Insulation board installation tool head and ultra-low energy consumption wall construction method

By designing the insulation board installation tool head and using technologies such as metal connectors and hydraulic cylinders, the problem of vertical adjustment and installation and fixation of insulation boards in ultra-low energy consumption buildings has been solved, the construction quality and efficiency have been improved, and damage to external walls and high altitudes have been reduced. Operational risks.

CN115977412BActive Publication Date: 2024-10-29SHANGHAI CONSTR NO 5 GRP CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202211497021.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-11-25
Publication Date
2024-10-29
Estimated Expiration
2042-11-25

AI Technical Summary

Technical Problem

In the exterior wall construction of ultra-low energy consumption buildings, it is difficult to adjust the verticality and install and fix the insulation panels, which affects the construction quality and efficiency.

Method used

A tool head for installing the insulation board is designed, which includes a metal connector, a suction cup frame, a driving motor, a hydraulic cylinder and a digital display angle meter. It uses an electromagnet to absorb the metal plate base and uses the hydraulic cylinder and the driving motor to adjust the verticality of the insulation board. Combined with the control circuit to achieve precise adjustment.

Benefits of technology

It achieves fast and precise fixing and vertical adjustment of insulation panels, improves construction quality and efficiency, reduces damage to exterior walls and the risk of high-altitude operations, reduces the risk of thermal bridges, and improves the level of construction automation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115977412B_ABST
    Figure CN115977412B_ABST
Patent Text Reader

Abstract

The present invention discloses an insulation board installation tool head and an ultra-low energy consumption wall construction method, wherein the insulation board installation tool head comprises a base, a mechanical arm, a driving motor, a suction cup frame, an electromagnet, a hydraulic cylinder, a digital display angle meter and a control circuit. The driving motor can adjust the angle between the mechanical arm and the base; a sliding arc seat is arranged on the back side of the suction cup frame, and the sliding arc seat comprises an arc plate and a mechanical arm connecting piece. The hydraulic cylinder can push the cylinder connecting piece to move, so that the arc plate and the mechanical arm connecting piece slide along the arc plate. The insulation board installation tool head can absorb the metal disc seat on the insulation board through the suction cup frame, and can adjust the angle between the insulation board and the horizontal plane through the driving motor, and can adjust the angle between the insulation board and the vertical plane through the hydraulic cylinder. The verticality of the insulation board can be accurately adjusted in conjunction with the digital display angle meter, so as to quickly complete the fixing and verticality adjustment of the insulation board, ensure the construction quality and improve the construction efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a thermal insulation board installation tool head and an ultra-low energy consumption wall construction method, belonging to the technical field of ultra-low energy consumption walls. Background Art

[0002] Ultra-low energy buildings can significantly reduce building energy consumption and reduce reliance on active mechanical heating and cooling systems while significantly improving indoor environmental comfort. According to the "Shanghai Ultra-Low Energy Building Project Management Regulations" (Shanghai Construction Materials

[2021] No. 114), the weighted average heat transfer coefficient of the exterior wall meets the requirement of no more than 0.4W / (㎡·k) as stipulated in the "Implementation Opinions on Promoting the Development of Ultra-Low Energy Buildings in the City" (Shanghai Construction Materials Federation

[2020] No. 541).

[0003] Ultra-low energy consumption buildings have higher requirements for thermal insulation and airtightness, and also require the integrity and continuity of the insulation layer and the airtight layer. Therefore, at all key nodes that may destroy the continuity of insulation and airtightness, there must be reasonable and complete detailed node processing methods, and more refined construction is required to achieve it. Whether ultra-low energy consumption buildings can meet the standard requirements after completion, the degree of refined construction and construction quality play a vital role.

[0004] During the construction of the exterior wall, the insulation board can be used as an external formwork. However, how to adjust the verticality and install the insulation board without destroying its continuity and airtightness has become a technical problem that needs to be solved urgently. Summary of the invention

[0005] In view of the problems in the prior art of vertical adjustment, installation and fixation of insulation boards as external formwork in construction, the present application provides an insulation board installation tool head and an ultra-low energy consumption wall construction method.

[0006] In order to solve the above technical problems, the present invention includes the following technical solutions:

[0007] A heat preservation board installation tool head, the heat preservation board is provided with a metal connector, the metal connector includes a metal disc seat, a threaded rod, a thermal insulation sleeve ring and a connecting nut, one end of the threaded rod is fixedly connected to the metal disc seat, and the thermal insulation sleeve ring is sleeved on the threaded rod near the metal disc seat; the metal disc seat and the thermal insulation sleeve ring are buried in the heat preservation board, and the other end of the threaded rod is provided with a connecting nut and extends out of the heat preservation board;

[0008] The insulation board installation tool head includes a base, a mechanical arm, a driving motor, a suction cup frame, an electromagnet, a hydraulic cylinder, a digital display angle meter and a control circuit; one end of the mechanical arm is hinged to the base, and the other end is connected to the suction cup frame; the driving motor can adjust the angle between the mechanical arm and the base; an electromagnet is arranged on the suction cup frame, and the control circuit is used to control the electromagnet to adsorb the metal disc seat or separate from the metal disc seat; a sliding arc seat is arranged on the back side of the suction cup frame, and the sliding arc seat includes an arc plate and a mechanical arm connecting piece, one end of the mechanical arm connecting piece is connected to the end of the mechanical arm, and the other end is slidably connected to the arc plate; a cylinder connecting piece is also arranged on the suction cup frame, one end of the hydraulic cylinder is hinged to the mechanical arm, and the other end is hinged to the cylinder connecting piece, and the extension and contraction of the hydraulic cylinder can push the cylinder connecting piece to move, so that the arc plate and the mechanical arm connecting piece slide along the arc plate, the arc plate rotates along the axis, and the axis of the arc plate is vertically arranged; the digital display angle meter is used to display the verticality of the insulation board.

[0009] Furthermore, the density of the metal connector on the insulation board is P, the suction force of the electromagnet on a single metal connector within the range of the suction cup frame is F, the area of ​​the suction cup frame is A, the friction coefficient between the suction cup frame and the insulation board is μ, the weight of the insulation board is G, and the safety factor is L, then:

[0010] F≥LG / (PAμ).

[0011] Furthermore, a slider is provided on the arc plate, and a slide groove is provided on the mechanical arm connecting piece, and the slider can slide in the slide groove.

[0012] Furthermore, the oil cylinder connecting piece includes a bottom plate and a pair of ear plates arranged at intervals, the bottom plate protrudes from the suction cup frame and forms a step shape with the suction cup frame; the ear plates are used to be hinged with the hydraulic oil cylinder.

[0013] Accordingly, the present application also provides an ultra-low energy consumption wall construction method, comprising the following steps:

[0014] Step 1: Tie up the wall reinforcement and set up the wall formwork;

[0015] Step 2: Set the insulation board installation tool head as mentioned above on the installation machine, use the control circuit on the installation tool head to control the electromagnet on the suction cup frame to adsorb the metal disc seat on the insulation board, adjust the verticality of the insulation board by driving the motor and the hydraulic cylinder until the reading of the digital display angle meter shows that the verticality of the insulation board meets the requirements, set a tension screw from one side of the inner template, and set a sleeve on the tension screw. One end of the tension screw is fixed to the outside of the inner template, and the other end is connected to the connecting nut of the metal connector, and the sleeve covers the connecting nut;

[0016] Step 3: pour concrete between the insulation board and the inner formwork;

[0017] Step 4: After the concrete strength meets the requirements, remove the inner formwork and tension screws.

[0018] Furthermore, the density of the metal connector on the insulation board is P, the suction force of the electromagnet on a single metal connector within the range of the suction cup frame is F, the area of ​​the suction cup frame is A, the friction coefficient between the suction cup frame and the insulation board is μ, the weight of the insulation board is G, and the safety factor is L;

[0019] In the step 2, when the control circuit on the installation tool head is used to control the electromagnet of the suction cup frame to adsorb the metal disc seat on the insulation board, the following conditions are met:

[0020] F≥LG / (PAμ).

[0021] Furthermore, a slider is provided on the arc plate, and a slide groove is provided on the mechanical arm connecting member, and the slider can slide in the slide groove;

[0022] In the step 2, when the verticality of the insulation board is adjusted by the hydraulic cylinder, the slider slides in the slide groove to make the arc-shaped board rotate along the axis.

[0023] Furthermore, the construction method further comprises:

[0024] Step 5. Seal the holes of the tension screws, perform waterproof and crack-resistant treatments on the joints and corners, construct the surface layer and finishing layer on the outside of the insulation board through a hanging basket, and construct the inner and outer side layers of the wall until the wall construction is completed.

[0025] Due to the adoption of the above technical scheme, the present invention has the following advantages and positive effects compared with the prior art: the insulation board installation tool head provided by the present application can absorb the metal disc seat on the insulation board through the suction cup frame, and can adjust the angle between the insulation board and the horizontal plane through the driving motor, and can adjust the angle between the insulation board and the vertical plane through the hydraulic cylinder, and can accurately adjust the verticality of the insulation board with the digital display angle meter, so as to quickly complete the fixation and verticality adjustment of the insulation board, ensure the construction quality and improve the construction efficiency. Moreover, the metal disc seat of the metal connector in the insulation board can not only realize the function of suction cup frame adsorption, but also increase the later fixing effect of the insulation board. The ultra-low energy consumption wall construction method provided by the present application simplifies the traditional construction process, merges the original process of separate construction of the insulation board metal connector and the tension screw, reduces the damage to the external wall insulation board, reduces the risk of thermal bridge, and improves the passive energy-saving efficiency of the low-energy consumption wall. In addition, the insulation board installation tool head can realize the fixation and verticality adjustment of the insulation board, reduce the risk of high-altitude operations, and improve the level of on-site construction automation. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a schematic structural diagram of a heat preservation board in one embodiment of the present invention;

[0027] Figure 2 is a schematic structural diagram of a metal connector in one embodiment of the present invention;

[0028] Figure 3 It is a structural schematic diagram of a magnetic tool head in one embodiment of the present invention;

[0029] Figure 4 is a top view of a magnetic tool head in one embodiment of the present invention;

[0030] Figure 5 It is a schematic structural diagram of a suction cup frame in one embodiment of the present invention;

[0031] Figure 6 The figure is a schematic diagram of the construction of the thermal insulation wall in one embodiment of the present invention.

[0032] The numbers in the figure are as follows:

[0033] 1-support frame; 2-inner formwork; 3-back rib; 4-tension screw; 5-side wall; 6-top plate;

[0034] 10-insulation board; 11-metal connector; 12-metal plate seat; 13-threaded rod; 14-broken bridge insulation ring; 15-connecting nut;

[0035] 20-magnetic tool head; 21-base; 22-mechanical arm; 23-driving motor; 24-suction cup frame; 241-sliding arc seat; 242-arc plate; 243-sliding block; 244-mechanical arm connector; 245-slideway; 246-cylinder connector; 25-electromagnet; 26-hydraulic cylinder; 27-digital display angle meter. DETAILED DESCRIPTION

[0036] The following is a further detailed description of an insulation board installation tool head and an ultra-low energy consumption wall construction method provided by the present invention in combination with the accompanying drawings and specific embodiments. The advantages and features of the present invention will become clearer in combination with the following description. It should be noted that the accompanying drawings are all in a very simplified form and are not in precise proportions, and are only used to conveniently and clearly assist in explaining the purpose of the embodiments of the present invention.

[0037] Embodiment 1

[0038] Combination Figure 1 and Figure 2As shown, the insulation board 10 in this embodiment is provided with a metal connector 11, and the metal connector 11 includes a metal disc seat 12, a threaded rod 13, a thermal insulation collar 14 and a connecting nut 15. One end of the threaded rod 13 is fixedly connected to the metal disc seat 12, and the thermal insulation collar 14 is sleeved on the threaded rod 13 near the metal disc seat 12. The metal disc seat 12 and the thermal insulation collar 14 are buried in the insulation board 10, and the other end of the threaded rod 13 is provided with a connecting nut 15 and extends out of the insulation board 10. The metal disc seat 12 can not only increase the tensile strength of the threaded rod 13, but also be magnetically connected to the electromagnet 25. The thermal insulation collar 14 can prevent the threaded rod 13 from conducting heat, thereby ensuring the insulation effect of the insulation board 10 at the threaded rod 13. The insulation board 10 can be processed in the factory. During the processing, the end nut is welded on the metal disc seat 12, and the thermal insulation ring 14 is fixed. The metal disc seat 12 and the thermal insulation ring 14 are buried in the insulation board 10. The through hole on the thermal insulation ring 14 is connected to the outside of the insulation board 10. The threaded rod 13 can be installed at the construction site. The threaded rod 13 is inserted into the through hole of the thermal insulation ring 14 and can be directly connected to the end nut by rotation. Of course, the threaded rod 13 can also be installed in the factory and directly transported to the construction site.

[0039] Combination Figures 3 to 5As shown, the insulation board installation tool head includes a base 21, a mechanical arm 22, a drive motor 23, a suction cup frame 24, an electromagnet 25, a hydraulic cylinder 26, a digital display angle meter 27 and a control circuit. One end of the mechanical arm 22 is hinged to the base 21, and the other end is connected to the suction cup frame 24. The mechanical arm 22 can be a multi-arm structure. The angle between adjacent arm sections can be adjusted by an electric push rod or a hydraulic cylinder to roughly adjust the angle between the suction cup frame 24 and the horizontal plane. The drive motor 23 can adjust the angle between the mechanical arm 22 and the base 21. The drive motor 23 can be a stepping motor, which can accurately adjust the angle between the arm section and the base 21, so as to cooperate with the reading of the digital display angle meter 27 to adjust the verticality of the insulation board 10. An electromagnet 25 is arranged on the suction cup frame 24. When the control circuit is powered on, it can control the electromagnet 25 to adsorb the metal disc seat 12, and when the power is off, it can control the electromagnet 25 to separate from the metal disc seat 12. The control circuit can be implemented by an existing circuit, which will not be described here. A sliding arc seat 241 is provided on the back side of the suction cup frame 24, and the sliding arc seat 241 includes an arc plate 242 and a mechanical arm connecting piece 244, one end of the mechanical arm connecting piece 244 is connected to the end of the mechanical arm 22, and the other end is slidably connected to the arc plate 242; a cylinder connecting piece 246 is also provided on the suction cup frame 24, one end of the hydraulic cylinder 26 is hinged to the mechanical arm 22, and the other end is hinged to the cylinder connecting piece 246, the hydraulic cylinder 26 can push the cylinder connecting piece 246 to move when it is extended and retracted, so that the arc plate 242 and the mechanical arm connecting piece 244 slide along the arc plate 242, the arc plate 242 rotates along the axis, and the axis of the arc plate 242 is vertically arranged; the digital display angle meter 27 is used to display the verticality of the insulation board 10. It should be noted that the driving motor 23 can adjust the angle between the insulation board 10 and the horizontal plane, and the hydraulic cylinder 26 can adjust the angle between the insulation board 10 and the vertical plane, so that the verticality of the insulation board 10 meets the construction requirements.

[0040] The insulation board installation tool head provided in this embodiment can absorb the metal disc seat 12 on the insulation board 10 through the suction cup frame 24, and can adjust the angle between the insulation board 10 and the horizontal plane through the driving motor 23, and can adjust the angle between the insulation board 10 and the vertical plane through the hydraulic cylinder 26. The verticality of the insulation board 10 can be accurately adjusted in conjunction with the digital display angle meter 27, thereby quickly completing the fixation and verticality adjustment of the insulation board 10, ensuring construction quality and improving construction efficiency.

[0041] In a specific embodiment, in order to ensure that the suction cup frame 24 can stably adsorb the insulation board 10, it is necessary to ensure the force between the suction cup frame 24 and the insulation board 10. The density of the metal connector 11 on the insulation board 10 is P, the suction force of the electromagnet 25 on the suction cup frame 24 on a single metal connector 11 within the range of the suction cup frame 24 is F, the area of ​​the suction cup frame 24 is A, the friction coefficient between the suction cup frame 24 and the insulation board 10 is μ, the weight of the insulation board 10 is G, and the safety factor is L, then it satisfies: F ≥ LG / (PAμ). The magnitude of the force F can be adjusted by adjusting the magnitude of the current or voltage in the control circuit so that the force meets the construction requirements of the insulation board 10.

[0042] In a specific embodiment, a slider 243 is provided on the arc plate 242, and a slide groove 245 is provided on the mechanical arm connecting member 244, and the slider 243 can slide in the slide groove 245. Further, in order to ensure the sliding effect, the mechanical arm connecting member 244 can also be provided with an arc-shaped edging structure, and the arc-shaped edging structure is clamped on the side of the arc plate 242 where the slider 243 is not provided, so as to ensure the stability of the arc plate 242 during sliding.

[0043] In a specific embodiment, the oil cylinder connecting member 246 includes a bottom plate and a pair of ear plates arranged at intervals, the bottom plate protrudes from the suction cup frame 24, and forms a step shape with the suction cup frame 24, and the ear plates are used to be hinged with the hydraulic oil cylinder 26. The bottom plate and the suction cup frame 24 form a step shape, which is conducive to the sliding between the arc plate 242 and the mechanical arm connecting member 244.

[0044] Embodiment 2

[0045] This embodiment provides an ultra-low energy consumption wall construction method. Figures 1 to 6 The construction method is further described. The construction method comprises the following steps:

[0046] The construction method comprises the following steps:

[0047] Step 1: Tie up the wall reinforcement and set up the inner wall formwork 2. The inner formwork 2 can be supported by the support frame 1. In order to ensure the structural stability of the inner formwork 2, back ribs 3 can be set at vertical intervals on the back of the inner formwork 2. The back ribs 3 can be made of wood. The back ribs 3 can be reinforced by steel pipes, and the ends of the tension screws 4 can be fixed by setting mountain-shaped fasteners. The inner formwork 2 can be made of plywood, and steel formwork can also be used when the height is high. Figure 6 The wall body includes side walls 5 and a top plate 6.

[0048] Step 2: Install the insulation board installation tool head on the installation machine, use the control circuit on the installation tool head to control the electromagnet 25 on the suction cup frame 24 to absorb the metal disc seat 12 on the insulation board 10, and adjust the verticality of the insulation board 10 by driving the motor 23 and the hydraulic cylinder 26 until the reading of the digital angle meter 27 shows that the verticality of the insulation board 10 meets the requirements; set the tension screw 4 from one side of the inner template 2, and set the sleeve on the tension screw 4. One end of the tension screw 4 is fixed to the outside of the inner template 2, and the other end is connected to the connection nut 15 of the metal connector 11, and the sleeve covers the connection nut 15. As an example, the insulation board installation tool head can be installed at the end of an excavator, a loader or a crane, so as to realize the transportation of the insulation board and fix the insulation board at a higher position.

[0049] Step 3: pour concrete between the insulation board 10 and the inner formwork 2.

[0050] Step 4: After the concrete strength meets the requirements, remove the inner formwork 2 and the tension screw 4.

[0051] In a specific embodiment, the density of the metal connector 11 on the insulation board 10 is P, the suction force of the electromagnet 25 on the suction cup frame 24 on a single metal connector 11 within the range of the suction cup frame 24 is F, the area of ​​the suction cup frame 24 is A, the friction coefficient between the suction cup frame 24 and the insulation board 10 is μ, the weight of the insulation board 10 is G, and the safety factor is L;

[0052] In the step 2, when the control circuit on the installation tool head is used to control the electromagnet 25 of the suction cup frame 24 to adsorb the metal disc seat 12 on the insulation board 10, the following is satisfied: F≥LG / (PAμ).

[0053] In a specific embodiment, a slider 243 is provided on the arc plate 242, and a slide groove 245 is provided on the robotic arm connector 244. The slider 243 can slide in the slide groove 245. In the step 2, when the verticality of the insulation plate 10 is adjusted by the hydraulic cylinder 26, the slider 243 slides in the slide groove 245 to make the arc plate 242 rotate along the axis.

[0054] In a specific embodiment, the construction method further comprises:

[0055] Step 5: seal the holes of the tension screws 4, perform waterproof and crack-resistant treatment on the joints and corners, construct the surface layer and finishing layer on the outside of the insulation board 10 through a hanging basket, and construct the inner and outer side layers of the wall until the wall construction is completed.

[0056] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0057] The above-mentioned embodiments only express several implementation methods of the present invention, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be subject to the attached claims.

Claims

1. A tool head for installing an insulation board, characterized in that: The insulation board is provided with a metal connector, which includes a metal disc seat, a threaded rod, a thermal insulation sleeve and a connecting nut. One end of the threaded rod is fixedly connected to the metal disc seat, and the thermal insulation sleeve is sleeved on the threaded rod near the metal disc seat. The metal disc seat and the thermal insulation sleeve are buried in the insulation board, and the other end of the threaded rod is provided with a connecting nut and extends out of the insulation board. The insulation board installation tool head includes a base, a mechanical arm, a driving motor, a suction cup frame, an electromagnet, a hydraulic cylinder, a digital display angle meter and a control circuit; one end of the mechanical arm is hinged to the base, and the other end is connected to the suction cup frame; the driving motor can adjust the angle between the mechanical arm and the base; an electromagnet is arranged on the suction cup frame, and the control circuit is used to control the electromagnet to adsorb the metal disc seat or separate from the metal disc seat; a sliding arc seat is arranged on the back side of the suction cup frame, and the sliding arc seat includes an arc plate and a mechanical arm connecting piece, one end of the mechanical arm connecting piece is connected to the end of the mechanical arm, and the other end is slidably connected to the arc plate; a cylinder connecting piece is also arranged on the suction cup frame, one end of the hydraulic cylinder is hinged to the mechanical arm, and the other end is hinged to the cylinder connecting piece, and the extension and contraction of the hydraulic cylinder can push the cylinder connecting piece to move, so that the arc plate and the mechanical arm connecting piece slide along the arc plate, the arc plate rotates along the axis, and the axis of the arc plate is vertically arranged; the digital display angle meter is used to display the verticality of the insulation board.

2. The insulation board installation tool head according to claim 1, characterized in that: The density of the metal connector on the insulation board is P, the suction force of the electromagnet on a single metal connector within the range of the suction cup frame is F, the area of ​​the suction cup frame is A, the friction coefficient between the suction cup frame and the insulation board is μ, the weight of the insulation board is G, and the safety factor is L, then: F≥LG / (PAμ).

3. The insulation board installation tool head according to claim 1, characterized in that: The arc plate is provided with a slider, and the mechanical arm connecting piece is provided with a slide groove, and the slider can slide in the slide groove.

4. The insulation board installation tool head according to claim 1, characterized in that: The oil cylinder connecting piece comprises a bottom plate and a pair of ear plates arranged at intervals, the bottom plate protrudes from the suction cup frame and forms a step shape with the suction cup frame; the ear plates are used for hinged connection with the hydraulic oil cylinder.

5. An ultra-low energy consumption wall construction method, characterized in that: The construction method comprises the following steps: Step 1: Tie up the wall reinforcement and set up the wall formwork; Step 2, setting the insulation board installation tool head as claimed in claim 1 on the installation machine, using the control circuit on the installation tool head to control the electromagnet on the suction cup frame to adsorb the metal disc seat on the insulation board, adjusting the verticality of the insulation board by driving the motor and the hydraulic cylinder until the reading of the digital display angle meter shows that the verticality of the insulation board meets the requirements, setting a tension screw from one side of the inner template, and sleeves on the tension screws, one end of the tension screw is fixed to the outside of the inner template, and the other end is connected to the connecting nut of the metal connector, and the sleeve covers the connecting nut; Step 3: pour concrete between the insulation board and the inner formwork; Step 4: After the concrete strength meets the requirements, remove the inner formwork and tension screws.

6. The ultra-low energy consumption wall construction method according to claim 5, characterized in that: The density of the metal connector on the insulation board is P, the suction force of the electromagnet on a single metal connector within the range of the suction cup frame is F, the area of ​​the suction cup frame is A, the friction coefficient between the suction cup frame and the insulation board is μ, the weight of the insulation board is G, and the safety factor is L; In the step 2, when the control circuit on the installation tool head is used to control the electromagnet of the suction cup frame to adsorb the metal disc seat on the insulation board, the following conditions are met: F≥LG / (PAμ).

7. The ultra-low energy consumption wall construction method according to claim 5, characterized in that: The arc-shaped plate is provided with a slider, the mechanical arm connecting piece is provided with a slide groove, and the slider can slide in the slide groove; In the step 2, when the verticality of the insulation board is adjusted by the hydraulic cylinder, the slider slides in the slide groove to make the arc-shaped board rotate along the axis.

8. The ultra-low energy consumption wall construction method according to claim 5, characterized in that: The construction method also includes: Step 5. Seal the holes of the tension screws, perform waterproof and crack-resistant treatments on the joints and corners, construct the surface layer and finishing layer on the outside of the insulation board through a hanging basket, and construct the inner and outer side layers of the wall until the wall construction is completed.

Citation Information

Patent Citations

  • Composite wall board mounting machine and composite wall board mounting method

    CN103046760A

  • External hanging type external wall insulation board installation equipment of energy-saving building

    CN112282320A