Master-slave teleoperation robot system and method
By combining high-altitude and ground control, the master-slave remote operation robot system uses virtual reality and multi-channel vision technology to solve the problems of difficulty in obtaining information and frequent tool switching in live operations, and achieve efficient and safe completion of heavy-duty operations.
Patent Information
- Application Number
- CN202310443783.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-04-19
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2043-04-19
AI Technical Summary
The existing master-slave remote operation robot system is difficult to accurately obtain three-dimensional information on the work site during live operations, resulting in low operation efficiency and high safety risks, and the inability to complete heavy operation tasks.
Using a combination of high-altitude control and ground control, the precise operation of the end of the robot arm is achieved through virtual reality equipment and multi-channel visual fusion technology. It is equipped with integrated live guide tools and flexible peeling tools, and integrated wire peeling and strand clamping storage. and tightening function to solve the problem of frequent tool switching.
It improves the working efficiency and control accuracy of remote operations, realizes the completion of heavy operations such as replacement of lightning arresters and drop switches, and improves the safety and efficiency of live operations.
Smart Images

Figure CN116572217B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of operating robots, and in particular to a master-slave teleoperation robot system and method. Background Art
[0002] The statements in this section merely provide background information related to the present invention and do not necessarily constitute prior art.
[0003] The master-slave teleoperated robot is mainly used for live operations in distribution networks to complete tasks such as live disconnection of leads, replacement of lightning arresters and drop switches, etc., so that the operators are completely isolated from the high-voltage electric field, and the safety of the operators is guaranteed to the greatest extent.
[0004] At present, the master-slave teleoperation robot still faces the following technical problems:
[0005] (1) At present, the operation of live-line working robots adopts the control mode that the operator performs remote control on the ground, and the robot arm is lifted into the work site with the aerial work platform to perform live-line working. The operator cannot observe the status of the working tool at the end of the robot arm at close range, and it is difficult to grasp the relative position relationship between the end of the robot arm and the working target; because the single-view visual equipment cannot present information such as whether the working tool is in place, the on-site information obtained by the operator through the camera lacks three-dimensional information, especially when the robot arm is operated, there is still a certain amount of occlusion, which makes it difficult for the operator to accurately obtain the position relationship of the working object at the operation site through the screen, which brings great challenges to remote operation and low working efficiency.
[0006] (2) Remote teleoperation is mainly used to complete light-duty tasks such as disconnecting live wires and removing foreign objects, but cannot complete heavy-duty tasks such as replacing lightning arresters and drop switches.
[0007] (3) When completing live-line connection work, the live-line working robot needs to use stripping tools and stranding clamp tightening tools alternately to perform the work. Therefore, the two tools need to be switched frequently during the operation, which seriously affects the work efficiency and poses a high safety risk.
[0008] (4) When the live working robot completes the cable stripping task, it needs to select the appropriate tool sleeve and manually adjust the tool according to the actual work requirements on site; it cannot automatically adjust the tool according to the wire diameter and insulation thickness. Summary of the invention
[0009] In order to solve the above problems, the present invention proposes a master-slave remote-controlled robot system and method, which have two operating modes: high-altitude control and ground control, and can complete heavy-duty operations such as replacing lightning arresters and drop switches. The system adopts the method of coordinating the control of the master hand and the slave hand, and uses a VR vision system to remotely control the robotic arm, so that the operator can accurately obtain visual information of the working position and improve working efficiency.
[0010] In some embodiments, the following technical solutions are adopted:
[0011] A master-slave teleoperated robot system, comprising: an insulating lifting mechanism, an aerial working mechanism, a ground control mechanism, a visual system and working tools;
[0012] The aerial work mechanism is connected to the insulating lifting mechanism, the aerial work mechanism includes an aerial work mechanical arm and an aerial mechanical arm master hand, the working tool is carried on the aerial work mechanical arm, the aerial work mechanical arm and the aerial mechanical arm master hand adopt a master-slave control mode, and the motion control of the aerial work mechanical arm can be realized by operating the aerial mechanical arm master hand;
[0013] The visual system is used to collect work tool information, work object information and work position information, and transmit the acquired information to the ground control mechanism, which includes a ground operation master hand and a virtual reality device. The ground operation master hand and the aerial work robot arm adopt a master-slave control mode, and the motion control of the aerial work robot arm can be achieved by operating the ground operation master hand; the virtual reality device can form a corresponding virtual scene based on the information acquired by the visual system, and can control the action of the visual system to achieve the switching of perspective.
[0014] As a further solution, the visual system includes:
[0015] A hand-eye camera is arranged on the aerial work robot arm, and the hand-eye camera moves with the aerial work robot arm, and is used to collect information about the work tool and the work object, and locate the position of the aerial work robot arm during operation;
[0016] A binocular camera with a pan-tilt, the pan-tilt can drive the binocular camera to achieve pitch or rotation movement; the virtual reality device can be linked with the pan-tilt to control the movement of the binocular camera, the binocular camera is used to obtain information about the working position;
[0017] Global camera, used to obtain global information of the aerial work mechanism;
[0018] The local camera is used to obtain the position information of the aerial work robot arm and the real-time position information between the aerial work robot arm and the work target.
[0019] As a further solution, the aerial work mechanism includes an aerial work platform, and the visual system, the aerial work robot arm and the aerial robot arm main hand are all arranged on the aerial work platform; the insulating lifting mechanism is connected to the aerial work platform and can drive the aerial work platform to achieve lifting and lowering; the aerial work robot arm and the aerial robot arm main hand communicate through optical fiber.
[0020] As a further solution, the aerial working mechanism and the ground control mechanism communicate with the insulating lifting mechanism respectively to control the lifting and lowering of the insulating lifting mechanism.
[0021] As a further solution, when working at high altitude, the operator on the aerial work platform can achieve master-slave control of the aerial work robot arm by controlling the main hand of the aerial robot arm; when working on the ground, the operator in the ground control room can achieve master-slave control of the aerial work robot arm by controlling the main hand of the ground robot arm with the help of virtual reality equipment.
[0022] As a further solution, an index switch is provided on the main hand of the aerial manipulator arm or the main hand of the ground manipulator arm. When the index switch is pressed, the aerial work manipulator arm can be fixed to the current position. At this time, after moving the main hand to the set position, pressing the index switch again can make the current position of the main hand correspond to the current position of the aerial work manipulator arm.
[0023] As a further solution, the main hand of the aerial manipulator arm or the main hand of the ground manipulator arm includes a continuous wrist operation mode, and the continuous wrist operation mode is used to control the wrist of the aerial work manipulator arm to automatically rotate continuously in any direction at a set speed mode.
[0024] As a further solution, the ground control mechanism communicates with the remote monitoring center through the local 5G network, and the remote monitoring center is used to monitor the entire process of high-altitude operations.
[0025] As a further solution, the working tool comprises: an integrated live-electric connection tool, the integrated live-electric connection tool comprises:
[0026] A supporting structure, and a stripping mechanism, a stranded wire clamp threading mechanism, a wire clamp material storage mechanism, and a stranded wire clamp tightening mechanism respectively connected to the supporting structure; the wire clamp material storage mechanism is fixed on the side of the supporting structure opposite to the stripping mechanism; the stranded wire clamp threading mechanism comprises: an X-axis moving module, a Y-axis moving module capable of moving along the X-axis moving module, and an execution terminal connected to the Y-axis moving module, and the stranded wire clamp tightening mechanism is arranged on the execution terminal;
[0027] The stripping mechanism is used to complete the stripping of the main cable. The parallel wire clamp tightening mechanism can remove the parallel wire clamp from the clamp storage mechanism and transport it to the main cable stripping position under the drive of the X-axis moving module and the Y-axis moving module, and then tighten the torque bolt head of the parallel wire clamp by driving the tightening sleeve through the motor.
[0028] As a further solution, the stripping mechanism includes a first wire clamping unit and a second wire clamping unit relatively arranged at both ends of the base plate, a linear motion unit fixed on the base plate, a rotating unit connected to the linear motion unit and capable of linear motion, and an automatic tool adjustment unit connected to the rotating unit and capable of rotating under the drive of the rotating unit.
[0029] As a further solution, the working tools also include: an electric automatic stripping tool, an electric wrench, a wire cutting tool, a branch removal tool, a bypass cable hanging tool and a bird-repelling tool.
[0030] As a further solution, the bypass cable hanging tool includes a wire hanging mechanism and a wire connecting mechanism;
[0031] The wire hanging mechanism is an insulating hook, comprising: a first clamping part, a hook body and a rope threading part respectively located at two ends of the first clamping part;
[0032] The wire connection mechanism at least includes a monkey head wire clamp, an adapter, an adapter extension, a rotating shaft and a bypass cable connector, the monkey head wire clamp is rotatably connected to the rotating shaft, and the first end of the adapter is connected to the first end of the adapter extension through the base of the rotating shaft;
[0033] The adapter is provided with a second clamping portion, the adapter extension is provided with a third clamping portion, the second end of the adapter is connected to the bypass cable connector, the bypass cable connector is connected to the bypass cable, one end of the insulating rope is connected to the insulating hook through the rope threading portion, and the other end of the insulating rope is connected to the bypass cable.
[0034] In other embodiments, the following technical solutions are adopted:
[0035] A working method of a master-slave teleoperation robot system includes the following process:
[0036] Install the set working tool on the aerial work robot arm;
[0037] In the aerial work mode, the operator on the aerial work platform controls the movement of the aerial work robot arm by manipulating the aerial robot arm main hand to achieve the set work task;
[0038] During ground operations, the operator in the ground control room receives the work tool information, work object information and work position information collected by the visual system, and with the help of virtual reality equipment, operates the ground operating main hand to control the movement of the aerial work robot arm; the virtual reality equipment can form a corresponding virtual scene based on the information obtained by the visual system, and can control the movement of the visual system to achieve switching of perspectives.
[0039] Compared with the prior art, the present invention has the following beneficial effects:
[0040] (1) The present invention proposes a three-dimensional real-time interactive operation method for master-slave teleoperated robots, develops a master-slave teleoperated robot system, uses virtual reality equipment to follow the motion of the pan / tilt platform, and uses multi-channel visual fusion and image recognition technology to adjust or switch the visual scene of the virtual scene in real time, thereby achieving precise operation of the end of the robot arm, solving the problem of the inability to accurately obtain work site information during teleoperation in the prior art, improving the work efficiency of the master-slave teleoperation, and enhancing the accuracy of work control.
[0041] (2) The present invention proposes an integrated live connection method of a master-slave remote-controlled robot and develops an integrated live connection tool. By integrating functions such as wire stripping, wire clamp storage, and wire clamp tightening, the problem of frequent replacement of working tools during the operation is solved, and the integrated continuous operation of cable stripping and automatic connection of three-phase cables is realized, thereby improving the work efficiency of live operations and ensuring the safety of operators.
[0042] (3) The present invention proposes a method for flexible stripping of distribution network cables under power, and develops a flexible stripping tool under power. The stripping tool moves along the long slot hole and the rotating hole at the same time, so that the stripping tool can cut a flexible arc on the cable, which solves the problem of being unable to actively adapt to multi-specification wire types, improves the quality of stripping of insulated wires, realizes the active adaptive stripping function of multi-specification wire types, improves the stability of stripping performance, and improves the efficiency of live operations.
[0043] Other features and advantages of additional aspects of the present invention will be given in part in the following description, and in part will become obvious from the following description, or will be learned through the practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] Figure 1 Schematic diagram of the overall structure of the master-slave teleoperated robot system in an embodiment of the present invention;
[0045] Figure 2 It is a structural schematic diagram of the aerial work mechanism in an embodiment of the present invention;
[0046] Figure 3 is a schematic diagram of a visual system in an embodiment of the present invention;
[0047] Figure 4 It is a structural schematic diagram of an integrated live-electric connection system in an embodiment of the present invention;
[0048] Figure 5 Schematic diagram of the structure of the automatic tool adjustment unit in an embodiment of the present invention;
[0049] Figure 6 Schematic diagram of flexible feeding of a tool in an embodiment of the present invention;
[0050] Figure 7 It is a structural schematic diagram of the thread-threading mechanism of the stranded wire clamp in an embodiment of the present invention;
[0051] Figure 8 It is a structural schematic diagram of a tightening mechanism for a stranded wire clamp in an embodiment of the present invention;
[0052] Fig. 9 It is a structural schematic diagram of the wire clamp material storage mechanism in an embodiment of the present invention;
[0053] Fig.10 This is a schematic diagram of the structure of an electric automatic stripping tool in an embodiment of the present invention;
[0054] 11(a)-(b) are schematic structural diagrams of a wire hanging mechanism and a wire connecting mechanism in an embodiment of the present invention;
[0055] Among them, 1. mobile chassis, 2. insulated lifting arm, 3. aerial work platform, 4. insulated bucket, 5. aerial work manipulator arm, 6. aerial manipulator arm main hand, 7. electric control box, 8. ball camera, 9. hand-eye camera, 10. binocular camera, 11. stripping mechanism, 12. parallel wire clamp threading mechanism, 13. parallel wire clamp tightening mechanism, 14. wire clamp storage mechanism, 15. supporting structure; 16. insulated hook, 17. first clamping part, 18. rope threading part, 19. rope threading hole, 20. bypass cable, 21. bypass cable connector, 22. adapter, 23. second clamping part, 24. third clamping part, 25. monkey head wire clamp, 26. adapter extension, 27. rotating shaft;
[0056] 111. First wire clamping unit, 112. Second wire clamping unit, 113. Linear motion unit, 114. Rotation unit, 115. Tool automatic adjustment unit;
[0057] 1051. a first clamping member, 1052. a second clamping member, 1053. a small tool fixing seat, 1054. a large tool fixing seat, 1055. a rotating shaft, 1056. a sliding shaft, 1057. a peeling tool, 1058. a bidirectional lead screw structure, 1059. a tool feeding motor, 1060. a large guide rod, 1061. a small lead screw nut assembly, 1062. a tool adjusting motor, 1063. a tool adjusting gear assembly;
[0058] 121. X-axis double-track moving module, 122. Y-axis single-track moving module, 123. base bracket; 131. tightening motor, 132. gear transmission mechanism, 133. sleeve feeding module, 134. sleeve, 135. wire clamp holding arm, 136. connecting bracket, 137. guide groove bracket, 138. guide groove, 139. connecting frame; 141. first bracket, 142. second bracket, 143. third bracket, 144. wire clamp support arm, 145. bracket. DETAILED DESCRIPTION
[0059] It should be noted that the following detailed descriptions are illustrative and are intended to provide further explanation of the present application. Unless otherwise specified, all technical and scientific terms used in the present invention have the same meanings as those commonly understood by those skilled in the art to which the present application belongs.
[0060] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present application. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprise" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.
[0061] Embodiment 1
[0062] In one or more embodiments, a master-slave teleoperated robot system is disclosed, in combination with Figure 1 , specifically including: insulated lifting mechanism, aerial work mechanism, ground control mechanism, visual system and work tools.
[0063] Among them, the insulating lifting mechanism adopts an insulating bucket arm vehicle, which includes a wheeled mobile chassis 1 and an insulating lifting arm 2 connected to the chassis; an aerial work platform 3 is arranged on the top of the insulating lifting arm 2, and an insulating bucket 4 is arranged on the aerial work platform 3, and the operator can operate the aerial work mechanism in the insulating bucket.
[0064] In this embodiment, the safety protection problem of live-line operation of robots under high voltage levels is solved by using an integrated software and hardware safety protection system. Glass fiber reinforced epoxy resin composite material made by wet layup molding process is used as the insulating material. The hardware insulation protection system composed of insulating lifting arms, working tool rods, insulating supports, etc. ensures the safety of the robot body and live-line equipment in the substation. Multi-source heterogeneous information fusion technology based on electromagnetic field detection, ultrasonic detection, visual detection and other detection technologies, combined with the real-time leakage current information of the robot to the ground, is used to build a robot software protection system to achieve full monitoring and intelligent protection of the robot's operation process.
[0065] The multi-sensor group can collect the air pressure, wind speed, temperature and humidity of the master and slave teleoperated robots. The control system integrates the working parameters collected by each sensor in the sensor group, calibrates the environmental information, and determines the working environment of the master and slave teleoperated robots. The multi-sensor group includes laser sensors, tilt angle sensors, ultrasonic sensors, leakage current sensors, etc. The laser sensors and ultrasonic sensors are located at the ends of the mechanical arms of the master and slave teleoperated robots to detect the working distance information. The tilt angle sensor is installed on the aerial work platform to detect the tilt angle of the work platform. The leakage current sensor is installed at the rear of the insulated boom truck to detect the leakage current in real time during the operation. High-altitude visual transmission uses optical fiber transmission to ensure the stability of video transmission.
[0066] The insulated lifting arm adopts a combined insulation method. Various detection sensors such as electromagnetic field detection, leakage current detection, ultrasonic detection, and visual detection are installed at the joints of the insulating lifting arm, which can detect changes in the working environment in real time during operation. The end of the insulating lifting arm is connected to the aerial work platform, and the aerial work platform uses insulating materials to construct its outer shell to ensure the external insulation of its internal electrical components. The supporting part of the robotic arm ensures insulation while meeting the support strength requirements.
[0067] The aerial work mechanism and the visual system are both arranged on the aerial work platform 3; Figure 2 The aerial work mechanism mainly includes: an aerial work robot arm 5, an aerial robot arm main hand 6 and an electric control system. The aerial work robot arm 5 adopts a double hydraulic robot arm, including a left slave hand and a right slave hand, which are fixed on the aerial work platform respectively; the hydraulic device actuator of the aerial work robot arm consists of five hydraulic cylinders and a hydraulic motor. The five hydraulic cylinders correspond to the five joints of the robot arm, namely, waist rotation, upper arm pitch, lower arm pitch, wrist pitch, and wrist swing; the hydraulic motor corresponds to the wrist rotation joint; the end gripper is opened and closed directly by hydraulic pressure. Each joint actuator is equipped with a pressure sensor and an angular displacement sensor to facilitate the measurement and feedback of parameters when each joint of the robot arm is running synchronously.
[0068] The aerial manipulator arm master hand 6 is arranged in the insulating bucket 4, including a left master hand and a right master hand, and is easy to disassemble; the aerial work manipulator arm and the aerial manipulator arm master hand communicate through optical fiber. The hydraulic manipulator arm right slave hand is controlled by the right master hand, and the hydraulic manipulator arm left slave hand is controlled by the left master hand. The left and right slave hands of the manipulator arm are driven by hydraulic power and driven by corresponding drivers; the driver itself is equipped with a lithium battery to achieve electrical isolation from the working platform to ensure the safety of the working platform during live working.
[0069] The electric control system is arranged in the electric control box 7. The outer shell of the electric control box is assembled from insulating materials and is waterproof. A door is opened at the rear side to facilitate the disassembly and assembly of the electric control box.
[0070] This embodiment can complete heavy-duty operations such as replacing lightning arresters and drop switches by setting up a high-altitude working mechanism; it solves the technical problem that remote teleoperation mainly completes lightweight operations such as disconnecting live leads and clearing foreign objects, but cannot complete heavy-duty operations such as replacing lightning arresters and drop switches.
[0071] Combination Figure 3 , the visual system includes:
[0072] The hand-eye cameras 9 are respectively arranged on the left and right wrists of the aerial work robot arm. The hand-eye cameras move with the aerial work robot arm and are used to collect information about the working tools and working objects and locate the position of the aerial work robot arm during operation.
[0073] A binocular camera 10 with a pan-tilt is fixed on the aerial work platform. The pan-tilt can drive the binocular camera to achieve pitch or rotation movement; the virtual reality device of the ground control mechanism can be linked with the pan-tilt to control the movement of the binocular camera. The binocular camera pan-tilt can achieve 360° continuous horizontal rotation and +40° to -90° vertical rotation, which can simulate human eye information, collect work position information, and perform precise operations.
[0074] The global camera is used to obtain global information of the aerial work mechanism. The global camera of this embodiment adopts a gun camera, and the horizontal range of the gun camera is 0 to 360°, and the vertical range is +40° to -90°. It can display the overall situation of the work platform, mechanical arm, and work equipment in real time.
[0075] The local camera is used to obtain the position information of the aerial work robot arm and the real-time position information between the aerial work robot arm and the work target. In this embodiment, the local camera adopts a ball camera 8, which is installed at the bottom of the aerial work platform. The ball camera has a pitch range of ±90° and a left and right range of ±90°. It can display the position of the hydraulic robot arm and the real-time position relationship between the hydraulic robot arm and the work target in real time during the ascent and operation of the aerial work platform to avoid bottom collision during the operation.
[0076] The transmission of the video or image acquired by the visual system of this embodiment adopts the transmission method of WiFi+optical fiber, the hand-eye camera and the binocular camera adopt the WiFi transmission method, the gun camera and the ball camera adopt the wired transmission method of pre-buried wires, and the video signal is connected to the video processor for processing, and then the optical fiber communication in the insulated lifting arm is connected to the vehicle control room through the optical fiber, and the video decoding module is connected. After the video is decoded, it is put into the main screen to display the operation status in real time.
[0077] The visual system collects work tool information, work object information and work location information, and transmits the acquired information to the ground control mechanism; the ground control mechanism is arranged in the on-board control room of the insulated boom truck, and mainly includes a ground operation master hand and a virtual reality device. The ground operation master hand and the aerial work robot arm adopt a master-slave control mode, and the motion control of the aerial work robot arm can be achieved by operating the ground operation master hand; the virtual reality device can form a corresponding virtual scene based on the information acquired by the visual system, and can control the action of the visual system to achieve the switching of perspective.
[0078] The specific image recognition process is as follows: the visual system collects images from the binocular camera through the image acquisition card, uses the parallax in the left and right images to obtain the three-dimensional point cloud information of the scene, and uses three-dimensional matching technology in the three-dimensional point cloud to realize automatic positioning of the working tool, thereby realizing automatic identification of the working position.
[0079] The acquisition of the three-dimensional point cloud of the scene is achieved through binocular stereo vision. Binocular stereo vision is based on the principle of parallax, the baseline distance B is the distance between the projection centers of the left and right cameras, and the focal length of the camera is f.
[0080] Two cameras view the same feature point P(x) of a spatial object at the same time. c ,y c ,z c ), the images of point P are obtained on the "left eye" and "right eye" respectively, and their image coordinates are:
[0081] p left =(X left ,Y left )
[0082] p right =(X right ,Y right ).
[0083] Assuming that the two cameras are on the same plane, the image coordinates of the feature point P have the same Y coordinate, which can be obtained from the triangular geometry relationship:
[0084]
[0085] Then the disparity is: Disparity = X left-X right . From this, the three-dimensional coordinates of the feature point P in the camera coordinate system can be calculated as:
[0086]
[0087] Therefore, any point on the left camera image plane can determine the 3D coordinates of any point as long as it can find a corresponding matching point on the right camera image plane. This method is a complete point-to-point operation. All points on the image plane can participate in the above operation as long as there are corresponding matching points, thereby obtaining their corresponding 3D coordinates.
[0088] Traverse all similar point pairs in the left and right images, calculate the disparity of the left and right views, and obtain the 3D point cloud information of the device according to the above algorithm.
[0089] The scene point cloud information is obtained through the binocular stereo vision algorithm. As long as the equipment is automatically identified in the three-dimensional point cloud, the equipment's operating position can be accurately located.
[0090] In this embodiment, the virtual reality device uses a VR helmet. The VR helmet can form a corresponding virtual scene based on the information of the high-altitude working object, the hydraulic mechanical arm and the working tool status information, and control the camera in the visual system through corresponding control instructions formed by voice control instructions or operator movements. For example: the movement of the camera gimbal and the rotation of the operator's VR helmet can be linked and in the same direction.
[0091] The default display content of the VR helmet is the content captured by the binocular camera in the visual system. The camera angle can be rotated by rotating the VR helmet, and the content displayed in the helmet is refreshed in real time. The video channel switching delay is ≤1s, giving operators a better sense of on-site operation.
[0092] The VR helmet can also switch the display of multiple video contents (visual display contents) and the camera video information in the vehicle control room. It can observe the environmental information and live working tool information on the data display screen, and also monitor the status and operation of the vehicle control room, facilitating human-computer interaction.
[0093] In this embodiment, the ground operating master hand and the aerial work robot arm also adopt the master-slave control mode. The motion control of the aerial work robot arm can be achieved by operating the ground operating master hand; the virtual reality technology can be used to form a virtual scene of the working phenomenon, and the state of the working tool, the relative position relationship between the aerial work machinery and the working target can be accurately observed, etc., which solves the problem that the existing technology cannot accurately obtain the working site information during remote operation, and improves the work efficiency and accuracy of live working.
[0094] As a specific example, an index switch is provided on the master hand of the aerial manipulator or the master hand of the ground manipulator. When the index switch is pressed, the aerial manipulator can be fixed to the current position. At this time, after moving the master hand to the set position (moving the master hand to a more comfortable position), pressing the index switch again can make the current position of the master hand correspond to the current position of the aerial manipulator. If the "index" is pressed continuously, the master arm will automatically align with the slave arm under the joint power.
[0095] The master hand of the aerial manipulator arm or the master hand of the ground manipulator arm also includes a continuous wrist operation mode and a master-slave wrist mode. The continuous wrist operation mode is used to control the wrist of the aerial work manipulator arm to automatically rotate continuously in any direction at a set speed mode; in the master-slave wrist mode, the slave hand will follow the master hand wrist for natural movement.
[0096] This embodiment is based on 5G communication technology. The ground control organization communicates with the remote monitoring center through the local 5G network. The on-board industrial computer pushes all video streams and environmental data information to the remote monitoring center through the 5G network. The remote monitoring center can monitor the entire operation process.
[0097] In this embodiment, the aerial working mechanism and the ground control mechanism communicate with the insulating lifting mechanism respectively, and both can control the lifting and lowering of the insulating lifting mechanism.
[0098] When working at high altitude, the operator on the aerial work platform controls the main hand of the aerial robot arm to achieve master-slave control of the aerial work robot arm; when working on the ground, the operator in the ground control room uses virtual reality equipment to control the main hand of the ground robot arm to achieve master-slave control of the aerial work robot arm.
[0099] The working tools are mounted on the aerial work robot arm. The working tools of this embodiment can be: an integrated live connection tool, a live automatic stripping tool, an electric wrench, a wire cutting tool, a branch removal tool, a bypass cable hanging tool and a bird-repelling tool, etc.
[0100] Combination Figure 4The integrated live connection tool of this embodiment includes: a supporting structure, and a stripping mechanism 11, a parallel wire clamp threading mechanism 12, a wire clamp material storage mechanism 14 and a parallel wire clamp tightening mechanism 13 respectively connected to the supporting structure; wherein the wire clamp material storage mechanism 14 is fixed on the side of the supporting structure 15 opposite to the stripping mechanism; the parallel wire clamp threading mechanism 12 includes: an X-axis moving module 121, a Y-axis moving module 122 that can move along the X-axis moving module, and an execution terminal connected to the Y-axis moving module 122, and the parallel wire clamp tightening mechanism 13 is arranged on the execution terminal. The stripping mechanism 11 is used to complete the stripping of the main cable, and the parallel wire clamp tightening mechanism can remove the parallel wire clamp from the wire clamp material storage mechanism 14 and transport it to the main cable stripping position under the drive of the X-axis moving module 121 and the Y-axis moving module 122, and then tighten the torque bolt head of the parallel wire clamp by driving the tightening sleeve through the motor.
[0101] The stripping mechanism of this embodiment includes: a first wire clamping unit 111, a second wire clamping unit 112, a linear motion unit 113, a rotating unit 114 and a tool automatic adjustment unit 115. The first wire clamping unit 111 and the second wire clamping unit 112 are relatively arranged at two ends of the bottom plate; the linear motion unit 113 is fixed on the bottom plate and can perform left and right linear motion; the rotating unit 114 is connected to the linear motion unit 113 and can perform linear motion under the drive of the linear motion unit; the tool automatic adjustment unit 115 is connected to the rotating unit 114 and can rotate under the drive of the rotating unit, and the tool automatic adjustment unit 115 can also perform linear motion with the rotating unit.
[0102] In this embodiment, the structures of the first wire clamping unit, the second wire clamping unit, the linear motion unit and the rotating unit can all be implemented using existing structures, and the specific structures will not be described in detail.
[0103] In this embodiment, combined with Figure 5 and Figure 6 The tool automatic adjustment unit 115 includes: a first clamping member 1051 and a second clamping member 1052 arranged opposite to each other, a connecting plate connected to the rotating unit, a bidirectional screw structure 1058 for realizing relative movement between the first clamping member 1051 and the second clamping member 1052; and a tool feed motor 1059 for driving the first clamping member 1051 and the second clamping member 1052 to perform relative movement.
[0104] The stripping tool 1057 is connected to one of the clamping parts through a tool fixing seat. One end of the stripping tool 1057 is rotatably connected to the tool fixing seat through a rotating shaft 1055, and the other end of the stripping tool is slidably connected to another sliding shaft 1056 on the tool fixing seat through a long slot hole, so as to realize the arc-shaped flexible cutting of the cable by the stripping tool.
[0105] The tool flexible feeding assembly is installed on the first clamping member and moves with the movement of the first clamping member; the tool flexible feeding assembly specifically includes: a tool adjusting motor 1062, a tool adjusting gear group 1063, a small screw nut group 1061, a large tool fixing seat 1054, a small tool fixing seat 1053, a peeling tool 1057, a tool rotating shaft 1055 and a tool sliding shaft 1056. The small tool fixing seat 1053 is on the first clamping member, and a tool sliding shaft 1056 is installed on it. The large tool fixing seat 1054 is connected to the first clamping member through a large guide rod 1060 and a small screw nut group 1061, and a tool rotating shaft is installed on it. The tool adjusting motor 1062 is fixed on the first clamping member, and drives the large tool fixing seat 1054 to move through the tool adjusting gear group 1063 and the small screw nut group 1061.
[0106] Combination Figure 6 The stripping tool 1057 has a U-shaped blade, which can completely strip the insulated wire without residue. It is designed with a U-shaped inclined groove chip removal structure, and a U-shaped inclined long groove structure and a rotating hole on the side. One end rotates around the tool rotation axis, and the other end slides along the tool sliding axis under the constraint of the inclined long groove structure. At this time, the stripping tool head moves out of a flexible arc to complete the flexible stripping operation, and can adapt to the stripping of wires of various wire diameters.
[0107] After the stripping is completed, the rotating unit 114 and the automatic tool adjustment unit 115 are driven by the linear motion unit 113 to move to the set position according to the set direction and moving distance to leave the stripping position and leave movement space for the stranding clamp threading mechanism.
[0108] Combination Figure 7 The parallel wire clamp threading mechanism 12 includes: a base bracket 123, an execution terminal, an X-axis double-track moving module 121, a Y-axis single-track moving module 122 and a driving motor; wherein the X-axis double-track moving module is fixed on the base bracket, the Y-axis single-track moving module is overlapped on the X-axis double-track moving module, and can perform linear motion along the Y-axis single-track moving module; the driving motor is used to provide driving force for the X-axis double-track moving module and the Y-axis single-track moving module; the execution terminal is arranged on the Y-axis single-track moving module, and the parallel wire clamp tightening mechanism is connected to the execution terminal.
[0109] Combination Figure 8 The tightening mechanism of the stranded wire clamp includes a connecting frame, in which two sleeves 134 adapted to the torque bolt heads of the stranded wire clamp are arranged. The two sleeves are connected to a sleeve feeding module 133, which is a linear motion module. The sleeve feeding module can drive the two sleeves to realize up and down linear motion.
[0110] The two sleeves are also connected to a tightening motor 131, which is connected to a tightening motor driver, which is arranged on a driver mounting plate. The tightening motor applies tightening torque to the two sleeves through a speed reducer and a gear transmission mechanism 132.
[0111] The left and right wire clamp arms 135 are fixed on the connecting frame 139 through the connecting bracket 136; each wire clamp arm 135 is connected to the guide groove 138 through the guide groove bracket 137 and the guide groove connecting block; the wire clamp arm is used to clamp the parallel wire clamp, and the guide groove is used to guide the parallel wire cables.
[0112] The parallel wire clamp tightening mechanism 13 drives the parallel wire clamp tightening mechanism 13 to the position of the wire clamp storage mechanism 14 through the cooperation of the X-axis double-track moving module and the Y-axis single-track moving module, and the sleeve feeding module 133 drives the two sleeves to rise and cover the two torque screw heads at the bottom of the parallel wire clamp; the height of the parallel wire clamp tightening mechanism is adjusted through the Y-axis single-track moving module, and the two wire clamp clamping arms 135 are used to drag the parallel wire clamp and remove it from the wire clamp storage mechanism, and then the parallel wire clamp is driven to move to the stripping position of the main cable through the cooperation of the X-axis double-track moving module and the Y-axis single-track moving module, and one connecting end of the parallel wire clamp is connected to the main cable, and the other connecting end is connected to the parallel cable; the torque bolt head of the parallel wire clamp is tightened, and the torque bolt is judged whether it is tightened by detecting the tightening motor current; after the torque bolt is tightened, the live connection of the first phase cable is completed;
[0113] Driven by the X-axis moving module 121 and the Y-axis moving module 122 of the stranded wire clamp upper mechanism, the stranded wire clamp tightening mechanism 13 removes the second stranded wire clamp from the wire clamp storage mechanism 14 and transports it to the main cable stripping position; repeats the action of the stranded wire clamp to complete the live connection of the second phase cable; and so on, until the live connection of the third phase cable is completed.
[0114] Combination Fig. 9 The wire clamp storage mechanism includes: a first bracket 141, a second bracket 142 and a third bracket 143; the second bracket 142 and the third bracket 143 are respectively fixed on the first bracket 141, and are both vertically arranged with the first bracket, and the second bracket and the third bracket are respectively provided with a wire clamp support arm 144, which cooperates with the positioning groove on the parallel wire clamp to position and support the parallel wire clamp; the bottom of the first bracket is connected to a bracket 145, which is used to support the torque bolt head of the parallel wire clamp.
[0115] In this embodiment, the structure of the live automatic stripping tool can be implemented by using the existing technology, or by using the same structure as the stripping mechanism in the integrated live connection tool; as an example, Fig.10 A schematic diagram of the structure of an electric automatic stripping tool is given. Fig.10, which also includes two wire clamping units 111 and 112, a linear motion unit 113, a rotation unit 114 and a tool automatic adjustment unit 115. Among them, the wire clamping unit includes two clamping jaws, and the driving motor drives the two clamping jaws to move in opposite directions at the same time through the gear transmission mechanism, so as to realize the loosening and closing of the clamping jaws; the linear motion unit adopts a linear motion module of a lead screw and a slider; the rotation unit drives the fixed plate to rotate along the U-shaped notch through a rotating motor; the tool automatic adjustment unit can adjust the feeding position of the tool, and its structure can be the same as that of the tool automatic adjustment unit in the integrated live lead tool, which will not be described in detail.
[0116] In this embodiment, the bypass cable hanging tool can be implemented by using existing technology. As an example, FIG. 11(a)-(b) shows a schematic diagram of the structure of a bypass cable hanging tool, including: a wire hanging mechanism and a wire connecting mechanism;
[0117] 11 (a), the wire hanging mechanism is an insulating hook 16, the insulating hook comprises: a hook body, a first clamping portion 17 and a rope threading portion 18, the hook body and the rope threading portion 18 are respectively located at both ends of the first clamping portion 17, and the rope threading portion 18 is provided with a rope threading hole 19;
[0118] 11( b ), the wire connection mechanism includes at least a monkey head wire clamp 25, an adapter 22, an adapter extension 26, a rotating shaft 27 and a bypass cable connector 21, the monkey head wire clamp 25 is rotatably connected to the rotating shaft 27, and one end of the adapter is connected to one end of the adapter extension 26 through the base of the rotating shaft 27;
[0119] The adapter 22 is provided with a second clamping portion 23, and the adapter extension 26 is provided with a third clamping portion 24. The other end of the adapter 22 is connected to the bypass cable connector 21, and the bypass cable connector 21 is used to connect to the bypass cable 20. One end of the insulating rope is connected to the insulating hook through the rope hole 19, and the other end of the insulating rope is connected to the bypass cable 20.
[0120] The first clamping portion 17, the second clamping portion 23 and the third clamping portion 24 are all parts used for clamping by the robot arm. They can be handle-shaped or long strip-shaped, as long as they are convenient for clamping by the claws of the robot arm. Those skilled in the art can select and design them according to specific working conditions.
[0121] In the present embodiment, the electric wrench, wire cutting tool, branch removal tool and bird repelling tool are all realized by using the existing technology, and their structures are known to those skilled in the art, so they are not illustrated one by one.
[0122] The master-slave remote-controlled robot system of this embodiment has two operating modes: high-altitude control and ground control. In the high-altitude control operating mode, the high-altitude operating robot arm is directly controlled by the high-altitude robot arm master hand, so as to complete heavy-duty operating tasks such as replacing lightning arresters and drop switches; in the ground control operating mode, virtual reality technology can be used to form a virtual scene of the operating phenomenon, accurately observe the status of the operating tools, the relative position relationship between the high-altitude operating machinery and the operating target, etc., which solves the problem that the existing technology cannot accurately obtain the operating site information during remote operation, and improves the work efficiency and accuracy of live working.
[0123] Embodiment 2
[0124] In one or more embodiments, a working method of a master-slave teleoperated robot system is disclosed, which specifically includes the following process:
[0125] (1) Install the set working tool on the aerial work robot arm;
[0126] (2) In the aerial work mode, the operator on the aerial work platform controls the movement of the aerial work robot arm by manipulating the main hand of the aerial work robot arm to achieve the set work task;
[0127] (3) During ground operations, the operator in the ground control room can control the movement of the aerial work robot arm by operating the ground operating hand with the help of virtual reality equipment by receiving the work tool information, work object information and work position information collected by the visual system; the virtual reality equipment can form a corresponding virtual scene based on the information obtained by the visual system, and can control the movement of the visual system to switch the perspective.
[0128] In the aerial work mode, the method of this embodiment can complete heavy work tasks such as replacing lightning arresters and drop switches through master-slave remote control; in the ground work mode, the state of the work tools, the relative position relationship between the aerial work machinery and the work target, etc. can be accurately observed with the help of virtual reality equipment, which solves the problem that the existing technology cannot accurately obtain the work site information during remote operation, and improves the work efficiency and accuracy of live work.
[0129] As a specific example, when the working tool is an integrated live-wire tool, the specific working process is as follows:
[0130] (1) The main cable is stripped by a stripping mechanism; the details are as follows:
[0131] (1-1) The operator's right hand remotely controls the right robotic arm, and the left hand remotely controls the left robotic arm; the right robotic arm is controlled to hold the integrated live connection tool, and the left robotic arm moves to a suitable position to hold the tool; the left robotic arm claw is opened to clamp the clamping end of the tool, and after ensuring that the claw and the clamping end are tightly fitted, the left robotic arm claw is locked; the left robotic arm drives the stripping mechanism to move to the set position, so that the main cable is simultaneously in the clamping groove of the first wire clamping unit, the second wire clamping unit, the rotating unit and the tool automatic adjustment unit;
[0132] (1-2) controlling the first wire clamping unit and the second wire clamping unit to clamp the cable;
[0133] (1-3) Control the stripping tool to move to the main cable position;
[0134] (1-4) The control rotation unit drives the tool automatic adjustment unit to rotate around the main cable, and at the same time, one end of the stripping tool rotates around the rotation axis relative to the tool fixing seat, and the other end slides based on another axis on the tool fixing seat through the long slot hole; while the stripping tool rotates with the tool automatic adjustment unit, it also moves continuously under the joint constraints of the rotation axis and the other axis to form a flexible arc movement; after detecting that the conductor core is exposed, the stripping tool is controlled to retreat a set distance and continue the stripping action to prevent the tool from damaging the conductor core.
[0135] (1-5) The linear motion unit pauses once each time it moves a set distance; after the cable stripping in the area is completed, the linear motion continues until the desired cable stripping length is reached.
[0136] (2) After the main cable stripping is completed, the stripping mechanism leaves the stripping position and leaves space for the stranding clamp upper mechanism to move;
[0137] (3) Controlling the tightening mechanism of the stranded wire clamp to remove the first stranded wire clamp from the wire clamp storage mechanism and transport it to the main cable stripping position under the drive of the X-axis moving module and the Y-axis moving module of the stranded wire clamp threading mechanism;
[0138] (4) One connecting end of the stranded cable clamp is connected to the main cable, and the other connecting end is connected to the stranded cable; the torque bolt head of the stranded cable clamp is tightened, and whether the torque bolt is tightened is determined by detecting the tightening motor current; after the torque bolt is tightened, the live connection of the first phase cable is completed;
[0139] (5) Driven by the X-axis moving module and the Y-axis moving module of the stranded wire clamp threading mechanism, the stranded wire clamp tightening mechanism removes the second stranded wire clamp from the wire clamp material storage mechanism and transports it to the main cable stripping position; repeats the action of the stranded wire clamp to complete the live connection of the second-phase cable; and so on, until the live connection of the third-phase cable is completed.
[0140] (4) After the entire integrated live-line operation is completed, the left master hand remotely controls the left robotic arm to rotate, controls the left robotic arm to release the gripper, and the right robotic arm receives the tool and puts it into the tool box, and turns off the power supply. At this point, the integrated live-line operation is completed.
[0141] As a specific example, when the working tool is an electric wrench, the lightning arrester or drop switch can be replaced. The specific working process is as follows:
[0142] (1) Replacement of drop switch
[0143] (1-1) Turn on the power switch of the electric wrench; the operator's right hand controls the right mechanical arm, and the left hand controls the left mechanical arm; the right mechanical arm is controlled to hold the electric wrench tightly, and the left mechanical arm moves to a suitable position to hold the electric wrench; the left mechanical arm claw is opened to clamp the clamping end of the electric wrench, and after ensuring that the claw and the clamping end are tightly fitted, the left mechanical arm claw is locked;
[0144] (1-2) The right master hand remotely controls the right robotic arm to hold the drop switch hung on the crossbar.
[0145] (1-3) The left master hand controls the left mechanical arm to hold the electric wrench and extend it forward. Adjust the direction of the electric wrench's rotating working head so that the slotted part of the electric wrench's working head is aligned with the bolt head. Press the right slow speed No. 1 button on the right master hand to tighten the drop safety fixing bolts one by one.
[0146] (1-4) After the operation is completed, the right robotic arm is retracted, and the electric wrench of the left robotic arm is placed in the tool box, and the power of the electric wrench is turned off to complete the operation task.
[0147] (1-5) The process of disassembling the drop switch is the opposite of the process of installing the drop switch.
[0148] (2) Replacement of lightning arrester
[0149] (2-1) Turn on the power switch of the electric wrench; the operator's right hand controls the right mechanical arm, and the left hand controls the left mechanical arm; operate the right mechanical arm to hold the electric wrench tightly, and the left mechanical arm rotates to a suitable range for clamping the electric wrench, open the claws to clamp the T-shaped clamping end of the electric wrench, ensure that the claws and the T-shaped clamping end of the electric wrench are tightly fitted, and then lock the claws.
[0150] (2-2) The right hand remotely controls the right mechanical arm to clamp the arrester and hang it on the cross arm. The right mechanical arm assists in supporting the arrester to prevent it from falling.
[0151] (2-3) The left master hand controls the left mechanical arm to hold the electric wrench and extend it forward. Adjust the direction of the electric wrench's rotating working head so that the slotted part of the electric wrench's working head is aligned with the bolt head and inserted. Press the right slow speed No. 1 button on the right master hand to tighten the arrester's fixing bolts one by one.
[0152] (2-4) After the operation is completed, the right robotic arm is retracted, and the electric wrench of the left robotic arm is placed in the tool box. The power of the electric wrench is turned off to complete the operation task.
[0153] (2-5) The process of disassembling a lightning arrester is the opposite of the process of installing it.
[0154] As a specific example, when the working tool is a wire breaking tool, a wire breaking operation can be performed, and the specific working process is as follows:
[0155] (1) Turn on the power switch of the automatic bolt cutter; the operator's right hand controls the right mechanical arm, and the left hand controls the left mechanical arm; the right mechanical arm is controlled to hold the automatic bolt cutter tightly, and the left mechanical arm is rotated to a suitable range for clamping the bolt cutter, and the claw is opened to clamp the T-shaped clamping end of the automatic bolt cutter. After ensuring that the claw and the T-shaped clamping end of the bolt cutter are tightly fitted, the claw is locked.
[0156] 2) The left master hand remotely controls the left mechanical arm to move the automatic wire cutter to a suitable wire cutting position, aligns the opening of the wire cutter with the wire and moves it horizontally to ensure that all the wires are pressed into the opening of the wire cutter.
[0157] 3) Press button No. 1 on the left side of the right master hand to complete the wire cutting task remotely; continue to press and the bolt cutter will automatically release pressure.
[0158] 4) The left hand remotely controls the left mechanical arm to rotate, releases the gripper, and the right mechanical arm takes over the automatic bolt cutter and puts it into the tool box. The power of the bolt cutter is turned off, and the safety rope fixed to the automatic bolt cutter is untied. At this point, the wire cutting operation is completed.
[0159] In this embodiment, the specific operation process of the live automatic stripping tool is consistent with the working process of the stripping mechanism in the integrated live connection tool, and will not be described in detail;
[0160] In this embodiment, the operation process of the bypass cable hanging tool is as follows:
[0161] Lift the insulated boom truck to a suitable position, and the operator's right hand controls the right mechanical arm, and the left hand controls the left mechanical arm;
[0162] The remote-controlled right robotic arm clamps the first clamping part of the insulating hook and hangs the hook body of the insulating hook on the wire; the rope threading hole of the insulating hook fixes the insulating rope, and the other end of the insulating rope fixes the bypass cable of the wire connecting mechanism. When the hook body is hung on the wire, the wire connecting mechanism naturally droops; one end of the insulating rope is tied to the bypass cable, and the other end is tied to the insulating hook. The right robotic arm gripper clamps the insulating hook, moves to the vicinity of the wire, and hangs the insulating hook on the wire.
[0163] The right robotic arm is remotely controlled to clamp the clamping adapter or adapter extension of the wire connecting mechanism; the wire hanging mechanism is hung at the position of the exposed wire that needs to be spliced, and then the electric wrench on the left robotic arm is remotely controlled to tighten the monkey head wire clamp to achieve the connection of the bypass cable.
[0164] The operation process of other operation tools, such as branch removal tools, bird repelling tools, etc., is similar to the above, and all of them are operated using the master-slave control mode, so they will not be illustrated one by one.
[0165] Although the above describes the specific implementation mode of the present invention in conjunction with the accompanying drawings, it is not intended to limit the scope of protection of the present invention. Those skilled in the art should understand that various modifications or variations that can be made by those skilled in the art on the basis of the technical solution of the present invention without creative work are still within the scope of protection of the present invention.
Claims
1. A master-slave teleoperated robot system, characterized in that: include: Insulated lifting mechanism, aerial working mechanism, ground control mechanism, visual system and working tools; The aerial work mechanism is connected to the insulating lifting mechanism, and the aerial work mechanism includes an aerial work mechanical arm and an aerial mechanical arm master hand adopting a master-slave control mode; the ground control mechanism includes a ground mechanical arm master hand and a virtual reality device, and the ground mechanical arm master hand and the aerial work mechanical arm adopt a master-slave control mode; The visual system is used to collect information about working tools, working objects and working positions, and transmit the acquired information to the ground control mechanism; the virtual reality device can form a corresponding virtual scene based on the information acquired by the visual system, and can control the visual system to follow the action to adjust or switch the working perspective, so as to complete the working task in the virtual scene and realize the remote operation; The working tool comprises: an integrated live-powered guiding tool, the integrated live-powered guiding tool comprises: A supporting structure, and a stripping mechanism, a stranded wire clamp threading mechanism, a wire clamp material storage mechanism, and a stranded wire clamp tightening mechanism respectively connected to the supporting structure; the wire clamp material storage mechanism is fixed on the side of the supporting structure opposite to the stripping mechanism; the stranded wire clamp threading mechanism comprises: an X-axis moving module, a Y-axis moving module capable of moving along the X-axis moving module, and an execution terminal connected to the Y-axis moving module, and the stranded wire clamp tightening mechanism is arranged on the execution terminal; The stripping mechanism is used to complete the stripping of the main cable. The parallel wire clamp tightening mechanism can, driven by the X-axis moving module and the Y-axis moving module, remove the parallel wire clamp from the clamp storage mechanism and transport it to the main cable stripping position, and then drive the tightening sleeve through the motor to tighten the torque bolt head of the parallel wire clamp; The stripping mechanism includes a first wire clamping unit and a second wire clamping unit arranged at two ends of the bottom plate, a linear motion unit fixed on the bottom plate, a rotating unit connected to the linear motion unit and capable of linear motion, and a tool automatic adjustment unit connected to the rotating unit and capable of rotating under the drive of the rotating unit; The automatic tool adjustment unit comprises a first clamping member and a second clamping member arranged opposite to each other, the stripping tool is connected to one of the clamping members via a tool fixing seat, one end of the stripping tool is rotatably connected to the tool fixing seat via a rotating shaft, and the other end of the stripping tool is slidably connected to another shaft on the tool fixing seat via a long slot hole, so as to realize arc-shaped flexible cutting of the cable by the stripping tool; The first clamping member or the second clamping member is provided with a distance measuring sensor, which can measure the real-time vertical distance between the distance measuring sensor and the cable surface, and predict the current cable diameter by using the vertical distance between the distance measuring sensor and the cable centerline; The parallel wire clamp threading mechanism comprises: a base bracket, an X-axis double-track moving module, a Y-axis single-track moving module and a driving motor; the X-axis double-track moving module is fixed on the base bracket, the Y-axis single-track moving module is overlapped on the X-axis double-track moving module, and can perform linear motion along the Y-axis single-track moving module; the driving motor is used to provide driving force for the X-axis double-track moving module and the Y-axis single-track moving module; The tightening mechanism of the parallel wire clamp includes: two sleeves adapted to the torque bolt heads of the parallel wire clamp, the two sleeves are connected to a sleeve feeding module, and the sleeve feeding module can drive the two sleeves to realize up and down linear motion; the sleeve feeding module is a linear motion module, and the photoelectric switch and the limit trigger strip are used to realize the upper and lower limits of the sleeve feeding module; the tightening mechanism of the parallel wire clamp also includes a tightening motor, and the tightening motor applies the tightening torque to the two sleeves respectively through a reducer and a gear transmission mechanism.
2. A master-slave teleoperated robot system as claimed in claim 1, characterized in that: The visual system comprises: A hand-eye camera installed on the aerial work robot arm, used to collect information about the work tool and the work object, and locate the position of the aerial work robot arm during operation; A binocular camera with a pan / tilt system that can follow the virtual reality device and is used to obtain the work position information; A global camera for obtaining global information of aerial work; A local camera used to obtain the position information of the aerial work robot arm and the real-time position information between the aerial work robot arm and the work target.
3. A master-slave teleoperated robot system as claimed in claim 1, characterized in that: When working at high altitude, the operator on the aerial work platform controls the main hand of the aerial robot arm to achieve master-slave control of the aerial work robot arm; when working on the ground, the operator in the ground control room uses virtual reality equipment to control the main hand of the ground robot arm to achieve master-slave control of the aerial work robot arm.
4. A master-slave teleoperated robot system as claimed in claim 1, characterized in that: The aerial work mechanism includes an aerial work platform, and the visual system, the aerial work robot arm and the aerial robot arm main hand are all arranged on the aerial work platform; the insulating lifting mechanism is connected to the aerial work platform and can drive the aerial work platform to be lifted and lowered; the aerial work robot arm and the aerial robot arm main hand communicate through optical fiber.
5. A master-slave teleoperation robot system as claimed in claim 1, characterized in that: The aerial work mechanism and the ground control mechanism communicate with the insulating lifting mechanism respectively. The insulating lifting mechanism is provided with an insulating safety protection system, which includes: a hardware insulation protection system mainly composed of an insulating lifting arm, an operating tool rod and an insulating support, which ensures the operating safety of the robot body and live equipment in the substation; a robot software protection system is constructed by multi-source heterogeneous information fusion based on a variety of detection technologies including electromagnetic field detection, ultrasonic detection and visual detection, combined with real-time robot-to-ground leakage current information, to achieve full-process monitoring and intelligent protection of the robot's operation process.
6. A master-slave teleoperated robot system as claimed in claim 1, characterized in that: An index switch is provided on the main hand of the aerial manipulator arm or the main hand of the ground manipulator arm. When the index switch is pressed, the aerial work manipulator arm can be fixed to the current position. At this time, after moving the main hand to the set position, pressing the index switch again can make the current position of the main hand correspond to the current position of the aerial work manipulator arm.
7. A master-slave teleoperated robot system as claimed in claim 1, characterized in that: The main hand of the aerial manipulator arm or the main hand of the ground manipulator arm includes a continuous wrist operation mode, and the continuous wrist operation mode is used to control the wrist of the aerial work manipulator arm to automatically rotate continuously in any direction at a set speed mode.
8. A master-slave teleoperated robot system as claimed in claim 1, characterized in that: The ground control mechanism communicates with the remote monitoring center through the local 5G network, and the remote monitoring center is used to monitor the entire process of high-altitude operations.
9. A master-slave teleoperated robot system as claimed in claim 1, characterized in that: The working tools also include: an electric automatic stripping tool, an electric wrench, a wire cutting tool, a branch removal tool, a bypass cable hanging tool and a bird-repelling tool.
10. A master-slave teleoperation robot system as claimed in claim 9, characterized in that: The bypass cable hanging tool includes a wire hanging mechanism and a wire connecting mechanism; The wire hanging mechanism is an insulating hook, comprising: a first clamping part, a hook body and a rope threading part respectively located at two ends of the first clamping part; The wire connection mechanism at least includes a monkey head wire clamp, an adapter, an adapter extension, a rotating shaft and a bypass cable connector, the monkey head wire clamp is rotatably connected to the rotating shaft, and the first end of the adapter is connected to the first end of the adapter extension through the base of the rotating shaft; The adapter is provided with a second clamping portion, the adapter extension is provided with a third clamping portion, the second end of the adapter is connected to the bypass cable connector, the bypass cable connector is connected to the bypass cable, one end of the insulating rope is connected to the insulating hook through the rope threading portion, and the other end of the insulating rope is connected to the bypass cable.
11. A method for controlling the master-slave teleoperated robot system according to claim 1, characterized in that: The process includes the following: Install the set working tool on the aerial work robot arm; In the aerial work mode, the operator on the aerial work platform controls the movement of the aerial work robot arm by manipulating the aerial robot arm main hand to achieve the set work task; During ground operations, the operator in the ground control room receives the work tool information, work object information and work position information collected by the visual system, and with the help of virtual reality equipment, operates the main hand of the ground manipulator to control the movement of the aerial work robot arm; the virtual reality equipment can form a corresponding virtual scene based on the information obtained by the visual system, and can control the movement of the visual system to switch the perspective.
12. A working method of a master-slave teleoperated robot system as claimed in claim 11, characterized in that: When the working tool is an integrated live-wire tool, the working process is as follows: The main cable is stripped by a stripping mechanism; After the main cable stripping is completed, the stripping mechanism leaves the stripping position and leaves movement space for the parallel cable clamp upper mechanism; Driven by the X-axis moving module and the Y-axis moving module of the stranded wire clamp threading mechanism, the stranded wire clamp tightening mechanism takes the first stranded wire clamp from the wire clamp storage mechanism and transports it to the main cable stripping position; One connecting end of the stranded wire clamp is connected to the main cable, and the other connecting end is connected to the stranded cable; the torque bolt head of the stranded wire clamp is tightened, and whether the torque bolt is tightened is determined by detecting the tightening motor current; after the torque bolt is tightened, the live connection of the first phase cable is completed; Driven by the X-axis moving module and the Y-axis moving module of the stranded wire clamp threading mechanism, the stranded wire clamp tightening mechanism removes the second stranded wire clamp from the wire clamp storage mechanism and transports it to the main cable stripping position; repeats the action of the stranded wire clamp to complete the live connection of the second phase cable; and so on, until the live connection of the third phase cable is completed.
13. A working method of a master-slave teleoperated robot system as claimed in claim 12, characterized in that: The process of stripping the main cable by the stripping mechanism is as follows: The flexible live stripping tool is driven to move to a set position, so that the main cable is simultaneously in the clamping grooves of the first wire clamping unit, the second wire clamping unit, the rotating unit and the tool automatic adjustment unit; Controlling the first wire clamping unit and the second wire clamping unit to clamp the cable; The stripping tool moves to the main cable position; The rotating unit drives the tool automatic adjustment unit to rotate around the main cable, and at the same time, one end of the stripping tool rotates around the rotating axis relative to the tool fixing seat, and the other end slides based on another axis on the tool fixing seat through the long slot hole; while the stripping tool rotates with the tool automatic adjustment mechanism, it also moves continuously under the joint constraints of the rotating axis and the other axis, forming a flexible arc motion; The linear motion mechanism pauses once each time it moves a set distance; after the cable stripping in this area is completed, the linear motion continues until the desired cable stripping length is reached.
14. A method for operating a master-slave teleoperated robot system as claimed in claim 11, characterized in that: The visual system collects images from the binocular camera through an image acquisition card, uses the parallax in the left and right images to obtain the three-dimensional point cloud information of the scene, and uses three-dimensional matching technology in the three-dimensional point cloud to achieve automatic positioning of the working tool, thereby realizing automatic identification of the working position.