A large crane ship with green energy saving and intelligent operation and construction method

By integrating energy management, automatic ship movement and ship operation auxiliary decision-making units on large lifting ships, the problems of single functions and insufficient energy saving during the construction process are solved, and efficient and safe intelligent construction is achieved.

CN117864983BActive Publication Date: 2024-11-08CCCC SECOND HARBOR ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311653207.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-05
Publication Date
2024-11-08
Estimated Expiration
2043-12-05

AI Technical Summary

Technical Problem

During the construction process, existing large crane ships have problems such as single functions, insufficient research on energy saving and intelligence, resulting in low construction efficiency, poor safety and serious energy waste.

Method used

Large-scale crane system adopts green energy-saving and intelligent operations, including hull system, energy management unit, automatic ship moving unit and ship operation auxiliary decision-making unit, through photovoltaic system, energy storage system, contactless laser wave measurement radar, multi- Technology such as PLEU ultrasonic flowmeter realizes automated control and intelligent decision-making.

Benefits of technology

It improves the economy, efficiency and safety of the crane ship, reduces energy consumption, realizes automated ship migration positioning and intelligent construction decisions, and improves the overall efficiency and safety of construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117864983B_ABST
    Figure CN117864983B_ABST
Patent Text Reader

Abstract

The present invention discloses a large-scale crane ship and construction method with green energy saving and intelligent operation. It includes a hull system and an energy management unit, an automatic ship moving unit, and a ship operation auxiliary decision unit arranged on the hull system. The hull system includes a hull and a crane. The crane is controlled to work in different working conditions according to a controller on the hull; the energy management unit cooperates with the controller to control the working state of each power supply device of the ship according to the working condition of the ship; the ship operation auxiliary decision unit cooperates with the controller to detect water environment information and hull posture information to determine the stability of the ship; the automatic ship moving unit cooperates with the controller to realize the automatic ship moving and positioning of the ship. The present invention can greatly improve the safety of the crane ship's operation, and can also reduce the construction complexity and energy loss problems during lifting and hoisting, and improve construction efficiency while meeting safety requirements.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of hydraulic engineering construction, and in particular relates to a large-scale crane ship and a construction method for green, energy-saving and intelligent operation. Background Art

[0002] With the development of marine resource development, the construction of marine oil and gas and marine exploration platforms, marine salvage projects, and cross-sea bridges has continued to increase. The demand for large-scale crane ships for large-scale offshore engineering operations has increased significantly, and the crane ships used for construction are becoming larger and larger. Existing crane ships can be divided into full-revolving crane ships and fixed-arm crane ships by type. Full-revolving crane ships are mostly self-propelled and equipped with DP, suitable for offshore operations, and are often used for offshore steel structure oil and gas module hoisting and wind power installation. The lifting capacity of full-revolving crane ships is mostly 1000-4000T, and the largest crane ship is Zhenhua 30, with a lifting capacity of 12000T. Fixed-arm crane ships are mostly non-self-propelled and auxiliary propulsion, suitable for coastal and offshore operations, and are often used for overall hoisting of prefabricated bridge components and wind power installation. The existing fixed-arm crane ships in China are mostly concentrated in various navigation bureaus and bridge bureaus, with a lifting capacity of 2000-5000T. The largest crane ship is the new Zhenfu 7, with a lifting capacity of 5000T. At sea, the lifting operation process is a huge and complex system engineering, with large changes in the state of the system, a very complex operating environment and high costs. It has always been an urgent problem to improve the safety of large crane ships while improving the lifting efficiency of crane ships and reducing energy consumption.

[0003] However, the crane ships currently used in construction have a single function, and their main research is on improving the lifting capacity, while there is less research on the energy saving and intelligence of ships. For example, the displacement of the crane ship is achieved through eight anchor winches on the ship. The existing ship shifting method generally uses manual control of the anchor winch method, which is difficult to coordinate the control of the eight winches to retract and release the cables. The construction is not only time-consuming and labor-intensive, but also has poor positioning accuracy for ship shifting. In addition, since the marine environmental conditions are far more severe and random than those on land, they have a great impact on the safety of offshore construction. How to combine the hydrological, meteorological and other environmental conditions of the construction sea area, and make correct construction decisions based on the current state of the ship according to the construction characteristics of different structures is also a major problem facing the construction personnel. Moreover, when a large crane ship is under construction, its ship state is not in the hoisting and installation state most of the time, but in the process of waiting for the installation of heavy objects. During this process, the main generator of the ship must be turned on all the time, resulting in a lot of energy waste. Summary of the invention

[0004] The purpose of the present invention is to solve the deficiencies of the above-mentioned background technology and to provide a large crane vessel and construction method with green energy saving and intelligent operation, so as to realize high-economic, high-efficiency and high-safety operation and construction of large crane vessels.

[0005] The technical solution adopted by the present invention is: a large-scale crane ship and a construction method for green energy-saving and intelligent operation, including a hull system and an energy management unit, an automatic ship moving unit, and a ship operation auxiliary decision unit arranged on the hull system.

[0006] The hull system includes a hull and a crane, and the crane is controlled to work in different working conditions according to a controller on the hull;

[0007] The energy management unit cooperates with the controller to control the working state of each power supply device of the ship according to the working condition of the ship.

[0008] The ship operation auxiliary decision unit cooperates with the controller to detect water environment information and hull posture information to determine the stability of the ship;

[0009] The automatic ship moving unit cooperates with the controller to realize automatic ship moving and positioning.

[0010] Furthermore, the energy management unit includes a ship power grid, a main generator, an auxiliary generator, a photovoltaic system, an energy storage system and an integrated energy management system. The ship power grid includes a 690V AC bus, a 400V AC bus and a 230V AC bus. The main generator and the 400V AC bus are connected to the 690V AC bus. The auxiliary generator, the photovoltaic system, the energy storage system and the 230V AC bus are connected to the 400V AC bus. The integrated energy management system cooperates with the controller to control the working status of the main generator, the auxiliary generator, the photovoltaic system and the energy storage system.

[0011] Furthermore, the ship operation auxiliary decision unit includes a non-contact laser wave measurement radar, a Doppler ultrasonic current meter, a gyroscope and a GPS. The non-contact laser wave measurement radar is used to measure the wave height and wave period of the ship's working waters and send them to the controller; the Doppler ultrasonic current meter is used to measure the flow velocity of the ship's working waters and send them to the controller; the gyroscope is used to measure the six-degree-of-freedom posture of the ship and send it to the controller; the GPS is used to measure the position of the ship and send it to the controller; the controller determines the stability of the ship based on the received information.

[0012] Furthermore, the Doppler ultrasonic flowmeter is installed on the hull through a bracket, the bracket includes a frame and a telescopic rod, the frame is a spatial truss structure, the frame is connected to the hull through a pin shaft, and the frame is installed inside the side of the hull; the telescopic rod is installed on the frame, and the Doppler ultrasonic flowmeter is installed at the lower end of the telescopic rod.

[0013] Furthermore, the ship operation auxiliary decision unit also includes a laser ranging radar, which is used to measure the six degrees of freedom of the crane main hook and send it to the controller. The controller determines whether the movement amplitude of the main hook exceeds the allowable value based on the received information.

[0014] Furthermore, the automatic ship moving unit includes a ship moving control console and eight mooring electric winches. Four mooring electric winches are arranged on the decks of the bow and stern of the hull respectively. A tension sensor and a photoelectric encoder are installed on each mooring electric winch. The tension sensor is used to monitor the tension of the mooring electric winch cable, and the photoelectric encoder is used to monitor the retraction and extension length of the mooring electric winch cable. The ship moving control console compares the ship position in the controller with the target position, controls the mooring electric winch to retract and release the cable, and realizes automatic ship moving and positioning. After the ship moves to the target position, the cable is tightened to stabilize the ship according to the monitoring value of the tension sensor.

[0015] Furthermore, when the main generator in the energy management unit is turned on, the hoisting operation is performed, and the process is as follows:

[0016] Step 1: Monitor the environmental status, determine whether the monitored information is within the set range, and proceed to step 2;

[0017] Step ②, if no, then end the operation; if yes, then control the ship to enter the vicinity of the lifting position, detect the water environment information and the hull posture information, and determine whether to move the ship and position it according to the detected information, and then enter step ③;

[0018] Step ③, if not, end the operation; if so, move the ship to the lifting position through the automatic ship moving unit and start lifting; during the lifting process of the heavy object, monitor the movement of the main hook, and when the movement amplitude of the main hook exceeds the allowable value, the main hook movement alarm is issued, otherwise the lifting continues until the heavy object is installed in place.

[0019] Furthermore, before carrying out the lifting and hoisting operation, the ship is first controlled to enter the waters to be operated, and the main generator and auxiliary generator in the energy management unit are detected to be turned on.

[0020] If the main generator is turned on, lifting and hoisting operations are carried out, and energy management of the first ship is carried out at the same time; if the auxiliary generator is turned on, energy management of the second ship is carried out.

[0021] Furthermore, the first ship energy management is: determining the number of main generators to be started according to the size of the grid load and controlling the charging and discharging of the energy storage system.

[0022] Furthermore, the process of ship moving and positioning is as follows:

[0023] Comparing the first position information of the ship with the first target position information;

[0024] If the first condition is not met, the mooring electric winch is controlled to retract and release the cable to adjust the lateral deviation until the first condition is met (i.e. |x1-x|≤σ);

[0025] If the second condition is not met, the mooring electric winch is controlled to retract and release the cable to adjust the longitudinal deviation until the second condition is met (i.e. |y1-y|≤σ);

[0026] When both the first and second conditions are met, the second position information of the ship is compared with the second target position information. If the third condition is not met, the mooring electric winch is controlled to retract and release the cable to adjust the torsion deviation until the third condition is met (i.e., |x2-x3|≤σ, and |y2-y3|≤σ), and the ship is moved to the lifting position.

[0027] The beneficial effects of the present invention are:

[0028] The present invention adopts a photovoltaic and energy storage energy management system to optimize the "source-grid-load-storage" configuration, realize reliable access to renewable energy, economical operation of diesel generators and safe operation of microgrids, thereby improving the energy efficiency of the entire ship and ensuring the safety and environmental comfort of the two ships' offshore construction operations; adopts a ship operation auxiliary decision-making unit based on environmental state perception and virtual-real mapping (that is, a three-dimensional detection model of the hull is established on a computer display screen, a digital twin is performed, and the actual movement and working conditions of the ship are dynamically simulated), combined with the hydrological, meteorological and other environmental conditions of the construction sea area, according to the construction characteristics of different structures, to form environmental perception and forecasting, provide intelligent prediction of whether the project can be operated, and improve construction safety; adopts an eight-anchor automatic ship moving unit, and uses a speed-tension-based ship moving control strategy to achieve efficient construction of the crane ship, greatly shorten the positioning time, and improve the positioning quality and the reliability of the positioning equipment; the method of the present invention can greatly improve the safety of the crane ship's work, and can also reduce the construction complexity and energy loss problems during lifting and hoisting, and improve construction efficiency while meeting safety. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 It is a schematic diagram of the composition of the large crane ship system of the present invention.

[0030] Figure 2 This is a front view of the distribution of the large crane ship system components of the present invention.

[0031] Figure 3 This is a top view of the distribution of the large crane ship system components of the present invention.

[0032] Figure 4 It is a schematic diagram of the retracted state of the ship-mounted current measuring device of the present invention.

[0033] Figure 5It is a schematic diagram of the state of the ship-mounted current measuring device after rotation of the present invention.

[0034] Figure 6 It is a monitoring schematic diagram of the ship-borne current measuring device of the present invention.

[0035] Figure 7 This is a schematic diagram of the installation of the laser wave measuring radar of the present invention.

[0036] Figure 8 It is a schematic diagram of the automatic ship moving scheme of the crane vessel of the present invention.

[0037] Fig. 9 The present invention is a construction flow chart of a crane vessel.

[0038] Fig.10 It is a lifting and hoisting flow chart of the present invention.

[0039] Fig.11 This is a schematic diagram of the power grid structure of the crane vessel of the present invention.

[0040] Fig.12 This is a schematic diagram of the current supply direction of the energy storage battery when one auxiliary generator is turned on in non-lifting working conditions of the present invention.

[0041] Fig.13 This is a schematic diagram of the current supply direction of the energy storage battery when two auxiliary generators are turned on in non-lifting working conditions of the present invention.

[0042] Fig.14 This is a schematic diagram of the charging flow of the energy storage battery when the three main generators are turned on in heavy working conditions of the present invention.

[0043] In the figure, 1-control room; 2-jib; 3-laser ranging radar; 4-main hook; 5-living and control area; 6-hoisting winch area; 7-hoisting area; 8-anchoring electric winch; 9-hull deck; 10-frame; 11-telescopic rod; 12-Doppler ultrasonic flowmeter; 13-tooling clamp; 14-clamp platform. DETAILED DESCRIPTION

[0044] The specific embodiments of the present invention are further described below in conjunction with the accompanying drawings. It should be noted that the description of these embodiments is used to help understand the present invention, but does not constitute a limitation of the present invention. In addition, the technical features involved in the various embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.

[0045] like Figure 1-7 As shown, the present invention provides a large-scale crane ship with green energy saving and intelligent operation, a hull system, an energy management unit, an automatic ship moving unit, and a ship operation auxiliary decision unit.

[0046] The hull system is composed of a hull and a crane. A hoisting winch area 6, a living and control room area 5, and a hoisting area 7 are arranged on the hull deck.

[0047] The hoisting winch area 6 is equipped with eight main hook hoisting winches, four auxiliary hook hoisting winches, and four luffing winches;

[0048] The living and control room area 5 is mainly composed of four layers, which are divided into area A, area B, area C and control room 1 from bottom to top. Area A, area B and area C are living areas. The control room is equipped with a console, a computer display and an acoustic and light roarer. The console includes a controller, a main hook control handle, an auxiliary hook control handle and a boom control handle. The controller is electrically connected with each main hook hoisting winch, auxiliary hook hoisting winch and luffing winch to control the movement of each winch.

[0049] The lifting area 7 is the working range of the crane. The crane is installed at the bow of the hull through a pin shaft so that the boom can be pulled to rotate around the hull by the luffing winch. In particular, the crane is composed of two identical lifting booms 2, each boom includes two main hooks 4 and one auxiliary hook. Each main hook is controlled by four main hook lifting synchronous winches for lifting heavy objects; each auxiliary hook is synchronously controlled by two auxiliary hook lifting winches for lifting light objects or for auxiliary lifting; each boom is connected to the steel wire ropes of the two luffing winches, and each boom is synchronously controlled by the two luffing winches. In particular, 12 tension sensors and 1 tilt sensor are also installed. A tension sensor is installed on each main hook lifting winch to monitor the lifting weight of the main hook, a tension sensor is installed on each auxiliary hook lifting winch to monitor the lifting weight of the auxiliary hook, and an tilt sensor is installed on the boom to monitor the tilt angle of the boom. The tension sensors and inclination sensors are electrically connected to the controller, and the controller is electrically connected to the computer display and the sound and light buzzer. The controller transmits the monitored signals to the display for display, and when the monitored lifting weight exceeds the allowable value, it issues a command to make the sound and light buzzer alarm.

[0050] The energy management unit includes a ship power grid, a generator, a photovoltaic system, an energy storage system and an EMS energy integrated management system. The ship power grid includes a three-layer voltage circuit of 690V, 400V and 230V, the voltage of 690V is converted to 400V through a transformer, and the voltage of 400V is converted to 230V through a transformer; the generator includes three main diesel generators and two auxiliary diesel generators, each main diesel generator described in this embodiment has a power of 3350kW, and each auxiliary diesel generator has a power of 400kW. The main diesel generator is connected to the 690V circuit of the ship power grid, and the auxiliary diesel generator is connected to the 400V circuit of the ship power grid. The two auxiliary diesel generators are one for use and one for backup; the energy storage system includes a number of battery packs and a bidirectional inverter. The energy storage system is arranged on the hull deck and connected to the ship power grid 400V through a bidirectional inverter. It is used to store excess electric energy in the power grid or release electric energy when the power grid is insufficient, so as to supply water pumps, ventilation and life on the ship. The photovoltaic system includes a number of photovoltaic panels and inverters. The photovoltaic panels are installed on the roof of the control room and are connected to the 400V circuit of the ship's power grid through the inverter. They are used to convert solar energy into electrical energy and input it into the battery pack in the energy storage system for storage; the EMS energy integrated management system is used to control the photovoltaic system and the energy storage system, and charge or discharge the energy storage system according to different working conditions (lifting and mooring) and time, so as to make the main diesel generator operate in the economic energy consumption area or reduce the start-up time of the auxiliary diesel generator.

[0051] The ship operation auxiliary decision-making unit includes the above-mentioned computer display screen, non-contact laser wave measurement radar, Doppler ultrasonic current meter, gyroscope, and GPS. Its function is to use digital and intelligent environmental perception and status monitoring data as input, combined with motion simulation, to predict the operation movement and realize intelligent operation auxiliary decision-making.

[0052] In the above scheme, the non-contact laser wave measuring radar is installed on the boom and electrically connected to the controller, and is used to measure the wave height and wave period of the working waters of the crane ship; the Doppler ultrasonic current meter 12 is installed on the side of the crane ship and electrically connected to the controller, and is used to measure the flow rate of the working waters of the crane ship; the gyroscope is installed on the hull deck and electrically connected to the controller, and is used to measure the six-degree-of-freedom posture of the crane ship; the GPS includes two, one is arranged on the bow and the other on the stern deck, and is used to measure the position of the crane ship; the controller inputs the wave height, wave period and flow rate of the working waters into the computer display screen, and inputs the weight to be lifted through the computer display screen, and the computer display screen calculates the stability of the ship according to the built-in simulation system, realizes the evaluation of the working waters, and ensures the safety of the crane ship operation.

[0053] In the above scheme, the ship operation auxiliary decision unit also includes 4 laser rangefinders 3 installed on the boom, which are used to measure the six-degree-of-freedom motion of the main hook. In order to ensure that the laser radar field of view can cover the space where the main hook moves, two laser rangefinders are installed at the crossbeam of each boom at a distance of 108m from the base (depending on the boom height setting) through the tooling clamp 13. A total of four laser radars are required for the two booms, and the laser radars are fixed on the clamp platform 14. The two laser radars on each boom are installed vertically and arranged at an angle of 60°, so that the two fan-shaped fields of view of the two laser radars form a large butterfly field of view, covering the motion space of the main hook under various working conditions.

[0054] In the above scheme, since the Doppler ultrasonic current meter 12 needs to be lowered into the water to monitor the flow rate, a special tooling bracket is designed to facilitate the lowering and recovery of the Doppler ultrasonic current meter. The bracket includes a frame 10 and a telescopic rod 11. The frame adopts a spatial truss structure. The frame is connected to the hull deck 9 by a pin shaft so as to rotate around the hull. Furthermore, the connection point between the frame and the hull is close to the inside of the side so that the frame can remain in a vertical state after rotation; the telescopic rod is installed on the frame, and the Doppler ultrasonic current meter 12 is installed at the lower end of the telescopic rod, which is an electric telescopic rod. When it is necessary to monitor the flow rate, the bracket is rotated 90 degrees around the pin shaft, and then the electric telescopic rod is extended into the water to measure the flow rate; when the flow rate measurement is completed, the electric telescopic rod is retracted, and then the bracket is rotated to retract the bracket.

[0055] The automatic ship moving unit includes a ship moving control console, eight anchoring electric winches 8, eight tension sensors, and eight photoelectric encoders. Four electric winches are arranged on the decks of the bow and stern of the hull, and each electric winch is equipped with a tension sensor and a photoelectric encoder. The tension sensor is used to monitor the tension of the electric winch cable, and the photoelectric encoder is used to monitor the length of the electric winch cable. The ship moving control console is electrically connected to the electric winch. The ship moving control console compares the current ship position monitored by GPS with the target position to control the electric winch to retract and release the cable to achieve automatic ship moving positioning of the ship. After the ship moves to the target position, the cable is tightened again according to the monitoring value of the tension sensor to stabilize the ship. In an embodiment of the present invention, the winch control signal includes a winch control rule. In order to achieve the ship moving positioning of the hull, the ship moving control console divides the ship position deviation into three situations in the control strategy: lateral deviation of the hull, longitudinal deviation of the hull, and angle deviation of the hull. The three situations may appear alone or in combination. Even if a combined deviation occurs, it can be decomposed into three situations and corresponding measures can be taken. The specific rules for moving ships are as follows:

[0056] C1: The ship moving console first takes the measurement of GPS1 (or GPS2) as a reference. By comparing the ship position data (x1, y1) measured by GPS1 with the position data (x, y) corresponding to the target ship position, if |x1 - x| > σ (where σ is the allowable positioning error), the ship moving console determines that there is a lateral deviation. At this time, the ship moving console controls the winch to take in and pay out the cable to adjust the lateral deviation and proceeds to C2. Then, if |y1 - y| > σ, the ship moving console determines that there is a longitudinal deviation. At this time, the ship moving console controls the winch to take in and pay out the cable to adjust the longitudinal deviation and proceeds to C3. If |x1 - x| ≤ σ and |y1 - y| ≤ σ, that is, there is no lateral deviation and longitudinal deviation for the ship (or after the lateral deviation and longitudinal deviation are adjusted), but the GPS2 position data (x2, y2) obtained by the ship moving console and its corresponding target ship stern position data (x3, y3) satisfy |x2 - x3| > σ or |y2 - y3| > σ, then the ship moving console determines that there is a torsional deviation. At this time, the ship moving console controls the winch to take in and pay out the cable to adjust the torsional deviation and proceeds to C4. Otherwise, there is no torsional deviation, that is, the ship has reached the target position.

[0057] C2: When adjusting the lateral deviation, if x1 < x, that is Figure 8 moving from the current ship position to target ship position 1 in the figure, the ship moving console controls winches F1, F2, F7, F8 to pay out the cable and winches F3, F4, F5, F6 to take in the cable until |x1 - x| ≤ σ. If x1 > x, then the ship moving console controls winches F1, F2, F7, F8 to take in the cable and winches F3, F4, F5, F6 to pay out the cable until |x1 - x| ≤ σ. And during the process of moving the ship, the ship moving console controls the winch speed through the collected cable tension, so that the cable tension T of the winch is always controlled within T1 < T < T2, where T1 is the specified minimum tension and T2 is the specified maximum tension, to prevent one or more cable tensions from being too small or too large and ensure the stability of ship movement.

[0058] C3: When adjusting the longitudinal deviation, if y1 < y, that is Figure 8 moving from target ship position 1 to target ship position 2 in the figure, the ship moving console controls winches F1, F2, F3, F4 to take in the cable and winches F5, F6, F7, F8 to pay out the cable until |y1 - y| ≤ σ. If y1 > y, then the ship moving console controls winches F1, F2, F3, F4 to pay out the cable and winches F5, F6, F7, F8 to take in the cable until |y1 - y| ≤ σ. And during the process of moving the ship, the ship moving console controls the winch speed through the collected cable tension, so that the cable tension T of the winch is always controlled within T1 < T < T2, where T1 is the specified minimum tension and T2 is the specified maximum tension, to prevent one or more cable tensions from being too small or too large and ensure the stability of ship movement.

[0059] C4: When adjusting the torsional deviation, if (y2 - y1) / (x2 - x1) > (y3 - y) / (x3 - x), that is Figure 8 when moving from the real-time ship position to the target ship position 3 in Figure 8 , the ship transfer console controls the winches F1, F2, F5, and F6 to take in the cables, and the winches F3, F4, F7, and F8 to pay out the cables until |x2 - x3| ≤ σ and |y2 - y3| ≤ σ. At this time, the ship has reached the target position; if (y2 - y1) / (x2 - x1) < (y3 - y) / (x3 - x), then the ship transfer console controls the winches F1, F2, F5, and F6 to pay out the cables, and the winches F3, F4, F7, and F8 to take in the cables until |x2 - x3| ≤ σ and |y2 - y3| ≤ σ. At this time, the ship has reached the target position. And during the process of ship transfer, the ship transfer console controls the winch speed through the collected cable tension, so that the cable tension T of the winch is always controlled within T1 < T < T2, where T1 is the specified minimum tension and T2 is the specified maximum tension, to prevent the tension of one or more cables from being too small or too large and ensure the stability of ship transfer.

[0060] In the above solution, the computer display screen includes a crane monitoring page, an energy management monitoring page, a ship operation auxiliary decision-making page, and an automatic ship transfer monitoring page. Each of the monitoring pages includes the display of key parameters and the simulation display of the lifting ship operation. The key parameters that can be displayed on the computer display screen include: main hook lifting weight, auxiliary hook lifting weight, boom luffing angle, energy storage of the energy storage system, ship power grid structure, wave height of the operation water area, wave period of the operation water area, flow velocity of the operation water area, current ship position, current ship position, tension and rope length of the mooring electric winch, etc. In addition, the controller in the control room transmits the key parameters of the lifting ship to the cloud platform through a wireless module. The simulation display of the lifting ship operation includes the operating state of the ship power grid running with energy management simulation; the ship stability attitude simulated with environmental perception and status monitoring data; the automatic ship transfer positioning information simulated with the real-time ship position and the ship target position.

[0061] The present invention also provides a construction method for the above-mentioned lifting ship, as Figure 9-14 shown, and the specific construction steps include:

[0062] (1) When the ship is in a non-lifting (non-working) condition, the main diesel generator is turned off, and an auxiliary generator is started. At this time, the output power P6 of the low-voltage side of the 690V / 400V transformer is 0, and the output power P7 of the auxiliary generator 1, the power generation power P9 of the solar power generation system, and the power of all loads P10 on the 400Vac bus are monitored. If the lithium-ion battery energy storage system does not operate, then P7 + P9 = P10.

[0063] S1: P7 meets the load P10 demand. At this time, further monitor the capacity of the lithium-ion battery system. If the lithium-ion battery system is full, disconnect the photovoltaic energy storage channels CB16, CB17, and CB18; if the remaining capacity of the lithium-ion battery system is not full, close the photovoltaic energy storage channels CB16, CB17, and CB18, and the remaining electric energy of the auxiliary generator and the photovoltaic simultaneously charge the lithium battery.

[0064] S2: In the above (1) working condition, when P7 does not meet the load P10 demand, but P7 + P9 >= P10, if the lithium-ion battery system has remaining capacity, the lithium-ion battery energy storage system charges; when P7 + P9 < P10 and the lithium-ion battery system has remaining capacity, the battery pack bidirectional DC / AC enters the discharge mode, and set the discharge power as P11 = P10 - P7 - P9. At this time, the load is supplied with energy by an auxiliary generator, a photovoltaic system, and a storage battery pack, as Fig.10 . If P7 + P9 < P10 and the lithium-ion battery system has no remaining capacity, the energy management monitoring page prompts an overload alarm, turn on the second auxiliary generator, and enter (2).

[0065] (2) When the ship is in a non-lifting (non-working) condition, the main diesel generator is turned off, and 2 auxiliary generators are turned on. At this time, the output power P6 of the low-voltage side of the 690V / 400V transformer is 0. Monitor the output power P7 of the auxiliary generator 1, monitor the output power P8 of the auxiliary generator 2, the power generation power P9 of the solar power generation system, and the power P10 of all loads on the 400Vac bus. If the lithium-ion battery energy storage system does not operate, then P7 + P8 + P9 = P10.

[0066] S3: P7 + P8 meets the load P10 demand. At this time, further monitor the capacity of the lithium-ion battery system. If the lithium-ion battery system is full, disconnect the photovoltaic energy storage channels CB16, CB17, and CB18; if the remaining capacity of the lithium-ion battery system is not full, close the photovoltaic energy storage channels CB16, CB17, and CB18, and the remaining electric energy of the auxiliary generator and the photovoltaic simultaneously charge the lithium battery.

[0067] S4: In the above (2) working condition, when P7 + P8 does not meet the load P10 demand, but P7 + P8 + P9 >= P10, if the lithium-ion battery system is not full, the lithium-ion battery energy storage system charges; when P7 + P8 + P9 < P10 and the lithium-ion battery system has electric energy, the battery pack bidirectional DC / AC enters the discharge mode, and set the discharge power as P11 = P10 - P7 - P8 - P9. At this time, the load is supplied with energy by two auxiliary generators, a photovoltaic system, and a storage battery pack, as Fig.11 . If P7 + P8 + P9 < P10 and the lithium-ion battery system has no remaining capacity, at this time the load is large, and the energy management monitoring page prompts an overload alarm, and enter (3).

[0068] (3) When the ship is in the hoisting condition or under heavy load, the auxiliary generator is shut down, and 1 main diesel generator is started. Monitor the input power P5 of the 690V / 400V transformer, the output power P1 of the main diesel generator 1, the power P4 of other loads on the AC690V bus, the power generation power P9 of the solar power generation system, and the power P10 of all loads on the 400Vac bus. Then P4 + P5 = P1.

[0069] S5: If the grid load P4 + P5 < P1, further monitor the capacity of the lithium-ion battery system at this time. If the lithium-ion battery system is full, disconnect the photovoltaic energy storage channels CB16, CB17, and CB18; if the remaining capacity of the lithium-ion battery system is not full, close the photovoltaic energy storage channels CB16, CB17, and CB18, and the remaining electric energy of the main diesel generator and the photovoltaic simultaneously charge the lithium battery.

[0070] S6: In the above (3) condition, if the grid load P4 + P5 >= P1, the energy management monitoring page prompts an overload alarm, and the energy management system automatically starts the second main diesel generator and enters (4).

[0071] (4) When the ship is in the hoisting condition or under heavy load, the auxiliary generator is shut down, and the second main diesel generator is started. Monitor the input power P5 of the 690V / 400V transformer, the output power P1 of the main diesel generator 1, the output power P2 of the main diesel generator 2, the power P4 of other loads on the AC690V bus, the power generation power P9 of the solar power generation system, and the power P10 of all loads on the 400Vac bus. Then P4 + P5 = P1.

[0072] S7: If the grid load P4 + P5 < P1 + P2, further monitor the capacity of the lithium-ion battery system at this time. If the lithium-ion battery system is full, disconnect the photovoltaic energy storage channels CB16, CB17, and CB18; if the remaining capacity of the lithium-ion battery system is not full, close the photovoltaic energy storage channels CB16, CB17, and CB18, and the remaining electric energy of the main diesel generator and the photovoltaic simultaneously charge the lithium battery.

[0073] S8: In the above (4) condition, if the grid load P4 + P5 >= P1 + P2, the energy management monitoring page prompts an overload alarm, and the energy management system automatically starts the third main diesel generator and enters (5).

[0074] (5) When the ship is in the hoisting condition or under heavy load, the auxiliary generator is shut down, and the third main diesel generator is started. Monitor the input power P5 of the 690V / 400V transformer, the output power P1 of the first main diesel generator, the output power P2 of the second main diesel generator, the output power P3 of the third main diesel generator, the power P4 of other loads on the AC690V bus, the power generation power P9 of the solar power generation system, and the power P10 of all loads on the 400Vac bus. Then, P4 + P5 = P1.

[0075] S9: If the grid load P4 + P5 < P1 + P2 + P3, further monitor the capacity of the lithium-ion battery system at this time. If the lithium-ion battery system is full, disconnect the photovoltaic energy storage channels CB16, CB17, and CB18; if the remaining capacity of the lithium-ion battery system is not full, close the photovoltaic energy storage channels CB16, CB17, and CB18, and the remaining electric energy of the main diesel generator and the photovoltaic energy charge the lithium battery simultaneously, as Fig.12 .

[0076] S10: In the condition of (5) above, if the grid load P4 + P5 >= P1 + P2 + P3, the energy management monitoring page prompts a serious overload alarm.

[0077] In the above grid management process, the output powers P1, P2, P3, P7, and P8 of the main diesel generator and the auxiliary generator will automatically change with the change of the load, but the maximum output power does not exceed 80% of the rated power. When the main diesel generator is started, the role of the battery system is to avoid the waste of electric energy of the main diesel generator and store energy when the load is low; when the auxiliary generator is started, the role of the battery system when the load is low is to avoid the waste of electric energy of the auxiliary generator, and when the load is high, the stored energy is used as a supplement to the auxiliary generator to keep the auxiliary generator working all the time.

[0078] Specifically, when the ship is in the hoisting (working) condition, the auxiliary generator is shut down and the main diesel generator is started. At this time, it also includes the hoisting and lifting construction process.

[0079] B1: When the ship enters the waiting operation water area, the main diesel generator needs to be started at this time, and then the environmental status monitoring is started, and B2 is carried out;

[0080] B2: The operator measures the flow velocity, wave period, and wave height of the waiting operation water area. When the monitored data exceeds the preset value, an environmental alarm prompt is given, otherwise B3 is carried out;

[0081] B3: After the crane vessel enters the vicinity of the lifting position, the ship operation auxiliary decision unit is started. The ship operation auxiliary decision unit performs simulation calculations based on the measured flow velocity, wave period, and wave height to obtain the pitch, roll, and lift motion values ​​of the ship, and compares them with the preset values. When the monitoring data exceeds the preset value, the ship shaking alarm prompts, otherwise proceed to B4.

[0082] B4: Ship positioning, the operator selects the target ship position, starts the automatic ship moving unit, and according to the deviation between the current ship position and the target position, eight anchoring electric winches retract and release the cables according to the pre-set algorithm until the ship position reaches the predetermined position, and then proceeds to B5;

[0083] B5: Start lifting and hoisting. The operator adjusts the boom length and raises and lowers the main hook. During the process of lifting the heavy object, the movement of the main hook is monitored. When the movement of the main hook exceeds the allowable value, the main hook movement alarm is triggered. Otherwise, the lifting is continued until the heavy object is installed in place.

[0084] The above are only specific embodiments of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed by the present invention should be included in the protection scope of the present invention. The contents not described in detail in this specification belong to the prior art known to professional and technical personnel in the field.

Claims

1. A construction method for a large crane ship with green energy saving and intelligent operation, characterized by: It includes a hull system and an energy management unit, an automatic ship moving unit, and a ship operation auxiliary decision unit installed on the hull system. The hull system includes a hull and a crane, and the crane is controlled to work in different working conditions according to a controller on the hull; The energy management unit cooperates with the controller to control the working state of each power supply device of the ship according to the working condition of the ship. The ship operation auxiliary decision unit cooperates with the controller to detect water environment information and hull posture information to determine the stability of the ship; The automatic ship moving unit cooperates with the controller to realize automatic ship moving and positioning of the ship; When the main generator in the energy management unit is turned on, the hoisting operation is carried out. The process is as follows: Step 1: Monitor the environmental status, determine whether the monitored information is within the set range, and proceed to step 2; Step ②, if no, then end the operation; if yes, then control the ship to enter the vicinity of the lifting position, detect the water environment information and the hull posture information, and determine whether to move the ship and position it according to the detected information, and then enter step ③; Step ③, if no, then end the operation; if yes, then move the ship to the lifting position through the automatic ship moving unit and start lifting; during the lifting process, monitor the movement of the main hook, and when the movement of the main hook exceeds the allowable value, the main hook movement alarm is issued, otherwise the lifting continues until the heavy object is installed in place; The automatic ship moving unit comprises a ship moving control console and eight anchoring electric winches. Four anchoring electric winches are arranged on the decks of the bow and the stern of the ship. A tension sensor and a photoelectric encoder are installed on each anchoring electric winch. The tension sensor is used to monitor the tension of the anchoring electric winch cable, and the photoelectric encoder is used to monitor the retracted and extended length of the anchoring electric winch cable. The ship moving control console compares the ship position in the controller with the target position, controls the anchoring electric winch to retract and release the cable, and realizes the automatic ship moving positioning of the ship. After the ship moves to the target position, the cable is tightened to stabilize the ship according to the monitoring value of the tension sensor. The rules for automatic ship positioning are: C1: Compare the ship position data (x1, y1) measured by GPS1 with the position data (x, y) corresponding to the target ship position. If |x1-x|>σ, σ is the positioning allowable error, the ship moving console determines that there is a lateral deviation, and the ship moving console controls the winch to retract and release the cable to adjust the lateral deviation, and proceed to C2; if |y1-y|>σ, the ship moving console determines that there is a longitudinal deviation, and the ship moving console controls the winch to retract and release the cable to adjust the longitudinal deviation, and proceed to C3; if |x1-x|≤σ, and |y1-y|≤σ, obtain the GPS2 position data (x2, y2) and the corresponding target ship position position data (x3, y3). If |x2-x3|>σ, or |y2-y3|>σ, the ship moving console determines that there is a torsional deviation, and the ship moving console controls the winch to retract and release the cable to adjust the torque deviation, and proceed to C4; otherwise, there is no torsional deviation, that is, the ship has reached the target position; C2: When adjusting the lateral deviation, if x1 < x, the ship moving console controls winches F1, F2, F7, and F8 to pay out the cable, and winches F3, F4, F5, and F6 to take in the cable until |x1 - x| ≤ σ; if x1 > x, the ship moving console controls winches F1, F2, F7, and F8 to take in the cable, and winches F3, F4, F5, and F6 to pay out the cable until |x1 - x| ≤ σ; and during the ship moving process, the ship moving console controls the winch speed through the collected cable tension, so that the cable tension T of the winch is always controlled within T1 < T < T2, where T1 is the specified minimum tension and T2 is the specified maximum tension. C3: When adjusting the longitudinal deviation, if y1 < y, the ship moving console controls winches F1, F2, F3, and F4 to take in the cable, and winches F5, F6, F7, and F8 to pay out the cable until |y1 - y| ≤ σ; if y1 > y, the ship moving console controls winches F1, F2, F3, and F4 to pay out the cable, and winches F5, F6, F7, and F8 to take in the cable until |y1 - y| ≤ σ; and during the ship moving process, the ship moving console controls the winch speed through the collected cable tension, so that the cable tension T of the winch is always controlled within T1 < T < T2. C4: When adjusting the torsional deviation, if (y2 - y1) / (x2 - x1) > (y3 - y) / (x3 - x), the ship moving console controls winches F1, F2, F5, and F6 to take in the cable, and winches F3, F4, F7, and F8 to pay out the cable until |x2 - x3| ≤ σ and |y2 - y3| ≤ σ; if (y2 - y1) / (x2 - x1) < (y3 - y) / (x3 - x), the ship moving console controls winches F1, F2, F5, and F6 to pay out the cable, and winches F3, F4, F7, and F8 to take in the cable until |x2 - x3| ≤ σ and |y2 - y3| ≤ σ, and during the ship moving process, the ship moving console controls the winch speed through the collected cable tension, so that the cable tension T of the winch is always controlled within T1 < T < T2.

2. The construction method according to claim 1, characterized in that: The energy management unit includes a ship power grid, a main generator, an auxiliary generator, a photovoltaic system, an energy storage system, and an energy comprehensive management system. The ship power grid includes a 690V AC bus, a 400V AC bus, and a 230V AC bus. The main generator and the 400V AC bus are connected to the 690V AC bus. The auxiliary generator, the photovoltaic system, the energy storage system, and the 230V AC bus are connected to the 400V AC bus. The energy comprehensive management system cooperates with the controller to control the working states of the main generator, the auxiliary generator, the photovoltaic system, and the energy storage system.

3. The construction method according to claim 1, characterized in that: The ship operation auxiliary decision-making unit includes a non-contact laser wave gauge, a Doppler ultrasonic current meter, a gyroscope, and a GPS. The non-contact laser wave gauge is used to measure the wave height and wave period of the ship's working water area and send them to the controller; the Doppler ultrasonic current meter is used to measure the water flow velocity of the ship's working water area and send it to the controller; the gyroscope is used to measure the six-degree-of-freedom attitude of the ship and send it to the controller; the GPS is used to measure the position of the ship and send it to the controller; the controller determines the stability of the ship according to the received information.

4. The construction method according to claim 3, characterized in that: The Doppler ultrasonic flowmeter is installed on the hull through a bracket, and the bracket includes a frame and a telescopic rod. The frame is a spatial truss structure, the frame is connected to the hull through a pin shaft, and the frame is installed inside the side of the hull; the telescopic rod is installed on the frame, and the Doppler ultrasonic flowmeter is installed at the lower end of the telescopic rod.

5. The construction method according to claim 3, characterized in that: The ship operation auxiliary decision unit also includes a laser ranging radar, which is used to measure the six degrees of freedom of the crane main hook and send it to the controller. The controller determines whether the movement range of the main hook exceeds the allowable value based on the received information.

6. The construction method according to claim 1, characterized in that: Before carrying out the lifting operation, the ship is first controlled to enter the waters to be operated, and the main generator and auxiliary generator in the energy management unit are checked to see if they are turned on. If the main generator is turned on, the hoisting operation is carried out and the first ship energy management is carried out at the same time; If the auxiliary generator is turned on, the second ship energy management is performed.

7. The construction method according to claim 6, characterized in that: The first ship energy management is: determining the number of main generators to be started according to the size of the grid load and controlling the charging and discharging of the energy storage system.