A horizontal connection structure of ultra-high performance concrete shear wall and its construction method
By adopting the grouting connection method that combines the cavity structure and the U-shaped steel frame in the shear wall structure, the problems of horizontal connection accuracy and hole forming quality in the existing technology are solved, and efficient, high-quality shear wall construction is achieved, with high strength. And the seismic performance is equivalent to that of cast-in-place walls.
Patent Information
- Application Number
- CN202311496511.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-10
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2043-11-10
AI Technical Summary
In terms of horizontal connections, existing shear wall structures have problems such as high precision requirements for sleeve grouting connections, large amounts of grouting, and difficulty in quality detection. The quality of holes formed by grout anchor lap connections is difficult to guarantee, resulting in stiffness weakening areas.
A cavity structure is set up between the upper and lower walls, the first U-shaped steel bar and the second U-shaped steel bar are interlocked with each other, and combined with multiple horizontal connecting bars to form a frame structure for grouting connection, which reduces the requirements for accuracy and hole formation. , and simplify construction through grouting and grouting methods.
It improves the construction speed and quality, reduces on-site wet work, shortens the construction period, and the strength and seismic performance are consistent with the cast-in-place wall. There is no need to tie steel bars and formwork, and the dead weight is reduced.
Smart Images

Figure CN117569479B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of building engineering structures, and in particular to an ultra-high performance concrete shear wall horizontal connection structure and a construction method thereof. Background Art
[0002] At present, shear wall structures have the advantages of high bearing capacity, large lateral stiffness and good integrity, and are widely used in the field of construction engineering, especially in multi-story and high-rise buildings. Cast-in-place shear wall structures have a series of problems such as high intensity of on-site wet work, large labor demand, long construction period, and serious environmental pollution.
[0003] Shear wall structures are mainly used to bear horizontal loads, and the horizontal joint structure of prefabricated shear wall structures is one of the key technologies of prefabricated shear walls. Existing vertical reinforcement connection methods for prefabricated solid shear walls mainly include sleeve grouting connection and grout-anchor lap connection; sleeve grouting connection has the disadvantages of large sleeve usage, high precision requirements, and difficult quality inspection, while grout-anchor lap connection requires large on-site grouting work for each hole, the quality of the holes formed by the grout-anchor lap connection is difficult to guarantee, and it is easy to form a stiffness weakening zone; the horizontal joints of the double-sided superimposed shear wall structure are connected by vertical steel bars and self-compacting concrete poured in the cavity. When the floor height is low, the cavity thickness is small and the quality of the internal poured concrete is difficult to guarantee. When the floor height is high, the poured concrete in the cavity is too thick, and there are problems of uneven force and heavy self-weight.
[0004] Therefore, it is urgent to propose a new solution to solve the above problems. Summary of the invention
[0005] The present invention provides an ultra-high performance concrete shear wall horizontal connection structure and a construction method thereof, which solves the problems of existing sleeve grouting connections, such as large sleeve consumption, high precision requirements, and difficult quality detection, as well as the problems of grouting on-site operations for each hole, difficulty in ensuring the hole quality of the grouting, and easy formation of a stiffness weakening zone in the grouting-anchor overlap connection.
[0006] The present invention provides an ultra-high performance concrete shear wall horizontal connection structure, which is arranged between an upper wall with a cavity and a lower wall with a cavity;
[0007] It includes an upper wall groove arranged at the lower end of the upper wall and a lower wall groove arranged at the upper end of the lower wall;
[0008] A first U-shaped steel bar with an opening facing upward is arranged in the upper wall, and a second U-shaped steel bar with an opening facing downward is arranged in the lower wall, the first U-shaped steel bar and the second U-shaped steel bar are buckled with each other, and a plurality of horizontal connecting bars are fixedly connected to the first U-shaped steel bar and the second U-shaped steel bar respectively;
[0009] The upper wall groove and the lower wall groove are combined to form a cavity, a grouting hole is reserved on the upper wall groove, and a grouting hole is reserved on the lower wall groove.
[0010] Furthermore, the first U-shaped steel bar and the second U-shaped steel bar are the same in size.
[0011] Furthermore, the upper wall groove includes an upper wall middle connecting portion located in the middle and upper wall protrusions located on both sides of the upper wall middle connecting portion, and the lower wall groove includes a lower wall middle connecting portion located in the middle and lower wall protrusions located on both sides of the lower wall middle connecting portion.
[0012] Furthermore, a plurality of shear key grooves are arranged at intervals on the lower surface of the middle connecting portion of the upper wall, and a plurality of shear keys which are concave-convexly matched with the shear key grooves are arranged at intervals on the upper surface of the middle connecting portion of the lower wall.
[0013] Furthermore, the upper wall includes an upper wall main body portion located at an upper end of the upper wall protrusion portion, and the thickness of the upper wall protrusion portion is smaller than the thickness of the upper wall main body portion.
[0014] Furthermore, the thickness of the protruding portion of the upper wall is 15 to 55 mm smaller than the thickness of the main body of the upper wall.
[0015] The present invention also provides a construction method for an ultra-high performance concrete shear wall horizontal connection structure, comprising the following steps:
[0016] S1. The lower wall is fixedly placed below the upper wall, and the first U-shaped steel bar on the upper wall and the second U-shaped steel bar on the lower wall are arranged opposite to each other. At this time, the distance between the lower end of the groove of the upper wall and the upper end of the groove of the lower wall is 100-150 mm. Then, a plurality of horizontal connecting bars are fixedly connected to the first U-shaped steel bar and the second U-shaped steel bar respectively. The first U-shaped steel bar and the second U-shaped steel bar are never connected to each other. The upper part of the lower cavity wall is subjected to mortar treatment.
[0017] S2, after the mortaring is completed, the upper wall is moved downward, and the lower end of the upper wall groove is abutted against the upper end of the lower wall groove, and the single shear key is inserted into the corresponding single shear key groove. At this time, the upper wall groove and the lower wall groove are surrounded to form a cavity;
[0018] S3. Pour high-strength grouting material into the above-mentioned cavity through the grouting holes of the groove of the lower wall until the slurry flows out from the slurry outlet holes at the upper part of the groove of the upper wall, then close the grouting holes and the slurry outlet holes, and turn to on-site maintenance.
[0019] Compared with the prior art, the present invention has the following beneficial effects:
[0020] 1. The ultra-high performance concrete shear wall horizontal connection structure of the present invention is different from the existing sleeve grouting connection and grout anchor lap connection. Instead, it uses the cavity formed by itself, and then cooperates with the frame structure composed of the first U-shaped steel bar, the second U-shaped steel bar and the horizontal connecting bar to perform grouting connection. It does not require the high precision requirements of the grouting sleeve, nor does it require the hole-by-hole grouting of the grout anchor lap connection. It also does not require on-site tying of steel bars and supporting formwork, so the construction speed is fast, and the assembly efficiency and quality are high.
[0021] 2. The strength and seismic performance of the horizontal connection structure of the assembled hollow shear wall of the present invention are equivalent to those of the cast-in-place wall body, and can be considered as equivalent to cast-in-place. In addition, the processes of tying steel bars, supporting formwork, pouring concrete and curing in cast-in-place are not required, which reduces on-site wet work and shortens the construction period.
[0022] 3. The construction method of the present invention combines the two methods of grouting and grouting. A plurality of horizontal connecting bars are respectively fixedly connected to the first U-shaped steel bar and the second U-shaped steel bar. Grouting is performed in the cavity. The grouting body, U-shaped steel bars and horizontal bars are used to realize the horizontal connection of the upper and lower walls. This method is relatively simple to construct and has low precision requirements. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a schematic cross-sectional view of a hollow wall of ultra-high performance concrete in the first embodiment of the present invention;
[0024] Figure 2 It is a schematic diagram of the longitudinal section structure when the upper wall and the lower wall are separated in the first embodiment of the present invention;
[0025] Figure 3 It is a schematic diagram of the longitudinal section structure when the horizontal connecting bar is connected to the first U-shaped steel bar and the second U-shaped steel bar in the first embodiment of the present invention;
[0026] Figure 4 It is a schematic diagram of the longitudinal section structure when the horizontal connecting bar is connected to the first U-shaped steel bar and the second U-shaped steel bar in the first embodiment of the present invention;
[0027] Figure 5 It is a schematic diagram of the longitudinal section structure when the upper wall groove and the lower wall groove abut against each other in the first embodiment of the present invention;
[0028] Figure 6 It is a schematic diagram of the longitudinal section structure when the upper wall groove and the lower wall groove abut against each other in the second embodiment of the present invention;
[0029] Figure numerals: 1. upper wall; 11. upper wall groove; 11a. middle connecting part of upper wall; 11b. upper wall protrusion; 11c. grouting hole; 12. first U-shaped steel bar; 13. shear key groove; 14. upper wall main body; 2. lower wall; 21. lower wall groove; 21a. middle connecting part of lower wall; 21b. lower wall protrusion; 21c. grouting hole; 22. second U-shaped steel bar; 23. shear key; 24. lower wall main body; 3. horizontal connecting ribs; 4. mortar layer. DETAILED DESCRIPTION
[0030] In order to further understand the content, features and effects of the present invention, the following embodiments are given together with the attached Figures 1 to 6 The detailed instructions are as follows.
[0031] like Figures 1 to 5 As shown, the first embodiment of the present invention provides a horizontal connection structure of an ultra-high performance concrete shear wall, which is arranged between an upper wall 1 with a cavity and a lower wall 2 with a cavity, wherein both the upper wall 1 and the lower wall 2 are made of ultra-high performance concrete, and a certain cavity is used to reduce the dead weight without reducing the bearing capacity and lateral stiffness of the wall.
[0032] The horizontal connection structure includes an upper wall groove 11 arranged at the lower end of the upper wall 1 and a lower wall groove 21 arranged at the upper end of the lower wall 1;
[0033] A first U-shaped steel bar 12 with an opening facing upward is provided in the upper wall 1, and a second U-shaped steel bar 22 with an opening facing downward is provided in the lower wall 2. The first U-shaped steel bar 12 and the second U-shaped steel bar 22 are of the same size and can be interlocked with each other. Four horizontal connecting bars 3 are fixedly connected to the first U-shaped steel bar 12 and the second U-shaped steel bar 22 respectively.
[0034] The upper wall groove 11 and the lower wall groove 21 are enclosed to form a cavity. A grouting hole 21 c is reserved on the upper wall groove 11 , and a grout outlet hole 11 c is reserved on the lower wall groove 21 .
[0035] The ultra-high performance concrete shear wall horizontal connection structure of the present invention adopts the cavity formed by itself for grouting connection, and then cooperates with the frame structure composed of the first U-shaped steel bar, the second U-shaped steel bar and the horizontal connecting bar for grouting connection. It does not require the high precision requirement of the grouting sleeve, nor does it require the hole-by-hole grouting of the grout anchor overlap. It also does not require on-site tying of steel bars and supporting formwork, so the construction speed is fast and the assembly efficiency and quality are high.
[0036] In this embodiment, the first U-shaped steel bar 12 and the second U-shaped steel bar 22 are of the same size, which ensures that the two can completely interlock with each other and facilitates the subsequent arrangement of the horizontal connecting bars 3.
[0037] like Figure 4As shown, in the first embodiment, the upper wall groove 11 includes an upper wall intermediate connecting portion 11a located in the middle and upper wall protruding portions 11b located on both sides of the upper wall intermediate connecting portion 11a, and the lower wall groove 21 includes a lower wall intermediate connecting portion 21a located in the middle and lower wall protruding portions 21b located on both sides of the lower wall intermediate connecting portion 21a.
[0038] like Figure 3 As shown, in the first embodiment, the lower surface of the upper wall intermediate connection part 11a is provided with a plurality of shear key grooves 13 at intervals, and the upper surface of the lower wall intermediate connection part 21a is provided with a plurality of shear keys 23 that are concave-convexly matched with the shear key grooves 13 at intervals. On the one hand, they play a role in positioning and temporary stabilization during splicing, and on the other hand, they serve as shear keys to increase the shear bearing capacity of the horizontal node after installation.
[0039] In the first embodiment, if Figure 4 and 5 As shown, the upper wall 1 includes an upper wall main body 14 located at the upper end of the upper wall protrusion 11b, the thickness of the upper wall protrusion 11b is thinned to 25mm, the thickness of the upper wall main body 14 is 40-80mm, and the thickness of the upper wall protrusion 11b is 15-55mm smaller than the thickness of the upper wall main body 14, which facilitates the buckling installation of the first U-shaped steel bar 12 and the second U-shaped steel bar 22, and the upper wall groove 11 and the lower wall groove 21 are enclosed to form a cavity.
[0040] In the second embodiment, if Figure 6 As shown, both the first U-shaped steel bar 12 and the second U-shaped steel bar 22 have a middle bending portion, and four horizontal connecting bars 3 are added to facilitate the buckling installation of the two. At this time, the thickness of the upper wall protrusion 11b is basically the same as the thickness of the upper wall main body 14.
[0041] like Figures 2 to 5 As shown, the present invention also provides a construction method for a horizontal connection structure of an ultra-high performance concrete shear wall, comprising the following steps:
[0042] S1, the lower wall 2 is fixedly placed below the upper wall 1, and the first U-shaped steel bar 12 on the upper wall 1 and the second U-shaped steel bar 22 on the lower wall 2 are arranged oppositely, at this time, the spacing between the lower end of the upper wall groove 11 and the upper end of the lower wall groove 21 is 130mm, and other values between 100 and 150mm can also be used according to actual conditions, and then four horizontal connecting bars 3 are fixedly connected to the first U-shaped steel bar 12 and the second U-shaped steel bar 22 respectively, and the first U-shaped steel bar 12 and the second U-shaped steel bar 22 are never connected to each other, and the upper part of the lower cavity wall is treated with grouting to form a grouting layer 4 to facilitate the subsequent grouting process;
[0043] S2, after the mortaring is completed, the upper wall 1 is moved downward, and the lower end of the upper wall groove 11 is abutted against the upper end of the lower wall groove 21, and the single shear key 23 is inserted into the corresponding single shear key groove 13, at this time, the upper wall groove 11 and the lower wall groove 21 are surrounded to form a cavity;
[0044] S3, pouring high-strength grouting material into the above-mentioned cavity through the grouting hole 21c of the lower wall groove 21 until the slurry flows out from the slurry outlet hole 11c at the upper part of the upper wall groove 11, then closing the grouting hole 21c and the slurry outlet hole 11c and turning to on-site maintenance.
[0045] The construction method of the present invention combines the two methods of grouting and grouting. A plurality of horizontal connecting bars are respectively fixedly connected to the first U-shaped steel bar and the second U-shaped steel bar. Grouting is performed in the cavity. The grouting body, the U-shaped steel bar and the horizontal bars are used to achieve horizontal connection of the upper and lower walls. The construction of this method is relatively simple and has low precision requirements.
[0046] According to the first embodiment, the present invention manufactures three cast-in-place UHPC (ultra-high performance concrete) hollow shear walls, including UHPCSW-XJ-1, UHPCSW-XJ-2 and UHPCSW-XJ-3, and three assembled UHPC hollow shear walls with horizontal seam nodes, including UHPCSW-ZP-1, UHPCSW-ZP-2 and UHPCSW-ZP-3, a total of three groups of six test models, wherein the holes of UHPCSW-XJ-1 and UHPCSW-ZP-1 are The hole rate is 30%, and the test axial compression ratio is 0.1; the hole rate of UHPCSW-XJ-2 and UHPCSW-ZP-2 is 45%, and the test axial compression ratio is 0.1; the hole rate of UHPCSW-XJ-3 and UHPCSW-ZP-3 is 45%, and the test axial compression ratio is 0.17. The six walls are of the same size, with a height H of 2800mm, a width B of 1350mm, and a thickness b of 300mm. The holes in the wall are square holes, and the holes are evenly distributed. There are two types of specimen cross-sections. All specimens are composed of three parts: foundation beam, loading beam, and wall. The size of the loading beam is 300mm×350mm×1600mm, and the size of the foundation beam is 500mm×600mm×2400mm. The grouting cavity of the grouting U-shaped steel bar overlap connection specimen is set at the bottom of the wall, with a design height of 200mm and a U-shaped steel bar overlap length of 190mm. At the same time, a thin wall is set on the upper part of the foundation beam to form a grouting cavity. When assembled, it is connected to the upper wall. Horizontal dowels are set in the U-shaped bar connection area with the same specifications as the vertical distribution bars. The horizontal dowels are inserted and fixed when the upper and lower U-shaped bars are overlapped during the wall assembly. The grouting material at the joint uses the same strength as the wall.
[0047] The steel bars used in the test wall are all HRB400. The wall uses double rows of longitudinal distribution steel bars and horizontal distribution steel bars, the diameter of the longitudinal distribution bars is 14mm, the spacing is 150mm, the diameter of the horizontal distribution bars is 12mm, the spacing is 200mm, and the foundation beam, loading beam, and wall are all cast with UHPC.
[0048] The specific cross-sectional dimensions and reinforcement information of each part of the ultra-high performance concrete prefabricated hollow shear wall and horizontal joint node model specimens are shown in the following table.
[0049]
[0050] Among them, the cross-sectional dimensions and reinforcement of UHPCSW-XJ-1, UHPCSW-XJ-2 and UHPCSW-XJ3 are exactly the same, and the cross-sectional dimensions and reinforcement of UHPCSW-ZP-1, UHPCSW-ZP-2 and UHPCSW-ZP-3 are exactly the same.
[0051] A total of 6 specimens were made in this test. The thinnest part of the specimen wall was only 65mm, and double-layer two-way reinforcement was adopted. Therefore, horizontal casting was selected, which can not only ensure the density of the wall concrete but also greatly reduce the difficulty of construction.
[0052] Then, material property tests were carried out on concrete and steel bars, and static tests were also carried out on ultra-high performance concrete prefabricated hollow shear walls and horizontal joints.
[0053] For UHPCSW-XJ-1, according to the proposed loading system, a predetermined axial pressure is first applied to the specimen through the hydraulic jack on the top of the specimen, and the pressure is kept constant after the application. Before the specimen is formally loaded, the horizontal load is pre-loaded to 50kN using force control, and two pre-load cycles are performed to check whether the loading device, data acquisition instrument, strain gauge, and displacement meter are in normal working condition. At the same time, the contact unevenness between the devices is eliminated to ensure the normal progress of the subsequent formal loading. The formal loading adopts displacement control to reciprocate loading. Each displacement cycle is repeated 2 times before yielding, and each displacement cycle is repeated 3 times after yielding. Loading is stopped until the specimen is destroyed or the load is reduced to less than 85% of the ultimate bearing capacity. The process from loading to destruction of the six specimens is similar, and can be roughly divided into three different stages: elasticity, plasticity, and destruction:
[0054] 1) Elastic stage: The crack development of this wall was mapped on the back. When the forward load was 2.8mm, three horizontal fine cracks appeared at 100-450mm on the left side of the specimen. The crack width was measured to be 0.02mm. When the reverse load was 2.8mm, three horizontal cracks appeared at 100-500mm on the right side of the wall. The longest crack was about 580mm wide. When the forward load was 4.2mm, two cracks appeared at 650mm and 900mm on the left side of the specimen. The crack at 900mm developed slightly downward for 150mm and then developed downward at a 30° angle. When the reverse load was 4.2mm, two horizontal cracks appeared at about 750mm and 900mm on the right side of the specimen. The maximum crack width was measured to be about 0.07mm. When the forward loading was 5.6mm, the cracks generated in the previous stages extended diagonally downward to a certain extent, and two horizontal cracks appeared at 1000mm on the left side of the specimen. The maximum crack width was measured to be about 0.1mm. When the reverse loading was 5.6mm, no new cracks appeared in the specimen. When the forward loading was 8.4mm, a short diagonal crack of about 80mm long appeared at the root of the wall in the lower left corner of the specimen. The existing cracks continued to extend diagonally downward. When the reverse loading was 8.4mm, a horizontal crack appeared at a height of about 1100mm on the right side of the specimen. The diagonal cracks on the wall began to cross, and the maximum crack width was measured to be 0.15mm. When the forward load reaches 11.2mm, a horizontal crack appears at about 1 / 2 of the wall height on the left side, and an oblique crack is generated near the middle of the wall. The existing cracks further develop obliquely downward. When the reverse load reaches 11.2mm, multiple horizontal cracks appear at 1 / 2 to 2 / 3 of the wall height on the right side of the wall. The maximum crack width is measured to be about 0.22mm. For the dry indoor Class Ⅰ-A environment, the maximum crack width limit is 0.3mm, which meets the requirements.
[0055] 2) Plastic stage: During the loading process from 11.2mm to 14mm, an inflection point was observed in the load-displacement curve. The data collected by the strain gauge showed that the outermost tensile steel bar had reached yield. Three horizontal cracks appeared at the root of the left wall of the wall, and multiple oblique cracks appeared at the root of the right wall. There was a horizontal crack at the right bottom corner, which was about 100mm long. The maximum width of the crack was measured to increase to 0.3mm. When loaded to 16.8mm, the cracks generated were mainly extensions of the previous cracks. The steel fibers began to make a "sizzling" sound of breaking, and concrete peeled off at the bottom of the left edge of the wall. When loaded to 19.6mm, the specimen had a peak load of 817.5kN, and a horizontal crack 1100mm long and 7mm wide appeared at a height of 100mm at the bottom of the wall. A "hissing" tearing sound appeared at the bottom of the wall. When loaded to 22.4mm, the bearing capacity of the wall began to decrease, the cracks continued to develop and penetrate to the right, and concrete bulged out at the right bottom corner and continued to fall off.
[0056] 3) Destruction stage: When loaded to 25.2mm, the bearing capacity dropped to 671.6kN. The bearing capacity of the specimen was lower than 85% of the peak bearing capacity. The specimen was judged to have failed and the test loading was ended.
[0057] The other five hollow shear walls were also subjected to quasi-static tests according to the above method, and based on the results of the quasi-static tests, the seismic performance of the UHPC hollow shear wall structure and the horizontal seam nodes were evaluated from the aspects of hysteresis curve, skeleton curve and bearing capacity. The bearing capacity, ductility performance, energy dissipation capacity, etc. of the assembled UHPC hollow shear wall connected by grouting U-shaped steel bar lap joints in this embodiment are close to those of cast-in-place (within 10%). In actual engineering, the horizontal seams of assembled UHPC hollow shear walls can be designed as equivalent to cast-in-place. Here, cast-in-place means that the upper wall 1 and the lower wall 2 are cast on-site as a whole, and there is no horizontal seam. Compared with cast-in-place, the present invention does not require the processes of tying steel bars, supporting formwork, pouring concrete and curing, which reduces on-site wet operations and shortens the construction period.
[0058] The invention described above only expresses the implementation methods of the embodiments of the present invention, and cannot be understood as limiting the scope of the invention patent, nor does it impose any form of limitation on the structure of the embodiments of the present invention. It should be pointed out that for ordinary technicians in this field, several changes and improvements can be made without departing from the concept of the embodiments of the present invention, which all belong to the protection scope of the embodiments of the present invention.
Claims
1. An ultra-high performance concrete shear wall horizontal connection structure, arranged between an upper wall (1) with a cavity and a lower wall (2) with a cavity, characterized in that: It comprises an upper wall groove (11) arranged at the lower end of the upper wall (1) and a lower wall groove (21) arranged at the upper end of the lower wall (2); A first U-shaped steel bar (12) with an opening facing upward is arranged in the upper wall (1), and a second U-shaped steel bar (22) with an opening facing downward is arranged in the lower wall (2), the first U-shaped steel bar (12) and the second U-shaped steel bar (22) are interlocked, and a plurality of horizontal connecting bars (3) are respectively fixedly connected to the first U-shaped steel bar (12) and the second U-shaped steel bar (22); The upper wall groove (11) and the lower wall groove (21) are enclosed to form a hollow cavity, a grouting hole (11c) is reserved on the upper wall groove (11), and a grouting hole (21c) is reserved on the lower wall groove (21); The upper wall groove (11) comprises an upper wall middle connection portion (11a) located in the middle and upper wall protrusions (11b) located on both sides of the upper wall middle connection portion (11a); the lower wall groove (21) comprises a lower wall middle connection portion (21a) located in the middle and lower wall protrusions (21b) located on both sides of the lower wall middle connection portion (21a); The lower surface of the upper wall middle connection part (11a) is provided with a plurality of shear key grooves (13) at intervals, and the upper surface of the lower wall middle connection part (21a) is provided with a plurality of shear keys (23) that are concave-convexly matched with the shear key grooves (13) at intervals; The upper wall (1) comprises an upper wall main body (14) located at the upper end of the upper wall protruding part (11b), and the thickness of the upper wall protruding part (11b) is smaller than the thickness of the upper wall main body (14); A construction method for an ultra-high performance concrete shear wall horizontal connection structure comprises the following steps: S1, the lower wall (2) is fixedly placed below the upper wall (1), and the first U-shaped steel bar (12) on the upper wall (1) and the second U-shaped steel bar (22) on the lower wall (2) are arranged opposite to each other, at which time the distance between the lower end of the upper wall groove (11) and the upper end of the lower wall groove (21) is 100 to 150 mm, and then a plurality of horizontal connecting bars (3) are fixedly connected to the first U-shaped steel bar (12) and the second U-shaped steel bar (22) respectively, the first U-shaped steel bar (12) and the second U-shaped steel bar (22) are never connected to each other, and a mortar treatment is performed on the upper part of the lower cavity wall; S2, after the mortaring is completed, the upper wall (1) is moved downward, and the lower end of the upper wall groove (11) is abutted against the upper end of the lower wall groove (21), and the single shear key (23) is inserted into the corresponding single shear key groove (13), at which time the upper wall groove (11) and the lower wall groove (21) are surrounded to form a cavity; S3, pouring high-strength grouting material into the above-mentioned cavity through the grouting hole (21c) of the lower wall groove (21) until the grout flows out from the grouting hole (11c) at the upper part of the upper wall groove (11), then closing the grouting hole (21c) and the grouting hole (11c) and turning to on-site curing.
2. The ultra-high performance concrete shear wall horizontal connection structure according to claim 1, characterized in that: The first U-shaped steel bar (12) and the second U-shaped steel bar (22) are of the same size.
3. The ultra-high performance concrete shear wall horizontal connection structure according to claim 1, characterized in that: The thickness of the upper wall protruding portion (11b) is 15 to 55 mm smaller than the thickness of the upper wall main body portion (14).