Flood control and waterlogging prevention system and method
By designing a flood control and flood prevention system that includes permeable shells and buoyancy mechanisms, the drainage problems and high land investment problems when floods occur simultaneously are solved, automatic rising water barriers and dynamic control are achieved, and flood prevention capabilities and systems are significantly improved. reliability.
Patent Information
- Application Number
- CN202410011530.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-02
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2044-01-02
AI Technical Summary
When floods occur simultaneously, it is difficult to discharge water from waterlogging normally, and floods in the river may flow back into low-lying areas, resulting in intensification of waterlogging. The existing technology has problems such as high land use and investment and difficulty in implementation.
A flood control and waterlogging system was designed, including a water supply and drainage device, a flood control lifting mechanism and a lifting limit mechanism. The internal and external water flow is separated by a permeable shell and partition. The buoyancy and spring mechanism are used to achieve automatic water barrier, combining three-dimensional simulation model and The big data network conducts dynamic monitoring and control to improve the efficiency and reliability of flood control and flood prevention.
It has achieved significant improvement in regional flood control and flood prevention capabilities without affecting the hydrophilicity of traffic and rivers, effectively prevent external floods from overflowing or backflow, reduce the risk of flood disasters, and added new external flood storage on the basis of retaining traditional drainage functions. function.
Smart Images

Figure CN117802935B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of flood control and waterlogging prevention, and in particular to a flood control and waterlogging prevention system and method. Background Art
[0002] Floods and storm surges have long been one of the main factors threatening the national economic and social development. Especially with the rapid development of the economy and society, the regional flood control and drainage standards are gradually improving. At present, flood control, especially urban flood control, pays more attention to "external blocking", that is, relying on water conservancy projects such as embankments to confine floods in the river, while drainage pays more attention to "external drainage", that is, relying on pipeline self-drainage or pump station systems to timely discharge the confluence in the pipeline into the river. Due to the differences in governance objects, governance standards, and hydrological calculation methods, there is a certain degree of disconnection in local flood control. Therefore, when floods and waterlogging occur at the same time, it is not only difficult to drain the waterlogging normally, but also the floods in the river often "backflow" into low-lying areas through the water supply network, aggravating the waterlogging. For this reason, it is of great significance to propose a system that does not require additional land, has low investment, is easy to implement, is highly practical, and can significantly improve the regional flood control and waterlogging prevention capabilities without affecting traffic and river hydrophilicity. Summary of the invention
[0003] The present invention overcomes the deficiencies of the prior art and provides a flood control and waterlogging prevention system and method.
[0004] To achieve the above object, the technical solution adopted by the present invention is:
[0005] The present invention provides a flood control and waterlogging prevention system, including a water supply and drainage device, a flood control lifting mechanism, and a lifting and limiting mechanism:
[0006] The water supply and drainage device comprises a water-proof shell and a water-permeable shell, a first exhaust hole is provided on the top of the water-proof shell, a water-permeable baffle is provided inside the water-proof shell, the water-permeable baffle divides the inside of the water-proof shell into a first shell cavity and a second shell cavity, and the flood prevention lifting mechanism is installed in the first shell cavity;
[0007] The flood prevention lifting mechanism comprises a first flood prevention lifting mechanism, the first flood prevention lifting mechanism is installed on the permeable baffle, the first flood prevention lifting mechanism comprises a first lifting shell, the bottom of the first lifting shell is provided with first two-ear through holes, and a movable lifting device is installed in the first two-ear through holes;
[0008] The lifting limit mechanism comprises a limit shell, on which two symmetrical first limit slide grooves are formed, two second limit slide grooves are formed on both sides of the first limit slide groove, and two third limit slide grooves are formed on both sides of the second limit slide groove.
[0009] Furthermore, in a preferred embodiment of the present invention, the second shell cavity is connected to the regional sewer network for normal drainage of water.
[0010] Furthermore, in a preferred embodiment of the present invention, a telescopic spring is arranged above the movable lifting device, one end of the telescopic spring is fixed to the first lifting shell, and the other end of the telescopic spring is fixed to the top of the movable lifting device.
[0011] Furthermore, in a preferred embodiment of the present invention, two groups of gear bars are arranged inside the first lifting shell, the movable lifting device is installed above the two groups of gear bars, the same movable lifting device is installed with a second lifting mechanism, the second lifting mechanism includes a second lifting shell, and the movable lifting device on the second lifting shell is exactly the same as the movable lifting device on the first lifting shell.
[0012] Furthermore, in a preferred embodiment of the present invention, a second two-ear through hole is provided at the bottom of the second lifting shell, the same telescopic spring is provided between the second lifting shell and the movable lifting device, and two groups of the gear bars are also provided in the second lifting shell.
[0013] Furthermore, in a preferred embodiment of the present invention, a third lifting shell is installed on the gear bar, drain valves are provided at the bottom of the first lifting shell and the second lifting shell, and a plurality of second exhaust holes are provided at the connection between the first lifting shell, the second lifting shell and the third lifting shell.
[0014] Furthermore, in a preferred embodiment of the present invention, both ends of the first lifting shell, the second lifting shell and the third lifting shell extend out of the water supply and drainage device, and sliders are provided at both ends of the first lifting shell, the second lifting shell and the third lifting shell, and pulleys are fixed on the sliders.
[0015] Furthermore, in a preferred embodiment of the present invention, the pulleys on both sides of the first lifting shell, the second lifting shell and the third lifting shell are respectively embedded and installed in the first limiting slide groove, the second limiting slide groove and the third limiting slide groove, and the heights of the first limiting slide groove, the second limiting slide groove and the third limiting slide groove correspond to the movement range of the first lifting shell, the second lifting shell and the third lifting shell.
[0016] A second aspect of the present invention provides a method for controlling a flood control and waterlogging prevention system, which is applied to any one of the flood control and waterlogging prevention systems described above, and comprises the following steps:
[0017] Acquire construction design drawing information of the flood control and waterlogging prevention system, extract basic design parameters of the flood control and waterlogging prevention system according to the construction design drawing information, construct a three-dimensional simulation model, import the basic design parameters into the three-dimensional simulation model, and obtain the three-dimensional simulation model of the flood control and waterlogging prevention system;
[0018] Based on the three-dimensional simulation model of the flood control and waterlogging prevention system, the extension distance of the flood control lifting mechanism is tested, and the corresponding rainfall under different extension distances is recorded to obtain multiple groups of rainfall, build a database, and import the multiple groups of rainfall into the database to obtain a rainfall database;
[0019] Retrieving the flood level corresponding to each group of rainfall in the big data network to obtain a number of flood level information, and constructing a system based on the number of flood level information to obtain a flood level classification system;
[0020] Acquire the actual rainfall in the area where the current flood control and waterlogging prevention system is located, define the actual rainfall as a search keyword, import the search keyword into the flood level classification system for retrieval, and obtain the actual flood level;
[0021] It is determined whether the actual flood level is greater than the preset flood level. If so, there is a flood risk in the area. A certain number of warning signs can be set in the area where the flood control and waterlogging prevention system is located to prohibit vehicles and personnel from traveling.
[0022] Furthermore, in a preferred embodiment of the present invention, the following steps are also included:
[0023] Acquire the area to be installed of the flood control and waterlogging prevention system, and scan the area to be installed by using a laser radar to obtain a plurality of terrain point cloud data;
[0024] Fitting the plurality of terrain point cloud data by using a RANSAC algorithm to obtain a three-dimensional model of the area to be installed, and obtaining a plurality of ground uplift heights of the area to be installed according to the three-dimensional model of the area to be installed;
[0025] Determine whether the plurality of ground uplift heights are greater than a preset height, and if so, remove the ground uplift heights greater than the preset height, and sort out and plan the remaining ground uplift heights to obtain an installation area for the flood control and waterlogging prevention system;
[0026] Based on the grid search algorithm, the best installation starting point and the best installation end point are calculated and found in the installable area, and the best installation starting point and the best installation end point are connected to define a range to obtain the best installation point of the flood control and waterlogging prevention system.
[0027] The beneficial technical effects of the present invention are:
[0028] When the water level rises and the buoyancy of the first lifting shell is greater than its own gravity, the first flood control lifting mechanism floats up to prevent water from entering the low-lying areas, thereby achieving the purpose of automatic rising and water blocking for the first level of flood control and waterlogging prevention, thereby improving the efficiency and quality of flood control and waterlogging prevention; when the water level continues to rise, the first lifting shell contacts the top, and at this time the movable lifting device at the first two ear through holes touches the top, and under the action of the telescopic spring, the first lifting shell moves downward relatively, so that the first lifting shell can maintain stable water blocking, and at the same time, it can allow water to enter the next level of flood control lifting mechanism, thereby improving the water blocking effect and operational reliability of flood control and waterlogging prevention, reducing the flood disasters caused by rainwater to low-lying areas, and at the same time, on the basis of retaining the drainage function of the traditional drainage system, a new function of intercepting and storing external flood and waterlogging water is added, which can effectively prevent external floods from overflowing or backflowing, and significantly improve the regional flood control and waterlogging prevention capabilities. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, drawings of other embodiments can be obtained based on these drawings without paying creative work.
[0030] Figure 1 This is a three-dimensional structural diagram of the flood control and waterlogging prevention system;
[0031] Figure 2 This is a schematic diagram of the internal structure of the flood control and waterlogging prevention system;
[0032] Figure 3 It is a three-dimensional structural schematic diagram of the lifting and limiting mechanism;
[0033] Figure 4 It is a schematic diagram of the installation position structure of the pulley and the slider;
[0034] Figure 5 It is a schematic diagram of the side structure of the flood control lifting mechanism in the water supply and drainage device;
[0035] Figure 6 It is a schematic diagram of the internal structure of the water supply and drainage device;
[0036] Figure 7 It is a schematic diagram of the specific installation distribution structure of the flood control lifting mechanism;
[0037] Figure 8 The potential application scenarios and installation methods of flood control and waterlogging prevention systems;
[0038] Fig. 9 The potential application scenarios and installation methods of flood control and waterlogging prevention systems;
[0039] Fig.10 It is a structural diagram of the three-level flood control and waterlogging prevention state of the flood control lifting mechanism.
[0040] The following are the descriptions of the reference numerals:
[0041] 1. Water supply and drainage device; 11. Water-proof shell; 12. Water-permeable shell; 13. First exhaust hole; 14. Water-permeable baffle; 1a. First shell cavity; 1b. Second shell cavity; 2. Flood control lifting mechanism; 21. First flood control lifting mechanism; 21a. First lifting shell; 21b. First two-ear through hole; 21c. Drain valve; 21d. Movable lifting device; 21e. Telescopic spring; 21f. Second exhaust hole; 21g. Baffle bar; 21h. Sliding block; 21i. Pulley; 22. Second lifting mechanism; 22a. Second lifting shell; 22b. Second two-ear through hole; 23a. Third lifting shell; 3. Lifting limit mechanism; 31. Limit shell; 32. First limit slide groove; 33. Second limit slide groove; 34. Third limit slide groove. DETAILED DESCRIPTION
[0042] In order to more clearly understand the above-mentioned purposes, features and advantages of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods. These drawings are all simplified schematic diagrams, which only illustrate the basic structure of the present invention in a schematic manner, and therefore only show the structures related to the present invention. It should be noted that the embodiments in this application and the features in the embodiments can be combined with each other without conflict.
[0043] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the scope of protection of the present application. In addition, the terms "first", "second", etc. are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, features defined as "first", "second", etc. may explicitly or implicitly include one or more of the features. In the description of the invention, unless otherwise specified, "multiple" means two or more.
[0044] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium, and it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood by specific circumstances.
[0045] In order to facilitate the understanding of the present invention, the present invention will be described more fully below with reference to the relevant drawings. The preferred embodiments of the present invention are given in the drawings. However, the present invention can be implemented in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the disclosure of the present invention more thoroughly understood.
[0046] like Figure 1 , 2 As shown in , 4, 5, and 6, a first aspect of the present invention provides a flood control and waterlogging prevention system, including a water supply and drainage device 1, a flood control lifting mechanism 2, and a lifting and limiting mechanism 3.
[0047] like Figure 2 , 6 As shown, the water supply and drainage device 1 includes a water-proof shell 11 and a water-permeable shell 12, a first exhaust hole 13 is opened on the top of the water-proof shell 11, a water-permeable partition 14 is arranged inside the water-proof shell 11, the water-permeable partition 14 divides the interior of the water-proof shell 11 into a first shell cavity 1a and a second shell cavity 1b, and the flood prevention lifting mechanism 2 is installed in the first shell cavity 1a.
[0048] like Figure 6 As shown, the second shell cavity 1b is connected to the regional sewer network for normal drainage of water.
[0049] It should be noted that, in general, the water supply and drainage device 1 should correctly distinguish the installation position and structural materials according to the protected terrain and purpose. When the water supply and drainage device is used in some low-lying terrain such as underground parking lots, the permeable shell 12 should be installed toward the water side. Rainwater enters the first shell cavity through the permeable shell 12, and then flows into the second shell cavity 1b through the permeable partition 14, which can make the rainwater pass quickly through the sewer network to treat the rainwater, achieve the effect of water blocking and treating rainwater, prevent rainwater from entering low-lying areas, and further improve the flood prevention and control of low-lying areas. When used for flood control and waterlogging prevention in urban rivers, the second shell cavity 1b should be changed into a permeable structure to facilitate river water to enter the second shell cavity 1b and be discharged into the sewer network. The first exhaust hole 13 can discharge the gas generated during the operation of the water supply and drainage device 1 and the flood control lifting mechanism 2, so as to avoid drainage abnormalities and improve the quality and efficiency of flood control and waterlogging prevention. If the water level continues to rise to the top of the water supply and drainage device 1, the water-free shell 11 begins to play a role, which can prevent water from flowing back into the interior through the bottom, so as to avoid the phenomenon of a large amount of backflow and accumulation of water, and the reliability is high.
[0050] like Figure 2 , 7 As shown, the flood-proof lifting mechanism 2 includes a first flood-proof lifting mechanism 21, which is installed on the permeable partition 14. The first flood-proof lifting mechanism 21 includes a first lifting shell 21a, and the bottom of the first lifting shell 21a is provided with a first two-ear through hole 21b, and a movable lifting device 21d is installed in the first two-ear through hole 21b.
[0051] like Figure 2 , 7 As shown, a telescopic spring 21e is arranged above the movable lifting device 21d, one end of the telescopic spring 21e is fixed to the first lifting shell 21a, and the other end is fixed to the top end of the movable lifting device 21d.
[0052] It should be noted that rainwater enters the second shell 1b after passing through the permeable shell 12 and the permeable baffle 14. However, due to heavy rainfall, or the drainage pipe network conduit and top support, the water level in the second shell 1b continues to rise and exceeds the second shell 1b, and when it overflows into the first shell 1a, the flood control lifting mechanism 2 will begin to be affected by buoyancy; when the water level rises and the buoyancy of the first lifting shell 21a is greater than its own gravity, the first flood control lifting mechanism 21 floats up to prevent water from entering the low-lying area, thereby achieving the purpose of automatic rising and water retaining of the first-level flood control and waterlogging prevention, thereby improving the efficiency of flood control and waterlogging prevention. and quality; when the water level continues to rise, the first lifting shell 21a contacts the top, and the movable lifting device 21d at the first two-ear through-hole 21b touches the top. Under the action of the telescopic spring 21e, the first lifting shell 21a moves downward relatively, so that the first lifting shell 21a can maintain stable water blocking, and at the same time, it can allow water to flow into the next level of flood control lifting mechanism 2, thereby improving the water blocking effect and operational reliability of flood control and waterlogging prevention, reducing the flood disasters caused by rainwater to low-lying areas, effectively preventing external floods from overflowing or backflowing, and significantly improving the regional flood control and waterlogging prevention capabilities.
[0053] like Figure 2 , 7 As shown, two groups of baffles 21g are arranged inside the first lifting shell 21a, and the movable lifting device 21d is installed above the two groups of baffles 21g. The same movable lifting device 21d is installed on the second lifting mechanism 22. The second lifting mechanism includes a second lifting shell 22a, and the movable lifting device 21d on the second lifting shell 22a is exactly the same as the movable lifting device 21d on the first lifting shell.
[0054] like Figure 2 , 7 As shown, the second lifting shell 22a is provided with second two-ear through holes 22b at the bottom, the same telescopic spring 21e is provided between the second lifting shell 22a and the movable lifting device 21d, and the second lifting shell 22a is also provided with two groups of the gear bars 21g.
[0055] like Figure 2 , 7 As shown, a third lifting shell 23a is installed on the gear bar 21g, a drain valve 21c is provided at the bottom of the first lifting shell 21 and the second lifting shell 22a, and a plurality of second exhaust holes 21f are provided at the connection between the first lifting shell 21a, the second lifting shell 22a and the third lifting shell 23a.
[0056] It should be noted that when the water level continues to rise, the movable lifting device 21d on the first lifting shell 21a touches the top. At this time, the bottom water flows into the first lifting shell 21a through the second two-ear through holes 22b, and the buoyancy of the rainwater causes the second lifting shell 22a to begin to rise under the influence of buoyancy, thereby further increasing the water retaining height of the flood control lifting mechanism, blocking the rainwater level at the corresponding height, and realizing the automatic water retaining effect of the secondary flood control and waterlogging prevention state, effectively improving the adaptive water retaining capacity of flood control and waterlogging prevention.
[0057] It should be noted that when the water level continues to rise, the movable lifting device 21d on the second lifting shell 22a contacts the top of the first lifting shell 21a. At this time, the movable lifting device 21d on the second two-ear through-hole 22b moves downward relative to the second lifting shell 22a under the action of the telescopic spring 21e, so that the second lifting shell 22a can maintain stable water blocking. When the water level continues to rise, rainwater can enter the third lifting shell 23a, thereby driving the third lifting shell 23a to float upward under the action of buoyancy until it touches the top, realizing the automatic rising water blocking effect of the three-level flood control and waterlogging prevention state, completing the purpose of blocking the corresponding water level step by step according to the rising height of the water level, improving the rapid switching rate of the intelligent water blocking of the flood control and waterlogging prevention system, and at the same time greatly improving the flood control and waterlogging prevention quality of different terrains, avoiding the threats caused by natural disasters such as rainwater and rivers; the second exhaust hole 21f can discharge the air generated during the lifting movement, thereby improving the operation safety and speed of the flood control lifting mechanism.
[0058] like Figure 4 As shown, both ends of the first lifting shell 21a, the second lifting shell 22a and the third lifting shell 23a extend out of the water supply and drainage device 1, and sliders 21h are provided at both ends of the first lifting shell 21a, the second lifting shell 22a and the third lifting shell 23a, and pulleys 21i are fixed on the sliders 21h.
[0059] like Figure 1 , 3 As shown in FIG. 4 , the lifting limit mechanism 3 includes a limit shell 31 , on which two symmetrical first limit slots 32 are provided, two second limit slots 33 are provided on both sides of the first limit slot 32 , and two third limit slots 34 are provided on both sides of the second limit slot 33 .
[0060] like Figure 1 , 3As shown in FIG. 4 , the pulleys 21i on both sides of the first lifting shell 21a, the second lifting shell 22a and the third lifting shell 23a are respectively embedded and installed in the first limiting slide groove 32, the second limiting slide groove 33 and the third limiting slide groove 34, and the heights of the first limiting slide groove 32, the second limiting slide groove 33 and the third limiting slide groove 34 correspond to the movement ranges of the first lifting shell 21a, the second lifting shell 22a and the third lifting shell 23a.
[0061] It should be noted that when the water level drops, the lifting shells of each level begin to gradually descend, and the internal water flows into the drainage network connected to the second shell cavity 1b through the drainage valves 21c at the bottom of the lifting shells of each level, and the flood control and waterlogging prevention are restored to their initial state, and the flood control and waterlogging prevention process ends; during the lifting and lowering movement of the first lifting shell 21a, the second lifting shell 22a and the third lifting shell 23a, the pulleys 21i and the slider 21h on both sides can slide up and down in the first limit slide groove 32, the second limit slide groove 33 and the third limit slide groove 34 respectively, so that the flood control lifting mechanism 3 can maintain a smooth up and down lifting, avoid lifting deviation and vibration, and improve the operation stability.
[0062] A second aspect of the present invention provides a method for controlling a flood control and waterlogging prevention system, which is applied to any one of the flood control and waterlogging prevention systems described above, and comprises the following steps:
[0063] Acquire construction design drawing information of the flood control and waterlogging prevention system, extract basic design parameters of the flood control and waterlogging prevention system according to the construction design drawing information, construct a three-dimensional simulation model, import the basic design parameters into the three-dimensional simulation model, and obtain the three-dimensional simulation model of the flood control and waterlogging prevention system;
[0064] Based on the three-dimensional simulation model of the flood control and waterlogging prevention system, the extension distance of the flood control lifting mechanism is tested, and the corresponding rainfall under different extension distances is recorded to obtain multiple groups of rainfall, build a database, and import the multiple groups of rainfall into the database to obtain a rainfall database;
[0065] Retrieving the flood level corresponding to each group of rainfall in the big data network to obtain a number of flood level information, and constructing a system based on the number of flood level information to obtain a flood level classification system;
[0066] Acquire the actual rainfall in the area where the current flood control and waterlogging prevention system is located, define the actual rainfall as a search keyword, import the search keyword into the flood level classification system for retrieval, and obtain the actual flood level;
[0067] It is determined whether the actual flood level is greater than the preset flood level. If so, there is a flood risk in the area. A certain number of warning signs can be set in the area where the flood control and waterlogging prevention system is located to prohibit vehicles and personnel from traveling.
[0068] It should be noted that since the flood control and waterlogging prevention system can be used in different water-blocking scenarios, such as flood barriers in underground garages and rivers, different water-blocking scenarios have different flood risk levels, and the initial state of the flood control and waterlogging prevention system remains parallel to the ground. It is difficult for people to judge from the working height of the flood control and waterlogging prevention whether a high-level flood disaster will occur in the current area. Therefore, it is necessary to distinguish the risk levels of different scenarios and make corresponding prompts; by creating a three-dimensional simulation model of the flood control and waterlogging prevention system, different water-blocking heights are simulated and the corresponding rainfall is recorded, so as to improve the data acquisition rate and save the process of manual field data collection; according to the rainfall, the corresponding flood level is obtained and a flood level system is planned, and the actual rainfall in the area where the current flood control and waterlogging prevention system is located is matched in the flood level system to obtain the actual flood level; finally, the difference between the actual flood level and the preset level is judged, and warning signs are added to the flood control and waterlogging prevention area according to the judgment result to remind vehicles and personnel not to travel or approach. The present invention can determine and judge the flood level in the area where the flood control and waterlogging prevention system is located, thereby reminding people of the flood danger level in the area and making corresponding prompts, timely protecting people's lives and safety, reducing the harm of flood disasters to the masses, and greatly improving the safety index of the flood control and waterlogging prevention system.
[0069] Furthermore, in a preferred embodiment of the present invention, the following steps are also included:
[0070] Acquire the area to be installed of the flood control and waterlogging prevention system, and scan the area to be installed by using a laser radar to obtain a plurality of terrain point cloud data;
[0071] Fitting the plurality of terrain point cloud data by using a RANSAC algorithm to obtain a three-dimensional model of the area to be installed, and obtaining a plurality of ground uplift heights of the area to be installed according to the three-dimensional model of the area to be installed;
[0072] Determine whether the plurality of ground uplift heights are greater than a preset height, and if so, remove the ground uplift heights greater than the preset height, and sort out and plan the remaining ground uplift heights to obtain an installation area for the flood control and waterlogging prevention system;
[0073] Based on the grid search algorithm, the best installation starting point and the best installation end point are calculated and found in the installable area, and the best installation starting point and the best installation end point are connected to define a range to obtain the best installation point of the flood control and waterlogging prevention system.
[0074] It should be noted that when installing a flood control and waterlogging prevention system, it is usually necessary to comprehensively consider the terrain conditions and distribution to select the installation point. Some terrain surfaces have many ridges, and the water flow rate is too large, which is not conducive to flood protection and the installation of flood control and waterlogging prevention systems. Therefore, it is necessary to select the best installation point in the flood control and waterlogging prevention installation area to improve the flood protection performance of the system; by acquiring the terrain point cloud data of the area to be installed to build a three-dimensional model, the ground ridges and their height values in the area to be installed can be known through this three-dimensional model, and the difference between the ground ridge height value and the preset height value is compared, and the ground ridges that do not meet the preset height value are eliminated. The remaining ground ridges after elimination are planned and defined as installable areas. The installable area can avoid the negative impact of uneven ground on the flood control and waterlogging prevention system, improve the flood protection effect, and finally introduce a grid search algorithm to calculate and search the best installation starting point and the best installation end point in the installable area to obtain the best installation point of the flood control and waterlogging prevention system. The present invention can select the best installation point for the flood control and waterlogging prevention system according to the terrain distribution and ground uplift conditions, improve the water retaining performance of the flood control and waterlogging prevention system, and reduce the negative optimization of flood control effects caused by terrain reasons.
[0075] The above is based on the ideal embodiment of the present invention, and its description is relatively specific and detailed, but it cannot be understood as limiting the scope of the invention patent. It should be pointed out that for ordinary technicians in this field, several modifications and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be based on the attached claims.
Claims
1. A control method for a flood control and waterlogging prevention system, comprising a water supply and drainage device, a flood control lifting mechanism and a lifting limit mechanism, characterized in that: The water supply and drainage device comprises a water-proof shell and a water-permeable shell, a first exhaust hole is provided on the top of the water-proof shell, a water-permeable baffle is provided inside the water-proof shell, the water-permeable baffle divides the inside of the water-proof shell into a first shell cavity and a second shell cavity, and the flood prevention lifting mechanism is installed in the first shell cavity; The flood prevention lifting mechanism comprises a first flood prevention lifting mechanism, the first flood prevention lifting mechanism is installed on the permeable baffle, the first flood prevention lifting mechanism comprises a first lifting shell, the bottom of the first lifting shell is provided with first two-ear through holes, and a movable lifting device is installed in the first two-ear through holes; The lifting limit mechanism comprises a limit shell, on which two symmetrical first limit slide grooves are formed, two second limit slide grooves are formed on both sides of the first limit slide groove, and two third limit slide grooves are formed on both sides of the second limit slide groove; A telescopic spring is arranged above the movable lifting device, one end of the telescopic spring is fixed to the first lifting shell, and the other end is fixed to the top of the movable lifting device; The control method comprises the following steps: Acquire construction design drawing information of the flood control and waterlogging prevention system, extract basic design parameters of the flood control and waterlogging prevention system according to the construction design drawing information, construct a three-dimensional simulation model, import the basic design parameters into the three-dimensional simulation model, and obtain the three-dimensional simulation model of the flood control and waterlogging prevention system; Based on the three-dimensional simulation model of the flood control and waterlogging prevention system, the extension distance of the flood control lifting mechanism is tested, and the corresponding rainfall under different extension distances is recorded to obtain multiple groups of rainfall, build a database, and import the multiple groups of rainfall into the database to obtain a rainfall database; Retrieving the flood level corresponding to each group of rainfall in the big data network to obtain a number of flood level information, and constructing a system based on the number of flood level information to obtain a flood level classification system; Acquire the actual rainfall in the area where the current flood control and waterlogging prevention system is located, define the actual rainfall as a search keyword, import the search keyword into the flood level classification system for retrieval, and obtain the actual flood level; Determine whether the actual flood level is greater than the preset flood level. If so, there is a flood risk in the area, and a certain number of warning signs are set up in the area where the flood control and waterlogging prevention system is located to prohibit vehicles and personnel from traveling; The control method further comprises the following steps: Acquire the area to be installed of the flood control and waterlogging prevention system, and scan the area to be installed by using a laser radar to obtain a plurality of terrain point cloud data; Fitting the plurality of terrain point cloud data by using a RANSAC algorithm to obtain a three-dimensional model of the area to be installed, and obtaining a plurality of ground uplift heights of the area to be installed according to the three-dimensional model of the area to be installed; Determine whether the plurality of ground uplift heights are greater than a preset height, and if so, remove the ground uplift heights greater than the preset height, and sort out and plan the remaining ground uplift heights to obtain an installation area for the flood control and waterlogging prevention system; Based on the grid search algorithm, the best installation starting point and the best installation end point are calculated and found in the installable area, and the best installation starting point and the best installation end point are connected to define a range to obtain the best installation point of the flood control and waterlogging prevention system.
2. A method for controlling a flood control and waterlogging prevention system according to claim 1, characterized in that: The second shell cavity is connected to the regional sewer network for normal drainage.
3. The control method of a flood control and waterlogging prevention system according to claim 1, characterized in that: Two groups of gear bars are arranged inside the first lifting shell, the movable lifting device is installed above the two groups of gear bars, the same movable lifting device is installed with a second lifting mechanism, the second lifting mechanism includes a second lifting shell, and the movable lifting device on the second lifting shell is exactly the same as the movable lifting device on the first lifting shell.
4. A method for controlling a flood control and waterlogging prevention system according to claim 3, characterized in that: The bottom of the second lifting shell is provided with second two-ear through holes, the same telescopic spring is provided between the second lifting shell and the movable lifting device, and the second lifting shell is also provided with two groups of the gear bars.
5. The control method of a flood control and waterlogging prevention system according to claim 3, characterized in that: A third lifting shell is installed on the gear bar, a drain valve is provided at the bottom of the first lifting shell and the second lifting shell, and a plurality of second exhaust holes are provided at the connection between the first lifting shell, the second lifting shell and the third lifting shell.
6. A method for controlling a flood control and waterlogging prevention system according to claim 5, characterized in that: Both ends of the first lifting shell, the second lifting shell and the third lifting shell extend out of the water supply and drainage device, and both ends of the first lifting shell, the second lifting shell and the third lifting shell are provided with sliders, and pulleys are fixed on the sliders.
7. A method for controlling a flood control and waterlogging prevention system according to claim 6, characterized in that: The pulleys on both sides of the first lifting shell, the second lifting shell and the third lifting shell are respectively embedded and installed in the first limiting slide groove, the second limiting slide groove and the third limiting slide groove, and the heights of the first limiting slide groove, the second limiting slide groove and the third limiting slide groove correspond to the movement ranges of the first lifting shell, the second lifting shell and the third lifting shell.
Citation Information
Patent Citations
Urban inland inundation intelligent modeling and analysis method based on GIS and SWMM
CN110298076A
Rainfall flood monitoring and early warning facility and method for urban subway station entrance
CN112669573A
Buoyancy device for preventing rainwater from flowing backwards at subway entrance
CN115387281A
Substation waterlogging disaster monitoring and early warning system
CN115394051A
Regional flood disaster grade prediction and early warning method and system
CN116434479A