A ground unmanned aerial vehicle power supply network testing system and testing method
By using temperature, current, voltage acquisition modules and electronic load simulators in the drone power supply network test system, different electric use scenarios and working conditions are simulated, and the fluctuations and line loss problems of drone power grid are solved, reducing the testing cost and Flight risks ensure the safety and stability of equipment power supply.
Patent Information
- Application Number
- CN202211483238.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-11-24
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2042-11-24
AI Technical Summary
The engine speed changes in the drone under different working conditions cause the power grid to fluctuate, bringing potential flight safety risks. There are safety hazards for line loss, voltage drop and temperature rise when powered by low voltage and high current, especially when high power cannot be turned on on the ground. In the case of mode or interference with civilian equipment, the testing cost is high.
Design a test system for power supply network of ground drone, including temperature acquisition module, current and voltage acquisition module, fan speed sensor and electronic load simulator. By simulating different electric use scenarios and working conditions, the quality and safety of the power supply network are evaluated. , use electronic load simulator to simulate the power consumption characteristics of high-power equipment, measure the parameters of engines, generators and cables, and evaluate the stability and safety of the power supply network.
Effectively simulate different electric use scenarios and working conditions of drones on the ground, evaluate the voltage drop, line loss, temperature rise and voltage fluctuations of the power supply network, reduce test costs, improve flight safety, reduce task execution risks, and avoid cable overheating and power grid fluctuations to ensure that the equipment is powered within a safe range.
Smart Images

Figure CN116047193B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of power supply and distribution for unmanned aerial vehicles, and relates to a ground unmanned aerial vehicle power supply network testing system and testing method, and specifically to a method and device for testing the load characteristics of an unmanned aerial vehicle generator and a power supply network. Background Art
[0002] Drones have the advantages of low cost, long flight time and high efficiency. They have been widely used in battlefield reconnaissance, target monitoring, fire strikes and emergency rescue, becoming an increasingly important aerial mission platform. In order to perform different flight missions, drones need to be equipped with various types of mission payloads and electrical equipment required for their own flight support. These devices are usually powered by a generator driven by the engine.
[0003] Under different working conditions, for example, when the drone is maneuvering, the engine speed will change, which will directly cause the generator speed to change. When the drone carries high-power pulse radio equipment, it will draw a large current in a short period of time. All of the above scenarios will cause impacts on the power grid. In the low-voltage and high-current scenario, the line loss, voltage drop and temperature rise of the power supply cable also pose potential risks to the system.
[0004] During actual operation, the UAV platform needs to mount different mission payloads according to the mission purpose to meet the mission needs. Common mission payloads include optoelectronic reconnaissance, radar reconnaissance, electronic countermeasures, communications, etc. The actual working indicators of radar, electronic countermeasures, and microwave communication mission payloads are related to their power amplifiers. In order to improve mission capabilities, high-power equipment is often carried to perform flight missions. In order to ensure that the UAV platform can effectively power each device under different working conditions of the UAV platform, ensure the execution of flight missions, effectively improve flight safety and reduce the risk of mission execution. It is particularly important to simulate different power usage scenarios for UAVs and fully test the power supply network.
[0005] Problems to be solved:
[0006] 1. When the UAV is maneuvering, the engine speed will change, which will directly lead to changes in the generator speed, thereby causing overall fluctuations in the power grid.
[0007] 2. Some special mission equipment cannot be turned on at high power on the ground (1. High-power echo of radar will burn TR components, 2. Turning on high power on the ground will cause certain radiation to personnel, 3. Electronic countermeasures will interfere with civil communications or civil positioning equipment in urban environments). Or find an unmanned area to turn on high-power ground verification test, but the cost is too high.
[0008] 3. If the load is a high-power pulse radar, the device will cause certain fluctuations in the power grid due to its intermittent working characteristics and large working current. Moreover, since the generator is driven by the engine during flight, this fluctuation will be reflected as fluctuations in engine speed, which will pose a potential risk to flight safety.
[0009] 4. When the power supply is low-voltage, the current of the high-power task load itself is too large. Taking the 6KW load 28V power supply as an example, the steady-state current is 214A. According to the heat calculation formula Q=I2Rt, when the current is too large, it is easy to accumulate heat, causing the cable to overheat, and there will be potential safety hazards such as fire. In addition, high-current cables should also avoid locations such as fuel tanks when routing.
[0010] 5. When the power is supplied at low voltage, the internal resistance of the wire will cause a certain voltage drop. According to the voltage law U=IR, the voltage output of the generator terminal, due to the existence of cable voltage drop, when the voltage fluctuates, there may be a risk that the power supply of the equipment exceeds the input voltage range of the equipment.
[0011] In order to ensure that the UAV platform can effectively power various devices during operation, ensure the execution of flight missions, effectively improve flight safety and reduce the risk of mission execution, it is particularly important to simulate different power usage scenarios and fully test the power supply network of the UAV. Summary of the invention
[0012] Technical issues to be solved
[0013] In order to avoid the shortcomings of the prior art, the present invention proposes a ground UAV power supply network testing system and testing method, which has good adaptability and can be used to simulate the power load characteristics of various UAVs under ground whole machine conditions, and monitor and evaluate the power supply quality of the whole machine power grid under various working conditions of the UAV platform.
[0014] Technical Solution
[0015] A ground unmanned aerial vehicle power supply network test system, characterized in that it includes a temperature acquisition module, a current and voltage acquisition module, a fan speed sensor, an electronic load simulator and a host computer; the engine's measurement and control channel is connected to the host computer to transmit measurement and control data to the host computer; the output end of the generator is connected in parallel to multiple device power input ends and multiple electronic load simulator power input ends; the fan speed sensor, the temperature acquisition module and the current and voltage acquisition module are connected to the host computer to transmit sensor signals to the host computer; the temperature acquisition module includes multiple temperature sensors, which are arranged in the power transmission line from the generator to the electrical equipment and the electronic load simulator; the current and voltage acquisition module includes multiple current and voltage sensors, which are arranged at the power input end of each electrical equipment and the electronic load simulator.
[0016] The electronic load simulator uses a DC high-power electronic load, which is set according to the power consumption characteristics of the mission load so that it can simulate the actual power consumption characteristics of the equipment on the ground; the power consumption characteristics of the mission load include supply voltage, steady-state power consumption, maximum power consumption, operating time, operating frequency, and operating duty cycle.
[0017] A method for testing a UAV power supply network using the ground UAV power supply network testing system is characterized by the following steps:
[0018] Step 1: Set the parameters of the electronic load simulator according to the electronic load of the actual mission payload; the parameters include but are not limited to: power, current, voltage, start time, working cycle, frequency, duty cycle;
[0019] Step 2: Stable engine working state: Control the engine and fan to work, simulating the working state of the engine during actual flight:
[0020] 1. Turn on the sensor and record the voltage, current, wire temperature and engine parameters of each device;
[0021] 2. Turn on the electronic load. Record the grid fluctuation and engine speed changes when the load is loaded;
[0022] 3. When the electronic load is working stably, record the voltage, current and steady-state temperature of each device;
[0023] The input voltage of each device in the entire power supply network during steady-state operation obtained in step 2 is used to evaluate whether the voltage drop of each power supply point in the entire power supply network meets the input voltage range of each device;
[0024] Step 3: Dynamic working state of the engine:
[0025] 1. Turn on the sensor and record the voltage, current, wire temperature and engine parameters of each device;
[0026] 2. Set the engine to high-power mode, simulate the working state of the engine and generator when the aircraft is accelerating, climbing or maneuvering, and record the voltage and current fluctuations of each device and the changes in engine speed;
[0027] 3. Set the engine to rated power mode, and simulate the working state of the engine and generator when the aircraft has completed acceleration, climbed, or started cruising with large maneuvers. Record the voltage and current fluctuations of each device, as well as the changes in engine speed;
[0028] Step 4: Turn off the engine and record the voltage and current changes of each device at the moment when the power is cut off.
[0029] An application of the data obtained by the test of the described method, characterized in that: the electronic load is turned on in step 2 to test the engine speed reduction parameters when the power supply network turns on the high-power load, so as to evaluate the safety of the flight process and provide a reference for the optimization of subsequent flight strategies.
[0030] An application of the data obtained by the test of the described method, characterized in that: the test of the steady-state temperature of the cable in step 2 can effectively evaluate the heat source and guide and optimize the cable routing and heat dissipation design.
[0031] An application of the data obtained by the test of the described method is characterized in that: through step 3, the power supply condition parameters of each device when the generator limit changes can be obtained, which can effectively evaluate whether each device works within its input voltage range and whether the voltage and current fluctuations meet the requirements of relevant standards.
[0032] Beneficial Effects
[0033] The present invention proposes a ground unmanned aerial vehicle power supply network test system and test method, wherein the engine's measurement and control channel is connected to a host computer to transmit measurement and control data to the host computer; the output end of the generator is connected in parallel to multiple device power input ends and multiple electronic load simulator power input ends; the fan speed sensor, temperature acquisition module and current and voltage acquisition module are connected to the host computer to transmit sensor signals to the host computer; the temperature acquisition module includes multiple temperature sensors, which are arranged in the power transmission line from the generator to the power-consuming equipment and the electronic load simulator; the current and voltage acquisition module includes multiple current and voltage sensors, which are arranged at the power input end of each power-consuming equipment and the electronic load simulator. When the power supply network is turned on with a high-power load, the engine speed drop parameter is tested to evaluate the safety of the flight process and provide a reference for the optimization of subsequent flight strategies. Effectively evaluate the heat source, and guide and optimize the cable routing and heat dissipation design. Effectively evaluate whether each device works within its input voltage range and whether the voltage and current fluctuations meet the requirements of relevant standards.
[0034] Compared with the prior art, the present invention has the following beneficial effects:
[0035] It can effectively test the dynamic response characteristics of engines and generators under load in ground environment;
[0036] Electronic loads can effectively simulate various types of loads, including but not limited to various high-power microwave equipment that is not powered on on the ground and equipment that has poor heat dissipation after being powered on for a long time on the ground: such as high-power amplifiers, pulse radars, etc. This can effectively reduce verification costs, shorten verification cycles, and ensure the personal safety of testers.
[0037] This device can be used to simulate various power usage conditions during flight on the ground, and measure the voltage drop, line loss, temperature rise, voltage fluctuation, etc. of the power supply network under various conditions, which can effectively reduce the test cost. The test can effectively improve flight safety and reduce the risk of mission execution. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] Figure 1 :Test system diagram DETAILED DESCRIPTION
[0039] The present invention will now be further described with reference to the embodiments and the accompanying drawings:
[0040] The ground unmanned aerial vehicle power supply network test system is characterized in that it includes a temperature acquisition module, a current and voltage acquisition module, a fan speed sensor, an electronic load simulator and a host computer; the engine's measurement and control channel is connected to the host computer to transmit the measurement and control data to the host computer; the output end of the generator is connected in parallel to multiple device power input ends and multiple electronic load simulator power input ends; the fan speed sensor, the temperature acquisition module and the current and voltage acquisition module are connected to the host computer to transmit the sensor signal to the host computer; the temperature acquisition module includes multiple temperature sensors, which are arranged in the power transmission line from the generator to the electrical equipment and the electronic load simulator; the current and voltage acquisition module includes multiple current and voltage sensors, which are arranged at the power input end of each electrical equipment and the electronic load simulator.
[0041] The test system is connected to the power supply network of the UAV to be tested; it includes a towing system; the towing system includes an aircraft engine, a gearbox, and a coupling; the aircraft generator is connected to the output shaft of the speed increaser; the UAV engine drives the generator to supply power to various devices on the UAV platform through the whole machine cable.
[0042] The measurement and control system is connected to the drive system and the power supply network, including a host computer, a data acquisition card, current, voltage, speed and temperature sensors; it tests the speed of the fan, the speed, temperature, pressure, etc. of the engine, the voltage and current of each device end, and the wire temperature of the high-power electrical equipment.
[0043] Cooling system: The cooling system mainly includes centrifugal fans and air guide devices;
[0044] Load system: The load system mainly includes electronic loads and some physical equipment.
[0045] The electronic load can adjust the power consumption according to the program. The electronic load is used to simulate the load conditions of some equipment on the ground that do not have the test conditions, such as high-power pulse radar, etc.; it is used to simulate the power consumption of radar, communication, and electronic countermeasure loads that cannot be turned on on the ground.
[0046] The engine operation is controlled through the engine measurement and control channel, and flight scenarios are simulated on the ground, including high-power maneuvers and steady-state flight.
[0047] By controlling the fan to simulate the incoming flow speed during flight, the engine cooling environment can be simulated.
[0048] Application Example 1:
[0049] Background: An electronic jammer type UAV is equipped with a high-power electronic jammer, and the power consumption is xKW using 28V power supply and steady-state current data. Due to radiation reasons, the jammer cannot be turned on on the ground for load testing. According to the working characteristics of the high-power electronic jammer, an electronic load is used to simulate the power consumption characteristics of the jammer when it is working to test the UAV power supply network.
[0050] Step 1: Set the electronic load to constant power mode, with the power consistent with the interference source power.
[0051] Step 2: Start the engine and control the engine to operate at the rated speed to simulate the working state of the engine and generator during actual cruise flight.
[0052] Step 3: Start the fan, set the fan speed according to the actual flight speed of the aircraft, and simulate the incoming air to cool the engine.
[0053] Step 4: Turn on the electronic load and record the grid fluctuation (voltage, current), engine speed change and the temperature of the electronic load power supply cable when the load is loaded.
[0054] Step 5: Increase the engine throttle to compensate for the drop in engine speed. When the speed returns to the rated speed, stop increasing the throttle.
[0055] Step 6: Observe the temperature changes of the power supply cable. When the temperature reaches a steady state, record the temperature at that time.
[0056] Step 7: Turn off the electronic load and record the grid fluctuations (voltage, current) and engine speed changes when the load is loaded.
[0057] Step 7: Turn on the electronic load, and after the power grid stabilizes, push the engine to its limit power and record the voltage and current changes of each device during the process.
[0058] Step 8: Reduce the engine speed to the rated speed and record the voltage and current changes of each device during the process.
[0059] Step 9: Turn off the engine and record the voltage and current changes of each device during the process.
[0060] Summary: Based on the above operations, the entire power supply network can be evaluated when the engine is maneuvering in a large range, stopping suddenly, and working in a steady state. The impact of adding and unloading high-power electrical equipment on the power supply performance of the engine and the UAV power supply network can be evaluated, and the flight control strategy can be adjusted in advance according to the situation. It can also effectively evaluate the heat source, avoid cable fires in advance, and keep the heat source away from flammable and explosive items such as fuel tanks and pyrotechnics in advance. It can effectively reduce testing costs and safety hazards. Improve flight safety.
[0061] Through the above methods, it is possible to simulate the actual working conditions of the air power grid on the ground. By measuring the current and voltage of each device, it is possible to evaluate whether the input voltage of the device under each working condition is within the input voltage range allowed by the device, and whether the voltage and current ripples meet the relevant requirements of the national standard. Whether there are safety hazards such as fire caused by the temperature rise of the cable. Whether the grid fluctuations and engine response when turning on and off high-power loads can ensure flight safety.
[0062] Through the above scheme, the effective simulation of the power grid working conditions during flight can be realized on the ground, which can effectively reduce the testing cost, fully test and evaluate the working conditions of the power grid, and effectively reduce the flight safety risks of drones before flight.
Claims
1. A method for testing a UAV power supply network using a ground UAV power supply network test system, characterized in that: The ground UAV power supply network test system includes a temperature acquisition module, a current and voltage acquisition module, a fan speed sensor, an electronic load simulator and a host computer; the engine's measurement and control channel is connected to the host computer to transmit measurement and control data to the host computer; the output end of the generator is connected in parallel to multiple device power input ends and multiple electronic load simulator power input ends; the fan speed sensor, the temperature acquisition module and the current and voltage acquisition module are all connected to the host computer to transmit sensor signals to the host computer; the temperature acquisition module includes multiple temperature sensors, which are arranged in the power transmission line from the generator to the power-consuming equipment and the electronic load simulator; the current and voltage acquisition module includes multiple current and voltage sensors, which are arranged at the power input end of each power-consuming equipment and the electronic load simulator; the electronic load simulator uses a DC high-power electronic load, which is set according to the power consumption characteristics of the mission load so that it can simulate the actual power consumption characteristics of the equipment on the ground; the power consumption characteristics of the mission load include power supply voltage, steady-state power consumption, maximum power consumption, working time, working frequency and working duty cycle; The method steps for testing the drone power supply network are as follows: Step 1: Setting the parameters of the electronic load simulator according to the electronic load of the actual mission payload; the parameters include but are not limited to: power, current, voltage, start time, duty cycle, frequency and duty cycle; Step 2: Engine stable working state: Control the engine and fan to simulate the working state of the engine during actual flight: a. Turn on the sensor and record the voltage, current, wire temperature and engine parameters of each device; b. Turn on the electronic load and record the grid fluctuation and engine speed changes when the load is loaded; c. When the electronic load is working stably, record the voltage, current and steady-state temperature of each device; The input voltage of each device in the entire power supply network during steady-state operation obtained in step 2 is used to evaluate whether the voltage drop of each power supply point in the entire power supply network meets the input voltage range of each device; Step 3: Dynamic working state of the engine: a. Turn on the sensor and record the voltage, current, wire temperature and engine parameters of each device; b. Set the engine to high-power mode, simulate the working state of the engine and generator when the aircraft is accelerating, climbing or maneuvering, and record the voltage and current fluctuations of each device and the changes in engine speed; c. Set the engine to rated power mode, simulate the working state of the engine and generator when the aircraft has completed acceleration or climb or has started cruising with large maneuvers; record the voltage and current fluctuations of each device and the changes in engine speed at this time; Step 4: Turn off the engine and record the voltage and current changes of each device at the moment of power failure.
2. An application of the data obtained by the test of the method according to claim 1, characterized in that: Turn on the electronic load through step 2, and test the parameters of engine speed reduction when the power supply network turns on the high-power load, so as to evaluate the safety of the flight process and provide a reference for the optimization of subsequent flight strategies.
3. An application of the data obtained by the test of the method according to claim 1, characterized in that: Testing the steady-state temperature of the cable in step 2 can effectively evaluate the heat source and provide guidance and optimization for cable routing and heat dissipation design.
4. An application of the data obtained by the test of the method according to claim 1, characterized in that: Through step three, the power supply parameters of each device when the generator limit changes can be obtained, which can effectively evaluate whether each device is working within its allowed input voltage range and whether the voltage and current fluctuations meet the requirements of relevant standards.