Concrete pouring system and pouring method with residual material recovery function
By introducing automatic control and recovery functions into the ballastless track pouring system, the problems of track plate floating and measurement caused by manual material collection and lack of experience are solved, efficient and accurate concrete pouring and residual material recovery are achieved, and labor costs are reduced. .
Patent Information
- Application Number
- CN202310536107.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-12
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2043-05-12
AI Technical Summary
During the filling process of the ballastless track, the existing technology requires manual material collection and unloading of remaining materials, resulting in high labor costs, and inexperienced operators can easily cause problems with floating and displacement of the track plate.
A concrete pouring system with residual material recovery function is designed, including an installation frame, a mixing bucket, a guide chute, a monitoring part, a feeding part and a recycling part. Through the automatic control of the monitoring part and electronic valve, the flow rate and flow rate of concrete are monitored. position to ensure the filling quality, and use the material pump to recover the overflowing residual material to reduce manual operations.
It realizes automatic control of concrete pouring volume, reduces labor costs, ensures pouring quality, avoids floating and measuring displacement of track plates, and improves pouring efficiency and accuracy.
Smart Images

Figure CN116728582B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of ballastless track production, and in particular to a concrete pouring system and a pouring method with a residual material recovery function. Background Art
[0002] CTRSⅢ slab ballastless track is a high-speed railway ballastless track construction technology independently developed by my country with completely independent intellectual property rights. Compared with other technologies, it has lower construction costs and construction difficulties and is more popular. At present, there are certain problems in the standardized process tooling, standardized process management, and integrated and convenient information system of CTRSⅢ slab ballastless track in China.
[0003] When pouring self-compacting concrete, the four corners of the track plate must be discharged to ensure that the track plate is fully poured and the air in the track plate is fully taken out by the self-compacting concrete. The existing residual materials need to be manually received and manually transported to transfer or scrapped. At the same time, there are too many operators on site, including 1 controller for the second electronic valve of the transfer bucket, 2 operators for the chute and funnel, and 4 operators for receiving the residual materials at the four corners of the track plate and closing the second electronic valve;
[0004] Moreover, the pouring of self-compacting concrete in China is mainly based on the experience of on-site workers. The opening and closing valves of the transfer hopper and the funnel are manually controlled according to the two observation holes of the track slab and the discharge conditions of the four corners of the track slab. If the on-site workers are inexperienced, the track slab is prone to floating and shifting when pouring self-compacting concrete into the track slab.
[0005] In view of the above-mentioned defects, the inventors of the present invention finally obtained the present invention after a long period of research and practice. Summary of the invention
[0006] The purpose of the present invention is to provide a concrete pouring system and a pouring method with a residual material recovery function, which solves the problem that the residual materials of the overflowed self-compacting concrete need to be manually collected, manually transported to a transfer station or scrapped, and the current construction is based on the experience of operators. When inexperienced on-site operators are involved in the construction, the track slab is prone to floating and shifting when the self-compacting concrete is poured into the track slab.
[0007] The present invention solves the above technical problems through the following technical solutions. The present invention includes a mounting frame, a mixing bucket, a material guide trough, a plurality of monitoring components, a material feed component and a recovery component; the mixing bucket is mounted on the upper side of the mounting frame, the material feed component is docked with the pouring port of the casting mold, the two ends of the material guide trough are respectively connected to the material outlet of the mixing bucket and the material inlet of the material feed component, a plurality of the monitoring components are arranged on the pull rods of a plurality of buckling devices of the casting mold, and the monitoring components are used to monitor the volume of concrete in the casting mold;
[0008] The recovery part includes a material receiving box, a material extraction pump and a reflux pipe; the material receiving box is located at the residual material overflow port of the casting mold, the material extraction end of the material extraction pump is located in the material receiving box, one end of the reflux pipe is connected to the discharge end of the material extraction pump, and the other end extends into the mixing bucket.
[0009] Preferably, a plurality of groups of traveling parts are arranged on the lower side of the mounting frame, and the traveling parts include motors and rollers; the rollers are mounted on the bottom of the mounting frame, and the output end of the motor is connected to the rollers.
[0010] Preferably, the number of the recycling parts is four groups, and the receiving boxes of the four groups of recycling parts are respectively located at the four corners of the casting mold.
[0011] Preferably, the feeding part includes a funnel, a plurality of support rods, a flow meter and a first electronic valve, the lower end of the funnel is plugged into the pouring port of the casting mold, the plurality of support rods are distributed on the outside of the funnel, and the flow meter and the first electronic valve are both installed inside the funnel.
[0012] Preferably, the feeding pipe of the mixing bucket is installed with a second electronic valve, and the mixing bucket, feeding part, recovery part and monitoring part are all controlled and operated by a controller.
[0013] Preferably, the monitoring component includes two mounting blocks, two groups of pull rods, a tension and pressure sensor, a compression spring, a wireless transmitter, a displacement sensor and a display screen; the two mounting blocks are arranged up and down, the two groups of pull rods are respectively fixed to one of the mounting blocks, and the two groups of pull rods respectively pass through the other mounting block, the tension and pressure sensor and the compression spring are respectively fixed to the side of the two mounting blocks close to each other, and the displacement sensor is installed on the lower mounting block. The tension and pressure sensor and the displacement sensor are both connected to the display screen through a data cable, the tension and pressure sensor is used to monitor the tension of the locking piece, and the displacement sensor is used to monitor the upward floating distance of the lower mounting block, and the wireless transmitter is connected to the external controller for wireless transmission.
[0014] Preferably, the pull rod of the buckling device has two sections, namely an upper pull rod and a lower pull rod, and the upper pull rod and the lower pull rod are fixed to the ends of the two groups of pull rods through connecting blocks respectively.
[0015] Preferably, the upper and lower mounting blocks are respectively fixed with an upper shell and a lower shell, the upper and lower shells have an opening on one side close to each other, the cross-section of the lower shell is smaller than the cross-section of the upper shell, and the upper side of the lower shell is inserted into the opening of the upper shell.
[0016] The present invention further provides a pouring method, which uses the concrete pouring system with the residual material recovery function as described above to perform a pouring operation, comprising the following steps:
[0017] Mix the concrete through the mixing bucket and open the second electronic valve to discharge the concrete;
[0018] Concrete is introduced into the funnel through the guide trough, and the concrete in the funnel is discharged into the pouring mold, and the flow meter and the first electronic valve respectively record and control the flow of the concrete;
[0019] Concrete flows into the pouring mold, and multiple monitoring components monitor the position and flow rate of the concrete inflow. If the monitoring data at a certain point exceeds the standard, the first electronic valve is closed to stop pouring. When the monitoring data is normal, the first electronic valve is opened to continue pouring;
[0020] The excess concrete overflows from the pouring mold and is recovered into the mixing bucket through the recovery part;
[0021] When the monitoring data obtained from multiple monitoring parts are all within the designed tolerance, the pouring is completed.
[0022] Preferably, the overflowed concrete is collected in a receiving box, and a pumping pump is started to pump the concrete in the receiving box into a mixing bucket.
[0023] Compared with the prior art, the beneficial effects of the present invention are:
[0024] 1. Through the setting of monitoring parts, according to the force change and displacement-time curve of the pouring mold during the construction process, combined with the cooperation of the second electronic valve of the feed part and the flow meter, the opening and closing size of the second electronic valve of the feed part is automatically controlled to adjust the pouring amount of self-compacting concrete; during the pouring process, the alarm can be given according to the tension and displacement set by the pouring mold, and the operator can manually adjust the outlet flow of the self-compacting concrete in time.
[0025] 2. When excess material flows out from the four corners of the pouring mold, the four recovery parts are powered by the built-in generator to pump the excess concrete into the mixing bucket through the suction pump, and then recycled for the pouring of the next track plate. This can reduce the number of people on the construction site and reduce labor costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a side view structural schematic diagram of the present invention;
[0027] Figure 2 It is a schematic diagram of the top view of the structure of the present invention;
[0028] Figure 3 It is a structural diagram of the monitoring component;
[0029] Figure 4 It is a schematic diagram of the main cross-sectional structure of the monitoring component in the present invention;
[0030] Figure 5It is a structural schematic diagram of the compression spring mounting seat in the present invention;
[0031] Figure 6 It is a schematic diagram of the internal structure of the compression spring mounting seat in the present invention;
[0032] The numbers in the figure represent:
[0033] 1-mounting frame; 11-material guide trough; 2-traveling part; 21-motor; 22-roller; 3-mixing bucket; 4-feeding part; 41-funnel; 42-support rod; 5-buttoning device; 6-monitoring part; 61-mounting block; 62-pull rod; 63-connecting block; 64-compression spring mounting seat; 641-semicircular block; 642-spiral hole; 65-compression spring; 66-resistance block; 67-tension pressure sensor; 68-displacement sensor; 69-lower shell; 610-upper shell; 611-wireless transmitter; 612-display screen; 7-recovery part; 71-material receiving box; 72-suction pump; 73-reflux pipe; 8-diesel generator. DETAILED DESCRIPTION
[0034] The above and other technical features and advantages of the present invention are described in more detail below in conjunction with the accompanying drawings.
[0035] Embodiment 1
[0036] This embodiment provides a technical solution: a concrete pouring system with a residual material recovery function, such as Figure 1-2 As shown, it includes a mounting frame 1, a mixing bucket 3, multiple monitoring parts 6, a material guide trough 11, a feed part 4 and a recovery part 7; the mixing bucket 3, the feed part 4, the recovery part 7 and the monitoring part 6 are all controlled and operated by a controller; a power supply is provided on the mounting frame 1, and the power supply is used to provide power to the mixing bucket 3, the recovery part 7, the feed part 4, the traveling part 2, the monitoring part 6 and the controller; no other electricity is required, and the power supply is a storage battery or a diesel generator 821.
[0037] The mixing bucket 3 is installed on the upper side of the mounting frame 1. The feeding pipe of the mixing bucket 3 is installed with a second electronic valve. By controlling the driving operation switch, a mixing mechanism is provided in the mixing bucket 3 to prevent the concrete in the mixing bucket 3 from solidifying.
[0038] The feed piece 4 is butted against the pouring port of the casting mold. The height of the feed piece 4 is lower than that of the mixing bucket 3. The two ends of the guide trough 11 are respectively connected to the discharge port of the mixing bucket 3 and the feed port of the feed piece 4. The guide trough 11 is inclined and installed on the mounting frame 1. The mounting frame 1 increases the height of the mixing bucket 3. The concrete discharged from the mixing bucket 3 flows down through the guide trough 11 due to the gravity potential energy and is discharged into the feed piece 4. The mixing bucket 3 can discharge approximately the required amount of concrete.
[0039] The four corners of the casting mold are provided with residual material overflow outlets. When pouring concrete, the residual material overflow outlets at the four corners of the casting mold are continuously discharged to ensure that the track plate is fully filled and the air in the track plate is fully taken out by the self-compacting concrete. The recovery part 7 can recover the residual material discharged from the four corners into the mixing bucket 3 to avoid waste and save manual handling and transportation;
[0040] The recycling component 7 in this embodiment includes a material receiving box 71, a suction pump 72 and a return pipe 73; the material receiving box 71 is located at the four corners of the casting mold, and is used to collect the overflowed residual materials. The suction pump 72 is located on one side of the material receiving box 71, and the suction end of the suction pump 72 extends into the material receiving box 71. When the suction pump 72 is in operation, the residual concrete in the material receiving box 71 is extracted. One end of the return pipe 73 is connected to the discharge end of the suction pump 72, and the other end extends into the mixing bucket 3. The return pipes 73 of the two recycling components 7 on one side can be connected to reduce costs. The residual concrete extracted by the suction pump 72 will be transported to the mixing bucket 3 through the return pipe 73, completing the recycling of the residual materials, avoiding waste, and saving manual handling and transportation.
[0041] In order to facilitate the movement of the mounting frame 1, four groups of traveling parts 2 are arranged on the lower side of the mounting frame 1. The four groups of traveling parts 2 are located at the four corners of the lower side of the mounting frame 1. The traveling parts 2 include a motor 21 and a roller 22. The roller 22 is installed at the bottom of the mounting frame 1, and the output end of the motor 21 is connected to the roller 22. When the motor 21 is running, it can drive the roller 22 to rotate, thereby driving the mounting frame 1 to move, and then pouring concrete into the casting molds at different positions.
[0042] Embodiment 2
[0043] This embodiment is further optimized on the basis of the above embodiment, and the same parts as the above technical solution will not be repeated here. Figure 3-6 As shown, in order to better realize the present invention, the following setting mode is particularly adopted: in this embodiment, multiple monitoring components 6 are arranged on the pull rods of multiple buckling devices 5 of the casting mold, and the monitoring components 6 are used to monitor the volume of concrete in the casting mold; the monitoring component 6 includes two mounting blocks 61, two groups of pull rods 62, a tension pressure sensor 67, a compression spring 65, a displacement sensor 68 and a display screen 612; the two mounting blocks 61 are arranged up and down, the two groups of pull rods 62 are respectively fixed to one of the mounting blocks 61, and the two groups of pull rods 62 respectively pass through the other mounting block 61, and the tension pressure sensor 67 and the compression spring 65 are respectively fixed to the side of the two mounting blocks 61 close to each other, that is, when the two groups of pull rods 62 are pulled in opposite directions, the tension pressure sensor 67 and the compression spring 65 are squeezed against each other, and the pulling pressure can be measured by the tension pressure sensor 67;
[0044] The installation method of the compression spring 65 is as follows: the compression spring 65 is installed on the lower mounting block 61 through the compression spring mounting seat 64, a spiral hole is processed on the upper side of the compression spring mounting seat 64, the spiral hole 641 is adapted to the compression spring 65, and the lower half of the compression spring 65 enters into the spiral hole 642 by rotating to complete the installation of the compression spring 65. This installation method ensures the firmness of the installation of the compression spring 65 and is convenient for replacing the compression spring; the compression spring 65 mounting seat includes two semicircular blocks 641 to facilitate the processing of the spiral hole 641, and the two semicircular blocks 641 are fixed by screws, and a stop block 66 is fixed on the upper side of the compression spring 65, and the stop block 66 and the compression spring 65 can be fixedly connected by welding;
[0045] The displacement sensor 68 is installed on the lower mounting block 61. The detection direction of the displacement sensor 68 is vertically downward, which can detect the upward floating size of the lower mounting block 61. The tension pressure sensor 67 and the displacement sensor 68 are connected to the display screen 612 through a data line. The tension pressure sensor 67 is used to monitor the tension of the locking member, and the displacement sensor 68 is used to monitor the upward floating distance of the lower mounting block 61. The data monitored by the tension pressure sensor 67 and the displacement sensor 68 are displayed on the display screen 612 for intuitive observation by the operator.
[0046] An upper shell 610 and a lower shell 69 are fixed to the outer sides of the upper and lower mounting blocks 61 respectively. The upper shell 610 and the lower shell 69 are symmetrically arranged up and down. The side where the upper shell 610 and the lower shell 69 are close to each other has an opening. The cross-section of the lower shell 69 is smaller than the cross-section of the upper shell 610, and the upper side of the lower shell 69 is inserted into the opening of the upper shell 610, which can also effectively prevent rainwater from entering. There is a certain gap between the four side walls of the lower shell 69 and the upper shell 610 to facilitate installation and avoid interference between the two. At the same time, there is no direct connection between the upper shell 610 and the lower shell 69. The upper shell 610 and the lower shell 69 are combined to form a protective cover, which can protect the internal electronic devices. In order to facilitate the observation of the operator, the display screen 612 is installed on the side wall of the upper shell 610 in an embedded manner.
[0047] The tie rod 62 of the buckling device 5 has two sections, namely an upper tie rod and a lower tie rod, which are respectively fixed to the ends of the two groups of tie rods through a connecting block 63. The upper tie rod is a threaded rod of the buckling device 5, and the lower tie rod is fixed to the track plate base.
[0048] The displacement sensor 68 is installed on the upper shell 62, and the displacement sensor 68 can measure the displacement of the upper shell 62. The wireless transmitter 611 is installed inside the upper shell 62. The tension and pressure sensor 67, the displacement sensor 68, the wireless transmitter 611 and the display screen 65 are all connected through a data line. The data monitored by the tension and pressure sensor 67 and the displacement sensor 68 are all transmitted to the display screen 65 and displayed, so as to facilitate intuitive observation by the operator;
[0049] The wireless transmitter 611 is connected to the controller by wireless transmission. The wireless transmitter 611 transmits the data monitored by the tension pressure sensor 67 and the displacement sensor 68 to the external controller via wireless transmission, so as to transmit the relevant data to the controller in real time and in a timely manner. Through the controller, relevant personnel can control the whole process of installation and pouring quality of each track plate to ensure the quality of the track plate.
[0050] The feeding part 4 includes a funnel 41, a plurality of support rods 42, a flow meter and a first electronic valve. The lower end of the funnel 41 is plugged into the pouring port of the casting mold to ensure that the concrete is discharged into the funnel 41. The plurality of support rods 42 are distributed on the outside of the funnel 41 to ensure the stability of the funnel 41. The flow meter and the first electronic valve are both installed inside the funnel 41. The flow meter and the first electronic valve respectively record and control the flow rate of the concrete, so that the concrete can be discharged into the casting mold at a uniform speed and in an appropriate amount as needed.
[0051] Embodiment 3
[0052] This embodiment provides a technical solution: a pouring method, using the concrete pouring system with residual material recovery function as in the above embodiment to perform pouring operations, such as Figure 1-2 As shown, the following steps are included:
[0053] The concrete is stirred by the mixing bucket 3 to prevent the concrete from solidifying, settling, etc., and the second electronic valve is opened by the controller to discharge a roughly appropriate amount of concrete;
[0054] Concrete is introduced into the funnel 41 through the guide trough 11 for temporary storage, and the amount of concrete temporarily stored in the funnel 41 should not be too much to prevent it from solidifying and settling; the concrete in the funnel 41 is discharged into the pouring mold, and the first electronic valve is controlled by the controller, and the flow rate of the discharged concrete is recorded by the flow meter;
[0055] Concrete flows into the pouring mold, and multiple monitoring components 6 monitor the position and flow rate of the concrete inflow. If the monitoring data at a certain point exceeds the standard, the controller automatically closes the first electronic valve and stops pouring, so that the concrete in the pouring mold adjusts its position by self-flow to avoid floating the top plate of the pouring mold. When the monitoring data is normal, the controller automatically opens the first electronic valve and continues pouring;
[0056] When the residual material overflows from the pouring mold, but the monitoring data at a certain place reaches the expected value, it proves that the concrete at this place has not been poured in place, and pouring continues. The residual material overflow continues to overflow concrete, and the overflowed concrete is collected in the material receiving box 71, and the pumping pump 72 is started to pump the concrete in the material receiving box 71 into the mixing bucket 3, so as to achieve the effect of recycling and avoid waste;
[0057] When the monitoring data obtained by the multiple monitoring components 6 are all within the designed tolerance, it is proved that the concrete in the pouring mold is uniform, that is, the pouring is completed; it can be accurately and intuitively observed whether the concrete in the pouring mold is uniform.
[0058] The above description is only a preferred embodiment of the present invention, which is only illustrative and not restrictive of the present invention. Those skilled in the art understand that many changes, modifications, and even equivalences may be made to the present invention within the spirit and scope defined by the claims of the present invention, but all of them will fall within the scope of protection of the present invention.
Claims
1. A concrete pouring system with residual material recovery function, characterized in that: It includes a mounting frame, a mixing bucket, a material guide trough, a plurality of monitoring components, a material feed component and a recovery component; the mixing bucket is mounted on the upper side of the mounting frame, the material feed component is docked with the pouring port of the casting mold, the two ends of the material guide trough are respectively connected to the material outlet of the mixing bucket and the material inlet of the material feed component, and the plurality of monitoring components are arranged on the pull rods of the plurality of buckling devices of the casting mold, and the monitoring components are used to monitor the volume of concrete in the casting mold; The recycling part includes a material receiving box, a material extraction pump and a reflux pipe; the material receiving box is located at the residual material overflow port of the casting mold, the material extraction end of the material extraction pump is located in the material receiving box, one end of the reflux pipe is connected to the material discharge end of the material extraction pump, and the other end extends into the mixing bucket; The monitoring component includes two mounting blocks, two groups of pull rods, a tension and pressure sensor, a compression spring, a wireless transmitter, a displacement sensor and a display screen; the two mounting blocks are arranged up and down, the upper end of one group of pull rods is fixed to the lower surface of the upper mounting block, and the lower end of this group of pull rods passes through the lower mounting block, the lower end of the other group of pull rods is fixed to the upper surface of the lower mounting block, and the upper end of this group of pull rods passes through the upper mounting block, the tension and pressure sensor and the compression spring are respectively fixed to the sides of the two mounting blocks close to each other, the displacement sensor is installed on the lower mounting block, the tension and pressure sensor and the displacement sensor are both connected to the display screen through a data line, the tension and pressure sensor is used to monitor the tension of the locking member, the displacement sensor is used to monitor the upward floating distance of the lower mounting block, and the wireless transmitter is connected to the external controller by wireless transmission; The compression spring is installed on the lower mounting block through the compression spring mounting seat. A spiral hole is processed on the upper side of the compression spring mounting seat. The spiral hole is adapted to the compression spring. The lower half of the compression spring enters the spiral hole by rotating to complete the installation of the compression spring. The compression spring mounting seat includes two semicircular blocks, which are fixed by screws. A resist block is fixed on the upper side of the compression spring. The resist block and the compression spring are fixedly connected by welding. The tie rod of the buckling device has two sections, namely an upper tie rod and a lower tie rod, and the upper tie rod and the lower tie rod are respectively fixed to the ends of the two groups of tie rods through connecting blocks; The upper and lower mounting blocks are respectively fixed with an upper shell and a lower shell, the upper and lower shells have an opening on one side close to each other, the cross section of the lower shell is smaller than that of the upper shell, and the upper side of the lower shell is inserted into the opening of the upper shell.
2. A concrete pouring system with residual material recovery function according to claim 1, characterized in that: A plurality of groups of traveling parts are arranged on the lower side of the mounting frame, and the traveling parts include motors and rollers; the rollers are mounted on the bottom of the mounting frame, and the output end of the motor is connected to the rollers.
3. The concrete pouring system with residual material recovery function according to claim 1, characterized in that: The number of the recycling parts is four groups, and the receiving boxes of the four groups of recycling parts are respectively located at the four corners of the casting mold.
4. The concrete pouring system with residual material recovery function according to claim 1, characterized in that: The feeding part includes a funnel, a plurality of support rods, a flow meter and a first electronic valve. The lower end of the funnel is plugged into the pouring port of the casting mold, the plurality of support rods are distributed on the outside of the funnel, and the flow meter and the first electronic valve are both installed inside the funnel.
5. The concrete pouring system with residual material recovery function according to claim 1, characterized in that: The feeding pipe of the mixing bucket is equipped with a second electronic valve, and the mixing bucket, feeding part, recovery part and monitoring part are all controlled and operated by a controller.
6. A pouring method, using the concrete pouring system with residual material recovery function as described in any one of claims 1 to 5 to perform a pouring operation, comprising the following steps: Mix the concrete through the mixing bucket and open the second electronic valve to discharge the concrete; The concrete is introduced into the funnel through the guide trough, and the concrete in the funnel is discharged into the pouring mold, and the flow meter and the first electronic valve respectively record and control the flow of the concrete; Concrete flows into the pouring mold, and multiple monitoring components monitor the position and flow rate of the concrete inflow. If the monitoring data at a certain point exceeds the standard, the first electronic valve is closed to stop pouring. When the monitoring data is normal, the first electronic valve is opened to continue pouring; The excess concrete overflows from the pouring mold and is recovered into the mixing bucket through the recovery part; When the monitoring data obtained from multiple monitoring parts are all within the designed tolerance, the pouring is completed.
7. A perfusion method according to claim 6, characterized in that: The overflowed concrete is collected in the receiving box, and the pump is started to pump the concrete in the receiving box into the mixing bucket.