A quality supervision method and system for cast-in-place pile concealed engineering
By digitally monitoring the parameters and inspection information of the steel cage in the hidden project of cast-injected piles, the quality problems in the use of steel bar raw materials are solved, and the whole process supervision and abnormal identification are realized to ensure the construction quality.
Patent Information
- Application Number
- CN202311621513.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-29
- Publication Date
- 2025-01-14
- Estimated Expiration
- 2043-11-29
AI Technical Summary
The lack of effective means of supervision of steel bar raw materials in the hidden project of cast-injected piles has led to quality problems such as inconsistency between construction and design, use of steel bars before inspection, and cutting corners.
通过数字化定义灌注桩钢筋笼参数,记录钢筋型号规格的收货和检测信息,关联收货与送检记录,进行全过程质量监管,识别钢筋使用异常和用量超出情况,生成施工异常预警报告。
The entire process quality traceability management of steel bar raw materials in the hidden project of cast-injected piles has been realized, ensuring that the construction quality complies with the specifications, and timely discover abnormal steel bar use and cutting corners, so as to ensure the construction quality.
Smart Images

Figure CN117634958B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of construction engineering management, and in particular to a quality supervision method and system for cast-in-place pile concealed engineering. Background Art
[0002] In the hidden project of bored piles (rebar cage), raw steel bar is one of the important building materials that affects the quality of project construction. According to the requirements of the quality supervision specifications for bored pile construction, the model and specifications of the raw steel bar actually used on site must meet the requirements of the construction design drawings, and the amount of steel bars of the corresponding model and specifications must also meet the design requirements. In addition, the raw steel bar materials entering the site for bored pile construction must be submitted to a third-party testing agency for quality inspection before they are used in construction. Only when the quality is qualified can they be used in construction. There is currently a lack of effective supervision measures for the construction and use of raw steel bar materials in the construction of hidden bored pile projects (rebar cages), resulting in quality problems such as inconsistency between construction and design, use of steel bars without inspection, and cutting corners at the construction site.
[0003] At present, there are digital management methods and systems for the entire process of bored pile construction, which can digitally collect and manage the construction process data of each bored pile, and also cover hidden projects (rebar cages). Therefore, based on the existing data of the entire process of bored pile construction, a quality supervision method and system for the hidden project (rebar cage) of bored piles can be constructed. For the use of steel raw materials in the construction process of the hidden project (rebar cage) of bored piles, the whole process quality supervision is carried out from material planning, material receipt, material inspection, material inspection and material use. All-round quality supervision is carried out from the time dimension, model specifications and usage, which can better meet the quality supervision specification requirements of the hidden project (rebar cage) of bored piles. Summary of the invention
[0004] In view of the shortcomings of the prior art and the actual demand for construction quality supervision of cast-in-place pile concealed engineering (reinforcing cage), the present invention proposes a quality supervision method and system for cast-in-place pile concealed engineering.
[0005] The objective of the present invention is achieved through the following technical solutions:
[0006] According to a first aspect of the present specification, a quality supervision method for cast-in-place pile concealed engineering is provided, the method comprising the following steps:
[0007] Step 1: Digitally define the parameters of the reinforced cage of the bored pile, and register the design parameters of the reinforced cage of each bored pile, including the main reinforcement, spiral stirrups, and stiffening stirrups, in accordance with the requirements of the bored pile concealed engineering-reinforced cage construction design drawings;
[0008] Step 2: Register and manage the receipt of steel bar raw materials during the construction of the cast-in-place pile concealed project - steel cage, record the arrival time, furnace batch number and receipt quantity of each steel bar model and specification, and upload the corresponding steel bar raw material quality certificate and receipt documents;
[0009] Step 3: Register and manage the steel bar raw materials delivered to the site for the cast-in-place pile concealed project - steel cage construction, record the inspection time and inspection results of each steel bar model and specification, upload the inspection report, and associate the inspection submission record with the receipt record, and record the number of inspection representatives. It is necessary to ensure that all receipt records are associated with the corresponding inspection submission record, and ensure that the receipt quantity is consistent with the number of inspection representatives;
[0010] Step 4: Register and manage the lowering of the steel cage during the construction of the cast-in-place pile concealed project - steel cage, record the construction data of each section of each steel cage, register and manage the overall construction data of the steel cage of the cast-in-place pile when the steel cage is lowered, and associate it with the corresponding steel raw material inspection report to ensure that the steel raw material used for each cast-in-place pile has a corresponding steel raw material inspection report;
[0011] Step 5: According to the construction data of the steel bar model and specification registered during the construction of the steel bar cage of each cast-in-place pile, the design parameter values of the steel bar model and specification corresponding to the main bar, spiral stirrup and stiffening stirrup registered for the cast-in-place pile are compared to identify the cast-in-place piles with abnormal steel bar use;
[0012] Step 6: According to the inspection time of the steel bar raw material inspection report associated with each cast-in-place pile, the time of lowering the cast-in-place pile steel bar cage is verified and supervised. If the inspection time of the steel bar raw material is later than the lowering time of the cast-in-place pile steel bar cage, it means that the cast-in-place pile has an abnormal situation that the steel bar raw material is used before inspection;
[0013] Step 7: Based on the construction data of the steel cage lowering registered during the construction of the cast-in-place pile concealed project - steel cage, including the data of spiral stirrups, stiffening stirrups and each section of main reinforcement, the steel bar usage of each cast-in-place pile is summarized and counted according to the steel bar model and specifications;
[0014] Step 8: For the cast-in-place piles associated with the steel bar raw material inspection report, sort them in chronological order according to the time of pile construction, combine the calculated and statistical steel bar usage of each cast-in-place pile corresponding to the steel bar model and specification, and compare it with the number of inspection representatives of the steel bar model and specification corresponding to the associated steel bar raw material inspection report, supervise the steel bar usage of the cast-in-place piles corresponding to the steel bar model and specification, and identify the cast-in-place piles with abnormal steel bar usage.
[0015] Furthermore, in the step 1, the parameters of the steel cage of the cast-in-place pile are digitally defined and represented by a quaternion (P, B, G, D), wherein P represents the cast-in-place pile project; B represents the pile number; G represents the overall design parameters of the steel cage; and D represents the main reinforcement design parameters of each section of the steel cage.
[0016] G is represented by a sextuple (LC, LJ, MGCD, BHCHD, LXGJ, JJGJ), where LC represents the length of the steel cage; LJ represents the diameter of the steel cage; MGCD represents the anchorage length; BHCHD represents the thickness of the protective layer; LXGJ represents the design parameters of the spiral stirrups, including the length of the dense area, the spacing of the dense area, the length of the non-densified area, the spacing of the non-densified area, and the specifications of the steel bar model; JJGJ represents the design parameters of the stiffening stirrups, including the diameter, spacing, and specifications of the steel bar model;
[0017] D is represented by a triple (Di, DLC, ZJ), where Di represents the i-th section of the steel cage; DLC represents the length of the steel cage; and ZJ represents the main reinforcement design parameters, including the number of main reinforcements and the steel bar model specifications.
[0018] Furthermore, the step 4 specifically includes:
[0019] Step 4.1 During the construction of the cast-in-place pile concealed project - steel cage, register the construction data of each steel cage lowering section, record the lowering time of the steel cage section, the section to which it belongs, the length of the section, the number of main bars, and the steel model and specifications;
[0020] Step 4.2: When the cast-in-place pile reinforcement cage is lowered, the overall construction data of the cast-in-place pile reinforcement cage is registered, including: reinforcement cage length, reinforcement cage diameter, anchorage length, protective layer thickness, spiral stirrup construction data, and stiffening stirrup construction data;
[0021] Step 4.3: For each cast-in-place pile, associate the corresponding steel bar raw material inspection report according to the steel bar model and specifications used.
[0022] Furthermore, the step five specifically includes:
[0023] Step 5.1 compares the model and specification data of the main reinforcement of each section of the reinforced cage of each cast-in-place pile registered when the reinforced cage is lowered with the model and specification design data of the main reinforcement of the reinforced cage of the corresponding section. If the model and specification are lower than the design data, it is determined that the main reinforcement of the reinforced cage of the cast-in-place pile has abnormal use;
[0024] Step 5.2 compares the corresponding model and specifications of the spiral stirrups / reinforcing stirrups of the steel cage registered when the steel cage of each cast-in-place pile is lowered with the design data of the corresponding model and specifications of the spiral stirrups / reinforcing stirrups of the steel cage registered for the cast-in-place pile. If the model and specifications are lower than the design data, it is determined that there is an abnormal use of the spiral stirrups / reinforcing stirrups of the steel cage of the cast-in-place pile.
[0025] Furthermore, the step seven specifically includes:
[0026] Step 7.1 For each cast-in-place pile, calculate the steel consumption S of each section of the steel cage according to the construction data of each section of the steel cage. 主筋 ;
[0027] Step 7.2 For each cast-in-place pile, calculate the steel consumption S of the corresponding steel bar model and specification in the spiral hoop reinforcement area of the cast-in-place pile according to the overall construction data of the steel cage registered when the steel cage is lowered. 加密区 , the amount of steel bars S corresponding to the steel bar model and specification in the non-densified area of spiral stirrups 非加密区 , the amount of steel bars S corresponding to the steel bar model and specification of the reinforcing stirrups 加劲箍筋 ;
[0028] Step 7.3 For each cast-in-place pile, summarize and calculate the steel consumption S of the main reinforcement, spiral stirrups, and reinforcing stirrups according to the steel bar model specification X x =S 主筋 +S 加密区 +S 非加密区 +S 加劲箍筋 .
[0029] Furthermore, in step seven, the steel bar amount S 主筋 The calculation method is as follows:
[0030] Assuming that there are k sections of steel cage, calculate the steel consumption S of each main reinforcement of the 1st to k-1th steel cage sections. i , 1≦i≦k-1, the calculation formula is: S i = (length of the i-th section + length of the joint) × number of main bars in the i-th section × weight per meter, where the joint length is calculated as “diameter of the main bar × 10 / 1000”; the weight per meter is calculated as “square of the main bar specification × 0.617 / 100”;
[0031] Calculate the steel consumption S of the main reinforcement of the kth section of the reinforcement cage k , the calculation formula is: S k = (length of section k + anchorage length + joint length) × number of main bars in section k × weight per meter, where the joint length is calculated as “main bar diameter × 10 / 1000”; the weight per meter is calculated as “square of main bar specification × 0.617 / 100”;
[0032] According to the steel bar model and specifications, calculate the steel bar consumption S of each cast-in-place pile reinforcement cage main bar 主筋 =∑S i +S k , 1≦i≦k-1.
[0033] Furthermore, in step seven, the steel bar amount S 加密区 The calculation formula is: 加密区 = (length of densified area × 1000 / densified area spacing + 1) × perimeter × weight per meter, where perimeter = 3.1416 × (pile diameter - 2 × thickness of steel cage protective layer) / 1000, and weight per meter is calculated according to "square of main reinforcement steel bar specification × 0.617 / 100";
[0034] The steel bar amount S 非加密区 The calculation formula is: 非加密区 = (length of non-reinforced area × 1000 / spacing of non-reinforced area + 1) × perimeter × weight per meter, where perimeter = 3.1416 × (pile diameter - 2 × thickness of steel cage protective layer) / 1000, and weight per meter is calculated according to "square of main reinforcement steel bar specification × 0.617 / 100";
[0035] The steel bar amount S 加劲箍筋 The calculation formula is: 加劲箍筋 =(total cage length / spacing+1)×weight per meter×circumference, where circumference=3.1416×(pile diameter-2×thickness of steel cage protective layer) / 1000+10D, D is the diameter of the reinforcing stirrups registered when the steel cage is lowered, and the weight per meter is calculated according to "square of the main reinforcement steel specification×0.617 / 100".
[0036] Furthermore, the step eight specifically includes:
[0037] Assume that the representative number of steel bar model specification X in the steel bar raw material inspection report is R x , detect the number of remaining representatives R x剩余 =R x , the ordered n-tuple (B1, B2, ..., B n ), where B i represents the pile number of the i-th pile, B i+1 The pile formation time is later than B i Pile time;
[0038] For B i , i is initialized to 1, get B i The amount of steel bars S for the pile corresponding to the steel bar type and specification X x-i , and R x剩余 contrast:
[0039] If S x-i >R x剩余 , then it means B i The amount of steel bars corresponding to the steel bar model specification X of the pile has exceeded the representative number of the test, B i There is an abnormality in the amount of steel bars used in the pile on the steel bar model specification X. i+1 To B n The piles all had the same abnormal condition;
[0040] If S x-i ≦R x剩余 , then it means B i The amount of steel bars used for the pile corresponding to the steel bar model specification X has not exceeded the number of representative tests, B i If there is no abnormality in the amount of steel bars used in the pile on the steel bar model specification X, then the remaining representative quantity R is recorded. x剩余 =R x剩余 -S x-i , and execute i=i+1 to detect the steel bar usage of the next pile corresponding to the steel bar model specification X.
[0041] Furthermore, the monitoring results of step five, step six and step eight are summarized, and finally a construction abnormality warning report for each bored pile is generated, so as to realize the effective supervision of the construction quality of the bored pile concealed project.
[0042] According to a second aspect of the present specification, a quality supervision system for cast-in-place pile concealed engineering is provided, the system comprising the following units:
[0043] The cast-in-place pile reinforcement cage design configuration management unit is used to digitally define the reinforcement cage parameters of the cast-in-place pile, and configure and manage the reinforcement cage design parameters of each cast-in-place pile in accordance with the requirements of the cast-in-place pile concealed engineering-reinforcement cage construction design drawings;
[0044] The receiving management unit for cast-in-place pile steel bar raw materials is used to register and manage the receiving of steel bar raw materials during the construction of cast-in-place pile concealed project - steel bar cage, record the arrival time, furnace batch number and receiving quantity of each steel bar model and specification, and upload the corresponding steel bar raw material quality certificate and receiving documents;
[0045] The inspection management unit for cast-in-place pile steel bar raw materials is used to register and manage the inspection of steel bar raw materials entering the cast-in-place pile hidden project - steel cage construction, record the inspection time and inspection results of each steel bar model and specification, upload the inspection report, and associate the inspection and delivery records with the receipt records, and record the number of inspection representatives. It is necessary to ensure that all receipt records are associated with the corresponding inspection and delivery records, and ensure that the number of receipts is consistent with the number of inspection representatives;
[0046] The construction management unit for lowering the steel cage of the bored pile is used to register and manage the lowering of the steel cage during the construction process of the hidden engineering of the bored pile - the steel cage, record the construction data of each section of each steel cage, register and manage the overall construction data of the steel cage of the bored pile when the steel cage is lowered, and associate it with the corresponding steel raw material inspection report to ensure that the steel raw material used for each bored pile has a corresponding steel raw material inspection report;
[0047] The abnormal supervision unit for the construction of cast-in-place pile concealed works includes the following three supervision components:
[0048] The first monitoring component is used to compare the steel bar model and specification construction data registered during the lowering construction of each cast-in-place pile steel bar cage with the design parameter values of the steel bar model and specification corresponding to the main bars, spiral stirrups, and stiffening stirrups registered for the cast-in-place pile, so as to identify the cast-in-place piles with abnormal steel bar usage;
[0049] The second supervision component is used to check and supervise the lowering time of the steel cage of the bored pile according to the inspection time of the steel raw material inspection report associated with each bored pile. If the inspection time of the steel raw material is later than the lowering time of the steel cage of the bored pile, it means that the bored pile has an abnormal situation that the steel raw material is used before inspection;
[0050] The third supervision component is used to summarize and count the steel bar usage of each cast-in-place pile according to the steel bar model and specification based on the construction data of the steel bar cage lowering registered during the construction process of the cast-in-place pile hidden project - steel bar cage; the cast-in-place piles associated with the steel bar raw material inspection report are sorted in chronological order according to the pile construction time, and the steel bar usage of each cast-in-place pile corresponding to the steel bar model and specification obtained by calculation is combined with the number of inspection representatives corresponding to the steel bar model and specification in the associated steel bar raw material inspection report, so as to supervise the steel bar usage of the cast-in-place piles corresponding to the steel bar model and specification, and identify the cast-in-place piles with abnormal steel bar usage.
[0051] The advantages and beneficial effects of the present invention are as follows:
[0052] The present invention digitally defines the parameters of the cast-in-place pile steel cage, registers the design data of the cast-in-place pile steel cage, registers and manages the receipt of steel raw materials during the construction process of the cast-in-place pile hidden project-steel cage, registers and manages the inspection of steel raw materials, and associates the corresponding material receipt records to achieve quality traceability management of steel receipt and inspection. By registering the construction data during the lowering construction of the cast-in-place pile steel cage, the construction data and design data can be compared to identify abnormal steel use; by summarizing and counting the steel consumption of each cast-in-place pile main reinforcement, spiral stirrup and stiffening stirrup corresponding to the steel model and specification, and comparing it with the number of detection representatives in the associated steel raw material inspection report, it is possible to identify abnormal steel consumption. On the one hand, it can ensure the quality of steel raw materials during the construction process of the cast-in-place pile hidden project-steel cage, and on the other hand, it can timely discover abnormal situations that may have cut corners through steel calculation, thereby ensuring the construction quality of the cast-in-place pile hidden project-steel cage. Its main advantages are as follows:
[0053] 1. The digital definition and collection of steel cage design data, steel raw material receipt data and inspection data, and steel cage lowering construction data during the construction of the cast-in-place pile concealed project - steel cage has been realized.
[0054] 2. It realizes the whole process management of the use of steel bar raw materials in the hidden project of cast-in-place piles - steel cage construction, and can carry out quality traceability management of the whole process of steel bar raw materials entering the site, inspection, testing and use.
[0055] 3. It realizes the quality supervision for the hidden project of cast-in-place piles - steel cage. According to the construction data registered for the deployment of the cast-in-place pile steel cage, combined with the steel cage design data and the steel raw material inspection data, it can timely discover the abnormal use of steel bars and the abnormal amount of steel bars in the construction of the hidden project of cast-in-place piles - steel cage. BRIEF DESCRIPTION OF THE DRAWINGS
[0056] Figure 1 It is a flowchart of the method described in the present invention.
[0057] Figure 2 It is a structural block diagram of the system of the present invention. DETAILED DESCRIPTION
[0058] The features and exemplary embodiments of various aspects of the present invention will be described in detail below. In order to make the purpose, technical solutions and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and Examples. It should be understood that the specific embodiments described herein are only configured to explain the present invention and are not configured to limit the present invention. For those skilled in the art, the present invention can be implemented without the need for some of these specific details. The description of the following implementation examples is only to provide a better understanding of the present invention by illustrating examples of the present invention.
[0059] like Figure 1 As shown, an embodiment of the present invention provides a quality supervision method for cast-in-place pile concealed engineering, the method comprising the following steps:
[0060] Step 1: Define the complex cast-in-place pile reinforcement cage parameters digitally, and configure and manage the reinforcement cage design parameters of each cast-in-place pile in accordance with the requirements of the cast-in-place pile hidden project-reinforcement cage construction design drawings, including: spiral stirrup configuration, stiffening stirrup configuration, and each section of main reinforcement configuration.
[0061] Step 1.1 Digitally define the parameters of the steel cage of the cast-in-place pile, which can be represented by a four-tuple (P, B, G, D), where P represents the cast-in-place pile project; B represents the pile number; G represents the overall design parameters of the steel cage; and D represents the main reinforcement design parameters of each section of the steel cage. G can be represented by a six-tuple (LC, LJ, MGCD, BHCHD, LXGJ, JJGJ), where LC represents the length of the steel cage; LJ represents the diameter of the steel cage; MGCD represents the anchorage length; BHCHD represents the thickness of the protective layer; LXGJ represents the design parameters of the spiral stirrup, including the length of the reinforced area, the spacing of the reinforced area, the length of the non-reinforced area, the spacing of the non-reinforced area, and the steel bar model specifications; JJGJ represents the design parameters of the stiffening stirrup, including the diameter, spacing, and steel bar model specifications. D can be represented by a triple (Di, DLC, ZJ), where Di represents the i-th section of the steel cage; DLC represents the length of the steel cage of this section; and ZJ represents the main reinforcement design parameters, including the number of main reinforcements and the steel bar model specifications.
[0062] Step 1.2: According to the requirements of the bored pile construction design drawings, the design parameter values of the reinforcement cage of each bored pile shall be registered according to the digital requirements.
[0063] Step 2: Register and manage the receipt of steel bar raw materials during the construction of the cast-in-place pile concealed project - steel cage, record the arrival time, furnace batch number and receipt quantity of each steel bar model and specification, and upload the corresponding steel bar raw material quality certificate and receipt documents to ensure the authenticity of the steel bar raw material receipt data.
[0064] Step 3: Register and manage the steel bar raw materials delivered to the construction site for the cast-in-place pile concealed project - steel cage construction, record the inspection time and results of each steel bar model and specification, upload the inspection report, and associate the inspection submission record with the receipt record, and record the number of inspection representatives. It is also necessary to ensure that all receipt records are associated with the corresponding inspection submission record, and ensure that the receipt quantity is consistent with the number of inspection representatives.
[0065] Step 4: Register and manage the lowering of the steel cage during the construction of the hidden project of cast-in-place piles - steel cage, record the construction data of each section of each steel cage, register and manage the overall construction data of the steel cage of the cast-in-place pile when the steel cage is lowered, and associate it with the corresponding steel raw material inspection report to ensure that each cast-in-place pile used steel raw material has a corresponding steel raw material inspection report.
[0066] Step 4.1 During the construction of the cast-in-place pile concealed project - steel cage, register the construction data of each steel cage lowering section, and record the lowering time, section, length, number of main bars and steel model specifications of the steel cage section.
[0067] Step 4.2 When the cast-in-place pile reinforcement cage is lowered, the overall construction data of the cast-in-place pile reinforcement cage shall be registered, including: reinforcement cage length, reinforcement cage diameter, anchorage length, protective layer thickness, spiral stirrup construction data (such as: length and spacing of the reinforced area / non-reinforced area, reinforcement model specifications), and stiffening stirrup construction data (such as: diameter, spacing, reinforcement model specifications).
[0068] Step 4.3 For each cast-in-place pile, associate the corresponding steel bar raw material inspection report according to the steel bar model and specifications used (including: main bars, spiral stirrups, and reinforcing stirrups).
[0069] Step 5: Compare the construction data of the steel bar model and specifications registered during the lowering construction of each cast-in-place pile reinforcement cage with the design parameter values of the corresponding steel bar models and specifications of the main bars, spiral stirrups, and stiffening stirrups registered for the cast-in-place pile to identify cast-in-place piles with abnormal steel bar use.
[0070] Step 5.1 compares the model and specification data of the main reinforcement of each section of the reinforced cage of each cast-in-place pile registered when the reinforced cage is lowered with the model and specification design data of the main reinforcement of the reinforced cage of the corresponding section. If the model and specification are lower than the design data, it is determined that there is an abnormal use of the main reinforcement of the reinforced cage of the cast-in-place pile.
[0071] Step 5.2 compares the corresponding model and specifications of the spiral stirrups / reinforcing stirrups of the steel cage registered when the steel cage of each cast-in-place pile is lowered with the design data of the corresponding model and specifications of the spiral stirrups / reinforcing stirrups of the steel cage registered for the cast-in-place pile. If the model and specifications are lower than the design data, it is determined that there is an abnormal use of the spiral stirrups / reinforcing stirrups of the steel cage of the cast-in-place pile.
[0072] Step six: According to the inspection time of the steel raw material inspection report associated with each bored pile, the lowering time of the bored pile steel cage is verified and supervised. If the inspection time of the steel raw material is later than the lowering time of the bored pile steel cage, it means that the bored pile has an abnormal situation of "using the steel raw material before inspection".
[0073] Step 7: Based on the construction data of the steel cage lowering registered during the construction of the cast-in-place pile hidden project - steel cage, including the data of spiral stirrups, reinforcing stirrups and each section of main reinforcement, the steel consumption of each cast-in-place pile is summarized and counted according to the steel model and specifications.
[0074] Step 7.1 For each cast-in-place pile, the amount of steel bars corresponding to the steel bar model and specification of each steel cage main bar can be calculated based on the construction data of each steel cage section. The specific calculation method is as follows (assuming that the number of steel cage sections is k):
[0075] (1) Calculate the steel consumption S of each main reinforcement of the 1st to k-1th reinforcement cage i (1≦i≦k-1), the calculation formula is: S i = (length of the i-th section + length of the joint) × number of main bars in the i-th section × weight per meter, where the joint length is related to the main reinforcement model and specifications of the steel cage in this section, and is calculated according to "main reinforcement diameter × 10 / 1000"; the weight per meter is calculated according to "square of the main reinforcement specification × 0.617 / 100";
[0076] (2) Calculate the steel consumption S of the main reinforcement of the kth section of the reinforcement cage k , the calculation formula is: S k = (length of section k + anchorage length + joint length) × number of main bars in section k × weight per meter, where the joint length is still calculated according to "main bar diameter × 10 / 1000"; the weight per meter is still calculated according to "square of main bar specification × 0.617 / 100";
[0077] (3) According to the steel bar model and specifications, calculate the steel bar consumption S of each cast-in-place pile reinforcement cage main bar 主筋 =∑S i +S k , 1≦i≦k-1.
[0078] Step 7.2 For each cast-in-place pile, the steel bar consumption of the spiral stirrups and stiffening stirrups corresponding to the steel bar model and specifications of the cast-in-place pile can be calculated based on the overall construction data of the steel cage registered when the steel cage is lowered. The specific calculation method is as follows:
[0079] (1) Calculate the amount of steel bars S in the spiral stirrup reinforcement area 加密区 , the calculation formula is: S 加密区 = (length of the densified area × 1000 / densified area spacing + 1) × perimeter × weight per meter, where perimeter = 3.1416 × (pile diameter - 2 × thickness of the steel cage protective layer) / 1000, and the weight per meter is still calculated according to "square of the main reinforcement specification × 0.617 / 100";
[0080] (2) Calculate the steel quantity S in the non-reinforced area of spiral stirrups 非加密区, the calculation formula is: S 非加密区 = (length of non-reinforced area × 1000 / spacing of non-reinforced area + 1) × perimeter × weight per meter, where perimeter = 3.1416 × (pile diameter - 2 × thickness of steel cage protective layer) / 1000, and weight per meter is still calculated according to "square of main reinforcement steel bar specification × 0.617 / 100";
[0081] (3) Calculate the amount of steel bars S for reinforcing stirrups 加劲箍筋 , the calculation formula is: S 加劲箍筋 =(total cage length / spacing+1)×weight per meter×circumference, where circumference=3.1416×(pile diameter-2×thickness of steel cage protective layer) / 1000+10D, D is the diameter of the reinforcing stirrups registered when the steel cage is lowered, and the weight per meter is still calculated according to "square of the main reinforcement steel bar specification×0.617 / 100".
[0082] Step 7.3 For each cast-in-place pile, the steel consumption S of the main reinforcement, spiral stirrups and reinforcing stirrups can be summarized according to the steel bar model specification X. x =S 主筋 +S 加密区 +S 非加密区 +S 加劲箍筋 .
[0083] Step 8: For the cast-in-place piles associated with the steel bar raw material inspection report of the associated cast-in-place piles (one steel bar raw material inspection report can be associated with multiple cast-in-place piles), sort them in order of pile construction time, combine the calculated and statistical steel bar usage of each cast-in-place pile corresponding to the steel bar model and specification, and check it with the number of inspection representatives corresponding to the steel bar model and specification of the associated steel bar raw material inspection report, supervise the steel bar usage of the cast-in-place pile corresponding to the steel bar model and specification, and identify the cast-in-place piles with abnormal steel bar usage. The specific algorithm is as follows:
[0084] (1) Assume that the representative number of steel bar model specification X in the steel bar raw material inspection report is R x , detect the number of remaining representatives R x剩余 =R x , the ordered n-tuple (B1, B2, ..., B n ), where B i represents the pile number of the i-th pile, B i+1 The pile formation time is later than that of B i The time of pile formation;
[0085] (2) Targeting B i , i is initialized to 1, get B i The amount of steel bars S for the pile corresponding to the steel bar type and specification X x-i , and Rx剩余 For comparison:
[0086] ① If S x-i >R x剩余 , then it means B i The amount of steel bars corresponding to the steel bar model specification X of the pile has exceeded the representative number of the test, B i There is an abnormality in the amount of steel bars used in the pile on the steel bar model specification X. At the same time, the subsequent B i+1 To B n The same abnormal situation exists in all piles, and the algorithm ends;
[0087] ②If S x-i ≦R x剩余 , then it means B i The amount of steel bars used for the pile corresponding to the steel bar model specification X has not exceeded the number of representative tests, B i If there is no abnormality in the amount of steel bars used in the pile on the steel bar model specification X, then the remaining representative quantity R is recorded. x剩余 =R x剩余 -S x-i , and execute i=i+1. If i>n, the algorithm ends; otherwise, go to step (2).
[0088] Step 9: Summarize the monitoring results of steps 5, 6 and 8, and finally generate a construction abnormality warning report for each bored pile, so as to achieve effective supervision on the construction quality of bored pile concealed engineering.
[0089] like Figure 2 As shown, the embodiment of the present invention also provides a quality supervision system for cast-in-place pile concealed engineering, including:
[0090] The cast-in-place pile reinforcement cage design configuration management unit is used to digitally define the reinforcement cage parameters of the cast-in-place pile, and configure and manage the reinforcement cage design parameters of each cast-in-place pile in accordance with the requirements of the cast-in-place pile concealed engineering-reinforcement cage construction design drawings;
[0091] The rebar raw material receiving management unit for cast-in-place piles is used to register and manage the rebar raw materials received during the construction of the cast-in-place pile concealed project - rebar cage, record the arrival time, furnace batch number and receiving quantity of each rebar model and specification, and upload the corresponding rebar raw material quality certificate and receiving documents to ensure the authenticity of the rebar raw material receiving data;
[0092] The inspection management unit for cast-in-place pile steel bar raw materials is used to register and manage the inspection of steel bar raw materials entering the cast-in-place pile hidden project - steel bar cage construction, record the inspection time and inspection results of each steel bar model and specification, upload the inspection report, and associate the inspection and inspection records with the receipt records, and record the number of inspection representatives. It is necessary to ensure that all receipt records are associated with the corresponding inspection and inspection records, and ensure that the receipt quantity is consistent with the number of inspection representatives; the system can check the material receipt data of each model and specification of steel bar raw materials according to the inspection record data to ensure that the corresponding steel bar raw materials have been inspected before the cast-in-place pile steel bar cage is lowered for construction, and the inspection results are qualified;
[0093] The construction management unit for lowering the steel cage of the bored pile is used to register and manage the lowering of the steel cage during the construction process of the hidden engineering of the bored pile - the steel cage, record the construction data of each section of each steel cage, register and manage the overall construction data of the steel cage of the bored pile when the steel cage is lowered, and associate it with the corresponding steel raw material inspection report to ensure that the steel raw material used for each bored pile has a corresponding steel raw material inspection report;
[0094] The abnormal supervision unit for the construction of cast-in-place pile concealed works includes the following three supervision components:
[0095] The first monitoring component is used to compare the steel bar model and specification construction data registered during the lowering construction of each cast-in-place pile steel bar cage with the design parameter values of the steel bar model and specification corresponding to the main bars, spiral stirrups, and stiffening stirrups registered for the cast-in-place pile, so as to identify the cast-in-place piles with abnormal steel bar usage;
[0096] The second supervision component is used to check and supervise the lowering time of the steel cage of the bored pile according to the inspection time of the steel raw material inspection report associated with each bored pile. If the inspection time of the steel raw material is later than the lowering time of the steel cage of the bored pile, it means that the bored pile has an abnormal situation that the steel raw material is used before inspection;
[0097] The third supervision component is used to summarize and count the steel bar usage of each cast-in-place pile according to the steel bar model and specification based on the construction data of the steel bar cage lowering registered during the construction process of the cast-in-place pile hidden project - steel bar cage; the cast-in-place piles associated with the steel bar raw material inspection report are sorted in chronological order according to the pile construction time, and the steel bar usage of each cast-in-place pile corresponding to the steel bar model and specification obtained by calculation is combined with the number of inspection representatives corresponding to the steel bar model and specification in the associated steel bar raw material inspection report, so as to supervise the steel bar usage of the cast-in-place piles corresponding to the steel bar model and specification, and identify the cast-in-place piles with abnormal steel bar usage.
[0098] Furthermore, the implementation of each unit refers to the steps in the above-mentioned quality supervision method for cast-in-place pile concealed engineering.
[0099] In addition, the present application also provides a server, which includes a processor and a memory, wherein the memory stores at least one instruction, at least one program, a code set or an instruction set, and the at least one instruction, the at least one program, the code set or the instruction set are loaded and executed by the processor to implement the steps in the above-mentioned quality supervision method for cast-in-place pile concealed engineering.
[0100] The present application also provides a computer-readable storage medium, in which is stored at least one instruction, at least one program, a code set or an instruction set, and the at least one instruction, the at least one program, the code set or the instruction set is loaded and executed by a processor to implement the steps in the above-mentioned quality supervision method for cast-in-place pile concealed engineering.
[0101] The flow chart and block diagram in the accompanying drawings illustrate the possible architecture, function and operation of the system, method and computer program product according to various embodiments of the present invention. In this regard, each square box in the flow chart or block diagram can represent a module, a program segment or a part of a code, and the module, the program segment or a part of the code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the square box can also occur in a sequence different from that marked in the accompanying drawings. For example, two square boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each square box in the block diagram and / or flow chart, and the combination of the square boxes in the block diagram and / or flow chart can be realized by a dedicated hardware-based system that performs a specified function or operation, or can be realized by a combination of dedicated hardware and computer instructions.
[0102] The units or modules involved in the embodiments described in the present application may be implemented by software or by hardware. The units or modules described may also be arranged in a processor. For example, each of the units may be a software program arranged in a computer or a mobile smart device, or may be a separately configured hardware device. The names of these units or modules do not, in some cases, constitute limitations on the units or modules themselves.
[0103] The above description is only a preferred embodiment of the present application and an explanation of the technical principles used. Those skilled in the art should understand that the scope of the invention involved in the present application is not limited to the technical solution formed by a specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the concept of the present application. For example, the above features are replaced with the technical features with similar functions disclosed in the present application to form a technical solution.
Claims
1. A quality supervision method for cast-in-place pile concealed engineering, characterized in that: The following steps are involved: Step 1: Digitally define the parameters of the reinforced cage of the bored pile, and register the design parameters of the reinforced cage of each bored pile, including the main reinforcement, spiral stirrups, and stiffening stirrups, in accordance with the requirements of the bored pile concealed engineering-reinforced cage construction design drawings; The digital definition of the reinforcement cage parameters of the cast-in-place pile is specifically as follows: it is represented by a quaternary group (P, B, G, D), wherein P represents the cast-in-place pile project; B represents the pile number; G represents the overall design parameters of the reinforcement cage; and D represents the main reinforcement design parameters of each section of the reinforcement cage. G is represented by a sextuple (LC, LJ, MGCD, BHCHD, LXGJ, JJGJ), where LC represents the length of the steel cage; LJ represents the diameter of the steel cage; MGCD represents the anchorage length; BHCHD represents the thickness of the protective layer; LXGJ represents the design parameters of the spiral stirrups, including the length of the dense area, the spacing of the dense area, the length of the non-densified area, the spacing of the non-densified area, and the specifications of the steel bar model; JJGJ represents the design parameters of the stiffening stirrups, including the diameter, spacing, and specifications of the steel bar model; D is represented by a triple (Di, DLC, ZJ), where Di represents the i-th section of the steel cage; DLC represents the length of the steel cage; ZJ represents the main reinforcement design parameters, including the number of main reinforcements and the steel bar model specifications; Step 2: Register and manage the receipt of steel bar raw materials during the construction of the cast-in-place pile concealed project - steel cage, record the arrival time, furnace batch number and receipt quantity of each steel bar model and specification, and upload the corresponding steel bar raw material quality certificate and receipt documents; Step 3: Register and manage the steel bar raw materials delivered to the site for the cast-in-place pile concealed project - steel cage construction, record the inspection time and inspection results of each steel bar model and specification, upload the inspection report, and associate the inspection submission record with the receipt record, and record the number of inspection representatives. It is necessary to ensure that all receipt records are associated with the corresponding inspection submission record, and ensure that the receipt quantity is consistent with the number of inspection representatives; Step 4: Register and manage the lowering of the steel cage during the construction of the cast-in-place pile concealed project - steel cage, record the construction data of each section of each steel cage, register and manage the overall construction data of the steel cage of the cast-in-place pile when the steel cage is lowered, and associate it with the corresponding steel raw material inspection report to ensure that the steel raw material used for each cast-in-place pile has a corresponding steel raw material inspection report; specifically: Step 4.1 During the construction of the cast-in-place pile concealed project - steel cage, register the construction data of each steel cage lowering section, record the lowering time of the steel cage section, the section to which it belongs, the length of the section, the number of main bars, and the steel model and specifications; Step 4.2: When the cast-in-place pile reinforcement cage is lowered, the overall construction data of the cast-in-place pile reinforcement cage is registered, including: reinforcement cage length, reinforcement cage diameter, anchorage length, protective layer thickness, spiral stirrup construction data, and stiffening stirrup construction data; Step 4.3 For each cast-in-place pile, associate the corresponding steel bar raw material test report according to the steel bar model and specifications used; Step 5: According to the construction data of the steel bar model and specification registered during the construction of the steel bar cage of each cast-in-place pile, the design parameter values of the steel bar model and specification corresponding to the main bar, spiral stirrup and reinforcing stirrup registered for the cast-in-place pile are compared to identify the cast-in-place piles with abnormal steel bar use; specifically: Step 5.1 compares the model and specification data of the main reinforcement of each section of the reinforced cage of each cast-in-place pile registered when the reinforced cage is lowered with the model and specification design data of the main reinforcement of the reinforced cage of the corresponding section. If the model and specification are lower than the design data, it is determined that the main reinforcement of the reinforced cage of the cast-in-place pile has abnormal use; Step 5.2 compares the corresponding model and specification of the spiral stirrups of the steel cage registered when the steel cage of each cast-in-place pile is lowered with the design data of the corresponding model and specification of the spiral stirrups of the steel cage registered for the cast-in-place pile. If the model and specification are lower than the design data, it is determined that the spiral stirrups of the steel cage of the cast-in-place pile have abnormal use; The corresponding model and specification of the reinforcement hoop of the steel cage registered when the reinforcement cage of each cast-in-place pile is lowered is compared with the design data of the corresponding model and specification of the reinforcement hoop of the steel cage registered for the cast-in-place pile. If the model and specification are lower than the design data, it is judged that the reinforcement hoop of the cast-in-place pile has abnormal use; Step 6: According to the inspection time of the steel bar raw material inspection report associated with each cast-in-place pile, the time of lowering the cast-in-place pile steel bar cage is verified and supervised. If the inspection time of the steel bar raw material is later than the lowering time of the cast-in-place pile steel bar cage, it means that the cast-in-place pile has an abnormal situation that the steel bar raw material is used before inspection; Step 7: According to the construction data of the steel cage lowering registered during the construction of the cast-in-place pile concealed project - steel cage, including the data of spiral stirrups, stiffening stirrups and each section of main reinforcement, the steel consumption of each cast-in-place pile is summarized and counted according to the steel bar model and specifications; specifically: Step 7.1 For each cast-in-place pile, calculate the steel consumption S of each section of the steel cage according to the construction data of each section of the steel cage. 主筋 ; The steel bar dosage S 主筋 The calculation method is as follows: Assuming that there are k sections of steel cage, calculate the steel consumption S of each main reinforcement of the 1st to k-1th steel cage sections. i , 1≦i≦k-1, the calculation formula is: S i = (length of the i-th section + length of the joint) × number of main bars in the i-th section × weight per meter, where the length of the joint is calculated as "diameter of the main bar × 10 / 1000"; the weight per meter is calculated as "square of the main bar specification × 0.617 / 100"; Calculate the steel consumption S of the main reinforcement of the kth section of the reinforcement cage k , the calculation formula is: S k = (length of section k + anchorage length + joint length) × number of main bars in section k × weight per meter, where the joint length is calculated as "main bar diameter × 10 / 1000"; the weight per meter is calculated as "square of main bar specification × 0.617 / 100"; According to the steel bar model and specifications, calculate the steel bar consumption S of each cast-in-place pile reinforcement cage main bar 主筋 =∑S i +S k , 1≦i≦k-1; Step 7.2 For each cast-in-place pile, calculate the steel consumption S of the corresponding steel bar model and specification in the spiral hoop reinforcement area of the cast-in-place pile according to the overall construction data of the steel cage registered when the steel cage is lowered. 加密区 , the amount of steel bars S corresponding to the steel bar model and specification in the non-densified area of spiral stirrups 非加密区 , the amount of steel bars S corresponding to the steel bar model and specification of the reinforcing stirrups 加劲箍筋 ; The steel bar amount S 加密区 The calculation formula is: 加密区 = (length of the densified area × 1000 / spacing of the densified area + 1) × perimeter × weight per meter, where perimeter = 3.1416 × (pile diameter - 2 × thickness of the steel cage protective layer) / 1000, and weight per meter is calculated according to "square of main reinforcement steel bar specification × 0.617 / 100"; The steel bar amount S 非加密区 The calculation formula is: 非加密区 = (length of non-reinforced area × 1000 / spacing of non-reinforced area + 1) × perimeter × weight per meter, where perimeter = 3.1416 × (pile diameter - 2 × thickness of steel cage protective layer) / 1000, and weight per meter is calculated according to "square of main reinforcement steel bar specification × 0.617 / 100"; The steel bar amount S 加劲箍筋 The calculation formula is: 加劲箍筋 = (total cage length / spacing + 1) × weight per meter × perimeter, where perimeter = 3.1416 × (pile diameter - 2 × thickness of steel cage protective layer) / 1000 + 10D, D is the diameter of the reinforcing stirrup registered when the steel cage is lowered, and the weight per meter is calculated according to "square of the main reinforcement steel bar specification × 0.617 / 100"; Step 7.3 For each cast-in-place pile, summarize and calculate the steel consumption S of the main reinforcement, spiral stirrups, and reinforcing stirrups according to the steel bar model specification X x =S 主筋 +S 加密区 +S 非加密区 +S 加劲箍筋 ; Step 8: For the cast-in-place piles associated with the steel bar raw material test report of the associated cast-in-place piles, sort them in order according to the pile-building time, combine the calculated and statistical steel bar usage of each cast-in-place pile corresponding to the steel bar model and specification, and check it with the number of test representatives corresponding to the steel bar model and specification in the associated steel bar raw material test report, supervise the steel bar usage of the cast-in-place piles corresponding to the steel bar model and specification, and identify the cast-in-place piles with abnormal steel bar usage; specifically: Assume that the representative number of steel bar model specification X in the steel bar raw material inspection report is R x , detect the number of remaining representatives R x剩余 =R x , the ordered n-tuple (B1, B2, ..., B n ), where B i represents the pile number of the i-th pile, B i+1 The pile formation time is later than B i Pile time; For B i , i is initialized to 1, get B i The amount of steel bars S for the pile corresponding to the steel bar type and specification X x-i , and R x剩余 contrast: If S x-i >R x剩余 , then it means B i The amount of steel bars corresponding to the steel bar model specification X of the pile has exceeded the representative number of the test, B i There is an abnormality in the amount of steel bars used in the pile on the steel bar model specification X. i+1 To B n The piles all had the same abnormal condition; If S x-i ≦R x剩余 , then it means B i The amount of steel bars used for the pile corresponding to the steel bar model specification X has not exceeded the number of representative tests, B i If there is no abnormality in the amount of steel bars used in the pile on the steel bar model specification X, then the remaining representative quantity R is recorded. x剩余 =R x剩余 -S x-i , and execute i=i+1 to detect the steel bar usage of the next pile corresponding to the steel bar model specification X.
2. The quality supervision method for cast-in-place pile concealed engineering according to claim 1 is characterized in that: The monitoring results of steps five, six and eight are summarized to eventually generate an abnormal construction warning report for each bored pile, thus achieving effective supervision on the construction quality of bored pile concealed projects.
3. A quality supervision system for cast-in-place pile concealed engineering implemented by the method of claim 1 or 2, characterized in that: The following units are included: The cast-in-place pile reinforcement cage design configuration management unit is used to digitally define the reinforcement cage parameters of the cast-in-place pile, and configure and manage the reinforcement cage design parameters of each cast-in-place pile in accordance with the requirements of the cast-in-place pile concealed engineering-reinforcement cage construction design drawings; The receiving management unit for cast-in-place pile steel bar raw materials is used to register and manage the receiving of steel bar raw materials during the construction of cast-in-place pile concealed project - steel bar cage, record the arrival time, furnace batch number and receiving quantity of each steel bar model and specification, and upload the corresponding steel bar raw material quality certificate and receiving documents; The inspection management unit for cast-in-place pile steel bar raw materials is used to register and manage the inspection of steel bar raw materials entering the cast-in-place pile hidden project - steel cage construction, record the inspection time and inspection results of each steel bar model and specification, upload the inspection report, and associate the inspection and delivery records with the receipt records, and record the number of inspection representatives. It is necessary to ensure that all receipt records are associated with the corresponding inspection and delivery records, and ensure that the number of receipts is consistent with the number of inspection representatives; The construction management unit for lowering the steel cage of the bored pile is used to register and manage the lowering of the steel cage during the construction process of the hidden engineering of the bored pile - the steel cage, record the construction data of each section of each steel cage, register and manage the overall construction data of the steel cage of the bored pile when the steel cage is lowered, and associate it with the corresponding steel raw material inspection report to ensure that the steel raw material used for each bored pile has a corresponding steel raw material inspection report; The abnormal supervision unit for the construction of cast-in-place pile concealed works includes the following three supervision components: The first monitoring component is used to compare the steel bar model and specification construction data registered during the lowering construction of each cast-in-place pile steel bar cage with the design parameter values of the steel bar model and specification corresponding to the main bars, spiral stirrups, and stiffening stirrups registered for the cast-in-place pile, so as to identify the cast-in-place piles with abnormal steel bar usage; The second supervision component is used to check and supervise the lowering time of the steel cage of the bored pile according to the inspection time of the steel raw material inspection report associated with each bored pile. If the inspection time of the steel raw material is later than the lowering time of the steel cage of the bored pile, it means that the bored pile has an abnormal situation that the steel raw material is used before inspection; The third supervision component is used to summarize and count the steel bar usage of each cast-in-place pile according to the steel bar model and specification based on the construction data of the steel bar cage lowering registered during the construction process of the cast-in-place pile hidden project - steel bar cage; the cast-in-place piles associated with the steel bar raw material inspection report are sorted in chronological order according to the pile construction time, and the steel bar usage of each cast-in-place pile corresponding to the steel bar model and specification obtained by calculation is combined with the number of inspection representatives corresponding to the steel bar model and specification in the associated steel bar raw material inspection report, so as to supervise the steel bar usage of the cast-in-place piles corresponding to the steel bar model and specification, and identify the cast-in-place piles with abnormal steel bar usage.
Citation Information
Patent Citations
Reinforcing steel bar engineering self-inspection acceptance method and system, intelligent terminal and storage medium
CN111984834A
Intelligent construction informatization system for cast-in-situ bored pile
CN112365222A
Construction site steel bar consumption management method and system
CN115018275A