therefore, the overall spiral rising casting method is adopted to achieve one-time casting of the entire 8.58m high range of the combined module. After overall insulation, subsequent equipment installation work is carried out simultaneously inside to achieve parallel construction of multiple processes.
[0108] Specifically in the embodiment of the present invention, in step S 600 In the process, after pouring concrete, the surrounding trusses are removed first, and then the outer scaffolding is removed.
[0109] Specifically in the embodiment of the present invention, in step S 500 In the process, the pre-embedded steel bars in the wall are covered with two layers of quilt insulation, which are then covered with two more layers of quilt insulation after pouring. The overlapping parts of the thermal insulation and waterproof quilt are firmly tied to the frame with steel wire or rope.
[0110] Compared with traditional construction methods, the construction of steel bar modules and steel lining modules in the core shaft allows the steel bar installation work to be intervened in advance, and part of the work content on the main construction period is transferred to the assembly site in parallel to be completed in advance, reducing the workload on site and saving construction period. The modular construction of steel bars reduces the cross-operation of steel lining and steel bars in on-site construction, and can help eliminate the construction period delay caused by working surface constraints during the trial assembly at the prefabrication site in advance. The materials are easy to obtain, recyclable materials, and the processing technology is simple.
[0111] Although the invention of the present invention is disclosed as above, the protection scope of the present invention is not limited thereto. Those skilled in the art may make various changes and modifications without departing from the spirit and scope of the present invention, and these changes and modifications will fall within the protection scope of the present invention.
Claims
1. A modular construction method for a nuclear power plant core shaft, characterized in that: A core shaft assembly module is used for construction, wherein the core shaft assembly module comprises a steel lining module (1), a steel bar module (2), a space truss support system (3) and a position limiting tool (4); the steel lining module (1) comprises a steel lining, embedded parts and through-pieces; the space truss support system (3) comprises an assembly truss support structure (31) and a hoisting truss support structure (32); the assembly truss support structure (31) is used to realize the combination of the steel lining module (1) and the steel bar module (2); and the hoisting truss support structure (32) is used to control the module deformation during hoisting and later pouring; The construction method of the core shaft assembly module comprises the following steps: S 100 : Processing and assembling the steel lining module (1) of the core shaft; Make welded steel linings and install penetrations and embedded parts on the welded and assembled steel linings; S 200 : Making the limit tooling (4); BIM software is used for modeling to generate a steel bar layout diagram, and two sets of position limiting tools (4) are manufactured using the same vertical steel bar positioning point, which are respectively put in place in advance during the foundation reinforcement construction stage and the steel bar module installation stage to assist in completing the steel bar positioning and position limiting; S 300 : Making a steel bar module (2); An adjustable sleeve connection process is adopted to verify the connection performance and the maximum adjustable deviation through simulation tests to connect the steel bars of the steel bar module (2) and the foundation dowel bars; S 400 : Install the space truss support system (3); The spatial truss support structure is designed and manufactured using channel steel to be used for assembly, hoisting and later concrete pouring of modular modules; S 500 : Hoisting and installation of core shaft assembly modules; Inserting a portion of the main hoisting wire rope into each hoisting hole on the hoisting truss support structure (32), and hooking the other end portion on a circular transition beam located above the center of the hoisting truss support structure (32), and operating a crane to lift the core shaft assembly module and hoist it to the installation position; S 600 : The whole spiral rises to pour concrete; After the core shaft assembly module is fixed in the installation position, the overall spiral rising casting method is adopted to achieve one-time casting of the entire height range of the core shaft assembly module. After overall insulation, subsequent equipment installation work is carried out simultaneously inside.
2. The modular construction method for a nuclear power plant core shaft according to claim 1, characterized in that: The assembled truss support structure (31) comprises a first vertical ring column group (311), a first horizontal ring beam group (312) and a first radial horizontal support rod group (313). The first vertical ring column group (311) includes a plurality of evenly spaced and vertically distributed three-ring columns (3111) and two-ring columns (3112), and the diameter of the cylinder formed by the two-ring columns (3112) is smaller than the diameter of the cylinder formed by the three-ring columns (3111); The first horizontal ring beam group (312) includes a plurality of three-column ring beams (3121) evenly spaced in the vertical direction of the three-column ring beams (3111) and a plurality of two-column ring beams (3122) evenly spaced in the vertical direction of the two-column ring beams (3112), and the intersections of the three-column ring beams (3111) and the three-column ring beams (3121) are welded and fixed; The first radial horizontal support rod group (313) includes a plurality of first radial horizontal support rods (3131) horizontally connected between the ring three columns (3111) and the ring two columns (3112), the first radial horizontal support rods (3131) are distributed radially outward, and each of the first radial horizontal support rods (3131) is respectively located between every two of the ring three column ring beams (3121).
3. The modular construction method for a nuclear power plant core shaft according to claim 2, characterized in that: The hoisting truss support structure (32) comprises a second vertical ring column group (321), a second horizontal ring beam group (322) and a second radial support rod group (323). The second vertical ring column group (321) comprises a plurality of ring-one columns (3211) evenly spaced in annular direction and distributed vertically, and the diameter of the cylinder formed by the ring-one columns (3211) is smaller than the diameter of the cylinder formed by the ring-two columns (3112), and the ring-one columns (3211) are located at the top of the steel lining module (1); The second horizontal ring beam group (322) comprises a top ring beam (3221) fixedly connected along the top of the ring column (3211) and a ring column ring beam (3222) fixedly connected along the bottom of the ring column (3211); The second radial support rod group (323) includes a spatial diagonal support rod group (3231) and a horizontal diagonal support rod group (3232). The spatial diagonal brace group (3231) comprises a first diagonal rod connected between the top ring ring beam (3221) and the ring three column ring beam (3121) and a second diagonal rod connected between the top ring ring beam (3221) and the ring two column ring beam (3122), and one end of the first diagonal rod is connected to the top of the ring one column (3211) at the corresponding position, and the other end is connected to the top of the ring three column (3111) at the corresponding position, and one end of the second diagonal rod is connected to the top of the ring one column (3211) at the corresponding position, and the other end is connected to the top of the ring two column (3112) at the corresponding position; The horizontal diagonal brace group (3232) includes a third diagonal rod connected between the ring beam (3222) of the first column and the ring beam (3122) of the second column, and a fourth diagonal rod connected between the ring beam (3122) of the second column and the ring beam (3121) of the third column. One end of the third diagonal rod is connected to the top of the second column (3112) at a corresponding position, and the other end is connected to the bottom of the first column (3211) at an adjacent position. One end of the fourth diagonal rod is connected to the top of the third column (3111) at a corresponding position, and the other end is connected to the bottom of the second column (3112) at an adjacent position.
4. The modular construction method for a nuclear power plant core shaft according to claim 3, characterized in that: The first ring column (3211) is a C20b channel steel, the second ring column (3112) is a C16b channel steel, the third ring column (3111) is a C8 channel steel, the top ring ring beam (3221), the first ring column ring beam (3222), the second ring column ring beam (3122) and the third ring column ring beam (3121) are all made of C16a channel steel, and the first diagonal rod, the first diagonal rod, the third diagonal rod and the fourth diagonal rod are all C16a channel steel.
5. The modular construction method for a nuclear power plant core shaft according to claim 1, characterized in that: The steel bar module (2) comprises vertical steel bars (21), horizontal annular steel bars (22), hook bars (23) and adjustable sleeves (24); the vertical steel bars (21) are vertically arranged in six layers from inside to outside along the horizontal radial direction, and the vertical steel bars (21) of each layer are evenly spaced and fixedly connected along the vertical direction through the horizontal annular steel bars (22) of the corresponding layer; the vertical steel bars (21) are connected by the adjustable sleeves (24); the intersection of the vertical steel bars (21) and the annular steel bars (22) is connected by the hook bars (23); and the joints of the horizontal annular steel bars (22) are connected by double wire connection and positive and negative wire connection.
6. The modular construction method for a nuclear power plant core shaft according to claim 1, characterized in that: The limiting fixture (4) is a two-layer steel truss, each layer of the steel truss is composed of annular C8 channel steels and radial C10 channel steels, and each layer of adjacent annular C8 channel steels is connected to the radial C10 channel steels.
7. The modular construction method for a nuclear power plant core shaft according to claim 1, characterized in that: In step S 600 In the process, the casting is carried out in sections according to the height of the supporting embedded parts of the core shaft combination module. The length of the casting hose is greater than or equal to 6 meters and the diameter is 120-160mm. As the casting height is increased and removed, the free fall height of the lower pipe mouth shall not exceed three meters.
8. The modular construction method for a nuclear power plant core shaft according to claim 1, characterized in that:In step S 600 In the process, after pouring concrete, the surrounding trusses are removed first, and then the outer scaffolding is removed.
9. The modular construction method for a nuclear power plant core shaft according to claim 1, characterized in that: In step S 600 In the process, the pre-embedded steel bars in the wall are covered with two layers of quilt insulation, which are then covered with two more layers of quilt insulation after pouring. The overlapping parts of the thermal insulation and waterproof quilt are firmly tied to the frame with steel wire or rope.