A BMS management system for energy hubs

By designing a BMS management system in an energy hub, using data acquisition, visualization and analysis modules to build an energy hub view, the flexibility problem of traditional systems being unable to effectively utilize multiple energy forms is solved, and the optimal planning of energy allocation is achieved. System reliability is improved.

CN117639248BActive Publication Date: 2024-11-22ZHEJIANG ZHAOHEGUI MINING TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311614257.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-11-29
Publication Date
2024-11-22
Estimated Expiration
2043-11-29

AI Technical Summary

Technical Problem

Traditional energy management systems cannot effectively utilize the flexibility of different energy forms, especially when multiple energy forms are coupled, making it difficult to achieve optimal energy allocation and scheduling.

Method used

A BMS management system for energy hubs is designed, including monitoring centers, data acquisition modules, data visual modules, data processing modules, data analysis modules and energy dispatch modules, and distributed grid equipment in different energy forms is acquired and analyzed. real-time operation data and prediction curves, build an energy hub view, judge the operation reliability of equipment, allocate levels, and perform energy allocation.

Benefits of technology

The optimal energy allocation planning between distributed grid equipment in different energy forms is realized, and system reliability and energy efficiency are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117639248B_ABST
    Figure CN117639248B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of BMS management technology, and specifically to a BMS management system for an energy hub, comprising a monitoring center, wherein the monitoring center is communicatively connected with a data acquisition module, a data visualization module, a data processing module, a data analysis module and an energy scheduling module; the data acquisition module is used to acquire data information; the data visualization module is used to construct an energy hub visualization diagram according to the position relationship, assembly connection relationship and operation data timing sequence of distributed power grid devices of different energy forms in a target area; the data processing module is used to acquire the operation reliability of each distributed power grid device; the data analysis module is used to acquire the level of distributed power grid devices to be allocated; the energy scheduling module acquires and selects distributed power grid devices in a state to be adjusted for energy allocation; the system solves the optimal planning of energy allocation between distributed power grid devices of different energy forms under the condition of considering system reliability and energy efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of BMS management, and in particular to a BMS management system for an energy hub. Background Art

[0002] Promoting distributed generation based on renewable energy is an inevitable trend in the development of the current power industry. Energy management has always been one of the research focuses of distributed generation. The essential difference between energy hubs and traditional energy systems is that they can utilize the flexibility of different energy forms. For example, the power load can be supplied by power facilities or by cogeneration units. At the same time, in the scenario of peak and valley time-of-use electricity prices, the use of appropriate energy management strategies can not only improve the economy of photovoltaic systems, but also help alleviate the peak load of the power grid.

[0003] The safety analysis module of the comparative document CN116365066A "Power management system based on BMS module" is used to obtain power battery data and perform battery load analysis to determine whether the battery charging and discharging is abnormal; to remind management personnel to inspect and maintain the battery; the operation and maintenance management module is used to assess the threat level of maintenance tasks and assign them to maintenance personnel of different levels; to maximize resource utilization; and to improve maintenance efficiency.

[0004] The comparative document "A data transmission method based on BMS battery management system" determines the local importance of the voltage data increment at each moment in the time series increment set; determines the coding priority of the voltage data increment according to the local importance, encodes the voltage data increment according to the coding priority to obtain the incremental data code, and transmits the incremental data code. The present invention can effectively improve the reliability of data transmission of the BMS battery management system.

[0005] Solar energy is a renewable energy with almost unlimited reserves and has broad application prospects. However, solar energy is affected by climatic conditions and has the characteristics of volatility and randomness, which leads to the weak ability of photovoltaic power generation systems to withstand disturbances. The optimal planning problem of traditional energy facilities solves the optimal capacity, location, and commissioning time of new energy during the planning period, but usually only optimizes a single form of energy without considering the mutual coupling with other types of energy. However, as the coupling of various forms of energy gradually strengthens, the traditional separate planning and relatively independent operation cannot fully utilize the flexibility of various forms of energy to achieve the purpose of optimal energy configuration. How to use the BMS management system to uniformly dispatch and manage loads, power supplies, and energy storage equipment is an issue that we urgently need to solve. Now we provide a BMS management system for energy hubs. Summary of the invention

[0006] In order to solve the above technical problems, the object of the present invention is to provide a BMS management system for an energy hub, including a monitoring center, wherein the monitoring center is communicatively connected with a data acquisition module, a data visualization module, a data processing module, a data analysis module and an energy scheduling module;

[0007] The data acquisition module is used to obtain real-time operation data curves and operation data prediction curves of distributed power grid equipment with different energy forms in the target area;

[0008] The data visualization module is used to construct an energy hub visualization diagram according to the positional relationship, assembly connection relationship and operation data time series of distributed power grid devices of different energy forms in the target area;

[0009] The data processing module is used to determine the operating reliability of each distributed power grid device in the energy hub visual graph according to the operating data time series sequence;

[0010] The data analysis module is used to obtain the to-be-assigned levels of other distributed power grid devices in normal state that have an assembly connection relationship with the distributed power grid device in the to-be-adjusted state;

[0011] The energy dispatching module obtains the energy output status of the distributed power grid equipment in the state to be adjusted, and selects the distributed power grid equipment in the state to be adjusted for energy dispatching.

[0012] Furthermore, the process of the data acquisition module acquiring the real-time operation data curve and the operation data prediction curve of the distributed power grid equipment with different energy forms in the target area includes:

[0013] Acquire real-time and historical operating data information of distributed power grid equipment with different energy forms in the target area, including the power generation of photovoltaic generator sets, the power generation of fuel generator sets, the power generation of cogeneration generator sets, environmental parameters, power reserves, collection time and collection cycle;

[0014] The historical operation data information of distributed power grid equipment with different energy forms in the target area is subjected to curve fitting using a regression model to obtain a prediction curve of the operation data of the distributed power grid equipment that changes over time during the current collection period;

[0015] At the same time, the real-time operation data information of distributed power grid equipment with different energy forms in the target area is converted into a real-time operation data curve that changes over time.

[0016] Furthermore, the process of constructing the energy hub visualization diagram according to the position relationship, assembly connection relationship and operation data time series of the distributed power grid equipment of different energy forms in the target area by the data visualization module includes:

[0017] The GIS geographic data and physical entities of distributed power grid equipment of different energy forms in the target area are obtained by GIS means, a two-dimensional coordinate system of the target area is constructed, the physical entities of the distributed power grid equipment are processed by three-dimensional modeling, and the generated three-dimensional model is mapped to the two-dimensional coordinate system of the target area according to the GIS geographic data to obtain the scene layer;

[0018] Obtaining energy flow pipelines between distributed power grid devices, generating a topological grid model about the assembly connection relationship between the grid devices according to the energy flow pipelines between the distributed power grid devices, and obtaining a grid model layer;

[0019] According to the time-varying operation data prediction curves and real-time operation data curves of distributed power grid equipment with different energy forms in the target area, the operation data standard sequence and the operation data time series sequence are obtained respectively, and the time data layer is obtained;

[0020] The scene layer is taken as the base layer, and the grid model layer and the time data layer are superimposed on the base layer to obtain a visible diagram of the energy hub.

[0021] Furthermore, the process of the data processing module judging the operation reliability of each distributed power grid device in the energy hub visual map according to the operation data time series sequence includes:

[0022] Obtaining the operating data time series sequence and the operating data standard sequence of the current collection period of each distributed power grid device in the energy hub visual graph, comparing the operating data time series sequence with the operating data standard sequence in sections, and obtaining the mean square error of each section subsequence;

[0023] An error threshold interval and an error threshold lower limit are set to determine whether the mean square error is greater than the error threshold lower limit. If so, it proves that the operating data of the current acquisition cycle does not meet the preset operating standards, and the distributed power grid equipment is marked as being in a state to be adjusted. A threshold point is selected within the error threshold interval to divide the sub-intervals into different levels to be adjusted. The point where the mean square error falls is determined to generate the corresponding level of operation to be adjusted for the distributed power grid equipment, and the changes in the operation to be adjusted of each distributed power grid equipment are visualized in the energy hub visual diagram.

[0024] If the mean square error is less than or equal to the lower limit of the error threshold, it is proved that the operating data of the current collection cycle meets the preset operating standard, and the distributed power grid device is marked as normal.

[0025] Furthermore, the process of the data analysis module acquiring the to-be-assigned levels of other distributed power grid devices in normal state having an assembly connection relationship with the distributed power grid device in the to-be-adjusted state includes:

[0026] Obtain other distributed power grid devices in normal states that have an assembly connection relationship with the distributed power grid devices in the state to be adjusted, obtain the coupling relationship, energy transmission cost, position relationship and transmission energy flow size between the distributed power grid devices in the state to be adjusted and the other distributed power grid devices in normal states, and determine the level to be allocated of the other distributed power grid devices in normal states according to the coupling relationship, energy transmission cost, position relationship and transmission energy flow size.

[0027] Furthermore, the process of the energy dispatching module acquiring the energy output state of the distributed power grid device to be adjusted includes:

[0028] Obtaining an energy demand duration curve, a battery capacity duration curve, and an electric power duration curve of a distributed power grid device in a state to be adjusted, and determining an energy output state of the distributed power grid device in a state to be adjusted according to the energy demand duration curve, the electric power duration curve, and the battery capacity duration curve of the distributed power grid device in a state to be adjusted;

[0029] Construct a two-dimensional coordinate system with electric power as the vertical axis and time as the horizontal axis, obtain the area enclosed by the electric power duration curve at the current moment in the current collection cycle and the start moment of the current collection cycle in the coordinate axis, and compare the area with the value of the energy demand duration curve at the current moment and the value of the battery pack capacity duration curve;

[0030] If the area is greater than the sum of the current energy demand duration curve value and the battery capacity duration curve value, the energy output state of the distributed power grid device to be adjusted is marked as a pending output state, and the energy to be output is obtained according to the difference between the area and the sum of the current energy demand duration curve value and the battery capacity duration curve value;

[0031] If the sum of the area and the current battery pack capacity duration curve value is less than the current energy demand duration curve value, the energy output state of the distributed power grid equipment to be adjusted is marked as a waiting-to-input state, and the energy to be input is obtained based on the difference between the sum of the area and the current battery pack capacity duration curve value and the current energy demand duration curve value.

[0032] Furthermore, the process in which the energy dispatching module selects the distributed power grid equipment in the state to be adjusted for energy allocation includes:

[0033] The distributed power grid devices to be adjusted are sorted in order according to their levels to be adjusted, and the distributed power grid devices to be adjusted are selected for energy allocation according to the sorting result.

[0034] Furthermore, the process of the energy dispatching module performing energy allocation on the selected distributed power grid equipment in the state to be adjusted includes:

[0035] Obtaining the to-be-allocated levels of other normal-state distributed power grid devices that have an assembly connection relationship with the to-be-adjusted distributed power grid device, sorting the other normal-state distributed power grid devices in order according to the to-be-allocated levels, and obtaining the distributed power grid device with the highest to-be-allocated level;

[0036] If the energy output state of the distributed power grid device in the state to be adjusted is the state to be output, the energy to be output is obtained, the redundant capacity of the battery pack of the distributed power grid device is obtained, and the energy to be output is compared with the redundant capacity of the battery pack. If the energy to be output is greater than the redundant capacity of the battery pack, the distributed power grid device with the highest level to be allocated receives the maximum allowed energy to be output, and then the distributed power grid device with a lower level to be allocated repeats the above-mentioned process of receiving the energy to be output until the energy to be output of the distributed power grid device in the state to be adjusted is allocated;

[0037] If the energy output state of the distributed power grid device in the state to be adjusted is the state to be input, then the energy to be input is obtained, the distributed power grid device that can be allocated energy is obtained, and the maximum adjustable energy is compared with the energy to be input. If the maximum adjustable energy is less than the energy to be input, the distributed power grid device with the highest level to be allocated allocates the maximum adjustable energy, and then the distributed power grid device with a lower level to be allocated repeats the above maximum adjustable energy allocation process until the energy input of the distributed power grid device in the state to be adjusted is allocated.

[0038] Compared with the prior art, the beneficial effects of the present invention are: a visual diagram of the energy hub is constructed according to the positional relationship, assembly connection relationship and operation data time series of distributed power grid equipment of different energy forms in the target area, thereby realizing the visualization of energy allocation of distributed power grid equipment of different energy forms, and at the same time obtaining the to-be-allocated levels of other normal-state distributed power grid equipment that has an assembly connection relationship with the distributed power grid equipment to be adjusted, the energy scheduling module obtains the energy output status of the distributed power grid equipment to be adjusted, selects the distributed power grid equipment to be adjusted for energy allocation, and solves the optimal planning of energy allocation between distributed power grid equipment of different energy forms while considering system reliability and energy efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] Figure 1 This is a schematic diagram of a BMS management system for an energy hub according to an embodiment of the present application. DETAILED DESCRIPTION

[0040] The following is a clear and complete description of the technical solutions in the embodiments of the present application in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present application.

[0041] like Figure 1 As shown, a BMS management system for an energy hub includes a monitoring center, wherein the monitoring center is communicatively connected to a data acquisition module, a data visualization module, a data processing module, a data analysis module, and an energy scheduling module;

[0042] The data acquisition module is used to obtain real-time operation data curves and operation data prediction curves of distributed power grid equipment with different energy forms in the target area;

[0043] The data visualization module is used to construct an energy hub visualization diagram according to the positional relationship, assembly connection relationship and operation data time series of distributed power grid devices of different energy forms in the target area;

[0044] The data processing module is used to determine the operating reliability of each distributed power grid device in the energy hub visual graph according to the operating data time series sequence;

[0045] The data analysis module is used to obtain the to-be-assigned levels of other distributed power grid devices in normal state that have an assembly connection relationship with the distributed power grid device in the to-be-adjusted state;

[0046] The energy dispatching module obtains the energy output status of the distributed power grid equipment in the state to be adjusted, and selects the distributed power grid equipment in the state to be adjusted for energy dispatching.

[0047] It should be further explained that, in the specific implementation process, the process of the data acquisition module acquiring the real-time operation data curve and the operation data prediction curve of the distributed power grid equipment with different energy forms in the target area includes:

[0048] Acquire real-time and historical operating data information of distributed power grid equipment with different energy forms in the target area, including the power generation of photovoltaic generator sets, the power generation of fuel generator sets, the power generation of cogeneration generator sets, environmental parameters, power reserves, collection time and collection cycle;

[0049] The historical operation data information of distributed power grid equipment with different energy forms in the target area is subjected to curve fitting using a regression model to obtain a prediction curve of the operation data of the distributed power grid equipment that changes over time during the current collection period;

[0050] At the same time, the real-time operation data information of distributed power grid equipment with different energy forms in the target area is converted into a real-time operation data curve that changes over time.

[0051] It should be further explained that, in the specific implementation process, the data visualization module constructs the energy hub visualization diagram according to the position relationship, assembly connection relationship and operation data time series of distributed power grid devices of different energy forms in the target area, including:

[0052] The GIS geographic data and physical entities of distributed power grid equipment of different energy forms in the target area are obtained by GIS means, a two-dimensional coordinate system of the target area is constructed, the physical entities of the distributed power grid equipment are processed by three-dimensional modeling, and the generated three-dimensional model is mapped to the two-dimensional coordinate system of the target area according to the GIS geographic data to obtain the scene layer;

[0053] Obtaining energy flow pipelines between distributed power grid devices, generating a topological grid model about the assembly connection relationship between the grid devices according to the energy flow pipelines between the distributed power grid devices, and obtaining a grid model layer;

[0054] According to the time-varying operation data prediction curves and real-time operation data curves of distributed power grid equipment with different energy forms in the target area, the operation data standard sequence and the operation data time series sequence are obtained respectively, and the time data layer is obtained;

[0055] The scene layer is taken as the base layer, and the grid model layer and the time data layer are superimposed on the base layer to obtain a visible diagram of the energy hub.

[0056] It should be further explained that, in the specific implementation process, the process of the data processing module judging the operation reliability of each distributed power grid device in the energy hub visual map according to the operation data time series sequence includes:

[0057] Obtaining the operating data time series sequence and the operating data standard sequence of the current collection period of each distributed power grid device in the energy hub visual graph, comparing the operating data time series sequence with the operating data standard sequence in sections, and obtaining the mean square error of each section subsequence;

[0058] An error threshold interval and an error threshold lower limit are set to determine whether the mean square error is greater than the error threshold lower limit. If so, it proves that the operating data of the current acquisition cycle does not meet the preset operating standards, and the distributed power grid equipment is marked as being in a state to be adjusted. A threshold point is selected within the error threshold interval to divide the sub-intervals into different levels to be adjusted. The point where the mean square error falls is determined to generate the corresponding level of operation to be adjusted for the distributed power grid equipment, and the changes in the operation to be adjusted of each distributed power grid equipment are visualized in the energy hub visual diagram.

[0059] If the mean square error is less than or equal to the lower limit of the error threshold, it is proved that the operating data of the current collection cycle meets the preset operating standard, and the distributed power grid device is marked as normal.

[0060] It should be further explained that, in a specific implementation process, the process in which the data analysis module obtains the to-be-assigned levels of other distributed power grid devices in normal state that have an assembly connection relationship with the distributed power grid device in the to-be-adjusted state includes:

[0061] Obtain other distributed power grid devices in normal states that have an assembly connection relationship with the distributed power grid devices in the state to be adjusted, obtain the coupling relationship, energy transmission cost, position relationship and transmission energy flow size between the distributed power grid devices in the state to be adjusted and the other distributed power grid devices in normal states, and determine the level to be allocated of the other distributed power grid devices in normal states according to the coupling relationship, energy transmission cost, position relationship and transmission energy flow size.

[0062] It should be further explained that, in the specific implementation process, the calculation formula for determining the level to be allocated of other distributed power grid devices in normal state according to the coupling relationship, energy transmission cost, position relationship and transmission energy flow size is:

[0063] E i =W i1 *G i1 +W i2 *G i2 +W i3 *G i3 +W i4 *G i4

[0064] Among them, E i represents the level to be allocated of the i-th distributed power grid equipment; G i1 represents the coupling coefficient between the ith distributed power grid device and the distributed power grid device to be adjusted; G i2 represents the energy transmission cost of the i-th distributed power grid device and the distributed power grid device to be adjusted; G i3 G represents the positional relationship between the i-th distributed power grid device and the distributed power grid device to be adjusted; i4 W represents the energy flow of the i-th distributed power grid device and the distributed power grid device to be adjusted; i1 , W i2 , W i3 and W i4 Represents the weight factor.

[0065] It should be further explained that, in the specific implementation process, the coupling coefficient G between the i-th distributed power grid device and the distributed power grid device to be adjusted is i1 The calculation formula is

[0066] G i1 =E αi / L βi

[0067] Among them, E αi represents the energy output of the i-th distributed power grid device to the distributed power grid device to be adjusted; L βi Indicates the energy input corresponding to the distributed power grid equipment in the state to be adjusted.

[0068] It should be further explained that, in a specific implementation process, the process of the energy scheduling module obtaining the energy output state of the distributed power grid device to be adjusted includes:

[0069] Obtaining an energy demand duration curve, a battery capacity duration curve, and an electric power duration curve of a distributed power grid device in a state to be adjusted, and determining an energy output state of the distributed power grid device in a state to be adjusted according to the energy demand duration curve, the electric power duration curve, and the battery capacity duration curve of the distributed power grid device in a state to be adjusted;

[0070] Construct a two-dimensional coordinate system with electric power as the vertical axis and time as the horizontal axis, obtain the area enclosed by the electric power duration curve at the current moment in the current collection cycle and the start moment of the current collection cycle in the coordinate axis, and compare the area with the value of the energy demand duration curve at the current moment and the value of the battery pack capacity duration curve;

[0071] If the area is greater than the sum of the current energy demand duration curve value and the battery capacity duration curve value, the energy output state of the distributed power grid device to be adjusted is marked as a pending output state, and the energy to be output is obtained according to the difference between the area and the sum of the current energy demand duration curve value and the battery capacity duration curve value;

[0072] If the sum of the area and the current battery pack capacity duration curve value is less than the current energy demand duration curve value, the energy output state of the distributed power grid equipment to be adjusted is marked as a waiting-to-input state, and the energy to be input is obtained based on the difference between the sum of the area and the current battery pack capacity duration curve value and the current energy demand duration curve value.

[0073] It should be further explained that, in the specific implementation process, the process in which the energy dispatching module selects the distributed power grid equipment in the state to be adjusted for energy allocation includes:

[0074] The distributed power grid devices to be adjusted are sorted in order according to their levels to be adjusted, and the distributed power grid devices to be adjusted are selected for energy allocation according to the sorting results.

[0075] It should be further explained that, in a specific implementation process, the process of the energy dispatching module performing energy allocation on the selected distributed power grid equipment in the state to be adjusted includes:

[0076] Obtaining the to-be-allocated levels of other normal-state distributed power grid devices that have an assembly connection relationship with the to-be-adjusted distributed power grid device, sorting the other normal-state distributed power grid devices in order according to the to-be-allocated levels, and obtaining the distributed power grid device with the highest to-be-allocated level;

[0077] If the energy output state of the distributed power grid device in the state to be adjusted is the state to be output, the energy to be output is obtained, the redundant capacity of the battery pack of the distributed power grid device is obtained, and the energy to be output is compared with the redundant capacity of the battery pack. If the energy to be output is greater than the redundant capacity of the battery pack, the distributed power grid device with the highest level to be allocated receives the maximum allowed energy to be output, and then the distributed power grid device with a lower level to be allocated repeats the above-mentioned process of receiving the energy to be output until the energy to be output of the distributed power grid device in the state to be adjusted is allocated;

[0078] If the energy output state of the distributed power grid device in the state to be adjusted is the state to be input, then the energy to be input is obtained, the distributed power grid device that can be allocated energy is obtained, and the maximum adjustable energy is compared with the energy to be input. If the maximum adjustable energy is less than the energy to be input, the distributed power grid device with the highest level to be allocated allocates the maximum adjustable energy, and then the distributed power grid device with a lower level to be allocated repeats the above maximum adjustable energy allocation process until the energy input of the distributed power grid device in the state to be adjusted is allocated.

[0079] The above embodiments are only used to illustrate the technical method of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical method of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical method of the present invention.

Claims

1. A BMS management system for an energy hub, comprising a monitoring center, characterized in that: The monitoring center is communicatively connected to a data acquisition module, a data visualization module, a data processing module, a data analysis module and an energy scheduling module; The data acquisition module is used to obtain real-time operation data curves and operation data prediction curves of distributed power grid equipment with different energy forms in the target area; The data visualization module is used to construct an energy hub visualization diagram according to the positional relationship, assembly connection relationship and operation data time series of distributed power grid devices of different energy forms in the target area; The data processing module is used to determine the operating reliability of each distributed power grid device in the energy hub visual graph according to the operating data time series sequence; The data analysis module is used to obtain the to-be-assigned levels of other distributed power grid devices in normal state that have an assembly connection relationship with the distributed power grid device in the to-be-adjusted state; The energy dispatching module obtains the energy output status of the distributed power grid equipment in the state to be adjusted, and selects the distributed power grid equipment in the state to be adjusted for energy allocation; The process of constructing the energy hub visualization diagram according to the position relationship, assembly connection relationship and operation data time series of distributed power grid equipment of different energy forms in the target area by the data visualization module includes: The GIS geographic data and physical entities of distributed power grid equipment of different energy forms in the target area are obtained by GIS means, a two-dimensional coordinate system of the target area is constructed, the physical entities of the distributed power grid equipment are processed by three-dimensional modeling, and the generated three-dimensional model is mapped to the two-dimensional coordinate system of the target area according to the GIS geographic data to obtain the scene layer; Also includes: Obtaining energy flow pipelines between distributed power grid devices, generating a topological grid model about the assembly connection relationship between the grid devices according to the energy flow pipelines between the distributed power grid devices, and obtaining a grid model layer; According to the time-varying operation data prediction curves and real-time operation data curves of distributed power grid equipment with different energy forms in the target area, the operation data standard sequence and the operation data time series sequence are obtained respectively, and the time data layer is obtained; Taking the scene layer as the base layer, superimposing the grid model layer and the time data layer on the base layer to obtain a visible diagram of the energy hub; The process of the data processing module judging the operating reliability of each distributed power grid device in the energy hub visual graph according to the operating data time series sequence includes: Obtaining the operating data time series sequence and the operating data standard sequence of the current collection period of each distributed power grid device in the energy hub visual graph, comparing the operating data time series sequence with the operating data standard sequence in sections, and obtaining the mean square error of each section subsequence; It also includes: setting an error threshold interval and an error threshold lower limit, judging whether the mean square error is greater than the error threshold lower limit, if greater, it proves that the operation data of the current acquisition cycle does not meet the preset operation standard, marking the distributed power grid equipment as a pending adjustment state, selecting a threshold point in the error threshold interval to divide sub-intervals of different pending adjustment levels, judging the point where the mean square error falls, generating the pending adjustment level of the operation pending adjustment corresponding to the distributed power grid equipment, and visualizing the pending adjustment changes of each distributed power grid equipment in the energy hub visual diagram; If the mean square error is less than or equal to the lower limit of the error threshold, it is proved that the operation data of the current collection period meets the preset operation standard, and the distributed power grid device is marked as normal; The process of the data analysis module acquiring the to-be-assigned levels of other distributed power grid devices in normal state having an assembly connection relationship with the distributed power grid device in the to-be-adjusted state comprises: Obtain other distributed power grid devices in normal states that have an assembly connection relationship with the distributed power grid devices in the state to be adjusted, obtain the coupling relationship, energy transmission cost, position relationship and transmission energy flow size between the distributed power grid devices in the state to be adjusted and the other distributed power grid devices in normal states, and determine the level to be allocated of the other distributed power grid devices in normal states according to the coupling relationship, energy transmission cost, position relationship and transmission energy flow size.

2. A BMS management system for an energy hub according to claim 1, characterized in that: The process of the data acquisition module acquiring the real-time operation data curve and the operation data prediction curve of the distributed power grid equipment with different energy forms in the target area includes: Acquire real-time and historical operating data information of distributed power grid equipment with different energy forms in the target area, including the power generation of photovoltaic generator sets, the power generation of fuel generator sets, the power generation of cogeneration generator sets, environmental parameters, electric energy reserves, collection time and collection cycle.

3. A BMS management system for an energy hub according to claim 2, characterized in that: The process of the data acquisition module acquiring the real-time operation data curve and the operation data prediction curve of the distributed power grid equipment with different energy forms in the target area also includes: The historical operation data information of distributed power grid equipment with different energy forms in the target area is subjected to curve fitting using a regression model to obtain a prediction curve of the operation data of the distributed power grid equipment that changes over time during the current collection period; At the same time, the real-time operation data information of distributed power grid equipment with different energy forms in the target area is converted into a real-time operation data curve that changes over time.